Barrick Earns $53 Million - $0.10 per Share - in Second Quarter. Higher Production and Lower Costs Expected for Second Half of Year

July 28, 2005

TORONTO--(BUSINESS WIRE)--July 28, 2005--Barrick Gold Corporation (NYSE:ABX)(TSX:ABX)(LSE:BGD)(SWX:ABX)(BOURSE:ABX)

    SECOND QUARTER REPORT 2005 - JULY 28, 2005

    Based on US GAAP and expressed in US dollars

    Highlights

- Second-quarter 2005 net income was $53 million, or $0.10 per share, and cash flow from operations was $101 million, or $0.19 per share, compared to net income of $34 million, or $0.06 per share, and cash flow from operations of $108 million, or $0.20 per share, in the prior-year period. Second-quarter 2005 cash flow from operations was reduced by $15 million, or $0.03 per share, due to increases in supplies and ore stockpiles inventories at our new mines and projects.

- Second-quarter gold sales were 1.1 million ounces at a total cash cost of $243 per ounce(1). The Company remains on track with its original guidance to produce between 5.4 - 5.5 million ounces of gold for the year at an average total cash cost of about $225 per ounce(2). The second half of 2005 is expected to have higher production and lower cash costs with Lagunas Norte in operation and a stronger operating performance expected at Goldstrike.

- The Lagunas Norte mine achieved start-up during the quarter, ahead of the original third-quarter schedule and within its $340-million budget, and will be a significant contributor to the Company's gold production for the second half of 2005 and in the years to come.

- Significant progress continues to be made on the remaining development projects. Veladero is on schedule to commence production in the fourth quarter of this year and Cowal is expected to pour its first gold in the first quarter of 2006.

- During the quarter, the Company increased its investment in Highland and acquired an interest in Diamondex, which it subsequently increased in early July. Barrick currently holds 20% and 14% of the outstanding shares of Highland and Diamondex, respectively.

Barrick Gold Corporation today reported earnings of $53 million ($0.10 per share) and operating cash flow of $101 million ($0.19 per share) for second quarter 2005 compared to earnings of $34 million ($0.06 per share) and operating cash flow of $108 million ($0.20 per share) in the year-earlier period.

"Eighteen months ago we embarked on an aggressive growth program without comparison in the industry. As of today, two of the four new mines are in production, and we are substantially advanced on the other two," said Greg Wilkins, President and Chief Executive Officer. "The Company is now entering the phase of reaping benefits and delivering value to our shareholders."

In second quarter 2005, earnings were favorably impacted by a $52-per-ounce higher realized gold price, and lower interest and amortization expense compared to the prior-year period, offset by lower gold sales volumes due to lower production levels and higher total cash costs. The Company's second-quarter 2005 earnings also included a number of special items, including a change in accounting policy for stripping costs as described below, with a positive effect totaling $24 million post-tax ($0.05 per share), compared to a positive effect of $34 million in the prior-year quarter ($0.06 per share). See page 8 of Management's Discussion and Analysis for further details.

Operating cash flow in second quarter 2005 was negatively impacted by $15 million due to an increase in supplies and ore stockpiles inventories at our new mines and development projects.

During the second quarter, the Company adopted a new accounting pronouncement on stripping costs incurred during the production stage of a mine (EITF 04-6). As a result, second-quarter results include a $10-million post-tax ($0.02 per share) credit in earnings and $6 per ounce reduction in total cash costs statistics. For the first half of 2005, there was a $19-million post-tax ($0.04 per share) credit to earnings, and lower total cash costs statistics of $8 per ounce. In accordance with EITF 04-6, cost of sales and related total cash costs per ounce statistics for 2004 and prior periods have not been restated and are therefore not comparable to current-year results and statistics. The Company expects the impact of this new policy to reduce cost of sales and therefore total cash costs statistics by approximately $8 per ounce for the full year 2005. See page 18 of Management's Discussion and Analysis for further details.

Furthermore, the Company has commenced including accretion expense in its definition of total cash costs per ounce which had the effect of increasing reported total cash costs statistics by $3 per ounce in the second quarter, year-to-date and for all comparable periods in 2004. This change was made to conform total cash cost statistics more closely with US GAAP. The expected impact of this change is to increase total cash costs by $3 per ounce for the full year in 2005. The Company expects total cash costs to be about $225 per ounce, at the top end of original guidance for the year, after adjusting for these net accounting changes of about $5 per ounce.

PRODUCTION AND COSTS

In second quarter 2005, Barrick produced 1.2 million ounces of gold and sold 1.1 million ounces at a total cash cost of $243 per ounce, compared to 1.3 million ounces produced and 1.2 million ounces sold at a total cash cost of $209 per ounce for the prior-year quarter. As previously announced, the second half of 2005 is expected to have higher production and lower cash costs than the first half, with Lagunas Norte now in production, Veladero expected to come on stream in the fourth quarter and a stronger operating performance expected at Goldstrike. The Company is on track with its original guidance to produce 5.4 - 5.5 million ounces of gold for the year at a total cash cost of about $225 per ounce, but remains subject to increasing cost pressures affecting the entire industry.

The North American region saw a decline in production over the first quarter 2005 at higher total cash costs, due in part to scheduled roaster downtime at Goldstrike in the second quarter 2005 and the mining of lower-grade ore at both the Goldstrike open pit and underground. In both cases, production is expected to increase in the second half of 2005 as higher-grade areas are mined.

The South American region had a solid production quarter, with second quarter production higher than the first quarter 2005 due to Lagunas Norte commencing operations in mid-June 2005. Pierina is expected to exceed its full-year production target and meet its total cash cost per ounce guidance target, as it sequences into higher-grade areas of the pit.

The Australian/African region's production in the second quarter was slightly higher than the first quarter 2005. Despite lower production at Plutonic due to the cessation of open-pit mining and lower grades from the underground Timor area, and high total cash costs at Bulyanhulu, the region is expected to meet its full-year guidance as a result of a stronger performance from Kalgoorlie.

GOLD HEDGE POSITION UPDATE

Barrick reduced its gold hedge commitments by a further 200,000 ounces in the quarter, bringing the Corporate Gold Sales Contracts position down to 6.6 million committed ounces, or 9% of year-end reserves excluding Pascua-Lama.

DEVELOPMENT PROJECTS UPDATE

On June 16, 2005 Lagunas Norte poured its first gold and went into production. This project was built in 15 months, ahead of schedule and within budget. In the last two weeks of June, it produced over 41,000 ounces of gold at a total cash cost of $116 per ounce, and is forecast to produce 550,000 ounces of gold in 2005 at total cash costs of $100-$110 per ounce, after reflecting the change in accounting policy on stripping costs. This new mine is the largest grassroots discovery in the industry in the last decade, and will be a key driver of the Company's growth in 2005, and in the years to come.

At Veladero in the Frontera district in Argentina, progress continues with overall mine development over 90% complete. Production is expected to commence in fourth quarter 2005.

The Company's Cowal project in Australia is progressing well. Engineering is 95% complete, mine development earthworks are well advanced, and prestrip activities are progressing well. Production is expected to commence in the first quarter 2006.

At the East Archimedes project located at the Ruby Hill mine site in Nevada, steady progress continues. Permitting approvals are expected by the end of the year. The first gold pour is targeted for mid-2007.

At the Pascua-Lama project in Chile/Argentina, work continues on community and government relations, permitting, protocol implementation and tax stability. While approvals for the environmental impact assessments and resolution of fiscal/tax matters are targeted for the end of 2005, timing of the receipt is largely beyond the Company's control. The Company reached an agreement with important stakeholders in the Huasco Valley of Chile's Region III. The protocol agreement proposes a joint board with the Water Users Cooperative to administer and invest in water management and infrastructure projects over the operating mine life.

At the Nevada power plant, building erection was completed and the first ten generator sets were received by mid-July. The plant is expected to commence operation in fourth quarter 2005.

EXPLORATION UPDATE

During the quarter, Barrick had drill programs underway on 24 properties(3). Early-stage exploration was carried out in all regions during the quarter and is helping to identify areas for follow up and drilling later in the year.

In the Frontera district in South America, exploration drilling stopped at the end of May due to the onset of winter conditions. Additional fieldwork, including extensive mapping, geochemical sampling and geophysics, was carried out in the quarter and has helped define and prioritize additional areas for follow up. The drilling and field programs will resume in September.

A drill program testing for mineralization beyond the currently defined resource continues at Buzwagi in Tanzania with positive results that confirm the potential for the project. Engineering studies are ongoing with the objective of bringing the project to pre-feasibility by the end of the year.

Barrick is building a new generation of mines around the globe and has the lowest total cash costs among the major gold producers. Its vision is to be the world's best gold company by finding, developing and producing quality reserves in a profitable and socially responsible manner. Barrick's shares are traded on the Toronto, New York, London and Swiss stock exchanges and the Paris Bourse.

(1) Total cash cost per ounce is defined as cost of sales divided by ounces sold.

(2) The Company's original guidance of $220-$230 per ounce restated for the impact of the new accounting policy for stripping costs and the inclusion of accretion expense.

(3) Barrick's exploration programs are designed and conducted under the supervision of Alexander J. Davidson, P. Geo., Executive Vice President, Exploration and Corporate Development of Barrick. For information on the geology, exploration activities generally, and drilling and analysis procedures on Barrick's material properties, see Barrick's most recent Annual Information Form/Form 40-F on file with Canadian provincial securities regulatory authorities and the US Securities and Exchange Commission.

Key Statistics

                                 Three months ended  Six months ended
(in United States dollars)                  June 30           June 30
                              ---------------------------------------
(Unaudited)                            2005    2004      2005    2004
---------------------------------------------------  ----------------
Operating Results
Gold production (thousands
 of ounces)(3)                        1,156   1,279     2,291   2,558
Gold sold (thousands of
 ounces)                              1,085   1,222     2,214   2,469

Per Ounce Data
  Average spot gold price             $ 427   $ 393     $ 427   $ 401
  Average realized gold price           424     372       426     377
  Total cash costs(1)                   243     217       242     209
  Amortization(4)                        81      88        79      90
  Total production costs                324     305       321     299
---------------------------------------------------  ----------------
Financial Results (millions)
Gold sales                            $ 463   $ 454     $ 947   $ 931
Net income                               53      34       113      60
Operating cash flow                     101     108       225     234

Per Share Data (dollars)
  Net income (basic and diluted)       0.10    0.06      0.21    0.11
  Operating cash flow                  0.19    0.20      0.42    0.44
Weighted average common shares
 outstanding (millions)(2)              535     534       535     535
---------------------------------------------------  ----------------

                                      As at         As at
                                   June 30,  December 31,
                                  -----------------------
                                       2005          2004
---------------------------------------------------------
Financial Position (millions)
Cash and equivalents                $ 1,131       $ 1,398
Non-cash working capital                249           141
Long-term debt                        1,774         1,655
Shareholders' equity                  3,632         3,576
---------------------------------------------------------
(1) Comprises cash operating costs, royalties, production taxes and
    accretion expense.
(2) Fully diluted, includes shares issuable upon exchange of BGI
    (Barrick Gold Inc.) exchangeable shares.
(3) Excludes equity ounces in Highland Gold.
(4) Represents amortization expense at the Company's producing mines
    divided by ounces of gold sold.


Production and Cost Summary

                                    Production (attributable ounces)
                             ----------------------------------------
                                     Three months          Six months
                                            ended               ended
                                         June 30,            June 30,
                             ----------------------------------------
(Unaudited)                        2005      2004      2005      2004
---------------------------------------------------------------------
North America
 Open Pit                       257,110   334,584   543,848   652,111
 Underground                    133,680   133,450   279,044   287,497
---------------------------------------------------------------------
 Goldstrike Property Total      390,790   468,034   822,892   939,608
 Eskay Creek                     51,322    90,732   106,127   156,405
 Round Mountain (50%)            99,160    98,102   193,058   191,598
 Hemlo (50%)                     58,162    66,367   120,517   127,509
 Holt-McDermott(2)                    -    20,620         -    39,429
 Marigold (33%)                  20,559    11,094    34,668    19,696
---------------------------------------------------------------------
                                619,993   754,949 1,277,262 1,474,245
---------------------------------------------------------------------
South America
 Pierina                        155,206   186,831   301,189   418,729
 Lagunas Norte                   41,333         -    41,333         -
---------------------------------------------------------------------
                                196,539   186,831   342,522   418,729
---------------------------------------------------------------------
Australia/Africa
 Plutonic                        63,824    75,497   134,242   158,345
 Darlot                          27,939    35,894    55,359    70,144
 Lawlers                         29,665    26,245    60,898    52,863
 Kalgoorlie (50%)               112,137   103,116   236,660   205,328
---------------------------------------------------------------------
                                233,565   240,752   487,159   486,680
 Bulyanhulu                      83,754    96,938   157,128   177,956
 Tulawaka (70%)                  22,147         -    26,701         -
---------------------------------------------------------------------
                                339,466   337,690   670,988   664,636
---------------------------------------------------------------------
Total                         1,155,998 1,279,470 2,290,772 2,557,610
---------------------------------------------------------------------
Highland equity portion           3,000     5,000    12,000    10,000
---------------------------------------------------------------------
                              1,158,998 1,279,470 2,302,772 2,557,610
---------------------------------------------------------------------
(1) Total cash costs per ounce statistics for 2005 and 2004 are not
    comparable due to the change in accounting for deferred stripping
    costs. Refer to pages 18 and 19 for further details.
(2) Holt-McDermott ceased production in fourth quarter 2004.



                                           Total Cash Costs (US$/oz)
                             ----------------------------------------
                                     Three months          Six months
                                            ended               ended
                                         June 30,            June 30,
                             ----------------------------------------
(Unaudited)                        2005      2004      2005      2004
---------------------------------------------------------------------
North America
 Open Pit                         $ 295     $ 254     $ 281     $ 261
 Underground                        289       262       288       258
---------------------------------------------------------------------
 Goldstrike Property Total          293       256       284       260
 Eskay Creek                         42        68        52        32
 Round Mountain (50%)               218       218       231       215
 Hemlo (50%)                        297       238       280       233
 Holt-McDermott(2)                    -       204         -       224
 Marigold (33%)                     184       160       201       200
---------------------------------------------------------------------
                                    257       224       254       225
---------------------------------------------------------------------
South America
 Pierina                            141       109       131        96
 Lagunas Norte                      116         -       116         -
---------------------------------------------------------------------
                                    138       109       130        96
---------------------------------------------------------------------
Australia/Africa
 Plutonic                           276       231       259       211
 Darlot                             331       197       292       203
 Lawlers                            285       253       278       244
 Kalgoorlie (50%)                   214       239       213       231
---------------------------------------------------------------------
                                    257       232       244        22
 Bulyanhulu                         372       344       363       311
 Tulawaka (70%)                     267         -       267         -
---------------------------------------------------------------------
                                    279       260       272       243
---------------------------------------------------------------------
Total                               243       217       242       209
---------------------------------------------------------------------
Highland equity portion             323       212       268       202
---------------------------------------------------------------------
                                  $ 243     $ 217     $ 242     $ 209
---------------------------------------------------------------------
(1) Holt-McDermott ceased production in fourth quarter 2004.



                                      Total Production Costs (US$/oz)
                             ----------------------------------------
                                     Three months          Six months
                                            ended               ended
                                         June 30,            June 30,
                             ----------------------------------------
(Unaudited)                        2005      2004      2005      2004
---------------------------------------------------------------------
 Direct mining costs at market
  foreign exchange rates          $ 286     $ 242     $ 279     $ 240
 Gains realized on currency and
  commodity hedge contracts        (25)      (16)      (24)      (20)
 By-product credits                (35)      (29)      (30)      (28)
---------------------------------------------------------------------
Cash operating costs                226       197       225       192
 Royalties                           12        10        12        10
 Production taxes                     2         2         2         2
 Accretion expense                    3         8         3         5
---------------------------------------------------------------------
Total cash costs                    243       217       242       209
 Amortization                        81        88        79        90
---------------------------------------------------------------------
Total production costs            $ 324     $ 305     $ 321     $ 299
---------------------------------------------------------------------

MANAGEMENT'S DISCUSSION AND ANALYSIS ("MD&A")

This portion of the Quarterly Report provides management's discussion and analysis of the financial condition and results of operations to enable a reader to assess material changes in financial condition and results of operations as at and for the three and six month periods ended June 30, 2005, in comparison to the corresponding prior-year periods. This MD&A has been prepared as of July 21, 2005. This MD&A is intended to supplement and complement the unaudited interim consolidated financial statements and notes thereto, prepared in accordance with US generally accepted accounting principles ("US GAAP"), for the three and six month periods ended June 30, 2005 (collectively, the "Financial Statements"), which are included in this Quarterly Report on pages 21 to 38. You are encouraged to review the Financial Statements in conjunction with your review of this MD&A. This MD&A should be read in conjunction with both the annual audited consolidated financial statements for the three years ended December 31, 2004, the related annual MD&A included in the 2004 Annual Report, and the most recent Form 40-F/Annual Information Form on file with the US Securities and Exchange Commission and Canadian provincial securities regulatory authorities. Certain notes to the Financial Statements are specifically referred to in this MD&A and such notes are incorporated by reference herein. All dollar amounts in this MD&A are in millions of US dollars, unless otherwise specified.

For the purposes of preparing this MD&A, we consider the materiality of information. Information is considered material if: (i) such information results in, or would reasonably be expected to result in, a significant change in the market price or value of Barrick Gold Corporation's shares; or (ii) there is a substantial likelihood that a reasonable investor would consider it important in making an investment decision, or if it would significantly alter the total mix of information available to investors. Materiality is evaluated by reference to all relevant circumstances, including potential market sensitivity.

---------------------------------------------------------------------
CONTENTS
Executive Summary                                                   6
Key Economic Trends                                                 7
Results                                                             8
 Overview of 2005 versus 2004                                       8
 Consolidated Gold Production and Sales                             9
 Results of Operating Segments                                      9
 Other Costs and Expenses                                          13
 Cash Flow                                                         15
 Balance Sheet                                                     16
 Quarterly Information                                             17
Off-Balance Sheet Arrangements                                     17
Critical Accounting Policies and Estimates                         18
---------------------------------------------------------------------

EXECUTIVE SUMMARY

In second quarter 2005 we produced 1.2 million ounces of gold and sold 1.1 million ounces at a total cash cost of $243 per ounce(1). We are on track with our original guidance to produce between 5.4-5.5 million ounces of gold for the year at an average total cash cost of about $225 per ounce(2). The second half of 2005 is expected to have higher production and lower cash costs with Lagunas Norte in operation and a stronger operating performance expected at Goldstrike.

(1) Total cash cost per ounce is defined as cost of sales divided by ounces sold.

(2) The Company's original guidance of $220-$230 per ounce restated for the impact of the new accounting policy for stripping costs and the inclusion of accretion expense.

