-- First quarter net income was $26 million, or $0.05 per share,
after a $10-million after-tax non-hedge derivative loss. Cash
flow from operations was $126 million, or $0.24 per share.
-- First quarter production was 1.28 million ounces of gold at a
total cash cost of $199(1) per ounce. The Company is on track
with its previous guidance to produce between 4.9 - 5.0
million ounces of gold for the year at an average total cash
cost of $205-$215 per ounce.
-- Alto Chicama's Environmental Impact Statement "EIS" and the
principal construction permit have been approved; construction
will commence in second quarter 2004. First quarter
development capital expenditures were $97 million as the
Company advanced construction at the Veladero, Cowal and
Tulawaka projects.
-- The Company reduced its gold hedge position by 800,000 ounces
in the quarter to 14.7 million ounces, representing 17% of
year-end reserves(2).
-- During the first quarter, the Company purchased 4.47 million
shares for $95 million under its share buyback program,
bringing the total purchased under the program to 13.2 million
shares for $249 million.
-- The Company held an Investor Day in New York during which it
outlined its targeted production profile rising 40% from 4.9 -
5.0 million ounces in 2004 to 6.8 - 7.0 million ounces in 2007
at an average total cash cost below $200 per ounce.
-- During the first quarter, Barrick agreed to a strategic
partnership with Highland Gold Mining and invested an
additional $41 million in shares of Highland, bringing its
total investment to $84 million representing approximately 17%
of the outstanding shares.
Barrick Gold Corporation today reported earnings of $26 million
($0.05 per share) and operating cash flow of $126 million for first
quarter 2004, compared to earnings of $29 million ($0.05 per share)
and operating cash flow of $131 million in the year earlier period.
Although the mines had a strong operating quarter, the Company's
earnings in first quarter 2004 included a $10-million after-tax
non-hedge derivative loss, whereas earnings in the prior year quarter
included a $38-million after-tax non-hedge derivative gain and a
$17-million after-tax charge for the cumulative effect of accounting
changes. Earnings for the first quarter 2004 compared to the same
period in 2003 reflect a $27-per-ounce higher realized gold price.
"I'm very pleased with both the operational performance of our
mines and the execution and focus of our worldwide development teams
this quarter," said Greg Wilkins, President and Chief Executive
Officer. "We bettered our overall operating targets and made
significant, tangible progress on our four development projects."
PRODUCTION AND COSTS
In first quarter 2004, Barrick produced 1.28 million ounces of
gold at an average total cash cost of $199 per ounce, compared to
1.26 million ounces at $194 per ounce for the prior year quarter.
Overall, the Company achieved solid operating results for the
quarter, with production in first quarter 2004 slightly exceeding the
prior year period.
The North American region performed well, with production
slightly higher in first quarter 2004 than the prior year period.
Eskay Creek's cash costs were significantly lower due to strong
silver by-product credits.
In the South American region, production from Pierina benefited
from increased leach pad recoveries and this increased production
combined with lower maintenance costs led to lower total cash costs.
The Australian/African region's production for the first quarter
exceeded the prior year quarter. As expected, cash costs were higher
in the quarter compared to the prior year period. Although Bulyanhulu
substantially met its targets for mining rates and production, total
cash costs were higher than full-year guidance. However, Bulyanhulu's
grades and recoveries steadily improved over the course of the
quarter as did total cash costs.
The Company re-affirmed its expectations that 2004 production
should be between 4.9 - 5.0 million ounces at an average total cash
cost of $205 - $215 per ounce.
DEVELOPMENT PROJECTS UPDATE
During the first quarter, the Company unveiled its targeted
production growth profile through 2007. It announced that its four
new mines - Alto Chicama, Veladero, Cowal and Tulawaka - are all
planned to enter production in the next two years, driving a Company
target of 6.8 - 7.0 million ounces of gold production in 2007, a
projected 40% increase over 2004. During the first quarter, Barrick
advanced all of the projects in its mine development pipeline.
Approval of the Environmental Impact Statement "EIS" for Alto
Chicama in Peru was received in April. The project's principal
construction permit was also awarded and construction is expected to
commence in the second quarter. The project is on target to pour its
first gold in the second half of 2005. "After extensive planning
efforts and consultation, the EIS for Alto Chicama has been approved,
demonstrating our focus on execution of the advancement of our
development projects," said Peter Kinver, Executive Vice President
and Chief Operating Officer.
At Veladero in Argentina, significant development progress was
made during the quarter. Pre-strip activities have begun and a steady
build-up to peak tonnage is expected to occur through to mid-year.
Road construction is well advanced. Construction of the leach pad,
pumphouse, truck shop, laboratory and permanent camp is progressing
well. The number of workers on-site continues to progress towards
peak employment of 2,550. Veladero is expected to commence production
in late 2005.
At the Pascua-Lama project in Chile/Argentina, the Company is
updating its 2001 feasibility study and will provide new project
parameters mid-year 2004 when the work is expected to be completed.
Work done to date indicates that previously estimated start-up
capital of $1.2 billion and life of mine total cash costs of $130 per
ounce are anticipated to be higher. The principal factors include:
utilizing a dry-grinding process versus a wet-grinding process, a
higher strip ratio, and various cost increases such as construction
materials, labour, fuel and reagents. Construction at Pascua-Lama is
expected to begin once permitting is complete, with production
targeted for the 2008-2009 timeframe. The Veladero/Pascua-Lama
District currently contains 28 million ounces in proven and probable
gold reserves. Veladero is currently in construction and Pascua-Lama
is expected to be a significant contributor to Barrick's production
for decades once production commences.
At the Company's Cowal property in Australia, permits are in
place for mine construction activities. The Engineering, Procurement
and Construction Management "EPCM" contract was awarded during the
quarter and construction of mine infrastructure and mine development
has begun. Production is expected to commence in first quarter 2006.
Construction on the 70%-owned Tulawaka joint venture in Tanzania
is proceeding according to schedule. Earthworks have been mobilized,
and construction of the pump station and water storage dam has begun.
Production is expected to begin in early 2005.
ORGANIZATIONAL UPDATE
On January 1, 2004, Barrick adopted a new Organization Design to
execute and optimize current producing assets and its growth profile.
"Our new design fits our increasing global presence - and our vision
of building Barrick into the gold industry leader - allowing us to be
more efficient, more effective, with more engaged employees and a
management structure to better execute our strategy," said Mr.
Wilkins.
Regional Business Units have been established with Vice
Presidents in place, each with regional P & L and strategic
responsibilities.
GOLD HEDGE POSITION
During the quarter, Barrick reduced its hedge position by 800,000
ounces towards a target reduction of a minimum of 1.5 million ounces
in 2004. For first quarter 2004, the Company realized an average
price of $382 per ounce compared to the $408 average spot price.
While the Company's hedge contracts allow flexibility to deliver all
of its production into the spot gold market, Barrick chose to deliver
a portion of production against hedge contracts at prices below spot
price as part of its commitment to reducing the gold hedge book to
zero. The Company continues to generate strong cash flow and margins
on its gold sales - a benefit of being the lowest cash cost producer
among the senior gold companies. At quarter end, the hedge position
was 14.7 million ounces, down 3.4 million ounces, or 19%, from the
beginning of 2003. At March 31, 2004, the Company had 83% of its
reported proven and probable year-end gold reserves unhedged.
SHARE BUYBACK
Barrick purchased 4.47 million of its common shares at an average
purchase price of $21.19 per share, for a total cost of $95 million
in first quarter 2004. A total of 13.2 million shares have been
purchased under the program at a total cost of $249 million, or an
average price of $18.79 per share.
EXPLORATION UPDATE
Drilling was carried out on 16 projects located in seven
countries during first quarter 2004.
In North America, a drill program on the Rossi property in Nevada
commenced during the quarter, with the objective of better defining
the Storm resource. At Goldstrike, drilling continues on targets
north and south of the Betze-Post pit, with the objective of
converting identified resources to reserves, as well as adding
resources. Results to date have improved the continuity of the
mineralization. The East Archimedes project, located at the Ruby Hill
mine site in Nevada, is progressing well. Based on the results of the
pre-feasibility study undertaken on the deeper, eastern half of the
deposit (mining of the western half of the Archimedes deposit was
completed in 2002), a decision was taken to proceed with a
feasibility study and permitting in 2004. Current resources stand at
approximately 900,000 ounces. At Gold Hill, a 50/50 joint venture at
Round Mountain, assay results available from a number of in-fill
holes drilled in first quarter 2004 confirm the current geological
model. The final development drill program is expected to be
completed in second quarter 2004 with a resource update in the third
quarter.
In South America, drilling on near surface targets in the Alto
Chicama district of Peru has recently commenced. In addition, the
Company is conducting field surveys in other areas in the region to
identify targets for drill testing later in the year.
In Tanzania, a 20,000-metre drill program is underway at the
Chocolate Reef property, located approximately 80 kilometres south of
the Bulyanhulu mine. It will be completed during the second quarter.
A zone of gold mineralization had been previously outlined down to a
depth of 150 metres. The objective of the current program is to test
for extensions of gold mineralization at depth and along strike.
Results to date are positive and, following completion of the drill
program, recommendations for follow up will be made during the second
quarter.
Barrick Gold Corporation is building new low-cost, long-life
mines in highly prospective gold mining districts around the globe.
It has the lowest total cash costs among major gold producers, a
proven exploration track record and the only industry's A-rated
balance sheet with no net debt. Barrick's shares are traded under the
ticker symbol ABX on the Toronto, New York, London and Swiss stock
exchanges and the Paris Bourse.
(1) For an explanation of non-GAAP performance measures refer to
pages 26-28 of the Management's Discussion and Analysis found
in the First Quarter Report 2004.
(2) Calculated in accordance with National Instrument 43-101 as
required by Canadian securities regulatory authorities. For
United States reporting purposes, Industry Guide 7 (under the
Securities Exchange Act of 1934), as interpreted by the Staff
of the SEC, applies different standards in order to classify
mineralization as a reserve. Accordingly, for U.S. reporting
purposes, Alto Chicama was classified, at the end of the first
quarter, as mineralized material. For additional information
on reserves see the tables and related footnotes on pages
109-113 of our 2003 Annual Report.
FIRST QUARTER REPORT 2004
CONTENTS PAGE
---------------------------------------------------------------------
Key Statistics 6
Production and Cost Summary 7
Operating and Financial Summary 8
Financial Results 8
Regional Operating Segments 9
Consolidated Statements of Income 14
Consolidated Statements of Cash Flows 15
Consolidated Balance Sheets 16
Consolidated Statements of Shareholders' Equity and
Comprehensive Income 17
Management's Discussion and Analysis 18
Income Statement 18
Gold Production and Sales 18
Cost of Sales and Other Operating Expenses 19
Amortization 19
Administration 19
Exploration, Development and Business Development 20
Interest Expense 20
Other Income/Expense 20
Non-Hedge Derivative Gains and Losses 21
Income Taxes 21
Statement of Comprehensive Income 21
Cash Flow Statement 21
Liquidity and Capital Resources 21
Operating Activities 21
Investing Activities 22
Financing Activities 22
Critical Accounting Policies and Estimates 23
Off-Balance Sheet Arrangements 23
Forward Gold Sales Contracts 23
Contractual Obligations and Commitments 26
Quarterly Information 26
Non-GAAP Performance Measures 26
Outstanding Share Data 28
Notes to the Financial Statements 29
Mine Statistics 46
Key Statistics
(in United States dollars) Three months ended March 31
---------------------------------------------------------------------
(Unaudited) 2004 2003
---------------------------------------------------------------------
Operating Results
Gold production (thousands of ounces) 1,278 1,263
Gold sold (thousands of ounces) 1,247 1,292
Per ounce data
Average spot gold price $408 $352
Average realized gold price 382 355
Cash operating costs(3) 187 182
Total cash costs(1) (3) 199 194
Total production costs(3) 290 285
---------------------------------------------------------------------
Financial Results (millions)
Gold sales $477 $459
Net income 26 29
Operating cash flow 126 131
Per share data (dollars)
Net income (basic and diluted) 0.05 0.05
Operating cash flow 0.24 0.24
Common shares outstanding (as at March
31) (millions)(2) 532 542
---------------------------------------------------------------------
As at As at
March 31, Dec. 31,
---------------------------------------------------------------------
2004 2003
---------------------------------------------------------------------
Financial Position (millions)
Cash and equivalents $850 $970
Non-cash working capital 10 45
Long-term debt 721 719
Shareholders' equity 3,437 3,494
---------------------------------------------------------------------
(1) Comprises cash operating costs, royalties and production taxes.