During the second quarter, we adopted a new accounting pronouncement on stripping costs incurred during the production stage of a mine (EITF 04-6). The new accounting rules require the actual stripping costs incurred each period be reflected in the cost of ore mined for the same period, and will likely lead to greater period-to-period volatility in total cash costs. Previously, stripping costs were deferred and amortized based on a life-of-mine stripping ratio that smoothed the costs over time. As a result of the implementation of the new policy, second-quarter results include a $6-million ($4-million earnings increase or $0.01 earnings per share increase) reduction in cost of sales, or $6 per ounce lower total cash costs, and an additional $6-million ($0.01 earnings per share increase) post-tax credit in earnings to reflect the cumulative effect of the policy for periods prior to January 1, 2005. The cumulative effect adjustment has not impacted second quarter total cash costs. For the first half of 2005, cost of sales was reduced by $18 million ($0.02 earnings per share increase), or $8 per ounce lower total cash costs. In accordance with the transition rules for EITF 04-6, cost of sales and related total cash costs per ounce statistics for 2004 and prior periods have not been restated and are therefore not comparable to current-year results and statistics. The impact of EITF 04-6 on our balance sheet was a decrease in capitalized mining costs of $226 million; and an increase in inventories, mainly ore in stockpiles, of $232 million as the new method of accounting results in the costs incurred being included in inventory rather than as a separate asset on the balance sheet. We expect the impact of this new policy to reduce cost of sales and therefore total cash costs statistics by approximately $8 per ounce for the full year 2005. Furthermore, we have commenced including accretion expense in our definition of total cash costs per ounce which had the effect of increasing reported total cash costs statistics by $3 per ounce in the second quarter, year-to-date and for all comparable periods in 2004. This change was made to conform the statistics more closely with US GAAP, and is consistent with changes made by other senior gold producers. The expected impact of this change is to increase total cash costs by $3 per ounce for the full year in 2005. We expect total cash costs to be about $225 per ounce, at the top end of the original guidance for the year, after adjusting for these two changes that net to about $5 per ounce.

Earnings of $53 million in second quarter ($0.10 earnings per share) were 56% higher than second quarter 2004. We generated operating cash flow of $101 million ($0.19 per share) in second quarter 2005. Operating cash flow was negatively impacted in second quarter 2005 by a $15-million increase in mine operating supplies and ore in stockpiles at our development projects and new mines.

We continue to make significant progress on the development of our new generation of mines. The Lagunas Norte mine in Peru was completed within budget and made its first gold pour in mid-June 2005, ahead of schedule. At Veladero in Argentina, we are on track to commence production in fourth quarter 2005. Lagunas Norte and Pierina are expected to contribute to higher production and lower total cash costs per ounce in the second half of 2005. At our fourth new mine, Cowal in Australia, production is expected to commence in the first quarter 2006. We continued work on advancing our two other projects in development, Pascua-Lama in Chile/Argentina and East Archimedes in Nevada. Although the approvals of the Pascua-Lama environmental impact assessments are targeted by year-end 2005, the timing of the receipt of these approvals, as well as resolution of some other external issues, is largely beyond our control.

KEY ECONOMIC TRENDS

The MD&A included in our 2004 Annual Report contained a discussion of the key economic trends that affect our business and how they impact our financial statements. In this interim MD&A, we have included an update to reflect any significant changes in those trends since the preparation of the 2004 Annual MD&A.

Gold Prices

The gold price ranged from $415 to $441 per ounce during second quarter 2005 with an average market gold price of $427 per ounce. We sold the majority of our production at market gold prices, with 0.1 million ounces of production delivered into existing fixed-price gold sales contracts for an opportunity cost of $4 million, resulting in an average realized selling price of $424 per ounce. We view the outlook for market gold prices to be positive.

Silver Prices

With an average market price of $7.15 per ounce during second quarter 2005, silver prices continue to be strong in 2005. Higher silver prices help to reduce total cash costs per ounce of gold as silver sales are recorded as a by-product credit.

Currency Exchange Rates

At the end of second quarter 2005, through our currency hedge position, we have protected local currency-based expenditures for approximately the next three years at average exchange rates that are more favorable than current market rates. The average rates for currency contracts designated against operating costs over the next three years are $0.66 for Australian dollar contracts and $0.73 for Canadian dollar contracts. Further details of our currency hedge position are included in note 13 to the Financial Statements.

    Energy Prices

    Diesel Fuel

Crude oil prices rose from $55 per barrel at the end of the first quarter 2005 to $57 per barrel at the end of the second quarter 2005. To help control costs, we have a fuel hedge position totaling 2.3 million barrels, representing approximately 40% of our estimated future diesel fuel consumption over the next three years, with an average cap price of $42 per barrel and participation to an average floor price of $29 per barrel on almost a quarter of the position.

Electricity

Electricity prices continue to rise in 2005 as a result of diesel fuel and natural gas price increases as well as the increasing demand for electricity. To partially mitigate rising electricity costs, we are building a 115-megawatt natural gas-fired power plant that will supply our Goldstrike mine from fourth quarter 2005 onwards.

Other Inflationary Cost Pressures

The mining industry has been experiencing significant inflationary cost pressures and supply constraints for certain items such as tires. Prices for tires and oil-related consumables have risen significantly over the past few quarters and continue to rise, mainly impacting mining costs. We are focusing on supply chain management and continuous improvement initiatives to mitigate the impact of constraints on supply and higher prices, but if these issues persist they could potentially impact our production and total cash costs per ounce statistics. Labor costs in Australia are higher in 2005 when compared to 2004, as a result of a supply shortage of skilled labor, which has been impacting costs at our Australian mines.

US Dollar Interest Rates

Over the first six months of 2005, short-term US interest rates have risen, while long-term rates (10-30 years) have declined, although rates remain at relatively low levels. In periods of higher interest rates, we earn higher interest income on cash balances and expect higher forward selling prices under our gold sales contracts. A significant portion of our long-term debt has fixed interest rates and therefore interest expense has not historically been materially affected by changing interest rates.

RESULTS

Selected Quarterly Information

---------------------------------------------------------------------
                                 Three months ended  Six months ended
($ millions, except per share               June 30           June 30
 and per ounce data in dollars)       2005     2004      2005    2004
---------------------------------------------------------------------
Gold production ('000s oz)(3)        1,156    1,279     2,291   2,558
---------------------------------------------------------------------
Gold sales
 '000s oz                            1,085    1,222     2,214   2,469
 $ millions                          $ 463    $ 454     $ 947   $ 931
---------------------------------------------------------------------
Market gold price(1)                   427      393       427     401
---------------------------------------------------------------------
Realized gold price(1)                 424      372       426     377
---------------------------------------------------------------------
Total cash costs(1),(2)                243      217       242     209
---------------------------------------------------------------------
Amortization(1)                         81       88        79      90
---------------------------------------------------------------------
Net income                              53       34       113      60
---------------------------------------------------------------------
Net income per share - basic
 and diluted                          0.10     0.06      0.21    0.11
---------------------------------------------------------------------
Cash inflow (outflow)
---------------------------------------------------------------------
 Operating activities                  101      108       225     234
---------------------------------------------------------------------
 Capital expenditures                (270)    (189)     (512)   (318)
---------------------------------------------------------------------
 Other investing activities           (53)      (5)      (78)    (40)
---------------------------------------------------------------------
 Financing activities                 $ 25   $ (73)     $ 101 $ (155)
---------------------------------------------------------------------
(1) Per ounce weighted average.
(2) Total cash costs per ounce statistics for 2005 and 2004 are not
    comparable due to the change in accounting for deferred stripping
    costs. Refer to page 18 for further details.
(3) Excludes equity ounces from Highland.

    OVERVIEW OF SECOND QUARTER 2005 VERSUS SECOND QUARTER 2004

    Earnings

Earnings in second quarter 2005 were $19 million higher than second quarter 2004. The main trends were higher realized gold sales prices ($56 million), lower amortization rates per ounce ($8 million) and lower interest expense ($3 million) partially offset by higher total cash costs per ounce ($28 million) and lower ounces sold ($8 million). These trends similarly affected results for the first six months of 2005, contributing to higher earnings compared to the same period in 2004.

Earnings in second quarter 2005 reflected various special items that combined had a positive effect of $24 million post-tax, compared with 2004 when similar items had a positive effect of $34 million post-tax. The items in second quarter 2005 mainly included a $15-million accounting gain recorded on closing of the Kabanga transaction as a result of a dilution of Barrick's ownership in Kabanga; $10 million post-tax for the effect of adopting a new accounting rule for stripping costs; a $4-million post-tax non-hedge derivative gain; and revisions to cost estimates that caused a $4-million post-tax increase in asset retirement obligations at closed mines. In the first six months of 2005, special items also included a $9-million gain on investments caused by the sale of investments in a deferred compensation plan upon change of the plan trustee. In the first six months of 2004, the main special item was a $30-million deferred tax credit related to a change in the Australian tax regime.

Special Items - Effect on earnings increase (decrease)

---------------------------------------------------------------------
                                    Three month period ended June 30,
($ millions)                           2005               2004
                                 Pre-Tax  Post-Tax  Pre-Tax  Post-Tax
---------------------------------------------------------------------
Non-hedge derivative gains
 (losses)                            $ 3       $ 4      $ 6       $ 4
---------------------------------------------------------------------
Gains on investment sales              -         -        -         -
---------------------------------------------------------------------
Gains on asset sales                   -         -        1         1
---------------------------------------------------------------------
Gain on Kabanga transaction           15        15        -         -
---------------------------------------------------------------------
Foreign currency translation
 gains (losses)                      (1)       (1)      (1)       (1)
---------------------------------------------------------------------
Deferred stripping accounting
 changes
---------------------------------------------------------------------
 Cumulative effect                     6         6        -         -
---------------------------------------------------------------------
 Impact on the period compared
  to previous policy                   6         4        -         -
---------------------------------------------------------------------
Changes in AROs at closed mines      (5)       (4)        -         -
---------------------------------------------------------------------
Income tax credits                     -         -        -        30
---------------------------------------------------------------------
Total                               $ 24      $ 24      $ 6      $ 34
---------------------------------------------------------------------



---------------------------------------------------------------------
                                      Six month period ended June 30,
($ millions)                           2005               2004
                                 Pre-Tax  Post-Tax  Pre-Tax  Post-Tax
---------------------------------------------------------------------
Non-hedge derivative gains
 (losses)                            $ 9       $ 7    $ (9)     $ (6)
---------------------------------------------------------------------
Gains on investment sales              9         8        2         1
---------------------------------------------------------------------
Gains on asset sales                   1         1        3         2
---------------------------------------------------------------------
Gain on Kabanga transaction           15        15        -         -
---------------------------------------------------------------------
Foreign currency translation
 gains (losses)                      (5)       (4)        1         1
---------------------------------------------------------------------
Deferred stripping accounting
 changes
---------------------------------------------------------------------
 Cumulative effect                     6         6        -         -
---------------------------------------------------------------------
 Impact on the period compared
  to previous policy                  18        13        -         -
---------------------------------------------------------------------
Changes in AROs at closed mines      (5)       (4)        -         -
---------------------------------------------------------------------
Income tax credits                     -         -        -        30
---------------------------------------------------------------------
Total                               $ 48      $ 42    $ (3)      $ 28
---------------------------------------------------------------------

Cash Flow

Our cash position decreased by $267 million compared to year-end 2004. We generated $101 million of operating cash flow in second quarter 2005, $7 million lower than in second quarter 2004, mainly because of lower gold sales volumes and increases in working capital at our development projects to support the start-up of production. Capital expenditures were $270 million, $81 million higher than in second quarter 2004 mainly due to the levels of construction activity at our development projects, and we spent $55 million on investments including Highland Gold and Diamondex Resources. We received $89 million on the drawdown of cash from financing facilities used to fund construction at our development projects, and we paid $59 million in dividends in second quarter 2005.

CONSOLIDATED GOLD PRODUCTION AND SALES

Gold production in second quarter 2005 was 0.1 million ounces lower than in second quarter 2004 primarily as a result of lower throughput levels at Goldstrike open pit and Eskay Creek and mining of lower-grade ore at Goldstrike open pit and Eskay Creek, partly offset by the commencement of production at Lagunas Norte and Tulawaka. Ounces sold decreased by 0.1 million ounces compared to second quarter 2004, consistent with the lower production levels. In the first six months of 2005, ounces produced decreased by 0.3 million ounces and ounces sold decreased by 0.3 million ounces for similar reasons as the changes in second quarter 2005.

Consolidated total cash costs per ounce

---------------------------------------------------------------------
                             Three month period      Six month period
                                 ended June 30,        ended June 30,
(in dollars per ounce)          2005       2004       2005       2004
---------------------------------------------------------------------
Cost of goods sold(1),(2)      $ 286      $ 242      $ 279      $ 240
---------------------------------------------------------------------
Currency and commodity
 hedge gains                    (25)       (16)       (24)       (20)
---------------------------------------------------------------------
By-product credits              (35)       (29)       (30)       (28)
---------------------------------------------------------------------
Royalties/mining taxes           14          12         14         12
---------------------------------------------------------------------
Accretion and other costs         3           8          3          5
---------------------------------------------------------------------
Total cash costs              $ 243       $ 217      $ 242      $ 209
---------------------------------------------------------------------
(1) At market currency exchange rates.
(2) Total cash costs per ounce statistics for 2005 and 2004 are not
    comparable due to the change in accounting for deferred stripping
    costs. Refer to page 18 for further details.

Total cash costs per ounce in second quarter 2005 were higher than in second quarter 2004, primarily because of lower production, the mining of lower-grade ore, and increases in the cost of input consumables, partly offset by higher silver by-product credits. In the second half of 2005, production is expected to increase and total cash costs per ounce to decrease, as our lower-cost Lagunas Norte and Pierina mines contribute gold production as well as higher mining rates and ore grades at Goldstrike open pit.

We realized an average selling price of $424 per ounce for our gold production in second quarter 2005. In second quarter 2005, we sold substantially all of our production at market prices, and we delivered 0.1 million ounces of production into fixed-price gold sales contracts. The price realized in second quarter 2005 was $52 per ounce higher than second quarter 2004, reflecting $34 per ounce higher market gold prices and fewer deliveries into fixed-price gold sales contracts. The price realized for gold sales in 2005 will depend upon market conditions and the selling prices of any gold sales contracts into which we voluntarily deliver, which could be below prevailing spot market prices.

RESULTS OF OPERATING SEGMENTS

In our Financial Statements, we present a measure of historical segment income that reflects gold sales at average consolidated realized gold prices, less segment operating costs and amortization of segment property, plant and equipment. Our segments mainly include producing mines and development projects. We monitor segment operating costs using "total cash costs per ounce" statistics that represent segment cost of sales divided by ounces of gold sold in each period. The discussion of results for producing mines focuses on this statistic in explaining changes in segment operating costs, and should be read in conjunction with the mine statistics presented on pages 39 to 42. Total cash costs per ounce statistics for 2005 and 2004 are not comparable due to the change in accounting for deferred stripping costs. Refer to page 18 for further details.

NORTH AMERICA

In second quarter 2005, the region produced 619,993 ounces at total cash costs of $257 per ounce, compared to production of 754,949 ounces at total cash costs of $224 per ounce in second quarter 2004. The lower gold production in 2005 was mainly due to lower throughput and ore grades at both the Goldstrike open pit and at Eskay Creek, which also resulted in higher total cash costs per ounce. Also in 2005, higher power and fuel costs were partly offset by higher silver by-product credits. The higher power costs were mainly due to increases in the price of natural gas and increasing demand for electricity. Power costs are expected to benefit, starting in fourth quarter 2005, from the start-up of a Barrick-owned power plant for Goldstrike. Higher fuel costs reflect the rise in the market price for oil, which we have partly mitigated through our fuel hedge position. Results for the first six months of 2005 in North America were affected by similar factors. The region is expected to meet its full-year total cash costs and production guidance. We expect increases in Goldstrike underground total cash costs guidance for 2005 to be offset by a decrease in the total cash costs guidance for Eskay Creek.

Goldstrike Open Pit, United States

Above average rainfall in the first half of 2005 led to a temporary lower mining rate in the first half of 2005. By the beginning of third quarter 2005, mining rates are expected to be back up to previously-expected levels. These factors, combined with lower processing rates at the roaster, due to scheduled downtime for maintenance, and harder ore encountered in 2005, caused the quantity of tons mined and processed to be lower than in 2004.

Lower mining rates resulted in a temporary delay in completing the ninth west layback, which caused us to mine in different areas of the pit than planned and also process some lower-grade stockpiled ore. Consequently, the grade of ore mined and processed in 2005 was lower than in 2004. In the second half of the year we expect mining rates, as well as the average grade of ore mined and processed, to increase with higher production, resulting in lower total cash costs per ounce than in the first half of the year.

We incurred higher maintenance costs at the roaster as well as higher power and fuel costs. The impact of higher costs, combined with lower gold production and lower-than-expected toll milling volumes, partly offset by the impact of the effect of a change in accounting for stripping costs, led to higher total cash costs per ounce in the first half of 2005 compared to 2004.

Goldstrike Underground, United States

In 2005, stope tonnages were lower due to a plugged backfill raise, partly mitigated by a reallocation of resources to drift-and-fill mining. Although mining rates were lower in second quarter 2005, tons processed were higher as we processed some stockpiled ore to compensate for temporary lower mining and processing rates. Overall, in the first half of 2005, tons mined and processed were lower than the first half of 2004 as incremental ore was mined at Rodeo in 2004.

The allocation of resources to drift-and-fill mining, combined with difficult ground conditions and lower availability of critical equipment, led to lower levels of underground development in 2005 than in 2004. Consequently a greater proportion of costs in 2005 were allocated to mining operations, rather than capitalized to underground development. Higher costs were also incurred for ground support due to higher steel and freight costs, as well as higher backfill tons leading to increased consumption of fly ash. The mine also experienced higher power and fuel costs for the same reasons as the open pit. Combined, these factors caused total cash costs per ounce in the first half of 2005 to exceed 2004. Goldstrike underground's full-year guidance for total cash costs has been revised upwards to $275-$285 per ounce.

Reserve increases at the end of 2004 resulted in lower amortization rates and a lower amortization expense.

Eskay Creek, Canada

Stope sequencing changes and lower availability of ore led to a fall in mining rates in 2005. Ore grades were lower and resulted in reduced recovery rates. Combined, these factors resulted in a fall in gold production in the first half of 2005, compared with 2004.

The mine is experiencing higher fuel, power and smelter costs in 2005, which were more than offset by higher silver by-product credits, due to higher silver content in the ore processed and higher silver prices, and overall resulted in lower total cash costs per ounce in 2005. Eskay Creek's full-year guidance for total cash costs has been revised slightly downwards to an average total cash cost of $110-$120 per ounce. Eskay Creek is expected to meet its full-year production guidance.

Lower production levels in second quarter 2005, combined with the reduction in book values of property, plant and equipment at the end of 2004, after recording an impairment charge, led to lower amortization in the first half of 2005.

Power Plant for Goldstrike, United States

The construction of a 115-megawatt natural gas-fired power plant in Nevada to supply our Goldstrike mine is on schedule, with the plant expected to commence operations in fourth quarter 2005. Project highlights include:

- Construction costs of $25 million were incurred in second quarter.

- All engineering work is essentially complete.

- First ten power generator sets were in place by mid-July. We expect to receive the rest of generators in third quarter 2005.

- Gas transmission and pressure reduction pipeline system was completed and construction of the secondary pressure reduction station for the fuel gas commenced in second quarter 2005.

- Building erection was completed in May.

- Plant Operating and Maintenance contract was awarded and the related workforce is being mobilized.

Round Mountain (50% owned), United States

Higher quantities of material were placed on the pad in 2004 than in 2005. Tons processed each period do not necessarily correlate to the ounces produced in the period as there is a time delay between placing tons on the leach pad and pouring ounces.

Higher fuel and power costs, higher royalties and the effect of the change in accounting for stripping costs resulted in higher total cash costs per ounce in the first half of 2005 versus 2004.

East Archimedes, United States

The East Archimedes project remains on schedule with production expected to commence by mid-2007. Project highlights include:

- Construction costs of $11 million were incurred in second quarter 2005.

- Preparations in progress included the setup of equipment, workforce recruitment and construction of the dewatering system.

    - Permits are targeted to be received by the end of 2005.

    SOUTH AMERICA

In second quarter 2005 the region produced 196,539 ounces at cash costs of $138 per ounce, compared to production of 186,831 ounces at total cash costs of $109 per ounce in second quarter 2004. Lagunas Norte achieved production start-up ahead of schedule in mid-June 2005, and Veladero is expected to begin production in the fourth quarter. We expect Lagunas Norte and Pierina to make a significant contribution to the region's results in the second half of 2005. The region is expected to exceed its full-year production guidance, and its full-year total cash cost guidance has been revised upwards to $115-$125 per ounce in 2005.

Pierina, Peru

In 2005, the mine achieved higher throughput levels following productivity improvements at the crusher. While mining occurred in lower-grade areas in first quarter 2005, in second quarter 2005 we were able to mine in higher-grade areas.

The mine experienced higher maintenance, power and fuel costs in 2005, partly offset by higher silver by-product credits. Combined with the lower gold production levels and the impact of the change in accounting for stripping costs, these cost pressures led to higher total cash costs per ounce in the first half of 2005. Pierina's full-year guidance for production has been revised upwards as the mine sequences into higher-grade areas of the pit. We now expect to produce between 635,000 to 645,000 ounces in 2005.

Lower gold production levels and increases in reserves at the end of 2004 resulted in a lower amortization expense in 2005.

Lagunas Norte, Peru

At Lagunas Norte, the mine was completed on budget and production start-up was achieved during the quarter, ahead of the original third-quarter schedule. Second quarter 2005 results included the sale of 27,000 ounces at total cash costs of $116 per ounce. Lagunas Norte is expected to be a significant low total cash cost contributor to our gold production in the second half of 2005 and in the years to come. The segment loss in 2004 relates to the expensing of development costs until May 1, 2004.

Veladero, Argentina

The Veladero project is on schedule to commence gold production in fourth quarter 2005. Project highlights include:

- Construction costs of $66 million were incurred in second quarter 2005 and construction at the project is about 90% complete.

- Industry-wide cost inflation has been impacting costs, and we have been taking steps to mitigate cost increases where possible. Veladero's full-year guidance for total cash costs has been revised upwards to $230-$240 per ounce in 2005 on forecast production of 50,000 to 55,000 ounces.

- The primary and secondary crushers are 95% complete. Testing of a primary crusher commenced in June 2005.

- Process plant steel erection, exterior architectural finishes and equipment installation are substantially complete.

- Ten power generators were installed, with five of the generators operating and providing power in preparation for plant commissioning.

- Phase 1 of the valley-fill leach facility, including the facility embankment, was substantially complete.

- About 2.2 million tons of ore has been stacked at the base of the leach facility to support the pumping system platform in preparation for process solution and production.

Pascua-Lama, Chile/Argentina

In 2004, we made a decision to proceed with the development of the Pascua-Lama project in Chile/Argentina, contingent upon obtaining the necessary permits, approvals and fiscal regimes. While approvals for the environmental impact assessments are targeted by the end of 2005, the timing of the receipt of these approvals, as well as the resolution of some of the other external issues, such as permitting and licensing; cross-border operating issues; and fiscal, tax and royalty issues, is largely beyond Barrick's control.

Barrick reached an agreement with important agricultural stakeholders in the Huasco Valley of Chile's Region III. The protocol agreement proposes a joint board with the Water Users Cooperative to administer and invest in water management and infrastructure projects over the operating mine life.

AUSTRALIA/AFRICA

In second quarter 2005, the region produced 339,466 ounces at total cash costs of $279 per ounce, compared to production of 337,690 ounces at total cash costs of $260 per ounce in second quarter 2004. In second quarter 2005 higher production at Kalgoorlie and Tulawaka was offset by lower production at Plutonic and Bulyanhulu. Total cash costs per ounce were higher than in second quarter 2004 mainly because of labor cost inflation in Australia, higher prices for fuel and grinding media, lower throughput at Plutonic and lower ore grades at Bulyanhulu. Results for the first six months of 2005 were affected to a similar extent by these factors compared to 2004. Full-year 2005 cash costs guidance for the region has been revised upwards to $265-$275 per ounce to reflect an increase in the guidance range for Plutonic, Bulyanhulu, and Tulawaka. The region is expected to meet its full-year production guidance.

Kalgoorlie (50% owned), Australia

In 2005, mining occurred in higher-grade areas of the pit although fewer tons were mined due to reduced shovel capacity. Mill throughput was higher than in 2004 due to lower maintenance downtime, and the positive impact of processing finer ore sizes. Production exceeded sales in 2005 as a build-up of concentrate inventory occurred due to limitations in roaster capacity.

The mine is experiencing higher labor costs and fuel prices in 2005, but this was more than offset by the higher production levels and effect of the change in accounting for stripping costs, leading to lower total cash costs per ounce in the first half of 2005 compared to the same period in 2004. Kalgoorlie's full-year production guidance has been revised upwards slightly to between 450,000 to 455,000 ounces.

Kalgoorlie, jointly owned by Newmont and Barrick, has indicated to Western Australian regulatory authorities that it will take measures to reduce mercury air emissions. Kalgoorlie is installing a mercury scrubber on its carbon kilns and is assessing process changes, controls and other management measures for the roaster facility. When that assessment is complete, we will be able to estimate any capital requirements and operating cost impact associated with such measures.

Plutonic, Australia

Open-pit mining ended in second quarter 2005 which, combined with difficult stoping conditions in the underground Timor area and a shortage of skilled operators, led to lower mining rates in the first half of 2005 than in the same period of 2004. The lower mining rates led to a decrease in ore tons processed, but because a higher percentage of ore came from the underground mine in the first half of 2005, the average grade of ore processed was higher than in the same period of 2004. Gold production was lower in the first half of 2005 as lower tons processed were only partly offset by higher ore grades.

The mine is experiencing higher labor and fuel costs in 2005. Combined with the lower gold production, these cost pressures, although partly offset by the impact of the change in accounting for stripping costs, resulted in an increase in total cash costs per ounce in the first half of 2005. Plutonic's full-year guidance has been revised to reflect lower-than-expected production and higher-than-expected total cash costs. We now expect to produce between 250,000 to 255,000 ounces in 2005 at an average total cash cost of $250-$260 per ounce.

Bulyanhulu, Tanzania

Mining rates were lower in 2005 due to equipment availability, power supply issues, mining schedule changes, hoist gearbox failure and labor issues due to roster changes. The lower mining rates led to a decrease in tons processed in the first half of 2005, which combined with lower average ore grades due to underperforming stopes and higher mining dilution, led to a fall in gold production compared to the first half of 2004. Inventory levels of unsold production were higher at 2005 quarter end as a result of some container delays that impacted shipment to the smelter.

The lower gold production levels, combined with equipment downtime and lower by-product credits resulted in higher total cash costs in the first half of 2005. Bulyanhulu's full-year guidance for total cash costs has been revised upwards to $340-$350 per ounce in 2005.

Lower gold production levels in second quarter 2005 resulted in lower amortization expense as a significant proportion of assets are amortized on a units of production basis.

Cowal, Australia

The project remains on schedule for production to commence in first quarter 2006. Project highlights include:

- Capital expenditures incurred were $65 million in second quarter 2005. Inflationary cost pressures in Australia have been impacting ongoing capital costs, and we have been taking steps to mitigate cost increases where possible.

- Engineering is 95% complete.

- Plant-site concrete is 65% complete and reagent and water tanks were erected.

- Mine development earthworks is progressing with the completion of the northern tailings storage facilities.

- With the installation of power poles in second quarter 2005, the electricity transmission line is anticipated to be completed in third quarter 2005.

    - Pre-strip activity commenced in April 2005.

    Russia/Central Asia

In second quarter 2005, we spent $50 million to increase our ownership in Highland Gold Mining PLC ("Highland") from 14% to 20%. Our 20% ownership interest is reflected in our financial statements and production statistics on an equity basis.

We continue to work with both Highland Gold and Celtic Resources on projects where we have the option to acquire a joint interest. In second quarter 2005, we agreed to exercise our right to acquire a 50% joint venture interest in the Taseevskoye deposit, subject to certain conditions.

OTHER COSTS AND EXPENSES

Exploration, Development and Business Development Expense

---------------------------------------------------------------------
                  Three months    Six months  Comments on significant
                 ended June 30 ended June 30   trends and variances
---------------------------------------------------------------------
($ millions)       2005   2004   2005   2004
---------------------------------------------------------------------
Exploration
---------------------------------------------------------------------
 North America      $ 5    $ 8   $ 12   $ 14
---------------------------------------------------------------------
 Australia/Africa    12      8     24     16  Increased activity at
                                              the Buzwagi project in
                                              2005.
---------------------------------------------------------------------
 South America        6      6     11     10
---------------------------------------------------------------------
 Russia/Central
  Asia                2      2      3      3
---------------------------------------------------------------------
 Other countries      -      1      1      1
---------------------------------------------------------------------
                     25     25     51     44
---------------------------------------------------------------------
Mine development
---------------------------------------------------------------------
 Cowal                2      -      2      -
---------------------------------------------------------------------
 Veladero             -      -      1      -
---------------------------------------------------------------------
 Lagunas Norte        -      3      -      9  In 2004, we expensed
                                              development costs until
                                              May 1, which was the
                                              date when the project
                                              achieved the criteria
                                              to classify
                                              mineralization as a
                                              reserve for US
                                              reporting purposes.
---------------------------------------------------------------------
 Other                2      -      2      -
---------------------------------------------------------------------
                      4      3      5      9
---------------------------------------------------------------------
Non-capitalizable
 project costs(1)
---------------------------------------------------------------------
 Cowal                1      -      2      -
---------------------------------------------------------------------
 Pascua-Lama          1      -      2      -
---------------------------------------------------------------------
 Veladero             2      -      2      -
---------------------------------------------------------------------
 Lagunas Norte        1      -      1      -
---------------------------------------------------------------------
                      5      -      7      -
---------------------------------------------------------------------
Business
 development/other    3      6      5     10  Decrease in overhead
                                              costs associated with
                                              the administration of
                                              exploration and
                                              development of
                                              projects.
---------------------------------------------------------------------
                   $ 37   $ 34   $ 68   $ 63
---------------------------------------------------------------------
(1) Non-capitalizable costs mainly represent items incurred in the
    development/construction phase that cannot be capitalized under
    US GAAP.



Amortization, Administration and Interest Expense

---------------------------------------------------------------------
($ millions,
 except per                                            Comments on
 ounce data    Three months ended     Six months ended significant
 and                      June 30              June 30 trends and
 percentages) 2005  2004 % Change  2005  2004 % Change variances
---------------------------------------------------------------------
Amortization
---------------------------------------------------------------------
 Absolute
  amount      $ 94 $ 115    (18)% $ 187 $ 235    (20)% Decrease due
                                                       to lower
                                                       sales volumes
                                                       and lower
                                                       amortization
                                                       rates per
                                                       ounce.
---------------------------------------------------------------------
 Per ounce
  (dollars)     81    88     (8)%    80    90    (11)% Lower rates
                                                       in 2005 are
                                                       due to
                                                       reserve
                                                       increases at
                                                       the end of
                                                       2004
                                                       (particularly
                                                       Goldstrike
                                                       open pit and
                                                       Pierina - see
                                                       pages 10 and
                                                       11), and the
                                                       lower book
                                                       value of
                                                       Eskay Creek
                                                       after an
                                                       impairment
                                                       charge was
                                                       recorded in
                                                       fourth
                                                       quarter 2004.
                                                       We do not
                                                       expect the
                                                       overall
                                                       average rate
                                                       per ounce to
                                                       change
                                                       significantly
                                                       for the
                                                       second half
                                                       of 2005.
---------------------------------------------------------------------
Administration  19    18       6%    36    34       6% Higher
                                                       regulatory
                                                       compliance
                                                       costs in 2005.
---------------------------------------------------------------------
Interest costs
---------------------------------------------------------------------
 Incurred       31    11     182%    59    23     157% Increase
                                                       mainly due to
                                                       new financing
                                                       put in place
                                                       in 2004 and
                                                       2005. Average
                                                       long-term
                                                       debt
                                                       outstanding
                                                       increased
                                                       from $0.7
                                                       billion in
                                                       the first
                                                       half of 2004
                                                       to $1.7
                                                       billion in
                                                       2005.
---------------------------------------------------------------------
Capitalized     30     7    329%    58    11     427%  Increased
                                                       amounts were
                                                       capitalized
                                                       to Lagunas
                                                       Norte,
                                                       Veladero and
                                                       Cowal
                                                       development
                                                       projects as
                                                       construction
                                                       costs were
                                                       incurred and
                                                       capitalized.
                                                       Average book
                                                       value of
                                                       these three
                                                       projects was
                                                       $0.9 billion
                                                       in the first
                                                       half of 2005
                                                       compared to
                                                       $0.2 billion
                                                       in the first
                                                       half of 2004.
                                                       Capitalization
                                                       at Pascua-Lama
                                                       also began in
                                                       third quarter
                                                       2004.
---------------------------------------------------------------------
Expensed        1     4    (75)%     1    12    (92)%  With the
                                                       start-up of
                                                       the Lagunas
                                                       Norte mine and
                                                       after our
                                                       Veladero
                                                       project begins
                                                       production, we
                                                       expect that
                                                       interest
                                                       expense each
                                                       quarter will
                                                       begin to
                                                       increase as
                                                       the combined
                                                       book value of
                                                       Cowal and
                                                       Pascua-Lama
                                                       will likely
                                                       be lower than
                                                       outstanding
                                                       long-term
                                                       debt.
---------------------------------------------------------------------



Other (Income) Expense

---------------------------------------------------------------------
                     Three months     Six months  Comments on
                    ended June 30  ended June 30  significant trends
($ millions)          2005   2004    2005   2004  and variances
---------------------------------------------------------------------
Non-hedge derivative
 (gains)/losses      $ (3)  $ (6)   $ (9)    $ 9  In second quarter
                                                  2005, gains mainly
                                                  arose from ongoing
                                                  hedge
                                                  ineffectiveness
                                                  calculated under
                                                  FAS 133, whereas in
                                                  second quarter
                                                  2004, gains mainly
                                                  represented gains
                                                  on non-hedge
                                                  interest rate
                                                  contracts partly
                                                  offset by losses
                                                  on non-hedge
                                                  Australian dollar
                                                  contracts caused by
                                                  movements in market
                                                  rates.
---------------------------------------------------------------------
Gains on asset sales     -     (1)     (1)   (3)
---------------------------------------------------------------------
Gain on Kabanga
 transaction          (15)       -    (15)     -  Gain recorded in
                                                  second quarter 2005
                                                  relates to the
                                                  closing of a
                                                  transaction in
                                                  which Falconbridge
                                                  acquired a 50%
                                                  indirect interest
                                                  in Kabanga.
---------------------------------------------------------------------
Gains on investment
 sales                   -       -     (9)    (2) Gains in first
                                                  quarter 2005 relate
                                                  to the sale of
                                                  investments held in
                                                  a rabbi trust for a
                                                  deferred
                                                  compensation plan
                                                  as a result of a
                                                  change in the plan
                                                  trustee.
---------------------------------------------------------------------
Environmental
 remediation costs       9       4      14     12 The higher expense
                                                  in second quarter
                                                  2005 reflects a
                                                  revision to cost
                                                  estimates at
                                                  certain closed
                                                  mines and
                                                  development
                                                  projects.
---------------------------------------------------------------------
Currency translation
 (gains)/losses          1       1       5    (1)
---------------------------------------------------------------------
Other items             11      11      20     14
---------------------------------------------------------------------
                       $ 3     $ 9     $ 5   $ 29
---------------------------------------------------------------------

Income Taxes

Income tax expense of $7 million or 13% in second quarter 2005 was lower than second quarter 2004 when it was 73% (excluding the impact of a deferred tax credit of $30 million in 2004). Our underlying expected effective tax rate for 2005 is 22%. The actual tax rate in second quarter 2005 was lower mainly because the gain recorded on the Kabanga transaction occurred in a low tax-rate jurisdiction. The higher actual effective tax rate in second quarter 2004 of 73% was mainly due to a $26-million opportunity cost through a voluntary reduction of outstanding fixed-price gold sales contracts that occurred in a low tax-rate jurisdiction. Excluding the impact of this opportunity cost, the effective rate in 2004 would have been similar to second quarter 2005. The expected rate for 2005 is based on a market gold price assumption of $425 per ounce. If actual average market gold prices vary from this assumption, our actual effective tax rate will also vary. The expected underlying tax rate excludes the effect of gains and losses on non-hedge derivatives; the effect of delivering into forward gold sales contracts at prices below prevailing market prices; and any release of deferred tax valuation allowances.

Operating Activities

Operating cash flow decreased by $7 million to $101 million in second quarter 2005 compared to second quarter 2004. A $15-million increase in mine operating supplies and ore in stockpiles at our development projects and new mines partly contributed to our operating cash flow decrease. The key factors that contributed to the period over period decrease are summarized in the table below.