(2) Includes shares issuable upon exchange of BGI (Barrick Gold
Inc.), formerly Homestake Canada Inc., exchangeable shares.
(3) For an explanation of non-GAAP performance measures
refer to pages 26-28 of Management's Discussion and Analysis.
Production and Cost Summary
Total
Production Cash Costs
(attributable ounces) (US$/oz)
---------------------------------------------------------------------
For the three months ended March 31 2004 2003 2004 2003
(Unaudited)
---------------------------------------------------------------------
North America
Open Pit 317,527 285,296 $267 $266
Underground 154,047 148,205 253 218
---------------------------------------------------------------------
Goldstrike Property Total 471,574 433,501 262 249
Eskay Creek 65,673 84,230 (19) 69
Round Mountain 93,496 95,815 207 168
Hemlo 61,142 68,353 227 227
Holt-McDermott 18,809 20,964 238 281
Marigold 8,602 11,076 248 169
---------------------------------------------------------------------
719,296 713,939 223 219
---------------------------------------------------------------------
South America
Pierina 231,898 231,075 82 85
---------------------------------------------------------------------
Australia/Africa
Plutonic 82,848 70,254 194 192
Darlot 34,250 43,157 208 141
Lawlers 26,618 20,802 236 311
Kalgoorlie 102,212 93,849 223 216
---------------------------------------------------------------------
245,928 228,062 213 203
Bulyanhulu 81,018 90,162 276 192
---------------------------------------------------------------------
326,946 318,224 226 200
---------------------------------------------------------------------
Total 1,278,140 1,263,238 $199 $194
---------------------------------------------------------------------
Total Production Costs (US$/oz)
---------------------------------------------------------------------
For the three months ended March 31
(Unaudited) 2004 2003
---------------------------------------------------------------------
Direct mining costs at market
foreign exchange rates $238 $208
Gains realized on currency
hedge contracts (24) (5)
By-product credits (27) (21)
---------------------------------------------------------------------
Cash operating costs 187 182
Royalties 9 9
Production taxes 3 3
---------------------------------------------------------------------
Total cash costs 199 194
Amortization 91 91
---------------------------------------------------------------------
Total production costs $290 $285
---------------------------------------------------------------------
(1) For an explanation of the use of non-GAAP performance measures
refer to pages 26-28 of Management's Discussion and Analysis.
OPERATING AND FINANCIAL SUMMARY
For the three months ended March 31
(in millions of US dollars, except per share and per ounce data)
---------------------------------------------------------------------
2004 2003
---------------------------------------------------------------------
Gold sales $ 477 $ 459
Average spot gold price per ounce 408 352
Average realized gold price per ounce 382 355
Net income 26 29
Net income per share - basic and diluted 0.05 0.05
Operating cash flow 126 131
---------------------------------------------------------------------
Financial Results
Realized gold prices, non-hedge derivative gains/losses and
income tax expense all had a significant effect on earnings for first
quarter 2004 as compared to the prior year quarter. In addition, to a
lesser extent, gains on asset and investment sales of $4 million
(prior year quarter - $1 million loss) and foreign currency
translation gains of $2 million (prior year quarter - $1 million
loss) also impacted earnings compared to the prior year quarter.
In first quarter 2004, Barrick's average realized gold price
increased by $27 per ounce over first quarter 2003. Increased
revenues from higher spot prices were partly offset by a 3% decrease
in ounces sold. Production for first quarter 2004 was slightly higher
than the prior year period.
Total cash costs per ounce for first quarter 2004 were $5 per
ounce higher than the prior year period. As expected, total cash
costs increased over first quarter 2003 due to higher total cash
costs at Goldstrike Underground and the Company's Australian mines,
the impact of which was partly offset by lower costs at Pierina and
Eskay Creek. Total cash costs were 5% lower than the plan mid-point
for full year 2004, primarily due to lower costs at Pierina and Eskay
Creek and a greater proportion of production for the first quarter
2004 from the Company's lower cost mines. Despite a stronger
performance in first quarter 2004, the Company is maintaining its
guidance of production at 4.9 million to 5.0 million ounces and total
cash costs at $205 to $215 per ounce for the full year.
During the quarter, the Company chose to deliver a portion of its
of gold production into long-term gold hedge contracts at below spot
market prices as part of its plan to reduce its gold hedge position.
This position was reduced by 0.8 million ounces during the quarter to
14.7 million ounces. By delivering a portion of production against
hedge contracts and the remainder at market gold prices, the Company
realized an average gold price of $382 per ounce for the quarter as
compared to the average spot gold price of $408.
In first quarter 2004, the Company recorded a non-hedge
derivative loss of $15 million ($10 million after tax) due mainly to
the impact of higher market silver prices on silver derivative
instruments not eligible for hedge accounting treatment. In first
quarter 2003, the Company recorded a non-hedge derivative gain of $36
million ($38 million after tax) mainly due to gains on gold lease
rate swaps caused by declining gold lease rates and US dollar
interest rates.
The Company's income tax expense increased by $12 million in
first quarter 2004 compared to prior year quarter. The increase was
primarily due to higher spot gold prices, but also because first
quarter 2003 included a $4 million tax credit following the release
of deferred tax valuation allowances in Australia.
Earnings in both years included various items that impacted the
comparability of results. These items are summarized below to assist
a reader in understanding the effect of the items on earnings with
more information on the items included within Management's Discussion
and Analysis.
Effect on earnings increase (decrease) ($ millions)
---------------------------------------------------------------------
For the three months ended March 31 2004 2003
---------------------------------------------------------------------
Pre-tax Post-tax Pre-tax Post-tax
---------------------------------------------------------------------
Non-hedge derivative
gains (losses) $ (15) $ (10) $ 36 $38
Gains on asset sales 2 2 6 4
Gains (losses) on
investments 2 2 (7) (7)
Severance costs - - (5) (4)
Cumulative effect of
accounting changes - - (17) (17)
Tax credits - - 4 4
Foreign currency
translation gains
(losses) 2 2 (1) (1)
---------------------------------------------------------------------
Regional Operating Segments
North America
Total Cash
Costs - per
Gold Institute
Production Cost Total Cash
Production Standard(1) Costs - per
(attributable ounces) ($/oz) US GAAP ($/oz)
---------------------------------------------------------------------
For the three For the three For the three
months ended months ended months ended
March 31 March 31 March 31
---------------------------------------------------------------------
2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
Goldstrike
Open Pit 317,527 285,296 $267 $ 266 $269 $ 267
Underground 154,047 148,205 253 218 254 219
---------------------------------------------------------------------
Goldstrike
property total 471,574 433,501 262 249 264 250
Eskay Creek 65,673 84,230 (19) 69 (18) 69
Round Mountain
(50% owned) 93,496 95,815 207 168 212 173
Hemlo (50% owned) 61,142 68,353 227 227 227 228
Holt-McDermott 18,809 20,964 238 281 238 281
Marigold (33% owned) 8,602 11,076 248 169 248 169
---------------------------------------------------------------------
719,296 713,939 $223 $ 219 $225 $ 220
---------------------------------------------------------------------
1. For an explanation of the use of non-GAAP performance measures,
refer to pages 26-28.
The region produced 1% more gold in first quarter 2004 compared
with the prior year quarter. Total cash costs per ounce were 2%
higher in 2004, with higher costs at Goldstrike Underground and Round
Mountain being partially offset by lower costs at Eskay Creek. In
first quarter 2004, production was in line with plan, but total cash
costs per ounce were 2% lower than the plan mid-point for the full
year, primarily attributable to lower costs at Eskay Creek where
by-product credits benefited from higher silver prices. The region is
expected to meet its plan for full year 2004.
Total cash costs were not significantly affected by changes in
market currency exchange rates as the Company protected substantially
all of its total cash costs that are denominated in Canadian dollars.
The average Canadian exchange rate under the hedge contracts was
$0.67 in first quarter 2004 compared with $0.65 in first quarter
2003. The effect of the difference in the hedge exchange rate on
total cash costs in first quarter 2004 over the prior year quarter
was an increase of about $3 per ounce at the Company's Canadian
mines, and $1 per ounce in the North American region.
Goldstrike - Open Pit, United States
Higher production in first quarter 2004 compared to the prior
year period was mainly due to increased throughput of Goldstrike ore
as a consequence of lower third-party toll milling volumes, higher
ore grades and a 3% improvement in gold recoveries as a result of
favorable ore characteristics. Total cash costs were in line with the
prior year period. Lower-than-expected toll milling volumes in first
quarter 2004 caused total cash costs to be higher than expected, but
toll milling is expected to reach planned levels in second quarter
2004, and the mine is expected to meet its production plan and total
cast cost plan for the full year.
In April 2004, a five-year agreement was entered into with
Newmont for toll milling roaster feed. Barrick expects to process
approximately 240,000 tons in 2004. Annual tonnage for the remaining
years could range from 250,000 to 1 million tons, depending on
tonnage available from Newmont and processing requirements for
Barrick.
Goldstrike - Underground, United States
During first quarter 2004, the mine produced 4% more ounces than
the prior year quarter with an 11% increase in tons mined (primarily
due to incremental ore from Rodeo), partly offset by lower grades.
Total cash costs were 16% higher than the prior year quarter largely
due to lower grades and higher rehabilitation expenses. In first
quarter 2004, actual production compared to plan benefited from an
increase in tons mined due primarily to higher-than-expected
incremental ore from Rodeo.
Eskay Creek, Canada
As expected, production in first quarter 2004 decreased by 22%
compared to the prior year quarter due to the planned processing of
20% lower grade ore. Production was adversely impacted by a rail
strike and operational issues at a third-party smelter, but the mine
is expected to achieve its production plan for the full year. Total
cash costs per ounce were $88 lower than the prior year period and
significantly better than plan due to higher by-product credits
caused by higher silver prices in first quarter 2004. If silver
prices remain at present levels, the mine will likely continue to
record lower total cash costs.
Round Mountain, United States
As expected, the mine experienced a decrease in ounces produced
in first quarter 2004 compared to the prior year quarter due to a 16%
decline in ore grades processed and 11% lower gold recovery rates,
partly offset by a 29% increase in tons processed. In first quarter
2004, total cash costs per ounce increased by 23% compared to the
prior year quarter due to the expected lower ore grades and recovery
rates. Also, total cash costs in first quarter 2003 benefited from
more low-cost leach pad ounces compared to first quarter 2004 when
higher cost stockpiled ore was processed.
Hemlo, Canada
As expected, the mine produced 10% less gold in first quarter
2004 compared to the prior year period due to a 14% decline in ore
grades processed. Lower ore grades were caused by a decrease in the
higher-grade underground tons mined, as well as mining occurring in
lower grade areas. Despite the decline in ore grades, total cash
costs were in line with the prior year quarter due to rationalization
of the workforce as well as improved productivity related to the
implementation of a paste backfill plant.
South America
Total Cash
Costs - per
Gold Institute
Production Cost Total Cash
Production Standard(1) Costs - per
(attributable ounces) ($/oz) US GAAP ($/oz)
---------------------------------------------------------------------
For the three For the three For the three
months ended months ended months ended
March 31 March 31 March 31
---------------------------------------------------------------------
2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
Pierina 231,898 231,075 $ 82 $85 $86 $89
---------------------------------------------------------------------
1. For an explanation of the use of non-GAAP performance measures
refer to pages 26-28.
Pierina, Peru
First quarter 2004 production was in line with the prior year
quarter. Total cash costs per ounce were 4% lower than the prior year
quarter due mainly to lower maintenance costs. The mine had a strong
first quarter in 2004 due to higher production from better leach pad
recoveries and is expected to achieve its plan for the full year.
Development Projects
Alto Chicama, Peru
The project remains on schedule for a first gold pour in the
second half of 2005. Highlights during first quarter 2004 were:
-- The project's Environmental Impact Statement was approved and
the principal construction permit was obtained.
-- $12 million was spent in first quarter 2004, of which $6
million represented mine development costs which have been
expensed for US GAAP reporting purposes. Most development
expenditures for the remainder of the year will be
capitalized, beginning in second quarter 2004, after
mineralization at Alto Chicama is classified as a reserve for
SEC purposes. Major expenditures in the quarter were on road
construction engineering and overhead costs.
-- Access road construction began in April 2004, with expected
completion scheduled for June 2004.
-- Permitting for a power line is underway. Construction is
expected to commence in second quarter 2004 with completion
expected in December 2004.
-- An exploration team continues work in the Lagunas Norte area,
with several targets identified and drilling planned in 2004.
Veladero, Argentina
The project remains on schedule for its first gold pour in late
2005. Highlights during first quarter 2004 include:
-- Capital expenditures were $64 million.
-- The access road between the camp and the project site is
substantially complete.