NOTE: A chart is available on CCNMatthews' website at: http://www2.ccnmatthews.com/database/fax/2000/abx0728.pdf

Key factors affecting operating cash flow
---------------------------------------------------------------------
                        Impact              Impact
                            on                  on
                 Three compar-         Six compar-
                months   ative      months   ative
                 ended   oper-       ended   oper- Comments on
               June 30   ating     June 30   ating significant
                          cash                cash trends and
            2005  2004    flow  2005  2004    flow variances
---------------------------------------------------------------------
Gold
 sales
 volumes
 ('000s
  oz)      1,085 1,222   $(21) 2,214 2,469   $(43) See page 9.
---------------------------------------------------------------------
Realized
 gold
 prices
 ($/oz)     $424  $372      56  $426  $377     108 See page 9.
---------------------------------------------------------------------
Total
 cash
 costs
 ($/oz)(1)   243   217    (28)   242   209    (73) See page 9.
---------------------------------------------------------------------
Sub-total                    7                 (8)
---------------------------------------------------------------------
Other
 inflows
 (outflows)
---------------------------------------------------------------------
Income      (17)  (22)       5  (29)  (51)      22 Lower required
 tax                                               income tax
 payments                                          payments.
---------------------------------------------------------------------
Increase    (51)  (21)    (30)  (74)  (26)    (48) Higher inventory
 in                                                at development
 inven-                                            projects to
 tories                                            support the
                                                   start-up of
                                                   production and
                                                   impact of
                                                   production
                                                   exceeding sales
                                                   at some mines in
                                                   the first half
                                                   of 2005.
---------------------------------------------------------------------
Other         36    23      13    41    20      21 Recovery of
 non-cash                                          goods
 working                                           and services
 capital                                           taxes
                                                   for Veladero in
                                                   second quarter
                                                   2005, partly
                                                   offset by an
                                                   increase in
                                                   amounts due from
                                                   contractors at
                                                   Lagunas Norte
                                                   for fuel
                                                   consumption
                                                   and the timing
                                                   of supplier
                                                   payments.
---------------------------------------------------------------------
Interest
 expense       1     4       3     1    12      11 See page 14.
---------------------------------------------------------------------
Effect
 of
 other
 factors                   (5)                 (7)
---------------------------------------------------------------------
Total                      (7)                $(9)
---------------------------------------------------------------------
(1) Variances between the 2005 and 2004 cash costs per ounce can be
    partially attributed to the change in accounting for stripping
    costs as the change was adopted on a cumulative basis with no
    restatement of 2004 cash costs per ounce.

Investing Activities

In second quarter 2005 we spent $270 million on capital expenditures, we received $15 million on closing of the Kabanga transaction, and we spent $55 million on investments. Investments included $50 million to increase our ownership interest in Highland Gold Mining PLC from 14% to 20%, as well as $5 million on the first tranche of a private placement with Diamondex Resources Ltd.

---------------------------------------------------------------------
         Three months ended Six months ended
                    June 30          June 30
($                        $                $
 millions) 2005 2004 Change 2005 2004 Change Comments
---------------------------------------------------------------------
Growth
 capital
 expendi-
 tures(1)
---------------------------------------------------------------------
Veladero    $66  $78  $(12) $135 $142   $(7) Construction activity
                                             at similar levels in
                                             each period.
---------------------------------------------------------------------
Lagunas      47   26     21  100   32     68 Construction activity
Norte                                        started in
                                             second quarter 2004.
                                             Production start-up in
                                             mid-June 2005, with
                                             lower capital
                                             expenditures expected in
                                             second half of 2005 on
                                             completion of
                                             construction.
---------------------------------------------------------------------
Cowal        65   11     54  109   31     78 Construction activity
                                             started in second
                                             quarter 2004. Higher
                                             levels of activity
                                             generally in 2005.
---------------------------------------------------------------------
Tulawaka      3   12    (9)    8   15    (7) Production began in
                                             first quarter 2005, with
                                             lower levels of capital
                                             expenditure expected
                                             from second quarter 2005
                                             onwards.
---------------------------------------------------------------------
Pascua-      20    6     14   39   10     29 Higher levels of
 Lama                                        activity since decision
                                             in mid-2004 to proceed
                                             with the project as well
                                             as higher capitalized
                                             interest.
---------------------------------------------------------------------
Nevada       25    -     25   34    -     34 Construction activity
 Power                                       started in fourth
 Plant                                       quarter 2004.
---------------------------------------------------------------------
East         11    -     11   12    -     12 Construction activity
 Archimedes                                  started in first quarter
                                             2005.
---------------------------------------------------------------------
Sub-
 total      237  133    104  437  230    207
---------------------------------------------------------------------
Sustaining
 capital
 expenditures
---------------------------------------------------------------------
North        18   32   (14)   33   46   (13) Deferral of 2005
 America                                     expenditures until later
                                             in the year.
---------------------------------------------------------------------
Australia/   11   23   (12)   34   38    (4) Deferral of 2005
 Africa                                      expenditures until later
                                             in the year.
---------------------------------------------------------------------
South America 2    -      2    5    2      3
---------------------------------------------------------------------
Other         2    1      1    3    2      1
---------------------------------------------------------------------
Sub-total    33   56   (23)   75   88   (13)
---------------------------------------------------------------------
Total      $270 $189    $81 $512 $318   $194
---------------------------------------------------------------------
(1) Includes construction costs and capitalized interest.

Financing Activities

The most significant financing cash inflows in second quarter 2005 were proceeds of $89 million from various financings, including $28 million from two lease facilities for Lagunas Norte, a $50 million public debt offering in Peru, and drawdowns of $11 million under the Veladero project financing. We also received $10 million on the exercise of employee stock options. We made scheduled repayments under long-term debt obligations totaling $14 million and paid dividends of $59 million in second quarter 2005.

 
    BALANCE SHEET

    SHAREHOLDERS' EQUITY

    Outstanding Share Data

As at July 15, 2005, 534.8 million of our common shares, one special voting share and 1.4 million Exchangeable Shares not owned by Barrick (exchangeable into 0.7 million of our common shares) were issued and outstanding. As at July 15, 2005, options to purchase 21.9 million common shares were outstanding under our option plans, as well as options to purchase 0.9 million common shares under certain option plans inherited by us in connection with prior acquisitions.

Comprehensive Income

Comprehensive income consists of net income or loss, together with certain other economic gains and losses that collectively are described as "other comprehensive income", and excluded from the income statement.

In second quarter 2005, the other comprehensive loss of $24 million mainly included gain reclassification adjustments totaling $32 million on hedge contracts that were transferred to earnings in second quarter 2005; partly offset by gains of $5 million on hedge contracts designated for future periods caused primarily by changes in currency exchange rates, interest rates and fuel prices.

QUARTERLY INFORMATION ($ millions, except where indicated)
---------------------------------------------------------------------
                             2005                    2004        2003
                       ---------- ----------------------- -----------
                         Q2    Q1    Q4    Q3    Q2    Q1    Q4    Q3
---------------------------------------------------------------------
Gold sales             $463  $484  $501  $500  $454  $477  $536  $549
---------------------------------------------------------------------
Net income               53    60   156    32    34    26    77    35
---------------------------------------------------------------------
Net income per share
 - basic (dollars)     0.10  0.11  0.30  0.06  0.06  0.05  0.14  0.07
---------------------------------------------------------------------

Our financial results for the last eight quarters reflect the following general trends: rising spot gold prices with a corresponding rise in prices realized from gold sales; and declining gold production, sales volumes, and rising total cash costs per ounce as a number of our mines have been processing lower-grade ore and experienced rising input costs for labor, fuel, power, and other consumables due to inflationary cost pressures. The trend of lower gold production and sales and higher total cash costs per ounce is expected to reverse in the second half of 2005 as our lower-cost Lagunas Norte mine began production in mid-June 2005 and the Veladero mine is expected to commence production in fourth quarter 2005. Net income in each quarter also reflects the timing of various special items. The items affecting the first and second quarters of 2005 and 2004 are presented in a table on page 8.

OFF-BALANCE SHEET ARRANGEMENTS

The MD&A included in our 2004 Annual Report contained a detailed discussion of off-balance sheet arrangements. In this interim MD&A, we have included an update of any significant changes in off-balance sheet arrangements.

Gold and Silver Sales Contracts

We have historically used gold and silver sales contracts as a means of selling a portion of our gold and silver production. The contracting parties are bullion banks whose business includes entering into contracts to purchase gold or silver from mining companies. All our gold and silver sales contracts (including Corporate Gold Sales Contracts, Pascua-Lama Gold Sales Contracts and Floating Spot-Price Gold Sales Contracts) retain all the benefits of our Master Trading Agreements ("MTAs") and are not subject to margining, downgrade or unilateral and discretionary "right to break" provisions. Furthermore, as part of our MTAs, Pascua-Lama Gold Sales Contracts are not subject to any provisions regarding any final go-ahead decisions with Pascua-Lama construction, or any possible delay or change in the Pascua-Lama project. Barrick guarantees the performance of all its gold and silver sales contracts.

Corporate Gold Sales and Floating Spot-Price Gold Sales Contracts

Fixed-price Corporate Gold Sales Contracts, which at June 30, 2005 totaled 6.6 million ounces, represent just over one year of expected future gold production and approximately 9% of our proven and probable reserves, excluding Pascua-Lama. We reduced our fixed-price Corporate Gold Sales contract commitments by 0.2 million ounces in second quarter 2005 via delivery of 0.1 million ounces and conversion of 0.1 million ounces into floating spot-price gold sales contracts.

At June 30, 2005, we had floating spot-price gold sales contracts under which we are committed to deliver 0.8 million ounces of gold over the next ten years at spot prices, less an average fixed-price adjustment of $78 per ounce.

Key Aspects of Corporate Gold Sales Contracts
(at June 30, 2005)
---------------------------------------------------------------------
Current termination date of contracts.     2015 in most cases.
---------------------------------------------------------------------
Average estimated realizable price in
 2015.                                     $423/oz.(1)
---------------------------------------------------------------------
Mark-to-market value at June 30, 2005.
 Corporate Gold Sales Contracts            $(892) million.(2)
 Floating Spot-Price Gold Sales Contracts. $(60) million.(2)
---------------------------------------------------------------------
(1) Approximate estimated value based on current market US dollar
    interest rates and an average lease rate assumption of 1%.
    Accelerating gold deliveries would likely lead to reduced
    contango that would otherwise have built up over time. Barrick
    may choose to settle any gold sales contract in advance of this
    termination date at any time, at its discretion. Historically,
    delivery has occurred in advance of the contractual termination
    date.
(2) At a spot gold price of $437 per ounce, and market interest
    rates.

Pascua-Lama Gold Sales Contracts

In anticipation of building Pascua-Lama and in support of any related financing, we have 6.5 million ounces of existing fixed-price gold sales contracts specifically allocated to Pascua-Lama (the "Pascua-Lama Gold Sales Contracts"). The allocation of these contracts will help reduce gold price risk at Pascua-Lama and is expected to help secure the financing for its construction. We expect the allocation of these contracts to eliminate any requirement by lenders to add any incremental gold sales contracts in the future to support the financing of Pascua-Lama. The forward sales prices on our Pascua-Lama Gold Sales Contracts have not been fully fixed, and thus remain sensitive to long-term (2009-2017) interest rates. Declining long-term interest rates in the second quarter have resulted in a lower expected realizable sales price for these contracts. If these interest rates rise, we anticipate the expected realizable sales price to increase (in 2009-2017).

Key Aspects of Pascua-Lama Gold Sales Contracts
(at June 30, 2005)
---------------------------------------------------------------------
Expected delivery dates.(1)                2009-2017, the term of the
                                           expected financing.
---------------------------------------------------------------------
Future estimated average realizable price. $365/oz.(2)
---------------------------------------------------------------------
Mark-to-market value at June 30, 2005.     $(950) million.(3)
---------------------------------------------------------------------
(1) The contract termination dates are 2014-2017 in most cases, but
    we expect to deliver Pascua-Lama production against these
    contracts starting in 2009, subject to the timing of receipt of
    approvals of the environmental impact assessments, as well as the
    resolution of other external issues, both of which are largely
    beyond our control.
(2) Upon delivery of production from 2009-2017, the term of expected
    financing. Approximate estimated value based on current market
    contango which is sensitive to US interest rates.

(3) At a spot gold price of $437 per ounce and market interest rates.

These contracts represent just over 36% of the 17.6 million ounces of gold reserves at Pascua-Lama, and do not impact any of the 643 million ounces of silver contained in gold reserves.

Fair Value of Derivative Positions
---------------------------------------------------------------------
Unrealized Gain/(Loss)                At Jun.30, 2005 At Dec.31, 2004
---------------------------------------------------------------------
Corporate Gold Sales Contracts(1)              $(952)          $(975)
---------------------------------------------------------------------
Pascua-Lama Gold Sales Contracts                (950)           (966)
---------------------------------------------------------------------
Silver Sales Contracts(1)                        (30)            (26)
---------------------------------------------------------------------
Currency contracts                                207             298
---------------------------------------------------------------------
Interest and lease rate contracts                  46              45
---------------------------------------------------------------------
Fuel contracts                                     41               4
---------------------------------------------------------------------
                                             $(1,638)        $(1,620)
---------------------------------------------------------------------
(1) Includes floating spot-price contracts.

Contractual Obligations and Commitments

Purchase obligations include only those items where binding commitments have been entered into. They do not include the full amount of future capital expenditures required to complete construction of our development projects, because commitments have yet to be made for a portion of these estimated future capital costs. Significant changes to the December 31, 2004 contractual obligations and commitments include an additional $0.3 billion of purchase obligations for supplies and consumables and power contracts that we expect to incur mainly in 2005 to 2008.

In second quarter 2005, we drew down a further $11 million under our Veladero project financing, $28 million under lease facilities in Peru, and issued a $50-million Peruvian public debenture for Lagunas Norte that matures in 2013. The additional Veladero project financing results in repayments of about $1 million each year for 2006 to 2010, with the remainder repayable in 2011 to 2012. The lease facilities drawdown will be repaid evenly on a quarterly basis over five years starting in fourth quarter 2005.

Capital expenditures not yet committed

We expect to incur about $2.2 billion in capital to complete the development of our present projects over the next five years (Veladero, Cowal, Pascua-Lama and East Archimedes and the Nevada Power Plant). A total of about $0.2 billion of these amounts had been committed at the end of second quarter 2005, with the remainder not yet committed.

CRITICAL ACCOUNTING POLICIES AND ESTIMATES

Management has discussed the development and selection of our critical accounting estimates with the Audit Committee of the Board of Directors, and the Audit Committee has reviewed the disclosure relating to such estimates in conjunction with its review of this MD&A. The accounting policies and methods we utilize determine how we report our financial condition and results of operations, and they may require management to make estimates or rely on assumptions about matters that are inherently uncertain.

In this MD&A, we have not repeated information provided in our 2004 annual MD&A. We have provided an update for any changes or expected changes in accounting policies and critical accounting estimates that were not included in our 2004 annual MD&A.

Accounting Policy Changes

There was one change in accounting policies in the second quarter of 2005 that significantly impacted our Financial Statements, the adoption of EITF 04-6.

EITF Issue No. 04-6, Accounting for Stripping Costs Incurred during Production in the Mining Industry ("EITF 04-6") In second quarter 2005, the FASB approved EITF 04-6, and we chose to adopt it in second quarter 2005. EITF 04-6 relates to the accounting for stripping costs in the production stage at a mine. Previously we capitalized stripping costs incurred in the production phase. We included amortization of capitalized costs in inventory based on a "stripping ratio" using the units of production method. Under EITF 04-6, stripping costs incurred each period during the production phase are recorded as a component of the cost of inventory produced each period. EITF 04-6 allows either retroactive restatement of all prior periods, or restatement of results for the current year, with the cumulative effect on prior years reflected as a charge or credit to earnings in the period of adoption. On adoption of EITF 04-6 in second quarter 2005, we recorded a decrease in capitalized mining costs of $226 million; an increase in inventory of $232 million; and a $6-million credit in second quarter 2005 earnings for the cumulative effect of adopting EITF 04-6. Results for second quarter 2005 reflect the method of accounting under EITF 04-6. The effect of implementing EITF 04-6 on restated earnings for first quarter 2005 was a decrease in cost of sales by $12 million, and an increase in income tax expense by $3 million, and is reflected in results for the six months ended June 30, 2005. The adoption of EITF 04-6 had no impact on our cash flow statement.

Impact of EITF 04-6 on Total Cash Costs Per Ounce Statistics
---------------------------------------------------------------------
                                           Three months    Six months
                                                  ended         ended
                                          June 30, 2005 June 30, 2005
                                               Increase      Increase
(dollars per ounce)                          (decrease)    (decrease)
---------------------------------------------------------------------
Goldstrike open pit                                $(9)          $(9)
---------------------------------------------------------------------
Round Mountain                                        6            11
---------------------------------------------------------------------
Hemlo                                                16            11
---------------------------------------------------------------------
Pierina                                            (27)          (26)
---------------------------------------------------------------------
Lagunas Norte                                      (18)          (18)
---------------------------------------------------------------------
Kalgoorlie                                         (19)          (28)
---------------------------------------------------------------------
Plutonic                                           (19)          (32)
---------------------------------------------------------------------
Lawlers                                              43            12
---------------------------------------------------------------------
Tulawaka                                             33            33
---------------------------------------------------------------------
Total cash costs per ounce                          (6)           (8)
---------------------------------------------------------------------

FAS 154, Accounting Changes and Error Corrections, a replacement of APB Opinion No. 20 and FAS 3

FAS 154 relates to the accounting for and reporting of a change in accounting principle and applies to all voluntary changes in accounting principles. The reporting of corrections of an error by restating previously issued financial statements is also addressed by this statement. FAS 154 applies to pronouncements in the event they do not include specific transition provisions. When a pronouncement includes specific transition provisions, those provisions should be followed. FAS 154 requires retrospective application to prior periods' financial statements of changes in accounting principle, unless the period specific effects or cumulative effects of an accounting change are impracticable to determine, in which case the new accounting principle is required to be applied to the assets and liabilities as of the earliest period practicable, with a corresponding adjustment made to opening retained earnings. Prior to FAS 154, most accounting changes were recorded effective at the beginning of the year of change, with the cumulative effect at the beginning of the year of change recorded as a charge or credit to earnings in the period a change was adopted. FAS 154 will be effective for us on accounting changes and corrections of errors beginning in 2006. FAS 154 does not change the transition provisions of any existing accounting pronouncements, including those that are in the transition phase as of the effective date of FAS 154.

Critical Accounting Estimates

Certain accounting estimates have been identified as being "critical" to the presentation of our financial condition and results of operations because they require management to make particularly subjective and/or complex judgments about matters that are inherently uncertain; and there is a reasonable likelihood that materially different amounts could be reported under different conditions or using different assumptions and estimates. Following the adoption of EITF 04-6, stripping ratios are no longer a critical accounting estimate. Critical accounting estimates include:

- Reserve estimates used to measure amortization of property, plant and equipment;

    - Impairment assessments of long-lived assets;

    - The fair value of asset retirement obligations; and

- The measurement of deferred income tax assets and liabilities and assessments of the amounts of valuation allowances recorded.

Reserve Estimates Used to Measure Amortization of Property, Plant and Equipment

We record amortization expense based on the estimated useful economic lives of long-lived assets. Effective December 31, 2004, we updated our estimates of proven and probable gold mineral reserves. Following the update of these estimates, we prospectively revised calculations of amortization and caused amortization during second quarter 2005 and year-to-date 2005 to decrease by $9 million and $18 million, respectively, for the mines listed below, which had reserve estimate changes (other than production) greater than 10%.

Impact of Historic Changes in Reserve Estimates on Amortization
---------------------------------------------------------------------
($millions, except reserves      Reserves       Amortization increase
 in millions of contained oz)    increase                  (decrease)
                            (decrease)(1) Periods ended June 30, 2005
                                           Three months    Six months
---------------------------------------------------------------------
Goldstrike open pit                   1.8          $(3)          $(7)
---------------------------------------------------------------------
Round Mountain                        0.3           (2)           (4)
---------------------------------------------------------------------
Lawlers                               0.1           (1)           (2)
---------------------------------------------------------------------
Eskay Creek                         (0.1)             2             4
---------------------------------------------------------------------
Pierina                               0.3           (5)           (9)
---------------------------------------------------------------------
Total                                 2.1           (9)          (18)
---------------------------------------------------------------------
Impact on overall
 amortization rate per
 ounce (dollars)                        -           (6)           (6)
---------------------------------------------------------------------
(1) Each year we update our reserve estimates as at the end of the
    year as part of our normal business cycle. Reserve changes, shown
    in millions of contained ounces, affect amortization expense on a
    prospective basis.

Impairment Assessments of Investments

Each reporting period we review all investments whose fair value at the end of the period is below cost to determine whether an other-than-temporary impairment has occurred. We consider both positive and negative evidence in order to reach a conclusion on whether any impairment is other-than-temporary, and if necessary, record any losses that are other-than-temporary in earnings within other (income)/expense. Changes in the values of investments are caused by market factors beyond our control and could be significant. Consequently, the amount of any impairment charge recorded could materially impact earnings in a particular reporting period. In second quarter 2005, we reviewed two investments for impairment purposes, which had an aggregate fair value that was $2 million below cost, and concluded that the impairment in value was not other-than-temporary, as disclosed in note 11 to the interim financial statements. If a further or prolonged deterioration in value of these investments occurs, we may reach a different conclusion that could lead to the recognition of an impairment charge in earnings of a future period.

Impairment Assessments of Property, Plant and Equipment

At the end of 2004, we conducted detailed impairment assessments for Eskay Creek and Cowal. In second quarter 2005, we did not perform any detailed impairment assessments on any groups of assets, but we are monitoring the impact of industry-wide inflationary cost pressures on our mining operations. It is reasonably possible that another detailed assessment could be required at these mines in future periods if cost pressures persist or increase in the future.

Consolidated Statements of Income

Barrick Gold Corporation                  Three months     Six months
(in millions of United States dollars,           ended          ended
 except per share data) (Unaudited)           June 30,       June 30,
                                        -----------------------------
                                           2005   2004    2005   2004
                                        --------------  -------------
Gold sales (notes 3 and 4)                $ 463  $ 454   $ 947  $ 931
------------------------------------------------------  -------------
Costs and expenses
Cost of sales(1) (note 5)                   266    266     537    516
Amortization (note 3)                        94    115     187    235
Administration                               19     18      36     34
Exploration, development and
 business development                        37     34      68     63
Other (income) expense (note 6)               3      9       5     29
------------------------------------------------------  -------------
                                            419    442     833    877
------------------------------------------------------  -------------

Interest income                              11      7      19     13
Equity in investees (note 11)                 -      -     (1)      -
Interest expense (note 13)                  (1)    (4)     (1)   (12)
------------------------------------------------------  -------------
Income before income taxes and
 other items                                 54     15     131     55
Income tax (expense) recovery (note 7)      (7)     19    (24)      5
------------------------------------------------------  -------------
Income before cumulative effect of
 change in accounting principles             47     34     107     60
Cumulative effect of changes in
 accounting principles (note 2b)              6      -       6      -
------------------------------------------------------  -------------
Net income for the period                  $ 53   $ 34   $ 113   $ 60
------------------------------------------------------  -------------
Earnings per share data (note 8):
Income before cumulative effect of
 change in accounting principles
  Basic and diluted                      $ 0.09 $ 0.06  $ 0.20 $ 0.11
Net income
  Basic and diluted                      $ 0.10 $ 0.06  $ 0.21 $ 0.11
------------------------------------------------------  -------------
(1) Exclusive of amortization (note 3).

The accompanying notes are an integral part of these unaudited
 interim consolidated financial statements.



Consolidated Statements of Cash Flow

Barrick Gold Corporation                  Three months     Six months
(in millions of United States dollars)           ended          ended
(Unaudited)                                   June 30,       June 30,
                                        -----------------------------
                                           2005   2004    2005   2004
------------------------------------------------------  -------------
OPERATING ACTIVITIES
Net income for the period                  $ 53   $ 34   $ 113   $ 60
Amortization (note 3)                        94    115     187    235
Deferred income taxes (note 7)              (1)   (31)       5   (35)
Increase in inventory                      (51)   (21)    (74)   (26)
Gain on Kabanga transaction (note 6)       (15)      -    (15)      -
Other items (note 9)                         21     11       9      -
------------------------------------------------------  -------------
Net cash provided by operating
 activities                                 101    108     225    234
------------------------------------------------------  -------------
INVESTING ACTIVITIES
Property, plant and equipment
  Capital expenditures (note 3)           (270)  (189)   (512)  (318)
  Sales proceeds                              -      2       3      8
Cash receipts from Kabanga transaction       15      -      15      -
Investments
  Purchases (note 11)                      (55)    (8)    (83)   (53)
  Sales proceeds                              -      4       -      8
Other items                                (13)    (3)    (13)    (3)
------------------------------------------------------  -------------
Net cash used in investing activities     (323)  (194)   (590)  (358)
------------------------------------------------------  -------------
FINANCING ACTIVITIES
Capital stock
  Proceeds on exercise of stock options      10     13      38     26
  Repurchased for cash                        -      -       -   (95)
Long-term debt
  Proceeds (note 13)                         89      -     138      -
  Repayments                               (14)   (27)    (15)   (27)
Dividends (note 14)                        (59)   (59)    (59)   (59)
Other items                                 (1)      -     (1)      -
------------------------------------------------------  -------------
Net cash provided by (used in)
 financing activities                        25   (73)     101  (155)
------------------------------------------------------  -------------
Effect of exchange rate changes on
 cash and equivalents                       (2)    (6)     (3)    (6)
Net decrease in cash and equivalents      (197)  (159)   (264)  (279)
Cash and equivalents at beginning
 of period                                1,330    850   1,398    970
------------------------------------------------------  -------------
Cash and equivalents at end of period   $ 1,131  $ 685 $ 1,131  $ 685
------------------------------------------------------  -------------

The accompanying notes are an integral part of these unaudited
interim consolidated financial statements.



Consolidated Balance Sheets

Barrick Gold Corporation
(in millions of United States      As at June 30,  As at December 31,
 dollars) (Unaudited)                        2005                2004
-------------------------------------------------  ------------------
ASSETS
Current assets
  Cash and equivalents                     $1,131             $ 1,398
  Accounts receivable                          62                  58
  Inventories (note 10)                       336                 215
  Other current assets                        301                 286
-------------------------------------------------  ------------------
                                            1,830               1,957
  Investments (note 11)                        56                  59
  Equity in investees (note 11)               143                  88
  Property, plant and equipment
   (note 12)                                3,732               3,391
  Capitalized mining costs (note 2b)            -                 226
  Other assets                                722                 566
-------------------------------------------------  ------------------
Total assets                               $6,483             $ 6,287
-------------------------------------------------  ------------------
LIABILITIES AND SHAREHOLDERS' EQUITY
Current liabilities
  Accounts payable                          $ 367               $ 335
  Other current liabilities                    83                  83
-------------------------------------------------  ------------------
                                              450                 418
  Long-term debt (note 13)                  1,774               1,655
  Other long-term obligations                 497                 499
  Deferred income tax liabilities             130                 139
-------------------------------------------------  ------------------
Total liabilities                           2,851               2,711
-------------------------------------------------  ------------------
Shareholders' equity
  Capital stock (note 14)                   4,168               4,129
  Deficit                                   (568)               (622)
  Accumulated other comprehensive
   income (note 16)                            32                  69
-------------------------------------------------  ------------------
Total shareholders' equity                  3,632               3,576
-------------------------------------------------  ------------------
Contingencies and commitments
 (note 12 and 17)
-------------------------------------------------  ------------------
Total liabilities and shareholders'
 equity                                    $6,483             $ 6,287
-------------------------------------------------  ------------------

The accompanying notes are an integral part of these unaudited
interim consolidated financial statements.



Consolidated Statements of Shareholders' Equity

Barrick Gold Corporation
(in millions of United States dollars) (Unaudited)      2005     2004
---------------------------------------------------------------------
Common shares (number in millions)
At January 1                                             534      535
  Issued on exercise of stock options                      1        2
  Repurchased (note 14a)                                   -      (5)
---------------------------------------------------------------------
At June 30                                               535      532
---------------------------------------------------------------------
Common shares (dollars in millions)
At January 1                                         $ 4,129   $4,115
  Issued on exercise of stock options                     39       26
  Repurchased (note 14a)                                   -     (35)
---------------------------------------------------------------------
At June 30                                           $ 4,168   $4,106
---------------------------------------------------------------------
Deficit
At January 1                                         $ (622)  $ (694)
  Net income                                             113       60
  Dividends                                             (59)     (59)
  Adjustment on repurchase of common shares
   (note 14a)                                              -     (60)
---------------------------------------------------------------------
At June 30                                           $ (568)  $ (753)
---------------------------------------------------------------------
Accumulated other comprehensive income (loss)
 (note 16)                                              $ 32   $ (42)
---------------------------------------------------------------------
Total shareholders' equity at June 30                $ 3,632   $3,311
---------------------------------------------------------------------



Consolidated Statements of Comprehensive Income

Barrick Gold Corporation        Three months ended   Six months ended
                                          June 30,           June 30,
(in millions of United States   ------------------  -----------------
 dollars)(Unaudited)                 2005     2004    2005       2004
--------------------------------------------------  -----------------
Net income                           $ 53     $ 34   $ 113       $ 60
Other comprehensive loss, net
 of tax (note 16)                    (24)     (89)    (37)      (102)
--------------------------------------------------  -----------------
Comprehensive income (loss)          $ 29   $ (55)    $ 76     $ (42)
--------------------------------------------------  -----------------

The accompanying notes are an integral part of these unaudited
interim consolidated financial statements.

NOTES TO UNAUDITED INTERIM CONSOLIDATED FINANCIAL STATEMENTS

Tabular dollar amounts in millions of United States dollars, unless otherwise shown. References to C$, A$ and EUR are to Canadian dollars, Australian dollars and Euros, respectively.

1. NATURE OF OPERATIONS

Barrick Gold Corporation ("Barrick" or the "Company") engages in the production and sale of gold from underground and open-pit mines, including related activities such as exploration and mine development. Our operations are mainly located in North America, South America, Australia and Africa.

    2. SIGNIFICANT ACCOUNTING POLICIES

    A Basis of preparation

The United States dollar is the principal currency of our operations. These unaudited interim consolidated financial statements have been prepared in United States dollars and under United States generally accepted accounting principles ("US GAAP") for the preparation of interim financial information. Accordingly, they do not include all of the information and disclosures required by US GAAP for annual consolidated financial statements. The accounting policies used in the preparation of the accompanying unaudited interim consolidated financial statements are the same as those described in our audited consolidated financial statements and the notes thereto for the three years ended December 31, 2004, except as noted below in note 2b.

In the opinion of management, all adjustments considered necessary for the fair presentation of results for the periods presented have been reflected in these financial statements. These unaudited interim consolidated financial statements should be read in conjunction with the audited annual consolidated financial statements and the notes thereto for the three years ended December 31, 2004.

The preparation of these financial statements requires us to make estimates and assumptions. The most significant estimates and assumptions are: quantities of proven and probable gold reserves; expected value of mineral resources not considered proven and probable reserves; expected future costs and expenses to produce proven and probable reserves; expected future commodity prices and foreign currency exchange rates; and expected costs to meet asset retirement obligations. Decisions and assessments affected by our critical estimates and assumptions include:

- decisions as to whether mine development costs should be capitalized or expensed;

- assessments of whether groups of long-lived assets are impaired and the fair value of those groups of assets that are the basis for measuring impairment charges;

- assessments of our ability to realize the benefits of deferred income tax assets;

- the useful lives of long-lived assets and the measurement of amortization recorded in earnings;

    - the fair value of asset retirement obligations; and

    - assessments of whether investments are impaired.

We regularly review these estimates and assumptions that affect our financial statements however, actual outcomes could differ from estimates and assumptions.

B Accounting changes

EITF Issue No. 04-6, Accounting for Stripping Costs Incurred during Production in the Mining Industry (EITF 04-6)

In second quarter 2005, we adopted EITF 04-6 and changed our accounting policy for stripping costs. Previously we capitalized stripping costs incurred in the production phase. We included amortization of capitalized costs in inventory based on a "stripping ratio" using the units of production method. Under EITF 04-6, stripping costs incurred each period during the production phase are recorded as a component of the cost of inventory produced each period. On adoption of EITF 04-6 in second quarter 2005, we recorded a decrease in capitalized mining costs of $226 million; an increase in inventory of $232 million; and a $6 million credit in earnings for the cumulative effect of adopting EITF 04-6. For the three month period ended June 30, 2005, the effect on earnings of adopting EITF 04-6 was an increase in income, before the cumulative effect of accounting changes, of $4 million ($0.01 per share), and for the six month period ended June 30 2005, the effect was an increase in income, before the cumulative effect of accounting changes, of $13 million ($0.02 per share).

    C Accounting developments

    FAS 123R, Accounting for Stock-Based Compensation (FAS 123R)

In December 2004, the Financial Accounting Standards Board ("FASB") issued FAS 123R. FAS 123R is applicable to transactions in which an entity exchanges its equity instruments for goods and services. It focuses primarily on transactions in which an entity obtains employee services in share-based payment transactions. FAS 123R requires that the fair value of such equity instruments be recorded as an expense as services are performed. Prior to FAS 123R, only certain pro forma disclosures of accounting for these transactions at fair value were required. FAS 123R will be effective for our first quarter 2006 financial statements, and permits varying transition methods including: retroactive adjustment of prior periods as far back as 1995 to give effect to the fair value based method of accounting for awards granted in those prior periods; or prospective application beginning in 2006. We are presently evaluating the effect of the varying methods of adopting FAS 123R. We expect to adopt FAS 123R using the prospective method effective January 1, 2006. Under this transition method we will begin recording stock option expense prospectively, starting in first quarter 2006.

FIN 47, Accounting for Conditional Asset Retirement Obligations (FIN 47)

FIN 47 was issued in March 2005 and relates to the accounting for a legal obligation to perform an asset retirement activity, when the timing or method of settlement are conditional on a future event, which may not be within the control of the entity. FIN 47 requires recognition of a liability for the fair value of a conditional asset retirement obligation if the fair value can be reasonably estimated. FIN 47 is effective no later than the end of fiscal years ending after December 31, 2005. We are presently evaluating the impact of FIN 47.

FAS 154, Accounting Changes and Error Corrections, a replacement of APB Opinion No. 20 and FAS 3

FAS 154 relates to the accounting for and reporting of a change in accounting principle and applies to all voluntary changes in accounting principles. The reporting of corrections of an error by restating previously issued financial statements is also addressed by this statement. FAS 154 applies to pronouncements in the event they do not include specific transition provisions. When a pronouncement includes specific transition provisions, those provisions should be followed. FAS 154 requires retrospective application to prior periods' financial statements of changes in accounting principle, unless the period specific effects or cumulative effects of an accounting change are impracticable to determine, in which case the new accounting principle is required to be applied to the assets and liabilities as of the earliest period practicable, with a corresponding adjustment made to opening retained earnings. Prior to FAS 154, most accounting changes were recorded effective at the beginning of the year of change, with the cumulative effect at the beginning of the year of change recorded as a charge or credit to earnings in the period a change was adopted. FAS 154 will be effective for us for accounting changes and corrections of errors beginning in 2006. FAS 154 does not change the transition provisions of any existing accounting pronouncements, including those that are in the transition phase as of the effective date of FAS 154.

    D Changes in estimates

    Gold Mineral Reserves

Effective December 31, 2004, we updated our estimates of proven and probable gold mineral reserves. Following the update of these estimates, we prospectively revised calculations of amortization of property, plant and equipment. The effect of the change in reserve estimates on amortization of property, plant and equipment for the three months ended June 30, 2005 was a decrease in this expense by approximately $9 million and for the six months ended June 30, 2005, a decrease in amortization of property, plant and equipment of $18 million, for mines with a greater than 10% change (excluding production for the period) in the reserve estimates.

Asset Retirement Obligations (AROs)

In second quarter 2005, we revised cost estimates at various closed mines and recorded an increase in the fair value of AROs by $5 million, which was included as a charge within environmental remediation costs in other income/expense.

3. SEGMENT INFORMATION

Income statement information
---------------------------------------------------------------------
                                                              Segment
                                          Gold   Segment       income
                                         sales expenses(1)     (loss)
---------------------------------------------------------------------
For the three months ended June 30   2005 2004   2005 2004  2005 2004
---------------------------------------------------------------------
Goldstrike                           $161 $172   $113 $118   $15  $17
Round Mountain                         42   36     21   22    17    8
Eskay Creek                            22   33      3    6    12   15
Hemlo                                  25   23     17   15     5    4
Other producing mines                   9   10      4    6     2    2
---------------------------------------------------------------------
 North America                        259  274    158  167    51   46
---------------------------------------------------------------------
Kalgoorlie                             40   36     21   23    14    9
Plutonic                               29   27     19   18     8    7
Bulyanhulu                             22   30     19   27   (2)  (5)
Other producing mines                  36   24     24   13     4    7
Cowal                                   -    -      2    -   (2)    -
---------------------------------------------------------------------
 Australia/Africa                     127  117     85   81    22   18
---------------------------------------------------------------------
Pierina                                65   63     22   18    25   16
Lagunas Norte                          12    -      4    3     7  (3)
Veladero                                -    -      2    -   (2)    -
Pascua-Lama                             -    -      1    -   (1)    -
---------------------------------------------------------------------
 South America                         77   63     29   21    29   13
---------------------------------------------------------------------
Exploration group                       -    -     30   25  (30) (25)
---------------------------------------------------------------------
Segment total                        $463 $454   $302 $294   $72  $52
---------------------------------------------------------------------


---------------------------------------------------------------------
                                                              Segment
                                          Gold   Segment       income
                                         sales expenses(1)     (loss)
---------------------------------------------------------------------
For the six months ended June 30     2005 2004   2005 2004  2005 2004
---------------------------------------------------------------------
Goldstrike                           $354 $335   $236 $231   $47  $32
Round Mountain                         82   69     44   40    30   18
Eskay Creek                            45   58      6    5    26   29
Hemlo                                  53   47     35   29    11   12
Other producing mines                  15   22      7   13     4    3
---------------------------------------------------------------------
 North America                        549  531    328  318   118   94
---------------------------------------------------------------------
Kalgoorlie                             89   81     45   49    34   23
Plutonic                               58   62     35   35    19   22
Bulyanhulu                             59   58     50   48   (7)  (6)
Other producing mines                  60   49     39   28    10   14
Cowal                                   -    -      3    -   (3)    -
---------------------------------------------------------------------
 Australia/Africa                     266  250    172  160    53   53
---------------------------------------------------------------------
Pierina                               120  150     37   38    50   46
Lagunas Norte                          12    -      4    9     7  (9)
Veladero                                -    -      3    -   (3)    -
Pascua-Lama                             -    -      2    -   (2)    -
---------------------------------------------------------------------
 South America                        132  150     46   47    52   37
---------------------------------------------------------------------
Exploration group                       -    -     56   44  (56) (44)
---------------------------------------------------------------------
Segment total                        $947 $931   $602 $569  $167 $140
---------------------------------------------------------------------
(1) In second quarter 2005, we revised our internal definition of
    segment expenses to include accretion expense. Segment
    information for all the periods presented reflects this change
    in the measurement of segment expenses.