-- Truck shop structural steel has been erected and partially
enclosed.
-- The primary crusher foundation excavations are substantially
complete.
-- Leach pad clearing and re-contouring is complete.
-- A temporary 1,500-bed construction camp has been completed,
with a permanent camp well advanced and due for expected
completion in late April.
-- Pre-strip activities have begun and a steady build-up to peak
tonnage is expected to occur through to mid-year.
-- The truck fleet has been delivered and several units built.
The first hydraulic shovel is due to arrive and be built in
May.
Pascua-Lama, Chile/Argentina
At the Pascua-Lama project in Chile/Argentina, the Company is
updating its 2001 feasibility study and will provide new project
parameters mid-year 2004 when the work is expected to be completed.
Work done to date indicates that previously estimated start-up
capital of $1.2 billion and life of mine total cash costs of $130 per
ounce are anticipated to be higher. The principal factors include:
utilizing a dry-grinding process versus a wet-grinding process, a
higher strip ratio, and various cost increases such as construction
materials, labour, fuel and reagents. Construction at Pascua-Lama is
expected to begin once permitting is complete, with production
targeted for the 2008-2009 timeframe. The Veladero/Pascua-Lama
District currently contains 28 million ounces in proven and probable
gold reserves. Veladero is currently in construction and Pascua-Lama
is expected to be a significant contributor to Barrick's production
for decades once production commences.
Australia/Africa
Total Cash
Costs - per
Gold Institute
Production Cost Total Cash
Production Standard(1) Costs - per
(attributable ounces) ($/oz) US GAAP ($/oz)
---------------------------------------------------------------------
For the three For the three For the three
months ended months ended months ended
March 31 March 31 March 31
---------------------------------------------------------------------
2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
Plutonic 82,848 70,254 $ 194 $ 192 $194 $ 192
Darlot 34,250 43,157 208 141 208 141
Lawlers 26,618 20,802 236 311 236 311
Kalgoorlie (50%
owned) 102,212 93,849 223 216 225 219
---------------------------------------------------------------------
245,928 228,062 213 203 214 204
Bulyanhulu 81,018 90,162 276 192 277 193
---------------------------------------------------------------------
326,946 318,224 $ 226 $ 200 $227 $ 201
---------------------------------------------------------------------
1. For an explanation of the use of non-GAAP performance measures
refer to pages 26-28.
In first quarter 2004, the region produced 3% more gold than the
prior year quarter, with 13% higher total cash costs per ounce. As
expected, higher total cash costs per ounce were mainly due to a
slight increase in Australian dollar currency hedge exchange rates
and higher total cash costs at Bulyanhulu. Production and total cash
costs in first quarter 2004 were slightly better than the plan for
the year, and the region's mines are expected to achieve their plan
for full year 2004.
Total cash costs were not significantly affected by changes in
market currency exchange rates during first quarter 2004 as the
Company had previously protected substantially all of its Australian
dollar denominated total cash costs using currency hedge contracts.
However, total cash costs are impacted by the average exchange rates
under the currency hedge contracts. The average Australian exchange
rate under the hedge contracts in first quarter 2004 was $0.58,
compared to $0.55 in first quarter 2003.
Plutonic, Australia
In first quarter 2004, production was 18% higher due to a 30%
increase in ore grades over the prior year period. In first quarter
2003, the mine processed more low-grade ore from stockpiles. The mine
had a good production performance in first quarter 2004 due to a 30%
increase in mill throughput as lower-grade open pit areas continued
to be available for processing. Total cash costs per ounce in first
quarter 2004 were in line with the prior year quarter and plan for
the year.
Kalgoorlie, Australia
In first quarter 2004, the mine produced 9% more gold than the
prior year quarter due to an increase in the volumes of higher-grade
underground ore processed. Furthermore, mining in the open pit during
first quarter 2004 occurred in higher-grade areas. Compared to plan,
production in first quarter 2004 was adversely impacted by the
failure of the SAG mill in late January. Total cash costs per ounce
were 3% higher than the prior year period, as the expected change in
currency hedge rates and higher maintenance costs were partly offset
by higher ore grades.
Darlot, Australia
First quarter 2004 production was 21% lower than the prior year
period as mining occurred in lower-grade areas of the mine. Total
cash costs per ounce in first quarter 2004 were 48% higher than the
prior year quarter due to lower production levels and the drawdown of
low-grade stockpiles.
Bulyanhulu, Tanzania
Production in first quarter 2004 was 10% lower than the prior
year quarter due to lower ore grades, mainly caused by the planned
processing of more low-grade development ore. As expected, total cash
costs per ounce in first quarter 2004 were higher than the prior year
period due to planned increases in underground mining costs, lower
productivity and lower processed ore grades.
With the implementation of various operational improvements, the
mine has begun to demonstrate better month-by-month performance from
the beginning of 2004. The mine expects this trend to continue,
allowing it to meet its plan for full year 2004.
Development Projects
Cowal, Australia
The Cowal project remains on schedule for its first gold pour in
first quarter 2006. Highlights in first quarter 2004 were:
-- Capital expenditures on the Cowal project were approximately
$20 million, including a payment of $15 million required under
the property acquisition agreement upon Board approval to
proceed with the project.
-- Permits have been obtained for mine construction activities.
-- The EPCM contract has been awarded.
-- Initial construction work commenced, including diversion of a
public road and condemnation drilling to enable site clearing
to begin.
-- A new road, rail crossing, and four fresh water bores were
completed.
-- Tenders have been requested for a preliminary earthworks
contract including site preparation, drainage, a tailings
storage area, and a fresh water supply pipeline.
Tulawaka, Tanzania
The 70%-owned Tulawaka project is on schedule to begin
construction in early 2005. Highlights in first quarter 2004 were:
-- Capital expenditures to the Company's account were $3 million.
-- Installation of permanent camp facilities is on schedule for
expected completion by June 2004.
-- Construction activities mainly included ramping up the
construction capability at site. The construction camp was
completed.
Consolidated Statements of Income
Barrick Gold Corporation Three months ended March 31
---------------------------------------------------------------------
(in millions of United States dollars,
except per share data) (Unaudited) 2004 2003
---------------------------------------------------------------------
Gold sales (notes 4 and 5) $477 $459
---------------------------------------------------------------------
Costs and expenses
Cost of sales and other operating
expenses 1 (note 6) 263 263
Amortization (note 4) 120 125
Administration 18 22
Exploration and business development 29 29
---------------------------------------------------------------------
430 439
---------------------------------------------------------------------
Other income/expense (note 7) 16 5
Interest expense (8) (13)
Non-hedge derivative gains (losses)
(note 11E) (15) 36
---------------------------------------------------------------------
Income before income taxes and other
items 40 48
Income tax expense (note 8) (14) (2)
---------------------------------------------------------------------
Income before cumulative effect of
changes in accounting principles 26 46
Cumulative effect of changes in
accounting principles (note 3) - (17)
---------------------------------------------------------------------
Net income for the period $26 $29
---------------------------------------------------------------------
Earnings per share data (note 9):
Income before cumulative effect of
changes in accounting principles
Basic and diluted $0.05 $0.09
Net income
Basic and diluted $0.05 $0.05
---------------------------------------------------------------------
1. Exclusive of amortization (note 6).
The accompanying notes are an integral part of these unaudited
interim consolidated financial statements
Consolidated Statements of Cash Flows
Barrick Gold Corporation Three months ended March 31
---------------------------------------------------------------------
(in millions of United States dollars)
(Unaudited) 2004 2003
---------------------------------------------------------------------
OPERATING ACTIVITIES
Net income for the period $26 $29
Amortization (note 4) 120 125
Changes in capitalized mining costs 1 19
Deferred income taxes (note 8) (4) (9)
Gains on sale of long-lived assets (note 7) (2) (6)
Other items (note 12) (15) (27)
---------------------------------------------------------------------
Net cash provided by operating
activities 126 131
---------------------------------------------------------------------
INVESTING ACTIVITIES
Property, plant and equipment
Capital expenditures (note 4) (129) (66)
Sales proceeds 2 5
Investments
Purchases (note 13) (41) -
Sales proceeds 4 -
---------------------------------------------------------------------
Net cash used in investing activities (164) (61)
---------------------------------------------------------------------
FINANCING ACTIVITIES
Capital stock
Proceeds from shares issued on exercise
of stock options 13 1
Repurchased for cash (note 16A) (95) -
---------------------------------------------------------------------
Net cash (used in) provided by financing
activities (82) 1
---------------------------------------------------------------------
Net increase (decrease) in cash and
equivalents (120) 71
Cash and equivalents at beginning of
period 970 1,044
---------------------------------------------------------------------
Cash and equivalents at end of period $850 $1,115
---------------------------------------------------------------------
The accompanying notes are an integral part of these unaudited
interim consolidated financial statements
Consolidated Balance Sheets
Barrick Gold Corporation
(in millions of United States dollars) At Mar. 31 At Dec. 31
(Unaudited) 2004 2003
---------------------------------------------------------------------
ASSETS
Current assets
Cash and equivalents $850 $970
Accounts receivable 72 69
Inventories (note 13) 162 157
Other current assets (note 13) 125 169
---------------------------------------------------------------------
1,209 1,365
Investments (note 13) 166 127
Property, plant and equipment (note 14) 3,149 3,131
Capitalized mining costs (note 15) 234 235
Unrealized fair value of derivative
contracts (note 11C) 269 256
Other assets 268 248
---------------------------------------------------------------------
Total assets $5,295 $5,362
---------------------------------------------------------------------
LIABILITIES AND SHAREHOLDERS' EQUITY
Current liabilities
Accounts payable $261 $245
Other current liabilities 88 105
---------------------------------------------------------------------
349 350
Long-term debt 721 719
Other long-term obligations 571 569
Deferred income tax liabilities 217 230
---------------------------------------------------------------------
Total liabilities 1,858 1,868
---------------------------------------------------------------------
Shareholders' equity
Capital stock (note 16) 4,093 4,115
Deficit (728) (694)
Accumulated other comprehensive income
(note 10) 72 73
---------------------------------------------------------------------
Total shareholders' equity 3,437 3,494
---------------------------------------------------------------------
Contingencies (note 18)
---------------------------------------------------------------------
Total liabilities and shareholders'
equity $5,295 $5,362
---------------------------------------------------------------------
The accompanying notes are an integral part of these unaudited
interim consolidated financial statements
Consolidated Statements of Shareholders' Equity
Barrick Gold Corporation
(in millions of United States dollars)
(Unaudited) 2004 2003
---------------------------------------------------------------------
Common shares (number in millions)
At January 1 535 542
Issued for cash/on exercise of stock options 1 -
Repurchased for cash (note 16A) (4) -
---------------------------------------------------------------------
At March 31 532 542
---------------------------------------------------------------------
Common shares (dollars in millions)
At January 1 $4,115 $4,148
Issued for cash/on exercise of stock options 13 1
Repurchased for cash (note 16A) (35) -
---------------------------------------------------------------------
At March 31 $4,093 $4,149
---------------------------------------------------------------------
Deficit
At January 1 $(694) $(689)
Net income 26 29
Repurchase of common shares(1) (60) -
---------------------------------------------------------------------
At March 31 $(728) $(660)
---------------------------------------------------------------------
Accumulated other comprehensive income
(loss) (note 10) $72 $(85)
---------------------------------------------------------------------
Total shareholders' equity at March 31 $3,437 $3,404
---------------------------------------------------------------------
(1) Represents the excess of cash paid over the average book value
repurchased as part of the share buyback plan (note 16A).