Reconciliation of segment income
---------------------------------------------------------------------
                                             Three months  Six months
                                                    ended       ended
                                                  June 30     June 30
                                               2005  2004  2005  2004
---------------------------------------------------------------------
Segment income                                  $72   $52  $167  $140
Amortization of corporate assets                (5)   (7)   (9)  (13)
Business development costs                      (1)   (6)   (3)  (10)
Administration                                 (19)  (18)  (36)  (34)
Equity in investee                                -     -   (1)     -
Interest income                                  11     7    19    13
Interest expense                                (1)   (4)   (1)  (12)
Other income (expense)                          (3)   (9)   (5)  (29)
---------------------------------------------------------------------
Income before income taxes and other items      $54   $15  $131   $55
---------------------------------------------------------------------


Asset information
---------------------------------------------------------------------
                                                              Segment
                                                              capital
                                           Amortization  expenditures
---------------------------------------------------------------------
For the three months ended June 30           2005  2004    2005  2004
---------------------------------------------------------------------
 Goldstrike                                   $33   $37     $40   $20
 Round Mountain                                 4     6       1     2
 Eskay Creek                                    7    12       -     3
 Hemlo                                          3     4       1     2
 Other operating segments                       3     2      12     5
---------------------------------------------------------------------
  North America                                50    61      54    32
---------------------------------------------------------------------
 Plutonic                                       2     2       4     6
 Kalgoorlie                                     5     4       1     3
 Cowal                                          -     -      65    11
 Bulyanhulu                                     5     8       2    10
 Tulawaka                                       4     -       3    12
 Other operating segments                       4     4       4     4
---------------------------------------------------------------------
  Australia/Africa                             20    18      79    46
---------------------------------------------------------------------
 Pierina                                       18    29       2     -
 Veladero                                       -     -      66    78
 Pascua-Lama                                    -     -      20     6
 Lagunas Norte                                  1     -      47    26
---------------------------------------------------------------------
  South America                                19    29     135   110
---------------------------------------------------------------------
Segment total                                  89   108     268   188
Other items not allocated to segments           5     7       2     1
---------------------------------------------------------------------
Enterprise total                              $94  $115    $270  $189
---------------------------------------------------------------------


---------------------------------------------------------------------
                                                              Segment
                                                              capital
                                           Amortization  expenditures
---------------------------------------------------------------------
For the six months ended June 30             2005  2004    2005  2004
---------------------------------------------------------------------
 Goldstrike                                   $71   $72     $60   $29
 Round Mountain                                 8    11       1     2
 Eskay Creek                                   13    24       1     4
 Hemlo                                          7     6       3     3
 Other operating segments                       4     6      14     8
---------------------------------------------------------------------
  North America                               103   119      79    46
---------------------------------------------------------------------
 Plutonic                                       4     5       7     8
 Kalgoorlie                                    10     9       3     5
 Cowal                                          -     -     109    31
 Bulyanhulu                                    16    16      16    18
 Tulawaka                                       4     -       8    15
 Other operating segments                       7     7       8     7
---------------------------------------------------------------------
  Australia/Africa                             41    37     151    84
---------------------------------------------------------------------
 Pierina                                       33    66       5     2
 Veladero                                       -     -     135   142
 Pascua-Lama                                    -     -      39    10
 Lagunas Norte                                  1     -     100    32
---------------------------------------------------------------------
  South America                                34    66     279   186
---------------------------------------------------------------------
Segment total                                 178   222     509   316
Other items not allocated to segments           9    13       3     2
---------------------------------------------------------------------
Enterprise total                             $187  $235    $512  $318
---------------------------------------------------------------------


4. REVENUE AND GOLD SALES CONTRACTS

---------------------------------------------------------------------
                                            Three months   Six months
                                                   ended        ended
                                                 June 30      June 30
                                              2005  2004   2005  2004
---------------------------------------------------------------------
Gold bullion sales
Spot market sales                             $409  $180   $861  $369
Gold sales contracts                            38   249     38   509
---------------------------------------------------------------------
                                               447   429    899   878
Concentrate sales                               16    25     48    53
---------------------------------------------------------------------
                                              $463  $454   $947  $931
---------------------------------------------------------------------

At June 30, 2005, we had fixed-price Corporate gold sales contracts with various counterparties for 6.6 million ounces of future gold production, fixed-price gold sales contracts specifically allocated to Pascua-Lama for 6.5 million ounces of future gold production and floating-price forward gold sales contracts for 0.8 million ounces. In 2004, we allocated 6.5 million ounces of fixed-price gold sales contracts specifically to Pascua-Lama. The allocation of these contracts will help reduce gold price risk at Pascua-Lama and is expected to help secure financing for its construction. In addition to the gold sales contracts allocated to Pascua-Lama, we had 6.6 million ounces of corporate gold sales contracts that we intend to settle through delivery of future gold production from our operating mines and development projects, excluding Pascua-Lama. The mark-to-market on the fixed-price gold sales contracts (at June 30, 2005) was negative $950 million for the Pascua-Lama Gold Sales Contracts and negative $892 million for the Corporate Gold Sales Contracts.

Floating spot price sales contracts were previously fixed-price forward sales contracts for which, in accordance with the terms of our master trading agreements, we have elected to receive floating spot gold and silver prices, adjusted by the difference between the spot price and the contract price at the time of such election. Floating prices were elected for these contracts so that we could economically regain spot gold price leverage under the terms of delivery into these contracts. Floating price mechanisms were elected for these contracts at a time when the then current market price was higher than the fixed price in the contract resulting in a mark-to-market on these contracts (at June 30, 2005) of negative $60 million, which equates to an average reduction to the future spot sales price of approximately $78 per ounce, when we deliver gold at spot prices against these contracts. At June 30, 2005, we held gold lease rate swaps, under which we receive a fixed gold lease rate, and pay a floating gold lease rate, on a notional 1.4 ounces of gold spread from 2005 to 2013. The swaps are associated with fixed-price gold sales contracts with expected delivery dates beyond 2006. Lease rate swaps are classified as non-hedge derivatives (note 13b).

5. COST OF SALES

---------------------------------------------------------------------
                                            Three months   Six months
                                                   ended        ended
                                                 June 30      June 30
                                              2005  2004   2005  2004
---------------------------------------------------------------------
Cost of goods sold(1)                         $289  $288   $573  $556
By-product revenues(2)                        (37)  (36)   (66)  (70)
Royalty expense                                 13    12     26    24
Mining taxes                                     1     2      4     6
---------------------------------------------------------------------
                                              $266  $266   $537  $516
---------------------------------------------------------------------
(1) Cost of goods sold includes accretion expense at producing mines
    of $3 million (2004 - $3 million) in the three months ended June
    30, 2005 and $6 million in the six months ended June 30, 2005
    (2004 - $5 million). The cost of inventory sold in the period
    reflects all components capitalized to inventory, except that,
    for presentation purposes, the component of inventory cost
    relating to amortization of property, plant and equipment is
    classified in the income statement under "amortization". Some
    companies present this amount under "cost of sales". The amount
    presented in amortization rather than cost of sales was $89
    million in the three months ended June 30, 2005 (2004 - $108
    million) and $178 million in the six months ended June 30, 2005
    (2004 - $222 million).
(2) We use silver sales contracts to sell a portion of silver
    produced as a by-product. Silver sales contracts have similar
    delivery terms and pricing mechanisms as gold sales contracts.
    At June 30, 2005, we had fixed-price commitments to deliver 12.0
    million ounces of silver at an average price of $5.87 per ounce,
    and floating spot price sales contracts for 11.2 million ounces,
    over periods primarily of up to 10 years.


6. OTHER (INCOME) EXPENSE

---------------------------------------------------------------------
                                              Three months Six months
                                                     ended      ended
                                                   June 30    June 30
                                                2005  2004 2005  2004
---------------------------------------------------------------------
Non-hedge derivative (gains) losses (note 13b)  $(3)  $(6) $(9)   $ 9
Gains on sale of assets                            -   (1)  (1)   (3)
Gain on Kabanga transaction                     (15)     - (15)     -
Environmental remediation costs(1)                 9     4   14    12
Gains on sale of investments                       -     -  (9)   (2)
World Gold Council fees                            2     3    4     5
Currency translation (gains) losses                1     1    5   (1)
Pension expense                                    1     1    2     2
Other items                                        8     7   14     7
---------------------------------------------------------------------
                                                  $3    $9   $5   $29
---------------------------------------------------------------------
(1) Includes costs at development projects and closed mines.

Kabanga transaction

In April 2005 we finalized a joint-venture agreement with Falconbridge Limited ("Falconbridge") for the Kabanga nickel deposit and related concessions located in Tanzania. Under the terms of the agreement, Falconbridge has acquired a 50% indirect joint venture interest for $15 million cash and will be the operator of the joint venture. On closing of the transaction with Falconbridge we recorded a gain of $15 million.

Pension expense
---------------------------------------------------------------------
                                             Three months  Six months
                                                    ended       ended
                                                  June 30     June 30
                                               2005  2004  2005  2004
---------------------------------------------------------------------
Expected return on plan assets                 $(3)  $(3)  $(6)  $(6)
Interest cost on benefit obligation               3     4     6     8
Actuarial losses                                  1     -     2     -
---------------------------------------------------------------------
                                                 $1    $1    $2    $2
---------------------------------------------------------------------


7. INCOME TAX (EXPENSE) RECOVERY

---------------------------------------------------------------------
                                             Three months  Six months
                                                    ended       ended
                                                  June 30     June 30
                                               2005  2004  2005  2004
---------------------------------------------------------------------
Current                                        $(8) $(12) $(19) $(30)
Deferred                                          1     1   (5)     5
---------------------------------------------------------------------
                                               $(7) $(11) $(24) $(25)
Recognition of deferred tax assets due
 to changes in the Australian tax regime          -    30     -    30
---------------------------------------------------------------------
                                                (7)   $19  (24)   $ 5
---------------------------------------------------------------------
Actual effective income tax rate,
 excluding recognition of deferred tax assets   13%   73%   18%   45%
---------------------------------------------------------------------

The primary reasons why our actual effective income tax rate differs from the 38% Canadian statutory rate are due to certain allowances and special deductions unique to extractive industries, and also because we operate in multiple tax jurisdictions that have different tax rates than the Canadian federal rate.

8. EARNINGS PER SHARE

---------------------------------------------------------------------
                                             Three months  Six months
                                                    ended       ended
($ millions, except shares in millions            June 30     June 30
 and per share amounts in dollars)             2005  2004  2005  2004
---------------------------------------------------------------------
Income available to common stockholders
 Basic                                          $53   $34  $113   $60
 Effect of dilutive stock options                 -     -     -     -
---------------------------------------------------------------------
 Diluted                                        $53   $34  $113   $60
---------------------------------------------------------------------
Weighted average shares outstanding
 Basic                                          535   532   535   533
 Effect of dilutive stock options                 1     2     1     2
---------------------------------------------------------------------
 Diluted                                        536   534   536   535
---------------------------------------------------------------------
 Earnings per share
  Basic and diluted                           $0.10 $0.06 $0.21 $0.11
---------------------------------------------------------------------


9. SUPPLEMENTAL CASH FLOW INFORMATION

---------------------------------------------------------------------
                                             Three months  Six months
                                                    ended       ended
($ millions, except shares in millions            June 30     June 30
 and per share amounts in dollars)             2005  2004  2005  2004
---------------------------------------------------------------------
Income statement items:
 Currency translation (gains) losses           $(1)    $7    $2    $5
 Accretion expense                                5     4    10     8
 Non-hedge derivative (gains) losses            (3)   (6)   (9)     9
 Current income tax expense                       8    12    19    30
 Revisions to expected cost of AROs
  at closed mines                                 5     -     5     -
 Cumulative effect of changes in
  accounting principles (note 2b)               (6)     -   (6)     -
 (Gains) losses on sale of investments            -     1   (9)   (1)
 Gains on sale of assets                          -   (1)   (1)   (3)
Changes in:
 Accounts receivable                           (10)   (2)   (4)   (5)
 Accounts payable                                18    20    36    20
 Capitalized mining costs                         -     2     -     3
 Taxes recoverable                               24  (11)     7  (17)
 Other assets and liabilities                     4    14     2    19
Cash payments:
 Asset retirement obligations                   (6)   (7)  (14)  (17)
 Current income taxes                          (17)  (22)  (29)  (51)
---------------------------------------------------------------------
Other net operating activities                  $21   $11    $9    $-
---------------------------------------------------------------------


10. INVENTORIES

---------------------------------------------------------------------
                                               At June 30, At Dec.31,
                                                      2005       2004
---------------------------------------------------------------------
Inventories
 Gold in process and ore in stockpiles                $495       $198
 Mine operating supplies                               107         82
---------------------------------------------------------------------
                                                       602        280
 Non-current ore in stockpiles(1)                    (266)       (65)
---------------------------------------------------------------------
                                                      $336       $215
---------------------------------------------------------------------
(1) Ore that we do not expect to process in the next 12 months is
    classified in other assets. On adoption of EITF 04-6, amounts
    totaling $233 million were transferred from capitalized mining
    costs to ore in stockpiles (see note 2b).


11. INVESTMENTS

A Available-for-sale securities
---------------------------------------------------------------------
                                     At June 30, 2005 At Dec.31, 2004
                                                Gains           Gains
                                        Fair (Losses)   Fair (Losses)
                                       value   in OCI  value   in OCI
---------------------------------------------------------------------
Securities in an unrealized
 gain position
Benefit plans:(1)
 Fixed-income securities                  $1       $-    $11       $-
 Equity securities                         3        -     19       10
Strategic investments:
 Equity securities(2)                     47       12     24       13
---------------------------------------------------------------------
                                         $51      $12    $54      $23
---------------------------------------------------------------------
Securities in an unrealized
 loss position(3)
Strategic investments:
 Equity securities                        $5     $(2)     $5     $(2)
---------------------------------------------------------------------
                                         $56      $10    $59      $21
---------------------------------------------------------------------
(1) Under various benefit plans for certain former Homestake
    executives, a portfolio of marketable fixed-income and equity
    securities are held in a rabbi trust that is used to fund
    obligations under the plans. As at June 30, 2005, the majority of
    the portfolio consisted of cash that is restricted as to its use,
    which was classified within "other current assets".
(2) Mainly includes an investment in the ordinary shares of Celtic
    Resources (fair value of $26 million at June 30, 2005).
(3) All securities have been in a continuous unrealized loss position
    for less than twelve months.

Strategic equity investments in an unrealized loss position include companies that operate in the gold mining industry, and their market share prices are significantly impacted by the price of gold. In evaluating whether these impairments were "other than temporary" we took into consideration the relatively recent decline in value; our positive outlook for the price of gold; the prospective nature of mineral properties held by these companies; and also the relative amount of the unrealized loss at June 30, 2005 compared to the fair value of the investments. We concluded that the impairments were not "other than temporary", and no impairment charges were recorded at June 30, 2005.

Investment in Celtic Resources Holdings PLC ("Celtic")

On January 5, 2005 we completed a subscription for 3,688,191 units of Celtic for $7.562 per unit for a total cost of $28 million. Each unit consisted of one ordinary share of Celtic and one-half of one share purchase warrant. On acquisition we allocated $27 million to the ordinary shares and $1 million to the share purchase warrants. On completion, we held a 9% direct and indirect interest in Celtic's outstanding common shares. On June 1, 2005, the number of warrants held increased under the terms of the subscription agreement by 922,048 warrants to 2,766,143 warrants. Each whole warrant entitles us to acquire one ordinary share of Celtic for $7.562, expiring on December 31, 2007. We determined that the share purchase warrants are derivative instruments as defined by FAS 133. The warrants are classified as non-hedge derivatives in the balance sheet with changes in fair value subsequent to acquisition recorded in earnings. We also entered into the following agreements:

- We have a pre-emptive right to subscribe for up to $75 million of Celtic shares at $7.562 per share.

- Celtic has granted us a right of first refusal on any proposed sale of its direct or indirect interest in Nezhdaninskoye, as well as the right to indirectly purchase 51% of its interest in Nezhdaninskoye for $195 million, exercisable for a period of six months starting if and when Celtic acquires 100% of Nezhdaninskoye.

Celtic has granted us the right to acquire 50% of any interest in any mineral property in Kazakhstan that Celtic acquires for a period of 12 months after any such acquisition for an amount equal to 50% of the cost to Celtic of its interest in the mineral property.

B Equity Method Investments
---------------------------------------------------------------------
                                               At June 30, At Dec.31,
                                                      2005       2004
---------------------------------------------------------------------
Carrying amount
 Highland Gold Mining PLC                            $ 138        $88
 Diamondex Resources Limited                             5          -
---------------------------------------------------------------------
                                                      $143        $88
---------------------------------------------------------------------

Highland Gold Mining PLC ("Highland")

On May 6, 2005, we purchased 11 million common shares of Highland for cash consideration of $50 million, increasing our equity ownership to 20%. Following this increase in ownership we re-evaluated the accounting method for this investment and concluded that the equity method is the most appropriate accounting treatment for this investment. Under the equity method we record our share of income or loss of Highland each period based on our actual ownership interest in each period from fourth quarter 2003, when we first purchased an equity interest in Highland. On transition to equity accounting, US GAAP requires financial statements for prior periods to be revised to reflect the new accounting treatment.

The difference between the cost of our investment in Highland and the underlying net assets of Highland was $94 million at June 30, 2005. We are in the process of determining whether mineralized material at mining properties owned by Highland meets the definition of a reserve for US reporting purposes and also finalizing valuations for the assets and liabilities of Highland to allocate the cost of the purchase, with any residual unallocated amount representing goodwill. Once this process is complete, we will evaluate the need for any revisions to the equity pick up to reflect the results of Highland on a US GAAP basis.

Diamondex Resources Limited ("Diamondex")

On May 18, 2005, we completed a subscription for 7,550,000 units of Diamondex for $5 million. Each unit consists of one ordinary share of Diamondex and one share purchase warrant. On completion, we held an 11% interest in the outstanding common shares of Diamondex (20% assuming exercise of the share purchase warrants). $4 million was allocated to the ordinary shares and $1 million to the share purchase warrants. The share purchase warrants are classified as available-for-sale securities. On July 4, 2005, we purchased an additional 3,561,111 units for $3 million, increasing our ownership to 14% of the outstanding common shares of Diamondex (25% assuming exercise of the share purchase warrants).

12. PROPERTY, PLANT AND EQUIPMENT

The following assets are not being amortized.

---------------------------------------------------------------------
                                      Carrying   Carrying    Targeted
                                     amount at  amount at   timing of
                                      June 30,   December  production
                                          2005   31, 2004    start-up
---------------------------------------------------------------------
Development projects
 Veladero                                 $486       $349        2005
 Cowal                                     246        128        2006
 Pascua-Lama                               282        243        2009
Buzwagi exploration project                102        102           -
Nevada Power Plant                          52         18        2005
---------------------------------------------------------------------
Total                                   $1,168      $ 840
---------------------------------------------------------------------

Capital commitments

In addition to entering into various operational commitments in the normal course of business, we have commitments of approximately $150 million to be paid during 2005 for construction activities at our development projects and for construction of a power plant in Nevada to supply the Goldstrike mine.

13. FINANCIAL INSTRUMENTS

A Long-term debt
Interest expense
---------------------------------------------------------------------
                                             Three months  Six months
                                                    ended       ended
                                                  June 30     June 30
---------------------------------------------------------------------
                                               2005  2004  2005  2004
---------------------------------------------------------------------
Interest incurred                               $31   $11   $59   $23
Less: capitalized                              (30)   (7)  (58)  (11)
---------------------------------------------------------------------
Interest expense                                 $1    $4    $1   $12
---------------------------------------------------------------------

Veladero project financing

In the three months ended June 30, 2005, we drew down $11 million (six months ended June 30, 2005: $35 million) under the $250 million Veladero financing facility, resulting in a total amount of $233 million outstanding under the facility at June 30, 2005.

Peru lease facilities

In the three months ended June 30, 2005, we drew down $25 million (six months ended June 30, 2005: $50 million) under an $80 million build to suit lease facility held by one of our wholly owned subsidiaries, Minera Barrick Misquichilca (MBM). Since the end of the quarter, we have secured an expansion of the facility to a total facility of $110 million. At June 30, 2005, a total of $80 million had been drawn down, which is being used to finance the construction of the leach pad and process facilities at the Lagunas Norte project. In second quarter 2005 MBM finalized a second build to suit lease facility for $20 million, which is being used to finance the extension of the leach pad at the Lagunas Norte project. In the three months ended June 30, 2005, $3 million was drawn down under this second facility.

Peruvian bonds

In second quarter 2005, MBM issued $50 million of debt securities in the Peruvian capital markets. The net proceeds will be used to partially fund the construction of the Lagunas Norte project. The securities bear interest at Libor plus 1.72%, and mature in 2013.

Bulyanhulu project financing

In June 2005, the terms of our Bulyanhulu financing were amended, with the lender having recourse to Barrick going forward in return for a reduction in the credit spread over Libor on the financing, from Libor plus 1.5% to Libor plus 0.35%. The covenants governing the financing have also been simplified. Kahama Mining Corporation Ltd. had a variable-rate recourse amortizing loan for $136 million at June 30, 2005.

Corporate loan facility

In July 2005, we extended our $1 billion Corporate loan facility by two years from April 2008 to April 2010.

B Derivative instruments ("derivatives")
Summary of derivatives at June 30, 2005(1)
---------------------------------------------------------------------
                                                Accounting
                 Notional Amount by         Classification       Fair
                   Term to Maturity     by Notional Amount      value
          --------------------------  ----------------------  -------
                                        Cash  Fair
           Within   2 to 5              flow value    Non-
           1 year    years    Total    hedge hedge   Hedge
------------------------------------  ----------------------  -------
US dollar
 interest
 rate
 contracts
Receive-
 fixed
 swaps
 (millions)   $ -  $ 1,050  $ 1,050    $ 550 $ 500     $ -     $ (10)
Pay-fixed
 swaps
 (millions)     -      261      261      136     -     125       (21)
------------------------------------  ----------------------  -------
Net notional
 position     $ -    $ 789    $ 789    $ 414 $ 500 $ (125)     $ (31)
------------------------------------  ----------------------  -------
Currency
 contracts
C$:US$
 contracts
 (C$
 millions) C$ 280   C$ 482   C$ 762   C$ 762  C$ - C$ -(3)       $ 69
A$:US$
 contracts
 (A$
 millions) A$ 662 A$ 1,457 A$ 2,119 A$ 2,113  A$ -    A$ 6      $ 140
EUR:US$
 contracts
 (EUR
 millions) EUR 26    EUR -   EUR 26   EUR 26 EUR -   EUR -    EUR (2)
ARS:US$
 contracts
 (ARS
 millions)   $ 36     $ 18     $ 54     $ 54   $ -     $ -        $ -
------------------------------------  ----------------------  -------
Commodity
 contracts
Fuel
 contracts
 (thousands
  of
  barrels)(2) 690    1,657    2,347    2,254     -      93       $ 39
Propane
 contracts
 (millions
  of
  gallons)     17        9       26       26     -       -        $ 2
------------------------------------  ----------------------  -------
(1) Excludes gold sales contracts (see note 4), gold lease rate swaps
    (see note 4) and Celtic share purchase warrants (see note 13b).
(2) Includes WTI, Mean of Platts Singapore (MOPS) and US Waterborne
    contracts.
(3) $62 million of non-hedge currency contracts were economically
    closed out by entering into offsetting positions albeit with
    differing counterparties.

    US dollar interest rate contracts

    Cash flow hedges - cash balances

Receive-fixed swaps have been designated against the first $550 million of our cash balances as a hedge of the variability of forecasted interest receipts on the balances caused by changes in Libor.

Cash flow hedges - Bulyanhulu financing

Pay-fixed swaps totaling $136 million have been designated against the Bulyanhulu financing as a hedge of the variability in forecasted interest payments caused by changes in Libor.

Fair value hedges

Receive-fixed swaps totaling $500 million have been designated against the 7 1/2% debentures as a hedge of the variability in the fair value of the debentures caused by changes in Libor.

Non-hedge contracts

We use gold lease rate swaps to achieve a more economically optimal term structure for gold lease rates implicit in fixed-price gold sales contracts (see note 4). The valuation of gold lease rate swaps is impacted by market US dollar interest rates. Our non-hedge pay-fixed swap position largely mitigates the impact of changes in US dollar interest rates on the valuation of gold lease rate swaps.

    Currency contracts

    Cash flow hedges

Currency contracts totaling C$762 million, A$2,113 million, EUR 26 million and 54 million Argentinean Pesos have been designated against forecasted local currency denominated expenditures as a hedge of the variability of the US dollar amount of those expenditures caused by changes in currency exchange rates.

    Commodity contracts

    Cash flow hedges

Commodity contracts totaling 2,254 thousand barrels of crude oil and 26 million gallons of propane have been designated against forecasted purchases of the commodities for expected consumption at our mining operations.

Non-hedge contracts

Non-hedge fuel contracts are used to mitigate the risk of oil price changes on consumption at the Lagunas Norte mine. On completion of regression analysis, we concluded that the contracts do not meet the "highly effective" criterion in FAS 133 due to currency and basis differences between contract prices and the prices charged to the mines by oil suppliers. Despite not qualifying as an accounting hedge, the contracts protect the Company to a significant extent from the effects of oil price changes.

Non-hedge derivative gains (losses)(1)
---------------------------------------------------------------------
                                           Three months    Six months
($ millions, except shares in millions    ended June 30 ended June 30
 and per share amounts in dollars)           2005  2004    2005  2004
---------------------------------------------------------------------
Non-hedge derivatives
  Commodity contracts                         $ 2   $ 3     $ 6 $ (9)
  Currency contracts                          (1)  (10)       1  (10)
  Interest rate contracts                       -    12       1     8
  Share purchase warrants                     (1)     -       -     -
---------------------------------------------------------------------
                                                -     5       8  (11)
Hedge ineffectiveness
  Ongoing hedge inefficiency                    3     -       -     -
  Due to changes in timing of hedged items      -     1       1     2
---------------------------------------------------------------------
                                              $ 3   $ 6     $ 9 $ (9)
---------------------------------------------------------------------

(1) Non-hedge derivative gains (losses) are classified as a component
    of other (income) expense.



Cash Flow Hedge Gains (Losses) in OCI
---------------------------------------------------------------------
           Commodity
               price                            Interest rate
              hedges          Currency hedges          hedges
           --------- ------------------------  --------------
                     Opera-  Adminis- Capital           Long-
                       ting   tration expend-     Cash   term
                Fuel  costs     costs  itures balances   debt   Total
---------------------------------------------------------------------
At Dec.31, 2004  $ 2  $ 240      $ 33    $ 48      $ 3 $ (25)   $ 301
Effective
 portion of
 change in fair
 value of
 hedging
 instruments      35   (20)       (1)       2        6      4      26
Transfers to
 earnings:
 On recording
  hedged items
  in earnings    (4)   (50)       (6)     (2)      (2)      1    (63)
 Hedge
  ineffectiveness
  due to changes
  in timing of
  hedged items     -      -         -     (1)        -      -     (1)
---------------------------------------------------------------------
At June 30,
 2005           $ 33  $ 170      $ 26    $ 47      $ 7 $ (20)   $ 263
---------------------------------------------------------------------
Hedge gains/
 losses         Cost    Cost                             Inte-
 classified       of     of  Adminis- Amorti- Interest   rest
 within        sales  sales   tration  zation   income   cost
---------------------------------------------------------------------
Portion of
 hedge gain
 (loss)
 expected to
 affect
 earnings in
 the next
 twelve
 months(1)      $ 10   $ 89      $ 13     $ 2      $ 7  $ (2)   $ 119
---------------------------------------------------------------------

(1) Based on the fair value of hedge contracts at June 30, 2005.

    14. CAPITAL STOCK

    A Common Shares

In the three month period ended June 30, 2005, we declared and paid dividends in US dollars totaling $0.11 per share (three months ended June 30, 2004: $0.11 per share). During the three month period ended March 31, 2004, we repurchased 4.47 million common shares for $95 million, at an average cost of $21.20 per share. This resulted in a reduction of common share capital by $35 million and a $60 million charge (being the difference between the repurchase cost and the average historic book value of shares repurchased) to retained earnings.

B Exchangeable Shares

In connection with a 1998 acquisition, Barrick Gold Inc. ("BGI"), issued 11.1 million BGI exchangeable shares, which are each exchangeable for 0.53 of a Barrick common share at any time at the option of the holder, and have essentially the same voting, dividend (payable in Canadian dollars), and other rights as 0.53 of a Barrick common share. BGI is a subsidiary that holds our interest in the Hemlo and Eskay Creek Mines.

At June 30, 2005, 1.4 million BGI exchangeable shares were outstanding, which are equivalent to 0.7 million Barrick common shares (2004 - 0.8 million common shares). While there are exchangeable shares outstanding, we are required to present summary consolidated financial information relating to BGI.

Summarized financial information for BGI
---------------------------------------------------------------------
                                          Three months     Six months
($ millions, except shares in millions   ended June 30  ended June 30
 and per share amounts in dollars)         2005   2004    2005   2004
---------------------------------------------------------------------

Total revenues and other income            $ 46   $ 60    $ 98  $ 112
Less: costs and expenses                   (19)   (31)    (76)   (84)
---------------------------------------------------------------------
Income before taxes                        $ 27   $ 29    $ 22   $ 28
---------------------------------------------------------------------
Net income                                 $ 25   $ 26    $ 20   $ 23
---------------------------------------------------------------------



                                            At June 30,    At Dec.31,
                                                   2005          2004
---------------------------------------------------------------------
Assets
  Current assets                                   $ 85          $ 67
  Non-current assets                                 99           119
---------------------------------------------------------------------
                                                  $ 184         $ 186
---------------------------------------------------------------------
Liabilities and shareholders' equity
  Other current liabilities                          29            24
  Intercompany notes payable                        356           395
  Other long-term liabilities                        35            36
  Deferred income taxes                              11            20
  Deficit                                         (247)         (289)
---------------------------------------------------------------------
                                                  $ 184         $ 186
---------------------------------------------------------------------

15. STOCK-BASED COMPENSATION

We record compensation cost for stock options based on the excess of the market price of the stock at the grant date of an award over the exercise price. Historically, the exercise price for stock options has equaled the market price of stock at the grant date, resulting in no compensation cost. We provide information in the following table to illustrate the pro forma effect of following an accounting policy of expensing the fair value of stock options.

Stock option expense
---------------------------------------------------------------------
                                          Three months     Six months
($ millions, except shares in millions   ended June 30  ended June 30
 and per share amounts in dollars)        2005    2004   2005    2004
---------------------------------------------------------------------
Pro forma effects
Net income, as reported                   $ 53    $ 34  $ 113    $ 60
Stock-option expense                       (8)     (7)   (15)    (14)
---------------------------------------------------------------------
Pro forma net income                      $ 45    $ 27   $ 98    $ 46
---------------------------------------------------------------------
Net income per share:
As reported(1)                          $ 0.10  $ 0.06 $ 0.21  $ 0.11
Pro forma(1)                            $ 0.08  $ 0.05 $ 0.18  $ 0.09
---------------------------------------------------------------------
(1) Basic and diluted.



16. OTHER COMPREHENSIVE INCOME (LOSS) ("OCI")

---------------------------------------------------------------------
                                         Three months      Six months
                                        ended June 30   ended June 30
                                         2005    2004    2005    2004
---------------------------------------------------------------------
Accumulated OCI at beginning of period
  Cash flow hedge gains, net of tax
   of $91, $91, $95, $99                $ 199   $ 181   $ 206   $ 189
  Investments, net of tax of
   $nil, $nil, $nil, $nil                  15      20      21      25
  Currency translation adjustments, net
   of tax of $nil, $nil, $nil, $nil     (146)   (147)   (146)   (147)
  Additional pension liability, net of
   tax of $nil, $nil, $nil, $nil         (12)     (7)    (12)     (7)
---------------------------------------------------------------------
                                         $ 56    $ 47    $ 69    $ 60
---------------------------------------------------------------------
Other comprehensive income (loss) for
 the period:
  Changes in fair value of cash flow
   hedges                                   5   (102)      26    (84)
  Changes in fair value of investments    (5)     (4)     (2)     (9)
Less: reclassification adjustments for
 gains/losses recorded in earnings:
  Transfers of cash flow hedge gains
   to earnings:
    On recording hedged items in
     earnings                            (32)    (22)    (63)    (55)
    Hedge ineffectiveness due to
     changes in timing of hedged items      -     (1)     (1)     (2)
  Investments:
    Other than temporary impairment
     charges                                -       1       -       1
    Gains realized on sale                  -     (3)     (9)     (3)
---------------------------------------------------------------------
Other comprehensive loss, before tax     (32)   (131)    (49)   (152)
Income tax recovery related to OCI          8      42      12      50
---------------------------------------------------------------------
Other comprehensive loss, net of tax   $ (24)  $ (89)  $ (37) $ (102)
---------------------------------------------------------------------
Accumulated OCI at June 30
  Cash flow hedge gains, net of tax
   of $83, $49, $83, $49                  180      98     180      98
  Investments, net of tax of
   $nil, $nil, $nil, $nil                  10      14      10      14
  Currency translation adjustments, net
   of tax of $nil, $nil, $nil, $nil     (146)   (147)   (146)   (147)
  Additional pension liability, net
   of tax of $nil, $nil, $nil, $nil      (12)     (7)    (12)     (7)
---------------------------------------------------------------------
                                         $ 32  $ (42)    $ 32  $ (42)
---------------------------------------------------------------------

    17. CONTINGENCIES

    Bre-X Minerals

In 1998, we were added as a defendant in a class action lawsuit initiated against Bre-X Minerals Ltd., and certain others in the United States District Court for the Eastern District of Texas, Texarkana Division. The class action alleges, among other things, that statements made by us in connection with our efforts to secure the right to develop and operate the Busang gold deposit in East Kalimantan, Indonesia were materially false and misleading and omitted to state material facts relating to the preliminary due diligence investigation undertaken by us in late 1996.

On March 31, 2003, the Court denied all of the Plaintiffs' motions to certify the case as a class action. Following the March 31, 2003 denial of the Plaintiffs' motions, the Court received a proposed Trial Plan along with full briefings from the parties with respect to the Plan. On March 31, 2005, the Court treated Plaintiffs' submission as a motion to vacate or change its class certification order of March 31, 2003. The Court denied Plaintiffs' motion because the Plaintiffs did not identify any new legal authority or changed circumstance that justified modification of the prior order. On April 14, 2005, Plaintiffs filed a petition with the Fifth Circuit Court of Appeals requesting permission to file an appeal of the Court order. In May 2005, Plaintiffs' petition was dismissed by the Court of Appeals. The amount of potential loss, if any, which we may incur arising out of the Plaintiffs' claim is not determinable.

Blanchard complaint

On January 7, 2003, we were served with a Complaint for Injunctive Relief by Blanchard and Company, Inc. ("Blanchard"), and Herbert Davies ("Davies"). The complaint, which is pending in the U.S. District Court for the Eastern District of Louisiana, also names J.P. Morgan Chase & Company ("J.P. Morgan") as a defendant, along with an unspecified number of additional defendants to be named later. The complaint, which has been amended several times, alleges that we and bullion banks with whom we entered into spot deferred gold sales contracts have manipulated the price of gold, in violation of U.S. anti-trust laws and the Louisiana Unfair Trade Practices and Consumer Protection Law. Blanchard and Davies both allege that they have been injured as a seller of gold due to reduced interest in gold as an investment. The complaint seeks damages and an injunction terminating certain of our trading agreements with J.P. Morgan and other bullion banks. In September 2003, the Court issued an Order granting in part and denying in part Barrick's motions to dismiss this action. In February 2005, the Court granted Blanchard's motion to amend their complaint to add an allegation of a violation of the Commodity Exchange Act and amend its allegation of Barrick's violation of anti-trust laws. Discovery has commenced in the case and a trial date has been tentatively set for January 2006. We have and will continue to vigorously defend the action.

McKenzie complaint

On September 21, 2004, a putative class action complaint was filed in the U.S. District Court for the Eastern District of Louisiana against Barrick and J.P. Morgan. The plaintiffs, Dr. Gregg McKenzie and others are alleged purchasers of gold and gold derivatives. The complaint alleges violations of the U.S. anti-trust laws and also of the Commodity Exchange Act, based upon the same conduct as alleged in the Blanchard complaint. The complaint seeks damages and an injunction terminating certain of our trading agreements with J.P. Morgan. On December 17, 2004, a second and substantially identical complaint was filed in the same court against the same defendants. We have and will continue to vigorously defend both actions.