Consolidated Statements of Comprehensive Income
Barrick Gold Corporation Three months ended March 31
---------------------------------------------------------------------
(in millions of United States dollars)
(Unaudited) 2004 2003
---------------------------------------------------------------------
Net income $26 $29
Foreign currency translation adjustments
(note 10) - (5)
Transfers of hedge gains to earnings
(note 10) (19) (9)
Hedge ineffectiveness transferred to
earnings (note 10) (1) -
Change in fair value of cash flow hedges
(note 10) 12 48
Impairment charges on available-for-sale
securities (note 10) - 7
Change in fair value of
available-for-sale securities (note 10) 7 (1)
---------------------------------------------------------------------
Comprehensive income $25 $69
---------------------------------------------------------------------
The accompanying notes are an integral part of these unaudited
interim consolidated financial statements
MANAGEMENT'S DISCUSSION AND ANALYSIS
This portion of the Quarterly Report provides a discussion and
analysis of the financial condition and results of operations
("Management's Discussion and Analysis") to enable a reader to assess
material changes in financial condition and results of operations for
the three months ended March 31, 2004, compared to those of the prior
year quarter. This Management's Discussion and Analysis has been
prepared as of April 22, 2004. The unaudited consolidated interim
financial statements prepared in accordance with US generally
accepted accounting principles (US GAAP) are on pages 14 to 17. This
Management's Discussion and Analysis is intended to supplement and
complement the unaudited interim consolidated financial statements
and notes thereto for the period ended March 31, 2004 (collectively,
the "Financial Statements"), which are included in this Quarterly
Report. You are encouraged to review the Financial Statements in
conjunction with your review of this Management's Discussion and
Analysis. This Management's Discussion and Analysis should be read in
conjunction with both the annual audited consolidated financial
statements for the three years ended December 31, 2003, and the
related annual Management's Discussion and Analysis included in the
2003 Annual Report, and the most recent Form 40F/Annual Information
Form on file with the US Securities and Exchange Commission and
Canadian provincial securities regulatory authorities. Certain notes
to the Financial Statements are specifically referred to in this
Management's Discussion and Analysis and such notes are incorporated
by reference herein. All dollar amounts in this Management's
Discussion and Analysis are in millions of US dollars, unless
otherwise specified.
INCOME STATEMENT
Gold Production and Sales
In first quarter 2004, Barrick produced slightly more ounces than
in first quarter 2003. The Company experienced higher production at
the Goldstrike Open Pit, Plutonic and Kalgoorlie offsetting lower
production at Eskay Creek and Bulyanhulu. Ounces sold were roughly 3%
lower than in the first quarter 2003 due to the timing of production
versus sales. Beginning in 2005 and through 2007, as its development
projects commence operations, the Company is targeting its annual
production profile to rise to between 6.8 and 7.0 million ounces in
2007.
In first quarter 2004, spot gold prices averaged $408 per ounce,
compared to the prior year quarter when spot gold averaged $352 per
ounce. By choosing to deliver a portion of its gold production into
long-term gold hedge contracts at below spot market prices, thereby
reducing the hedged position 0.8 million ounces, Barrick realized an
average price of $382 per ounce for the quarter. This compares to an
average realized price of $355 per ounce in first quarter 2003.
Barrick expects to continue to deliver part of its gold
production into its fixed-price forward sales contracts over the rest
of 2004 to achieve a targeted reduction of its gold hedge position by
1.5 million ounces. The price realized for gold sales throughout 2004
will depend upon market conditions and the selling prices of hedge
contracts into which the Company delivers, and could be below average
spot market prices.
As spot gold prices increase, the value of the Company's gold
mineral reserves and amount of potential operating cash inflows
generally rises. The unrealized mark-to-market loss on its
fixed-price forward gold sales contracts also rises. The unrealized
mark-to-market value changed from an unrealized loss of $1,725
million at the end of 2003 to an unrealized loss of $1,801 million at
the end of first quarter 2004, primarily due to increasing spot gold
prices (quarter end spot gold prices, 2004 - $427 compared to year
end 2003- $415). Mark-to-market value represents the replacement
value of these contracts based on current market levels, and does not
represent an economic obligation for payment. For additional detail
see "Off-Balance Sheet Arrangements - Key Contract Terms and
Conditions - Significance of mark-to-market gains and losses" on page
25.
Cost Of Sales and Other Operating Expenses
---------------------------------------------------------------------
For the three months ended March 31 2004 2003
---------------------------------------------------------------------
Total cash production costs - per US GAAP $ 250 $ 253
Accretion expense and reclamation costs
at the operating mines (2) (2)
---------------------------------------------------------------------
Total cash production costs - per Gold
Institute Production Cost Standard(1) $ 248 $ 251
---------------------------------------------------------------------
Ounces sold (thousands) 1,247 1,292
Total cash costs per ounce sold - per US
GAAP (dollars) $ 200 $ 196
Total cash costs per ounce sold - per
Gold Institute Production Cost
Standard(1) (dollars) $ 199 $ 194
---------------------------------------------------------------------
Total cash costs - per Gold Institute
Production Cost Standard(1) ($/oz)
---------------------------------------------------------------------
For the three months ended March 31 2004 2003
---------------------------------------------------------------------
Cost of sales at market foreign exchange rates $ 238 $ 208
Gains realized on currency hedge contracts (24) (5)
By-product credits (27) (21)
---------------------------------------------------------------------
Cash operating costs 187 182
Royalties 9 9
Production taxes 3 3
---------------------------------------------------------------------
Total cash costs $ 199 $ 194
---------------------------------------------------------------------
1. Barrick reports total cash costs per ounce data calculated in
accordance with The Gold Institute Production Cost Standard (the
"Standard"). Adoption of the Standard is voluntary, but it
understands that most senior gold producers follow the Standard when
reporting cash cost per ounce data. The data does not have a meaning
prescribed by US GAAP and therefore amounts presented may not be
comparable to data presented by gold producers who do not follow the
Standard. Total cash costs per ounce are derived from amounts
included in the Statements of Income and include mine site operating
costs such as mining, processing, administration, royalties and
production taxes, but exclude amortization, reclamation costs,
financing costs, and capital, development and exploration costs. A
GAAP measure of cost per ounce has also been presented as required by
securities regulations that govern non-GAAP performance measures.
Within this disclosure document the discussion and analysis is
focused on the "total cash cost" measure as defined by the Standard,
but the most directly comparable financial measure calculated and
presented in accordance with GAAP is also provided throughout. See
pages 26 to 28 for further information on non-GAAP performance
measures.
As expected, total cash costs during the first quarter of 2004
were higher than the prior year period, primarily due to higher costs
at Goldstrike Underground, Round Mountain and the Australian mines
partially offset by lower costs at Pierina and Eskay Creek. Total
cash costs for first quarter 2004 were lower than the plan for the
year primarily because of lower total cash costs at Pierina and
higher by-product credits at Eskay Creek, which benefited from higher
silver prices. A detailed discussion and analysis of gold production
and cash production costs at each of the Company's significant mining
operations is contained on pages 9 to 13 of this first quarter report.
Amortization
Amortization expense mainly arises on property, plant and
equipment at Barrick's operating mines. The majority of these assets
are amortized on a units of production basis. As a result,
amortization expense is affected by the overall quantity of gold
produced and sold, changes in reserve estimates, and the mix of
production across its mines. The combined effect of a 3% decrease in
ounces sold, a change in production mix and reserve increases at the
end of 2003, led to an overall $5 million decrease in amortization
expense for the quarter. In first quarter 2004, the overall average
amortization was $91 per ounce, the same as first quarter 2003. For
details of the impact of changes in reserve estimates on amortization
expense in 2004, refer to page 23. For an explanation of how the
Company calculates amortization per ounce, refer to page 28.
Administration
First quarter 2004 administration costs of $18 million were $4
million lower than in the prior year quarter, mainly due to severance
costs of $5 million incurred in first quarter 2003.
Exploration, Development and Business Development
---------------------------------------------------------------------
Exploration, Development and Business Development Expense
---------------------------------------------------------------------
For the three months ended March 31, 2004 2003
---------------------------------------------------------------------
Exploration costs
North America $ 5 $ 2
Australia/Africa 5 4
South America 4 3
Other Countries 1 1
Development project costs
Veladero - 6
Alto Chicama 6 7
Other 4 4
Organization design costs 1 -
Business Development 3 2
---------------------------------------------------------------------
$ 29 $ 29
---------------------------------------------------------------------
Barrick's exploration strategy is to consistently fund a
geographic mix of projects at different stages in the exploration
process. The Company's early stage exploration effort focuses on five
major areas where it possesses significant infrastructure: the United
States, Peru, Australia, Chile/Argentina, and Tanzania. In first
quarter 2004, Barrick continued to invest in its exploration program,
with costs slightly higher than first quarter 2003 levels. In
particular, higher activity on the Rossi property and various targets
at Goldstrike led to an increase in exploration costs in North
America. Exploration expense reflects the planned funding of various
exploration projects. Barrick may spend more or less on these
projects depending on the results of ongoing exploration activities,
and may also fund further exploration projects in addition to those
presently planned.
During first quarter 2004, the Company incurred development
expenditures at each of its development projects. Under US GAAP,
development expenditures are not capitalized until after
mineralization is classified as a proven and probable reserve in
accordance with US reporting standards. The most significant expensed
development expenditures in 2003 were incurred at the Alto Chicama
project. The Company expensed development costs at Veladero until
October 1, 2003, when the project achieved the criteria needed to
classify material as a reserve under SEC rules. In 2004, all
development costs at Veladero have been capitalized. At Alto Chicama,
the Company continues to expense development costs until the
mineralization there qualifies as a reserve under SEC rules. Barrick
received approval of the Alto Chicama Environmental Impact Statement
in April 2004, and upon finalization of the project feasibility study
in second quarter 2004, it will classify mineralization at Alto
Chicama as a reserve under SEC rules. From that point forward, mine
development costs will be capitalized.
Interest Expense
Barrick incurred $12 million in interest costs and financing
charges in first quarter 2004, related mainly to its debentures and
its Bulyanhulu project financing compared to $14 million in the prior
year quarter. Interest incurred was lower than the prior year period
due to the general decline in market US dollar interest rates. In
first quarter 2004, the Company capitalized $4 million of interest at
Veladero, Cowal and Tulawaka and expensed $8 million. In first
quarter 2003, it capitalized $1 million at Cowal and expensed $13
million.
Barrick uses interest rate swaps to manage the effective rates of
interest it pays on long-term debt. On the $500 million debentures,
Barrick has converted the fixed 7.5% interest rate to a floating
rate, taking advantage of low market floating interest rates. On the
Bulyanhulu financing, the Company has taken advantage of the present
low interest rates to fix the interest rate for the term of the debt
at a rate of about 7%.
Actual interest expense on existing debt obligations, as well as
amounts of interest capitalized, will be affected by changes in
market interest rates on variable-rate debt obligations, as well as
whether other development projects meet US GAAP criteria for interest
capitalization during 2004.
Other Income/Expense
In first quarter 2004, Barrick earned interest income of $9
million on its cash balances, similar to first quarter 2003. Through
interest rate swaps, the Company earned a fixed rate of 3.4% in first
quarter 2004 on most of its cash balances, with any excess cash
balances earning interest at market interest rates. In first quarter
2004, the Company also realized pre-tax gains of $4 million on the
sale of various assets and investments, compared to gains on asset
sales of $6 million in the prior year period. Barrick may sell
further assets in 2004. In first quarter 2003, it recorded losses of
$7 million on various investments held in a post-retirement benefit
plan.
Non-Hedge Derivative Gains and Losses
Non-hedge derivative gains and losses arising on derivative
instruments used in Barrick's risk management strategy that do not
qualify for hedge accounting treatment are recorded in earnings.
These gains and losses do not include the unrealized mark-to-market
loss on the Company's fixed-price forward gold and silver sales
contracts. The gains and losses occur because of changes in commodity
prices, currency exchange rates and interest rates.
In first quarter 2004, non-hedge derivative losses of $15 million
were caused primarily by the impact of rising silver prices on silver
derivative instruments that did not qualify for hedge accounting
treatment. In first quarter 2003, the Company recorded non-hedge
gains of $36 million, which mainly included gains of $34 million on
interest-rate and gold lease rate swaps due to declining market gold
lease rates and US dollar interest rates.
Income Taxes
In first quarter 2004, Barrick recorded a tax expense of $14
million compared to a tax expense of $2 million in first quarter
2003. Income tax expense increased primarily due to the rise in spot
gold prices, but also because first quarter 2003 included a $4
million tax credit on release of deferred tax valuation allowances.
Excluding the impact of tax credits in first quarter 2003, the
consolidated effective income tax rate increased from 12% in first
quarter 2003 to 35% in first quarter 2004. The consolidated income
tax rate is significantly affected by gains and losses recorded in a
low tax rate jurisdiction. These gains and losses arise from both
non-hedge derivatives and also mark-to-market gains and losses
realized on delivery of gold into hedge contracts.
Should gold prices remain in the $400 per ounce range, the
Company expects its effective tax rate in 2004 to be about 30%,
excluding: gains and losses on non-hedge derivatives and
market-to-market gains and losses crystallized by deliveries into
gold hedge contracts in a low tax rate jurisdiction, and the effect
of any release of deferred tax valuation allowances.
Income tax expense is affected by changes in the level of
valuation allowances recorded against deferred tax assets. Valuation
allowances are recorded where there is substantial uncertainty over
the realization of a tax asset. Among other things, a further
sustained upward trend in gold prices may result in further releases
of valuation allowances with corresponding tax credits recorded in
earnings. The Company may also record a tax credit in the future
based on its eligibility to file an election to revalue assets for
tax purposes under a new tax regime in Australia.