Wagner complaint

On June 12, 2003, a complaint was filed against Barrick and several of its current or former officers in the U.S. District Court for the Southern District of New York. The complaint is on behalf of Barrick shareholders who purchased Barrick shares between February 14, 2002 and September 26, 2002. It alleges that Barrick and the individual defendants violated U.S. securities laws by making false and misleading statements concerning Barrick's projected operating results and earnings in 2002. The complaint seeks an unspecified amount of damages. Other parties on behalf of the same proposed class of Barrick shareholders filed several other complaints, making the same basic allegations against the same defendants. In September 2003, the cases were consolidated into a single action in the Southern District of New York. The Plaintiffs filed a Consolidated and/or Amended Complaint on November 5, 2003. On January 14, 2004, Barrick filed a motion to dismiss the complaint. On September 29, 2004, the Court issued an order granting in part and denying in part Barrick's motion to dismiss the action. The Plaintiffs filed a Second Amended Complaint on October 20, 2004. The Plaintiffs filed a Third Amended Complaint on January 6, 2005. On May 23, 2005, Barrick filed a motion to dismiss the Third Amended Complaint. On July 5, 2005, the Plaintiffs filed their opposition to Barrick's motion to dismiss. We have and will continue to vigorously defend the action.

Wilcox complaint

On September 8, 2004, two of our U.S. subsidiaries, Homestake Mining Company of California ("Homestake California") and Homestake Mining Company ("Homestake") were served with a First Amended Complaint by persons alleging to be current or former residents of a rural area near the former Grants Uranium Mill. The Complaint, which was filed in the U.S. District Court for the District of New Mexico, identifies 26 plaintiffs. Homestake and Homestake California, along with an unspecified number of unidentified defendants, are named as defendants. The plaintiffs allege that they have suffered a variety of physical, emotional and financial injuries as a result of exposure to radioactive and other hazardous substances. The Complaint seeks an unspecified amount of damages. A motion to dismiss the claim was filed with the Court, but the Court has not yet ruled on the motion. We have and will continue to vigorously defend the action.

Mine Statistics


                                  UNITED STATES
                  ---------------------------------------------------
                                             Goldstrike      Round
                    Open Pit   Underground      Total      Mountain
Three months
 ended June 30,   2005   2004   2005  2004   2005   2004  2005   2004
---------------------------------------------------------------------
Tons mined
 (thousands)    33,554 35,748    383   397 33,937 36,145 4,104  5,296
Tons processed
 (thousands)     2,563  2,751    406   391  2,969  3,142 8,755  9,540
Average grade
 (ounces per
  ton)           0.121  0.145  0.367 0.383  0.155  0.174 0.013  0.015
Recovery rate
 (percent)       82.8%  84.1%  89.7% 89.0%  85.1%  84.6%   n/a    n/a
---------------------------------------------------------------------
Production
 (thousands
  of ounces)       257    334    134   133    391    467    99     99

Production costs
 per ounce
 Cash operating
  costs          $ 282  $ 236  $ 263 $ 243  $ 275  $ 238 $ 180  $ 184
 Royalties and
  production
  taxes             11     16     26    19     16     17    34     30
 Accretion
  expense            2      2      -     -      2      1     4      4
---------------------------------------------------------------------
 Total cash
  costs(1)         295    254    289   262    293    256   218    218
 Amortization       75     60    111   134     87     81    42     56
---------------------------------------------------------------------
Total production
 costs           $ 370  $ 314  $ 400 $ 396  $ 380  $ 337 $ 260  $ 274
---------------------------------------------------------------------
Capital
 expenditures
 (US$ millions)   $ 34   $ 14    $ 6   $ 6   $ 40   $ 20   $ 1    $ 2
---------------------------------------------------------------------


Six months
 ended June 30,  2005   2004   2005  2004   2005   2004   2005   2004
---------------------------------------------------------------------
Tons mined
 (thousands)   65,966 69,834    765   835 66,731 70,669  8,601 10,082
Tons processed
 (thousands)    4,892  5,412    795   843  5,687  6,255 17,851 19,149
Average grade
 (ounces per
  ton)          0.134  0.144  0.389 0.383  0.170  0.177  0.014  0.015
Recovery rate
 (percent)      83.0%  83.4%  90.3% 89.0%  85.3%  84.2%    n/a    n/a
---------------------------------------------------------------------
Production
 (thousands of
  ounces)         544    652    279   287    823    939    193    192

Production costs
 per ounce
 Cash operating
  costs         $ 267  $ 242  $ 263 $ 236  $ 265  $ 240  $ 192  $ 180
 Royalties and
  production
  taxes            12     17     25    21     17     18     34     32
 Accretion
  expense           2      2      -     1      2      2      5      3
---------------------------------------------------------------------
 Total cash
  costs(1)        281    261    288   258    284    260    231    215
 Amortization      70     61    115   127     84     81     43     57
---------------------------------------------------------------------
Total production
 costs          $ 351  $ 322  $ 403 $ 385  $ 368  $ 341  $ 274  $ 272
---------------------------------------------------------------------
Capital
 expenditures
 (US$ millions)  $ 45   $ 17   $ 15  $ 12   $ 60   $ 29    $ 1    $ 2
---------------------------------------------------------------------
(1) Total cash costs per ounce statistics for 2005 and 2004 are not
    comparable due to the change in accounting for deferred stripping
    costs.



                                  AUSTRALIA
                 ----------------------------------------------------
                   Plutonic      Darlot       Lawlers     Kalgoorlie
Three months
 ended June 30,  2005   2004   2005  2004   2005   2004   2005   2004
---------------------------------------------------------------------
Tons mined
 (thousands)      734  2,973    198   226    181  1,617 11,288 11,615
Tons processed
 (thousands)      520    710    226   202    218    212  1,897  1,883
Average grade
 (ounces per
  ton)          0.138  0.130  0.130 0.184  0.141  0.129  0.069  0.066
Recovery rate
 (percent)      88.9%  88.5%  95.8% 96.7%  96.5%  96.6%  85.2%  85.2%
---------------------------------------------------------------------
Production
 (thousands
  of ounces)       64     75     28    36     30     26    112    103

Production costs
 per ounce
 Cash operating
  costs         $ 264  $ 222  $ 322 $ 189  $ 276  $ 245  $ 202  $ 228
 Royalties and
  production
  taxes            12      9      9     8      9      8     10      9
 Accretion
  expense           -      -      -     -      -      -      2      2
---------------------------------------------------------------------
 Total cash
  costs(1)        276    231    331   197    285    253    214    239
 Amortization      35     33     69    55     56     58     52     45
---------------------------------------------------------------------
Total production
 costs          $ 311  $ 264  $ 400 $ 252  $ 341  $ 311  $ 266  $ 284
---------------------------------------------------------------------
Capital
 expenditures
 (US$ millions)   $ 4    $ 6    $ 3   $ 3    $ 1    $ 1    $ 1    $ 3
---------------------------------------------------------------------


Six months
 ended June 30,  2005   2004   2005  2004   2005   2004   2005   2004
---------------------------------------------------------------------
Tons mined
 (thousands)    2,934  5,928    382   438    358  2,211 21,685 23,479
Tons processed
 (thousands)    1,161  1,404    399   420    430    420  3,728  3,433
Average grade
 (ounces per
  ton)          0.130  0.126  0.145 0.172  0.146  0.130  0.073  0.069
Recovery rate
 (percent)      89.1%  89.7%  95.7% 97.0%  96.2%  96.8%  87.1%  86.2%
---------------------------------------------------------------------
Production
 (thousands
  of ounces)      134    158     55    70     61     53    237    205

Production costs
 per ounce
 Cash operating
  costs         $ 248  $ 203  $ 283 $ 195  $ 269  $ 237  $ 201  $ 222
 Royalties and
  production
  taxes            11      8      8     8      8      7     10      8
 Accretion
  expense           -      -      1     -      1      -      2      1
---------------------------------------------------------------------
 Total cash
  costs(1)        259    211    292   203    278    244    213    231
 Amortization      33     32     68    52     53     51     46     42
---------------------------------------------------------------------
Total production
 costs          $ 292  $ 243  $ 360 $ 255  $ 331  $ 295  $ 259  $ 273
---------------------------------------------------------------------
Capital
 expenditures
 (US$ millions)   $ 7    $ 8    $ 5   $ 5    $ 3    $ 2    $ 3    $ 5
---------------------------------------------------------------------
(1) Total cash costs per ounce statistics for 2005 and 2004 are not
    comparable due to the change in accounting for deferred stripping
    costs.



                                            CANADA
                        ---------------------------------------------
                               Hemlo      Eskay Creek  Holt-McDermott
Three months
 ended June 30,            2005   2004    2005   2004     2005   2004
--------------------------------------  -------------  --------------
Tons mined (thousands)    1,237  1,239      55     67        -    135
Tons processed (thousands)  491    515      56     72        -    152
Average grade (ounces
 per ton)                 0.012  0.137   0.990  1.359        -  0.146
Recovery rate (percent)   93.9%  94.5%   90.9%  93.6%        -  93.1%
--------------------------------------  -------------  --------------
Production (thousands
 of ounces)                  59     67      51     91        -     20

Production costs per
 ounce
 Cash operating costs     $ 286  $ 228    $ 32   $ 64      $ -  $ 202
 Royalties and
  production taxes           10      9       7      4        -      -
 Accretion expense            1      1       3      -        -      2
--------------------------------------  -------------  --------------
 Total cash costs (1)       297    238      42     68        -    204
 Amortization                59     50     137    132        -    120
--------------------------------------  -------------  --------------
Total production costs    $ 356  $ 288   $ 179  $ 200      $ -  $ 324
--------------------------------------  -------------  --------------
Capital expenditures
 (US$ millions)             $ 1    $ 2     $ -    $ 3      $ -    $ -
--------------------------------------  -------------  --------------


Six months
 ended June 30,            2005   2004    2005   2004     2005   2004
--------------------------------------  -------------  --------------
Tons mined (thousands)    2,369  2,361     111    132        -    274
Tons processed (thousands)  983    992     113    132        -    287
Average grade (ounces
 per ton)                 0.123  0.137   1.025  1.262        -  0.148
Recovery rate (percent)   93.8%  94.3%   91.1%  93.4%        -  92.9%
--------------------------------------  -------------  --------------
Production (thousands
 of ounces)                 121    128     106    156        -     39

Production costs per
 ounce
 Cash operating costs     $ 269  $ 222    $ 43   $ 26      $ -  $ 223
 Royalties and
  production taxes           11      9       6      5        -      -
 Accretion expense            -      2       3      1        -      1
--------------------------------------  -------------  --------------
 Total cash costs (1)       280    233      52     32        -    224
 Amortization                57     45     126    151        -    134
--------------------------------------  -------------  --------------
Total production costs    $ 337  $ 278   $ 178  $ 183      $ -  $ 358
---------------------------------------------------------------------
Capital expenditures
 (US$ millions)             $ 3    $ 3     $ 1    $ 4      $ -    $ -
--------------------------------------  -------------  --------------
(1) Total cash costs per ounce statistics for 2005 and 2004 are not
    comparable due to the change in accounting for deferred stripping
    costs.



                            PERU                   TANZANIA
                 ----------------------------------------------------
                   Pierina  Lagunas Norte    Bulyanhulu    Tulawaka
Three months
 ended June 30,  2005   2004   2005  2004   2005   2004   2005   2004
-----------------------------------------  --------------------------
Tons mined
 (thousands)   11,788 10,312  2,086     -    273    284  1,673      -
Tons processed
 (thousands)    4,159  3,889  1,456     -    274    294     96      -
Average grade
 (ounces per
  ton)          0.043  0.034  0.083     -  0.342  0.373  0.241      -
Recovery rate
 (percent)          -      -      -     -  89.1%  88.5%      -      -
-----------------------------------------  --------------------------
Production
 (thousands
  of ounces)      155    186     41     -     84     97     22      -

Production costs
 per ounce
 Cash operating
  costs         $ 134  $ 104  $ 104   $ -  $ 350  $ 240  $ 238    $ -
 Royalties and
  production
  taxes             -      -     12     -     20     13     28      -
 Accretion
  expense           7      5      -     -      2     91      1      -
-----------------------------------------  --------------------------
 Total cash
  costs(1)        141    109    116     -    372    344    267      -
 Amortization     115    165     51     -    109    103    150      -
-----------------------------------------  --------------------------
Total production
 costs          $ 256  $ 274  $ 167   $ -  $ 481  $ 447  $ 417    $ -
-----------------------------------------  --------------------------
Capital
 expenditures
 (US$ millions)   $ 2    $ -   $ 47  $ 26    $ 2   $ 10    $ 3   $ 12
-----------------------------------------  --------------------------


Six months
 ended June 30,  2005   2004   2005  2004   2005   2004   2005   2004
-----------------------------------------  --------------------------
Tons mined
 (thousands)   23,162 20,635  2,086     -    501    568  2,589      -
Tons processed
 (thousands)    8,176  7,927  1,456     -    518    566    120      -
Average grade
 (ounces per
  ton)          0.035  0.042  0.083     -  0.341  0.356  0.237      -
Recovery rate
 (percent)          -      -      -     -  88.8%  88.4%  96.1%      -
-----------------------------------------  --------------------------
Production
 (thousands of
  ounces)         301    419     41     -    157    178     27      -

Production costs
 per ounce
 Cash operating
  costs         $ 123   $ 91  $ 104   $ -  $ 347  $ 251  $ 238    $ -
 Royalties and
  production
  taxes             -      -     12     -     14     13     28      -
 Accretion
  expense           8      5      -     -      2     47      1      -
-----------------------------------------  --------------------------
 Total cash
  costs(1)        131     96    116     -    363    311    267      -
 Amortization     115    165     51     -    118    104    151      -
-----------------------------------------  --------------------------
Total production
 costs          $ 246  $ 261  $ 167   $ -  $ 481  $ 415  $ 418    $ -
-----------------------------------------  --------------------------
Capital
 expenditures
 (US$ millions)   $ 5    $ 2  $ 100  $ 32   $ 16   $ 18    $ 8   $ 15
---------------------------------------------------------------------
(1) Total cash costs per ounce statistics for 2005 and 2004 are not
    comparable due to the change in accounting for deferred stripping
    costs.



CORPORATE OFFICE                     TRANSFER AGENTS AND REGISTRARS
Barrick Gold Corporation             CIBC Mellon Trust Company
BCE Place, Canada Trust Tower,       P.O. Box 7010,
Suite 3700                           Adelaide Street Postal Station
161 Bay Street, P.O. Box 212         Toronto, Ontario M5C 2W9
Toronto, Canada M5J 2S1              Tel: (416) 643-5500
Tel: (416) 861-9911                  Toll-free throughout
Fax: (416) 861-0727                  North America: 1-800-387-0825
Toll-free within Canada and          Fax: (416) 643-5501
United States: 1-800-720-7415        Email: inquiries@cibcmellon.ca
Email: investor@barrick.com          Website: www.cibcmellon.com
Website: www.barrick.com

SHARES LISTED                        Mellon Investor Services L.L.C.
ABX-The Toronto Stock Exchange       85 Challenger Road,
    The New York Stock Exchange      Overpeck Center
    The Swiss Stock Exchange         Ridgefield Park, New Jersey
    La Bourse de Paris               07660
BGD-The London Stock Exchange        Tel: (201) 329-8660
                                     Toll-free within the
                                     United States:
                                     1-800-589-9836
                                     Website: www.mellon-investor.com

INVESTOR CONTACT:                    MEDIA CONTACT:
James Mavor                          Vincent Borg
Vice President,                      Vice President,
Investor Relations                   Corporate Communications
Tel: (416) 307-7341                  Tel: (416) 307-7477
Email: jmavor@barrick.com            Email: vborg@barrick.com

FORWARD-LOOKING INFORMATION

Certain information contained or incorporated by reference in this Second Quarter Report 2005, including any information as to our future financial or operating performance, constitutes "forward-looking statements". All statements, other than statements of historical fact, are forward-looking statements. The words "believe", "expect", "anticipate", "contemplate", "target", "plan", "intends", "continue", "budget", "estimate", "may", "will", "schedule" and similar expressions identify forward-looking statements. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by us, are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements. Such factors include, but are not limited to: fluctuations in the currency markets (such as the Canadian and Australian dollars versus the U.S. dollar); fluctuations in the spot and forward price of gold or certain other commodities (such as silver, copper, diesel fuel and electricity); changes in U.S. dollar interest rates or gold lease rates that could impact the mark to market value of outstanding derivative instruments and ongoing payments/receipts under interest rate swaps and variable rate debt obligations; risks arising from holding derivative instruments (such as credit risk, market liquidity risk and mark to market risk); changes in national and local government legislation, taxation, controls, regulations and political or economic developments in Canada, the United States, Australia, Chile, Peru, Argentina, Tanzania, Russia or Barbados or other countries in which we do or may carry on business in the future; business opportunities that may be presented to, or pursued by, us; our ability to successfully integrate acquisitions; operating or technical difficulties in connection with mining or development activities; the speculative nature of gold exploration and development, including the risks of obtaining necessary licenses and permits; diminishing quantities or grades of reserves; adverse changes in our credit rating; and contests over title to properties, particularly title to undeveloped properties. In addition, there are risks and hazards associated with the business of gold exploration, development and mining, including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion losses (and the risk of inadequate insurance, or inability to obtain insurance, to cover these risks). Many of these uncertainties and contingencies can affect our actual results and could cause actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, us. Readers are cautioned that forward-looking statements are not guarantees of future performance. All of the forward-looking statements made in this Second Quarter Report 2005 are qualified by these cautionary statements. Specific reference is made to Barrick's most recent Form 40-F/Annual Information Form on file with the US Securities and Exchange Commission and Canadian provincial securities regulatory authorities for a discussion of some of the factors underlying forward-looking statements.

We disclaim any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise.

Barrick Gold Corporation (PARIS:ABX) (NYSE:ABX) (TSX:ABX) (Swiss:ABX) (LSE:BGD)

    CONTACT: Barrick Gold Corporation
             Vincent Borg
             Vice President, Corporate Communications
             (416) 307-7477
             Fax: (416) 861-1509
             media@barrick.com

    SOURCE: Barrick Gold Corporation

Email Alerts

Email Address *
Mailing Lists *


 
Enter the code shown above.

By providing your e-mail address, you are consenting to receive press releases, quarterly and annual reports, presentations and other information concerning Barrick Gold Corporation and its affiliates and partners. You may withdraw your consent at any time using the unsubscribe link below.

Unsubscribe

Email Address:  *
Gold  $ 1,244.17 +1.24 +0.1% Volume: December 12, 2017
ABX NYSE  $ 13.65 +0.00 +0% Volume: 12,464,454 December 11, 2017
ABX TSX  $ 17.54 -0.03 -0.17% Volume: 2,115,216 December 11, 2017
Gold  $ 1,244.17 +1.24 +0.1% Volume: December 12, 2017

Our vision is the generation of wealth through responsible mining — wealth for our owners, our people, and the countries and communities with which we partner.

World Gold Council MemberMember of ICMM

En Español