STATEMENT OF COMPREHENSIVE INCOME
Comprehensive income consists of net income or loss, together
with certain other economic gains and losses that collectively are
described as "other comprehensive income" and excluded from the
income statement.
In first quarter 2004, other comprehensive income mainly included
gains of $18 million arising on cash flow hedge contracts and the
transfer of $33 million of the gains on cash flow hedges to earnings
during the quarter.
CASH FLOW STATEMENT
Liquidity And Capital Resources
In previous years, the main sources of liquidity have been cash
inflow from operating activities, the large cash position, and
various debt-financing facilities. Currently, debt facilities include
Barrick's publicly traded debentures, the Bulyanhulu project
financing, and the undrawn $1 billion revolving credit facility with
a syndicate of global banks.
In the last three fiscal years, Barrick has generated a total
operating cash inflow of $1.7 billion. The Company expects to
continue to generate significant operating cash flow over the next
few years, providing it can maintain present production levels and
also provided that there is no material decline in the spot price of
gold. Barrick expects further capital needs of approximately $0.9
billion through the end of 2006 to build its Veladero, Cowal, Alto
Chicama and Tulawaka development projects, as well as between $100
and $200 million per year for sustaining capital at existing
operations. Alternatives for sourcing this capital include Barrick's
significant cash position, $1 billion credit facility, future
operating cash flow, project financings and public debt financings.
These alternatives are being evaluated to determine the optimal mix
of capital resources for the projects. The Company expects that,
absent a material adverse change in a combination of these sources of
liquidity, present levels of liquidity will be adequate to meet its
expected capital needs. If the Company is unable to access project
financing due to unforeseen political or other problems, Barrick
expects that it will be able to access public debt markets as an
alternative source of financing.
Capital structure
Barrick regularly reviews its capital structure with an overall
goal of lowering its cost of capital, while preserving the balance
sheet strength and flexibility that is important due to the cyclical
nature of commodity markets, and to ensure access to cash for
strategic purposes.
Following a review of the capital structure during 2003, the
Company concluded that a share buyback program would be consistent
with these overall goals, in view of the high levels of operating
cash flow being generated at current gold prices, the high levels of
liquidity that exist in the capital markets presently, and its belief
that its current share price represents an attractive buying
opportunity. In first quarter 2004, the Company continued to purchase
its common shares under this program, buying 4.5 million shares at a
total cost of $95 million.
Operating Activities
Operating cash flow is significantly affected by the volume of
gold sales, realized gold prices, cash operating costs and movements
in non-cash working capital. The overall effect of changes in these
principal factors and other factors was a $5 million decrease in
operating cash flow in first quarter 2004 compared to the prior year
quarter. In first quarter 2004 operating cash flow benefited from a
$27 per ounce increase in the average realized gold price over the
prior year period. This was partially offset by a $5 per ounce
increase in total cash costs. The effect of these changes, combined
with a 3% decrease in ounces sold, was a $20 million increase in
operating cash flow in first quarter 2004 compared to the prior year
period.
Due to the timing of gold production versus gold sales, movements
in inventory caused a $5 million outflow in first quarter 2004,
compared to an $11 million inflow in the prior year period. The level
of deferred stripping activity at the open pit mines also impacts
operating cash flow. In first quarter 2003, due to lower levels of
stripping, the movement in capitalized mining costs gave rise to a
$19 million operating inflow, whereas in first quarter 2004 this
movement gave rise to a $1 million inflow.
Investing Activities
The most significant ongoing investing activities are for capital
expenditures at the Company's mines. Capital expenditures consist of
annual investment in sustaining capital at the mines, including
expenditures relating to underground development activities and
significant capital expenditures in the development and construction
phases of mines. The annual amount varies depending on the status of
the development projects.
In first quarter 2003, expenditures were mainly for sustaining
capital and underground development at the operating mines. The
increase in capital expenditures in first quarter 2004 mainly relates
to $97 million spent at the Company's development projects, mainly
for construction activity at Veladero and Cowal. Spending is expected
to increase for the remainder of 2004 to support advancement of the
four development projects that are in construction presently.
Proceeds of $6 million from various asset and investment sales
were realized in first quarter 2004. The Company also made a $41
million payment for the cost of an investment in the shares of
Highland Gold, further to its initial investment in fourth quarter
2003.
Financing Activities
The most significant ongoing financing activities are
repayments/drawdowns of debt obligations; dividend payments; proceeds
from issuing capital stock on exercise of stock options; and
purchases of common shares under the share buyback program.
In first quarter 2004 the most significant financing cash flows
were $95 million spent purchasing 4.5 million common shares under the
share buyback program.
CRITICAL ACCOUNTING POLICIES AND ESTIMATES
Accounting policy changes
There were no changes in accounting policies in first quarter
2004.
Critical Accounting Estimates
Critical accounting estimates represent estimates that are highly
uncertain and for which changes in those estimates could materially
impact the Company's financial statements. The following accounting
estimates are critical:
-- amortization of property, plant and equipment and capitalized
mining costs;
-- impairment assessments of long-lived assets;
-- asset retirement obligations;
-- the measurement of deferred income tax assets and liabilities
and assessment of the need to record valuation allowances
against those assets;
-- the valuation of derivative instruments and measurement of
gains and losses on cash flow and fair value hedges that are
recorded in other comprehensive income; and
-- contingencies.
Amortization Expense
Barrick amortizes a large portion of its property, plant and
equipment using the units of production method based on proven and
probable reserves. Changes in reserves during first quarter 2004
caused amortization to decrease by approximately $7 million for the
mines listed below, which had reserve estimate changes (other than
production) greater than 10% effective December 31, 2003.
Impact of Actual Changes in Reserve Estimates on Amortization
---------------------------------------------------------------------
For the three months ended March 31 2004
---------------------------------------------------------------------
(in millions of dollars, except reserves Reserves Amortization
which are in millions of contained ounces) increase increase
(decrease) (decrease)
---------------------------------------------------------------------
Goldstrike - Underground 0.2 $ (2)
Plutonic 0.5 -
Goldstrike - Open Pit 1.5 (2)
Eskay Creek (0.1) 1
Kalgoorlie 0.9 (1)
Pierina 0.3 (3)
---------------------------------------------------------------------
Changes in reserve estimates calculated at the end of the year
affect amortization expense prospectively. The amounts presented
represent the effect of reserve changes at the end of 2003.
Capitalized Mining Costs
Effective January 1, 2004, the Company reduced the stripping
ratio at the Goldstrike Open Pit from 112:1 to 109:1 and increased
the stripping ratio at Pierina from 48:1 to 60:1. The effect of this
change in estimate on amortization of capitalized mining costs in
first quarter 2004 was essentially nil at the Goldstrike Open Pit and
an increase of $2 million at Pierina.
OFF-BALANCE SHEET ARRANGEMENTS
Forward Gold Sales Contracts
Prior to the adoption of a no-hedge policy for gold in fourth
quarter 2003, Barrick historically entered into fixed-price forward
sales contracts in a gold hedging program to manage exposure to
market gold prices. Following the adoption of its gold no-hedge
policy, no new gold hedge contracts will be added and the existing
gold hedge position will be reduced to zero over time.
Barrick has used fixed-price forward gold sales contracts to
protect its earnings and cash flow from declining gold prices. These
contracts permit the Company to sell all of its current gold
production in the gold spot market. Barrick has the ability to
deliver its gold at the higher spot price, or deliver under the
contract at the contract price. In first quarter 2004, the hedge
position was reduced by 0.8 million ounces to 14.7 million ounces.
Fixed-price Forward Gold Sales Contracts ("The Gold Hedge Position")
(as of March 31, 2004)
---------------------------------------------------------------------
Gold ounces hedged 14.7 million ounces (or slightly less than
three years of expected future production)
---------------------------------------------------------------------
Current termination date 2013 in most cases
of gold sales contracts
---------------------------------------------------------------------
Average estimated $397/oz(1)
realizable gold sales
contract price at 2013
termination date.
---------------------------------------------------------------------
Delivery obligations Barrick will deliver gold production from
operations against gold sales contracts by
the termination date (which is currently
2013 in most cases). However, Barrick may
choose to settle any gold sales contract
in advance of this termination date at any
time, at its discretion. Historically,
delivery has occurred in advance of the
contractual termination date. This means
Barrick can deliver gold at spot prices, or
prices under the hedge contracts, until the
termination date of these contracts.
---------------------------------------------------------------------
Unrealized mark-to-market $1,801 million.(2) The mark-to-market
loss at March 31, 2004 would approach zero (breakeven) at a spot
gold price of $303 per ounce, assuming all
other variables are constant.
---------------------------------------------------------------------
---------------------------------------------------------------------
Fixed-price Forward Silver Sales Contracts ("The Silver Hedge
Position")
(as of March 31, 2004)
---------------------------------------------------------------------
Silver ounces hedged 22.3 million ounces(3)
---------------------------------------------------------------------
Current termination date 2013 in most cases
of silver sales contracts
---------------------------------------------------------------------
Average estimated $6.82/oz(1)
realizable silver sales
contract price at 2013
termination date.
---------------------------------------------------------------------
Delivery obligations Barrick will deliver silver production from
operations against silver sales contracts
by the termination date (which is currently
2013 in most cases). However, Barrick may
choose to settle any silver sales contract
in advance of this termination date at any
time, at its discretion. Historically,
delivery has occurred in advance of the
contractual termination date. This means
Barrick can deliver silver at spot prices,
or prices under the hedge contracts, until
the termination date of these contracts.
---------------------------------------------------------------------
Unrealized mark-to-market $59 million.(3),(4) The mark-to-market
loss at March 31, 2004 would approach zero (breakeven) at a spot
silver price of $5.23 per ounce, assuming
all other variables are constant.
---------------------------------------------------------------------
Non-Hedge Silver Call 7.0 million ounces (see Note 11B)
Options
---------------------------------------------------------------------
1. Approximate estimated value based on current market US dollar
interest rates and an average lease rate assumption of 1.25%.
Accelerating gold and silver deliveries could potentially lead to
reduced contango that would otherwise have built up over time.
2. At a spot gold price of $427 per ounce.
3. Excludes written silver call options of 7 million ounces.
4. At a spot silver price of $7.92 per ounce. The non-hedge silver
call option mark-to-market position is negative $12 million and
changes in this value flow through current period earnings under
FAS133.
In all of the Company's Master Trading Agreements, which govern
the terms of its gold and silver sales contracts with its 19
counterparties, the following applies:
-- The counterparties do not have unilateral and discretionary
'right to break' provisions.
-- There are no credit downgrade provisions.
-- The Company is not subject to any margin calls - regardless of
the price of gold or silver.
-- The Company has the right to accelerate the delivery of gold
or silver at any time during the life of its contracts. This
flexibility is demonstrated by the terms that allow it to
deliver under hedge contracts at any time on two days notice,
or keep these hedge contracts outstanding for as long as 15
years. This feature means that the Company at its option can
sell its gold or silver at the market price or the hedge
price, whichever is higher, to the termination date of our
contracts (currently 2013 in most cases).
The Company's trading agreements with its counterparties do
provide for early close out of certain transactions in the event of a
material negative change in the Company's ability to produce gold or
silver for delivery under its hedging agreements, or a lack of gold
or silver market, and for customary events of default such as
covenant breaches, insolvency or bankruptcy. The significant
financial covenants are:
-- Barrick must maintain a minimum consolidated net worth of at
least $2 billion - currently, it is $3.4 billion.
-- Barrick must maintain a maximum long-term debt to consolidated
net worth ratio of 1.5:1 - currently, it is under 0.25:1.
-- Barrick's agreements exclude unrealized mark-to-market
valuations in the calculation of consolidated net worth.
-- The foregoing information is a summary of certain aspects of
the Company's forward sales program and is not intended to be
comprehensive. For a more complete understanding, reference
should be made to pages 51 to 55 of the Company's 2003 Annual
Report and its website (www.barrick.com).
In most cases, under the terms of Barrick's Master Trading
Agreements (MTAs), the period over which it is required to deliver
gold is extended annually by one year, or kept "evergreen",
regardless of the intended delivery dates, unless otherwise notified
by the counterparty. This means that, with each year that passes, the
termination date of most MTAs is extended into the future by one year.
Significance of mark-to-market gains and losses
At the end of first quarter 2004, the unrealized mark-to-market
(fair value) on the Company's derivative instruments position,
including gold and silver forward sales contracts, as well as the
currency and interest rate hedge programs, was approximately negative
$1.6 billion.
The mark-to-market value of the gold contracts is based on the
closing spot gold price of $427 per ounce and market rates for LIBOR
and gold lease rates on March 31, 2004. The mark-to-market value of
the contracts would approach zero (breakeven) at a spot gold price of
approximately $303 per ounce, assuming all other variables are
constant. The mark-to market value represents the replacement value
of these contracts based on current market levels, and does not
represent an economic obligation for payment by Barrick. Barrick's
obligations under the gold sales contracts are to deliver an agreed
upon quantity of gold at a hedge price by the termination date on the
contracts (currently 2013 in most cases).
In accordance with hedge accounting rules, the positive
mark-to-market value of $297 million relating to the currency and
interest rate hedge programs is recorded as an asset on the balance
sheet. The mark-to-market value of the gold and silver sales
contracts is not recorded on the balance sheet as accounting rules
that govern these contracts do not require balance sheet recognition.
Instead, in accordance with US GAAP, the economic impact of these
sales contracts is reflected in the financial statements as the
Company physically delivers gold and silver under the contracts.
A short-term spike in gold lease rates would not have a material
negative impact on Barrick because it is not exposed under its
fixed-price forward gold sales contracts to short-term gold lease
rate variations. A prolonged rise in gold lease rates could result in
lower contango (or negative contango i.e. "backwardation") and
therefore a smaller forward premium (or backwardation) under the
contract. However, because of the large amount of Central Bank gold
available for lending relative to demand, gold lease rates have
historically tended to be low and any spikes short-lived.
---------------------------------------------------------------------
At March 31, 2004 Fair Value
Gain/(Loss)
---------------------------------------------------------------------
Forward gold sales contracts $(1,801)
Forward silver sales contracts (59)
Silver option contracts (12)
Foreign currency contracts 253
Interest rate contracts 44
---------------------------------------------------------------------
$(1,575)
---------------------------------------------------------------------
Change in the Fair Value of Forward Gold Sales Contracts
---------------------------------------------------------------------
Unrealized loss at January 1, 2004 $1,725
Impact of change in spot price(1) 182
Contango earned in the period (30)
Impact of change in valuation inputs(2) (44)
Mark-to-market impact of deliveries into gold sales contracts (32)
---------------------------------------------------------------------
Unrealized loss at March 31, 2004 $1,801
---------------------------------------------------------------------
1. From $415 per ounce to $427 per ounce.
2. Other than spot metal prices (e.g. interest rates and gold lease
rates).
Change in the Fair Value of Forward Silver Sales Contracts
---------------------------------------------------------------------
Unrealized loss at January 1, 2004 $17
Impact of change in spot price(1) 45
Contango earned in the period (1)
Impact of change in valuation inputs(2) (2)
---------------------------------------------------------------------
Unrealized loss at March 31, 2004 $59
---------------------------------------------------------------------
1. From $5.92 per ounce to $7.92 per ounce.
2. Other than spot metal prices (e.g. interest rates and silver lease
rates).
Contractual Obligations and Commitments
Capital expenditures
Purchase obligations for capital expenditures include only those
items where binding commitments have been entered into. They do not
include the full amount of future expenditures relating to the
Company's development pipeline over the next 5 years, because
commitments have yet to be made for a large portion of the estimated
future capital costs related to these projects.
QUARTERLY INFORMATION (in millions, except per share
and per ounce data)
---------------------------------------------------------------------
March 31 December 31 September 30 June 30
2004 2003 2003 2002 2003 2002 2003 2002
---------------------------------------------------------------------
Gold sales $ 477 $ 459 $ 536 $ 526 $ 549 $ 473 $ 491 $ 490
Average spot gold
price per ounce 408 352 392 323 364 314 347 313
Average realized gold
price per ounce 382 355 394 343 365 342 352 341
Net income 26 29 77 54 35 34 59 59
Net income per
share(1) 0.05 0.05 0.14 0.10 0.07 0.06 0.11 0.11
Operating cash flow 126 131 134 195 188 126 66 148
---------------------------------------------------------------------
1. Basic and diluted.
The financial results for the last eight quarters reflect the
following general trends: rising spot gold prices and rising prices
realized from gold sales; declining gold production and sales
volumes; and rising total cash costs. These trends are discussed
elsewhere in this Management's Discussion and Analysis, and the
quarterly trends are consistent with explanations for annual trends
over the last two years.
NON-GAAP PERFORMANCE MEASURES
Barrick has included total cash costs per ounce data because it
understands that certain investors use this information to assess the
Company's performance. The inclusion of total cash costs per ounce
statistics enables investors to better understand year-on-year
changes in production costs, which in turn affect profitability and
the ability to generate operating cash flow for use in investing and
other activities. Non-GAAP measures do not have any standardized
meaning prescribed by US GAAP, and therefore they may not be
comparable to similar measures prescribed by other companies. The
data are intended to provide additional information and should not be
considered in isolation or as a substitute for measures of
performance prepared in accordance with GAAP. The measures are not
necessarily indicative of operating profit or cash flow from
operations as determined under GAAP.
Reconciliation Of Total Cash Costs Per Ounce To Financial Statements
---------------------------------------------------------------------
Goldstrike - Goldstrike -
Open pit Underground
---------------------------------------------------------------------
For the three months ended March 31 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs - per
US GAAP(1) $ 77.1 $ 89.9 $ 35.7 $ 39.6
Accretion expense and reclamation
costs at operating mines (0.6) (0.6) (0.1) (0.1)
---------------------------------------------------------------------
Total cash production costs per
Gold Institute Production Cost
Standard $ 76.5 $ 89.3 $ 35.6 $ 39.5
---------------------------------------------------------------------
Ounces sold (thousands) 287 337 141 181
Total cash costs per ounce sold per
US GAAP (dollars) $ 269 $ 267 $ 254 $ 219
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production Cost
Standard (dollars) $ 267 $ 266 $ 253 $ 218
---------------------------------------------------------------------
1. Represents cost of sales and other operating costs (excluding
amortization).
---------------------------------------------------------------------
Eskay Creek Round Mountain
---------------------------------------------------------------------
For the three months ended March 31 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs - per
US GAAP(1) $ (1.1) $ 5.9 $ 18.2 $ 14.3
Accretion expense and reclamation
costs at operating mines (0.1) - (0.4) (0.4)
---------------------------------------------------------------------
Total cash production costs per
Gold Institute Production Cost
Standard $ (1.2) $ 5.9 $ 17.8 $ 13.9
---------------------------------------------------------------------
Ounces sold (thousands) 66 85 86 83
Total cash costs per ounce sold per
US GAAP (dollars) $ (18) $ 69 $ 212 $ 173
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production Cost
Standard (dollars) $ (19)(2) $ 69 $ 207 $ 168
---------------------------------------------------------------------
1. Represents cost of sales and other operating costs (excluding
amortization).
2. Eskay Creek's total cash costs in first quarter 2004 are negative
due to the impact of higher silver prices, which the Company
treats as a by-product. Total cash costs on a co-product basis
are: first quarter 2004 - gold $186 per ounce, silver $3.49 per
ounce (2003 first quarter - gold $178 per ounce, silver $2.41 per
ounce).
---------------------------------------------------------------------
Hemlo Holt-McDermott
---------------------------------------------------------------------
For the three months ended March 31 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs - per
US GAAP(1) $ 14.2 $ 14.9 $ 5.2 $ 5.4
Accretion expense and reclamation
costs at operating mines - (0.1) - -
---------------------------------------------------------------------
Total cash production costs per
Gold Institute Production Cost
Standard $ 14.2 $ 14.8 $ 5.2 $ 5.4
---------------------------------------------------------------------
Ounces sold (thousands) 62 65 22 19
Total cash costs per ounce sold per
US GAAP (dollars) $ 227 $ 228 $ 238 $ 281
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production Cost
Standard (dollars) $ 227 $ 227 $ 238 $ 281
---------------------------------------------------------------------
---------------------------------------------------------------------
Total
Marigold North America
---------------------------------------------------------------------
For the three months ended March 31 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs - per
US GAAP(1) $ 2.1 $ 1.9 $ 151.4 $ 171.9
Accretion expense and reclamation
costs at operating mines - - (1.2) (1.2)
---------------------------------------------------------------------
Total cash production costs per
Gold Institute Production Cost
Standard $ 2.1 $ 1.9 $ 150.2 $ 170.7
---------------------------------------------------------------------
Ounces sold (thousands) 8 11 672 781
Total cash costs per ounce sold per
US GAAP (dollars) $ 248 $ 169 $ 225 $ 220
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production Cost
Standard (dollars) $ 248 $ 169 $ 223 $ 219
---------------------------------------------------------------------
---------------------------------------------------------------------
Total
Pierina South America
---------------------------------------------------------------------
For the three months ended March 31 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs - per
US GAAP(1) $ 19.4 $ 17.3 $ 19.4 $ 17.3
Accretion expense and reclamation
costs at operating mines (0.8) (0.8) (0.8) (0.8)
---------------------------------------------------------------------
Total cash production costs per
Gold Institute Production Cost
Standard $ 18.6 $ 16.5 $ 18.6 $ 16.5
---------------------------------------------------------------------
Ounces sold (thousands) 227 194 227 194
Total cash costs per ounce sold per
US GAAP (dollars) $ 86 $ 89 $ 86 $ 89
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production Cost
Standard (dollars) $ 82 $ 85 $ 82 $ 85
---------------------------------------------------------------------
---------------------------------------------------------------------
Plutonic Darlot
---------------------------------------------------------------------
For the three months ended March 31 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs - per
US GAAP(1) $ 17.3 $ 13.4 $ 7.7 $ 6.1
Accretion expense and reclamation
costs at operating mines - - - -
---------------------------------------------------------------------
Total cash production costs per
Gold Institute Production Cost
Standard $ 17.3 $ 13.4 $ 7.7 $ 6.1
---------------------------------------------------------------------
Ounces sold (thousands) 89 70 37 43
Total cash costs per ounce sold per
US GAAP (dollars) $ 194 $ 192 $ 208 $ 141
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production Cost
Standard (dollars) $ 194 $ 192 $ 208 $ 141
---------------------------------------------------------------------
---------------------------------------------------------------------
Lawlers Kalgoorlie
---------------------------------------------------------------------
For the three months ended March 31 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs - per
US GAAP(1) $ 7.1 $ 6.3 $ 26.3 $ 20.2
Accretion expense and reclamation
costs at operating mines - - (0.2) (0.3)
---------------------------------------------------------------------
Total cash production costs per
Gold Institute Production Cost
Standard $ 7.1 $ 6.3 $ 26.1 $ 19.9
---------------------------------------------------------------------
Ounces sold (thousands) 30 20 117 92
Total cash costs per ounce sold per
US GAAP (dollars) $ 236 $ 311 $ 225 $ 219
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production Cost
Standard (dollars) $ 236 $ 311 $ 223 $ 216
---------------------------------------------------------------------
---------------------------------------------------------------------
Total
Bulyanhulu Australia/Africa
---------------------------------------------------------------------
For the three months ended March 31 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs - per
US GAAP(1) $ 20.7 $ 17.9 $ 79.1 $ 63.9
Accretion expense and reclamation
costs at operating mines (0.1) (0.1) (0.3) (0.4)
---------------------------------------------------------------------
Total cash production costs per
Gold Institute Production Cost
Standard $ 20.6 $ 17.8 $ 78.8 $ 63.5
---------------------------------------------------------------------
Ounces sold (thousands) 75 92 348 317
Total cash costs per ounce sold per
US GAAP (dollars) $ 277 $ 193 $ 227 $ 201
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production Cost
Standard (dollars) $ 276 $ 192 $ 226 $ 200
---------------------------------------------------------------------
1. Represents cost of sales and other operating costs (excluding
amortization).
Reconciliation of Amortization per Ounce to Financial Statements
---------------------------------------------------------------------
For the three months ended March 31 2004 2003
---------------------------------------------------------------------
Amortization expense per consolidated financial
statements $120 $125
Amortization expense recorded on property, plant and
equipment not at operating mine sites (6) (7)
---------------------------------------------------------------------
Amortization expense for per ounce calculation $114 $118
---------------------------------------------------------------------
Ounces sold (thousands) 1,247 1,292
---------------------------------------------------------------------
Amortization per ounce (dollars) $91 $91
---------------------------------------------------------------------
OUTSTANDING SHARE DATA
As at April 15, 2004, 531.4 million common shares ("Common
Shares") and one special voting share ("Special Voting Share") in the
capital of Barrick were issued and outstanding. Computershare Trust
Company of Canada ("Computershare"), the holder of the Special Voting
Share, is entitled to cast the number of votes equal to the number of
BGI Exchangeable Shares (as defined below) outstanding (excluding
those owned by Barrick and its subsidiaries), multiplied by 0.53, for
which it receives voting instructions from holders of such BGI
Exchangeable Shares.
In connection with Barrick's acquisition of Homestake Mining
Company effective December 14, 2001, Barrick Gold Inc. (formerly
Homestake Canada Inc.) issued securities ("BGI Exchangeable Shares"),
which, by their terms, are each exchangeable at any time for 0.53 of
a Common Share. Each BGI Exchangeable Share entitles the holder to
exercise the same voting rights as a holder of 0.53 of a Common
Share. Generally, a holder of a BGI Exchangeable Share may exercise
his or her voting right by either providing voting instructions to
Computershare or attending a meeting of holders of Common Shares and
voting in person. As at April 15, 2004, there were 1.5 million BGI
Exchangeable Shares outstanding that were not owned by Barrick, which
would entitle the holders of the BGI Exchangeable Shares to cast 0.8
million votes at a meeting of holders of Common Shares. For further
information regarding the BGI Exchangeable Shares, please refer to
the Company's current Management Information Circular and Proxy
Statement.
As at April 15, 2004, options to purchase 20.7 million Common
Shares were outstanding under Barrick's option plan. In addition, as
at April 15, 2004, options to purchase 2.3 million Common Shares were
outstanding under certain option plans inherited by Barrick in
connection with prior acquisitions.
Notes to Unaudited Interim Consolidated Financial Statements
Tabular dollar amounts in millions of United States dollars,
unless otherwise indicated. References to C$ and A$ are to Canadian
and Australian dollars, respectively.
1 NATURE OF OPERATIONS
Barrick Gold Corporation ("Barrick" or the "Company") engages in
the production and sale of gold, including related mining activities
such as exploration, development, mining and processing. Our
operations are mainly located in the United States, Canada,
Australia, Peru, Tanzania, Chile and Argentina. They require
specialized facilities and technology, and we rely on those
facilities to support our production levels. The market price of
gold, quantities of gold mineral reserves and future gold production
levels, future cash operating costs, foreign currency exchange rates,
market interest rates and the level of exploration expenditures are
some of the things that could materially affect our operating cash
flow and profitability. Due to the global nature of our operations we
are also affected by government regulations, political risk and the
interpretation of taxation laws and regulations. We seek to mitigate
these risks, and in particular we use derivative instruments as part
of a risk management program that seeks to mitigate the effect of
volatility in commodity prices, interest rates and foreign currency
exchange rates. Many of the factors affecting these risks are beyond
our control and their effects could materially impact our
consolidated financial statements.
2 BASIS OF PREPARATION
The United States dollar is the principal currency of our
operations. We prepare our primary consolidated financial statements
in United States dollars and under United States generally accepted
accounting principles ("US GAAP"). The accompanying unaudited interim
consolidated financial statements have been prepared in accordance
with US GAAP for the preparation of interim financial information.
Accordingly, they do not include all of the information and
disclosures required by US GAAP for annual consolidated financial
statements. The accounting policies used in the preparation of the
accompanying unaudited interim consolidated financial statements are
the same as those described in our audited consolidated financial
statements and the notes thereto for the three years ended December
31, 2003.
In the opinion of management, all adjustments considered
necessary for fair presentation of results for the periods presented
have been reflected in these financial statements. These unaudited
interim consolidated financial statements should be read in
conjunction with the audited annual consolidated financial statements
and the notes thereto for the three years ended December 31, 2003.
The preparation of financial statements under US GAAP requires us
to make estimates and assumptions that affect:
-- the reported amounts of assets and liabilities;
-- disclosures of contingent assets and liabilities; and
-- revenues and expenses recorded in each reporting period.
The most significant estimates and assumptions that affect our
financial position and results of operations are those that use
estimates of proven and probable gold reserves; future estimates of
costs and expenses; and/or assumptions of future commodity prices,
interest rates and foreign currency exchange rates. Such estimates
and assumptions include:
-- decisions as to whether exploration and mine development costs
should be capitalized or expensed;
-- assessments of whether property, plant and equipment, ore in
stockpiles and capitalized mining costs may be impaired;
-- assessments of our ability to realize the benefits of deferred
income tax assets;
-- the useful lives of long-lived assets and the rate at which we
record amortization in earnings;
-- the estimated fair value of asset retirement obligations;
-- the timing and amounts of forecasted future expenditures that
represent the hedged items underlying hedging relationships
for our cash flow hedge contracts;
-- the estimated fair values of derivative instruments;
-- the value of slow-moving and obsolete inventories (which are
stated at the lower of average cost and net realizable value);
and
-- assessments of the likelihood and amounts of contingencies.
We regularly review the estimates and assumptions that affect our
financial statements; however, what actually happens could differ
from those estimates and assumptions.
3 ACCOUNTING CHANGES
A FAS 143, Accounting for asset retirement obligations
On January 1, 2003, we adopted FAS 143 and changed our accounting
policy for recording obligations relating to the retirement of
long-lived assets. This accounting change is described in note 2B of
our audited annual consolidated financial statements for the three
years ended December 31, 2003. On adoption of FAS 143 in first
quarter 2003, we recorded on our balance sheet an increase in
property, plant and equipment by $39 million; an increase in other
long-term obligations by $32 million; and an increase in deferred
income tax liabilities by $3 million. We recorded in our income
statement a $4 million credit for the cumulative effect of this
accounting change.
B Amortization of underground development costs
On January 1, 2003, we changed our accounting policy for
amortization of underground mine development costs to exclude
estimates of future underground development costs. This accounting
change is described in note 2B of our audited annual consolidated
financial statements for the three years ended December 31, 2003. On
adoption of this change on January 1, 2003, we decreased property,
plant and equipment by $19 million, and increased deferred income tax
liabilities by $2 million. We recorded in our income statement a $21
million charge for the cumulative effect of this accounting change.
C Changes in estimates
Amortization of property, plant and equipment
Effective December 31, 2003, we updated our estimates of proven
and probable gold mineral reserves. Following the update of these
estimates, we revised our calculations of amortization of property,
plant and equipment that is amortized on the units of production
basis. The effect of the change in reserve estimates on amortization
of property, plant and equipment in first quarter 2004, was a
decrease in this expense by approximately $7 million for mines with a
greater than 10% change (other than ounces produced) in the reserve
estimates.
Amortization of capitalized mining costs
In 2004, we revised the estimated stripping ratios used in the
calculation of amortization of capitalized mining costs with a
decrease in the stripping ratio at Goldstrike Open Pit and an
increase in the stripping ratio at Pierina. See note 15 for a
description of the effect of this change in estimate.
4 SEGMENT INFORMATION
We operate in the gold mining industry and our operations are
managed on a regional basis. Our three primary regions are North
America, Australia/Africa, and South America, which includes Peru,
Chile and Argentina. In 2003, we changed the composition of our
reportable segments by the addition of our development projects. We
also changed our determination of which costs are charged to
segments. Prior periods have been restated to conform to the current
presentation. Our chief operating decision maker reviews financial
information on all our individual mines and development projects
regularly, and accordingly our definition of a business segment
includes each of our operating mines and development projects. Our
development projects are not presently generating revenue and
therefore the measure of segment loss represents expensed exploration
and development costs.
Income statement information
---------------------------------------------------------------------
Total cash Segment income
production (loss) before
Gold sales costs(1) income taxes
---------------------------------------------------------------------
For the three months ended
March 31 2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
Operating mines
Goldstrike $ 163 $ 185 $ 112 $ 129 $ 16 $ 15
Pierina 87 70 19 16 31 19
Bulyanhulu 28 34 21 18 (1) 5
Kalgoorlie 45 34 26 20 14 9
Eskay Creek 25 30 (1) 6 14 13
Hemlo 24 23 14 15 8 5
Plutonic 35 25 17 13 15 10
Round Mountain 33 29 18 14 10 10
Other operating mines 37 29 22 20 8 4
Development projects
Veladero - - - - - (6)
Cowal - - - - - -
Pascua-Lama - - - - - -
Alto Chicama - - - - (6) (7)
---------------------------------------------------------------------
Segment total $ 477 $ 459 $ 248 $ 251 $ 109 $ 77
---------------------------------------------------------------------
1. Includes cost of sales, by-product revenues, royalty expenses and
production taxes (note 6). Excludes accretion expense, other
reclamation and closure costs, and amortization.
Asset information
---------------------------------------------------------------------
Segment capital
Amortization expenditures
---------------------------------------------------------------------
For the three months ended March 31 2004 2003 2004 2003
---------------------------------------------------------------------
Operating mines
Goldstrike $ 35 $ 41 $ 9 $ 12
Pierina 37 35 2 1
Bulyanhulu 8 11 8 10
Kalgoorlie 5 5 2 1
Eskay Creek 12 11 1 2
Hemlo 2 3 1 3
Plutonic 3 2 2 5
Round Mountain 5 5 - 1
Other operating mines 7 5 6 16
Development projects
Veladero - - 64 3
Cowal - - 20 4
Pascua-Lama - - 4 2
Alto Chicama - - 6 1
Tulawaka - - 3 -
---------------------------------------------------------------------
Segment total 114 118 128 61
Other items outside operating segments 6 7 1 5
---------------------------------------------------------------------
$ 120 $ 125 $ 129 $ 66
---------------------------------------------------------------------
Reconciliation of segment income to enterprise net income
---------------------------------------------------------------------
For the three months ended March 31 2004 2003
---------------------------------------------------------------------
Segment income $109 $ 77
Accretion expense, reclamation, closure
and other costs (15) (12)
Amortization outside operating segments (6) (7)
Exploration and business development costs,
excluding development projects (23) (16)
Administration (18) (22)
Other income/expense 16 5
Interest expense (8) (13)
Non-hedge derivative gains (losses) (15) 36
Income tax expense (14) (2)
Cumulative effect of changes in accounting principles - (17)
---------------------------------------------------------------------
Net income $ 26 $ 29
---------------------------------------------------------------------
5 REVENUE RECOGNITION AND COMMODITY CONTRACTS
Gold contracts
We have fixed-price forward gold sales contracts with various
counterparties for 14.7 million ounces of future gold production. The
terms of the contracts are governed by master trading agreements that
we have in place with the counterparties to the contracts. Contract
prices are established at inception through to an interim date, which
may be materially in advance of the Termination Date (typically 2013)
defined under the master trading agreement. If we do not deliver at
this interim date, a new interim date is set. The price for the new
interim date is determined in accordance with the master trading
agreements, which have contractually agreed price adjustment
mechanisms based on the market gold price. The master trading
agreements have both fixed and floating price mechanisms. The
fixed-price mechanism represents the market price at the start date
(or previous interim date) of the contract plus a premium (in most
cases) based on the difference between the forward price of gold and
the current market price of gold. For the majority of fixed-price
forward gold sales contracts, selling prices are fixed through 2006.
The contracts have final delivery dates primarily over approximately
the next 10 years, but we have the right to settle these contracts at
any time over these periods. If at an interim date we opt for a
floating price, the floating price represents the spot market price
of gold plus or minus the difference between the previously fixed
price and the market gold price at that interim date. Forward gold
market prices are principally influenced by the current market price
of gold, gold lease rates and US dollar interest rates. The final
realized selling price under a contract will depend on the timing of
the actual future delivery date, the market price of gold at the
start of the contract and the actual amount of the premium of the
forward price of gold over the spot price of gold for the periods
that fixed selling prices are set. The largest single counterparty as
of March 31, 2004 made up 12% of the ounces of outstanding forward
gold sales contracts.
We use gold lease rate swap contracts to manage our gold lease
rate exposure. Because historic short-term gold lease rates have
tended to be lower than longer-term gold lease rates, and also
because fixed-price forward gold sales contracts have fixed gold
lease rates, we have used these gold lease rate swap contracts to
economically achieve a more optimal term structure for gold lease
costs. Under these swaps we receive a fixed gold lease rate, and pay
a floating gold lease rate, on a notional 3.3 million ounces of gold
spread from 2004 to 2013. The swaps are associated with forward gold
sales contracts with expected delivery dates beyond 2006. These gold
lease rate swap contracts are accounted for as non-hedge derivatives
(see note 11B).
In addition to the fixed-price forward gold sales contracts, we
have floating-price gold sales contracts under which we will deliver
0.5 million ounces of gold over the next 10 years at prices that will
be based on the then prevailing spot price.
Silver contracts
Forward silver sales contracts have similar delivery terms and
pricing mechanisms as forward gold sales contracts. At March 31,
2004, we had fixed-price commitments to deliver 22.3 million ounces
of silver over periods primarily of up to 10 years. We also had
written silver call options on a notional 7 million ounces of silver
with an average exercise price of $5.76 per ounce. These options
expire at various dates in 2004 and 2005. The options are classified
as non-hedge derivatives for accounting purposes.
6 COST OF SALES AND OTHER OPERATING EXPENSES
---------------------------------------------------------------------
For the three months ended March 31 2004 2003
---------------------------------------------------------------------
Cost of sales(1) $266 $ 262
By-product revenues (34) (27)
Royalty expenses 12 12
Production taxes 4 4
Accretion expense 4 4
Other reclamation and closure costs 11 8
---------------------------------------------------------------------
$263 $ 263
---------------------------------------------------------------------
1. Cost of sales includes all costs that are capitalized to
inventory, except for amortization of property, plant and
equipment. The amount of amortization excluded from cost of sales,
and presented separately on the income statement, was $114 million
in the three months ended March 31, 2004 (2003 - $118 million).
7 OTHER INCOME/EXPENSE
---------------------------------------------------------------------
For the three months ended March 31 2004 2003
---------------------------------------------------------------------
Interest income $ 9 $ 8
Gains on sale of long-lived assets 2 6
Foreign currency translation gains (losses) 2 (1)
Realized gains on sale of available-for-sale securities 2 -
Other than temporary impairment charge on
available-for-sale securities - (7)
Other items 1 (1)
---------------------------------------------------------------------
$ 16 $ 5
---------------------------------------------------------------------
8 INCOME TAXES
Income tax expense
---------------------------------------------------------------------
For the three months ended March 31 2004 2003
---------------------------------------------------------------------
Current $ 18 $ 11
Deferred (4) (5)
---------------------------------------------------------------------
14 6
Release of deferred tax valuation allowances
recorded in prior years - (4)
---------------------------------------------------------------------
$14 $ 2
---------------------------------------------------------------------
Reconciliation to the Canadian federal statutory rate
---------------------------------------------------------------------
For the three months ended March 31 2004 2003
---------------------------------------------------------------------
Canadian federal statutory rate 38% 38%
Increase (decrease) resulting from:
Resource and depletion allowances (15) (18)
Non-hedge derivative gains in a low
tax-rate jurisdiction - (16)
Impact of deliveries under forward
gold sales contracts in a low tax-rate
jurisdiction 18 -
Losses on investments not subject to
taxation in the hands of the company - 6
Release of deferred tax valuation
allowances recorded in prior years - (8)
Other items (6) 2
---------------------------------------------------------------------
Actual income tax rate 35% 4%
---------------------------------------------------------------------
Peruvian tax assessment
One of our Peruvian subsidiaries has received a revised income
tax assessment of $32 million, excluding interest and penalties, from
the Peruvian tax authority, SUNAT. The tax assessment related to a
tax audit of our Pierina Mine for the 1999 and 2000 fiscal years. The
assessment mainly relates to the revaluation of the Pierina mining
concession for the purpose of determining its tax basis. Under the
valuation proposed by SUNAT, the tax basis of the Pierina assets
would change from what we previously assumed with a resulting
increase in current and deferred income taxes. We believe that the
tax assessment is incorrect and we are appealing the decision. The
full life of mine effect on our current and deferred income tax
liabilities was fully recorded at December 31, 2002, as were other
related payments of about $21 million due for periods through 2003.
The case is pending before Peru's Tax Court. If the case is not
resolved in our favor, we intend to pursue all available remedies,
including judicial appeals. If we are successful and our original
valuation is confirmed as the appropriate tax basis of the Pierina
assets, we would benefit from a $141 million reduction in current and
deferred tax liabilities. The effect of this contingent gain, if any,
will be recorded in the period the contingency is resolved.
In the event of an unfavorable Tax Court ruling, Peruvian law is
unclear with respect to whether it is necessary to make payment of
the disputed current taxes for the years covered by the tax
assessment, pending the outcome of an appeal process, a process which
can take several years. Currently, the amount of income taxes
potentially payable is $80 million. In the event of an unfavorable
Tax Court ruling, we will consider taking all available action to
prevent payment of the amount in dispute until the appeal process is
complete.
We have not provided for $59 million of potential interest and
penalties on the income tax assessed in the audit. Even if the tax
assessment is upheld, we believe that we will prevail on the interest
and penalties part, because the assessment runs counter to applicable
law and previous Peruvian tax audits. The potential amount of
interest and penalties will continue to increase over time while we
contest the tax assessment. A liability for interest and penalties
will only be recorded should it become probable that SUNAT's position
on interest and penalties will be upheld, or if we exhaust our
available remedies.
Change in Australian tax regime
A new consolidations tax law has been enacted in Australia that
allows wholly owned groups of companies resident in Australia to
elect to be treated as a single entity and to file consolidated tax
returns. This new regime is elective and the election is irrevocable.
An election is filed with a company's income tax returns, which are
due by July 1 after each fiscal year and effective from January 1 of
the applicable year covered by the tax return. The earliest fiscal
year for which the Company could file an election is 2004.
Under certain circumstances, the rules governing the election
allow for a choice to reset the tax cost basis of certain assets
within a consolidated group. We are presently considering the merits
of filing for election under this new regime. If such an election is
filed and if this results in an upward revaluation of the tax basis
of our assets, then this tax benefit will be recorded as a component
of income tax expense in the fiscal year for which the election is
filed. The amount of any potential tax benefit, if any, under such an
election is not presently determinable.
9 EARNINGS PER SHARE
---------------------------------------------------------------------
For the three months ended March 31
($ millions, except shares in millions
and per share amounts) 2004 2003
---------------------------------------------------------------------
Income available to common stockholders $ 26 $ 29
---------------------------------------------------------------------
Weighted average shares outstanding - basic 535 541
Effect of dilutive stock options 2 1
---------------------------------------------------------------------
Weighted average shares outstanding
and on assumed conversions 537 542
---------------------------------------------------------------------
Earnings per share
Basic and diluted $ 0.05 $ 0.05
---------------------------------------------------------------------
10 COMPREHENSIVE INCOME
Comprehensive income consists of net income and other gains and
losses that are excluded from net income. These other gains and
losses consist mainly of gains and losses on derivative instruments
accounted for as cash flow hedges; unrealized gains and losses on
available-for-sale securities; and foreign currency translation
adjustments.
Accumulated other comprehensive income (loss) (OCI)
---------------------------------------------------------------------
2004 2003
---------------------------------------------------------------------
Pre-tax Tax Post-tax Pre-tax Tax Post-tax
amount effect amount amount effect amount
---------------------------------------------------------------------
Foreign currency
translation
adjustments
At January 1 $ (147) $ - $ (147) $ (144) $ - $ (144)
Translation
adjustments recorded
in the period - - - (5) - (5)
---------------------------------------------------------------------
At March 31 $ (147) $ - $ (147) $ (149) $ - $ (149)
---------------------------------------------------------------------
Accumulated gains on
cash flow hedges
At January 1 $ 288 $ (99) $ 189 $ 49 $ (17) $ 32
Changes in fair value
of cash flow hedges
(note 11D) 18 (6) 12 78 (30) 48
Transfer of hedge gains
to earnings
(note 11D) (33) 14 (19) (14) 5 (9)
Hedge ineffectiveness
transferred to
earnings (note 11D) (1) - (1) - - -
---------------------------------------------------------------------
At March 31 $ 272 $ (91) $ 181 $ 113 $ (42) $ 71
---------------------------------------------------------------------
Available-for-sale
securities
At January 1 $38 $- $ 38 $ (6) $ - $ (6)
Changes in fair value
of securities 7 - 7 (1) - (1)
Other than temporary
impairment charges
recorded in earnings
(note 7) - - - 7 - 7
---------------------------------------------------------------------
At March 31 $ 45 $ - $ 45 $ - $ - $ -
---------------------------------------------------------------------
Additional minimum
pension liability
At January 1 and
March 31 $ (7) $ - $ (7) $ (7) $ - $ (7)
---------------------------------------------------------------------
Total OCI at March 31 $ 163 $ (91) $ 72 $ (43) $ (42) $ (85)
---------------------------------------------------------------------
11 DERIVATIVE INSTRUMENTS
A Use of derivative instruments
We use derivative instruments to mitigate the effects of certain
risks that are inherent in our business, and also to take advantage
of opportunities to secure attractive pricing for commodities,
currencies and interest rates. The inherent risks that we most often
attempt to mitigate by the use of derivative instruments occur from
changes in commodity prices (gold and silver), interest rates and
foreign currency exchange rates. Because we produce gold and silver,
incur costs in foreign currencies, and invest and borrow in US
dollars and are therefore subject to US interest rates, our
derivative instruments cover natural underlying asset or liability
positions. The purpose of the hedging elements of our derivative
program is so that changes in the values of cash flows from or fair
values of hedged items are offset by equivalent changes in the values
of derivative instruments.
We do not hold derivatives for the purpose of speculation; our
risk management programs are designed to enable us to plan our
business effectively and, where possible, mitigate adverse effects of
future movements in gold and silver prices, interest rates and
foreign currency exchange rates. For a more detailed description of
the types of derivative instruments we use, and our accounting
policies for derivative instruments, refer to note 11 to our audited
consolidated financial statements for the three years ended December
31, 2003.
B Derivative instruments outstanding as at March 31, 2004
---------------------------------------------------------------------
Maturity 2004 2005 2006 2007 2008+ Total
---------------------------------------------------------------------
Interest rate contracts
Receive-fixed swaps
Notional amount (millions)$ 150 - $ 100 $ 725 $ 175 $ 1,150
Fixed rate (%) 3.6% - 3.0% 3.4% 4.1% 3.5%
Pay-fixed swaps
Notional amount (millions) - - - - $ 324 $ 324
Fixed rate (%) - - - - 5.7% 5.7%
---------------------------------------------------------------------
Net notional position $ 150 - $ 100 $ 725 $ (149) $ 826
---------------------------------------------------------------------
Foreign currency contracts
Canadian dollar forwards
C$ (millions) C$ 269 C$ 289 C$ 200 C$ 96 C$ 22 C$ 876
Average price (US cents) 0.66 0.66 0.73 0.67 0.68 0.68
Australian dollar forwards
A$ (millions) A$ 511 A$ 680 A$ 233 A$ 139 A$ 19 A$1,582
Average price (US cents) 0.60 0.64 0.57 0.58 0.53 0.61
Australian dollar
min-max contracts
A$ (millions) A$ 17 A$ 10 A$ 10 - - A$ 37
Average cap price
(US cents) 0.54 0.52 0.52 - - 0.53
Average floor price
(US cents) 0.52 0.51 0.51 - - 0.51
Fuel contracts
Barrels WTI (thousands) 270 180 - - - 450
Cap $30 $30 - - - $ 30
Floor $ 23 $ 21 - - - $ 23
---------------------------------------------------------------------
---------------------------------------------------------------------
Classification of interest rate and
foreign currency contracts
---------------------------------------------------------------------
Cash flow Fair value Non-
At March 31, 2004 hedge hedge hedge Total
---------------------------------------------------------------------
Interest rate contracts
Receive-fixed swaps on
cash balances $ 650 $ - $ - $ 650
Receive-fixed swaps on debentures - 500 - 500
---------------------------------------------------------------------
$ 650 $ 500 $ - $ 1,150
---------------------------------------------------------------------
Pay-fixed swaps on Bulyanhulu
project financing $ 174 $ - $ - $174
Pay-fixed swaps on lease
rate swaps - - 150 150
---------------------------------------------------------------------
$ 174 $ - $ 150 $ 324
---------------------------------------------------------------------
Canadian dollar contracts
Operating costs and expenses C$ 833 C$ - C$ 14 C$ 847
Capital expenditures 29 - - 29
---------------------------------------------------------------------
C$ 862 C$ - C$ 14 C$ 876
---------------------------------------------------------------------
Australian dollar contracts
Operating costs and expenses A$ 1,052 A$ - A$ 154 A$1,206
Capital expenditures 413 - - 413
---------------------------------------------------------------------
A$ 1,465 A$ - A$ 154 A$ 1,619
---------------------------------------------------------------------
We also held gold lease rate swaps at March 31, 2004 that are based
on a notional amount of 3.3 million ounces of gold spread from 2004
to 2013 and written silver call options on a notional 7 million
ounces of silver with an average exercise price of $5.76 per ounce
(see note 5). These gold lease rate contracts and written silver call
options, are classified as non-hedge derivatives.
C Unrealized fair value of derivative instruments (excluding normal
sales contracts)
---------------------------------------------------------------------
For the three months ended March 31 2004 2003
---------------------------------------------------------------------
Beginning of period $ 337 $ 29
Derivative instruments settled (48) (16)
Change in fair value of derivative instruments:
Non-hedge derivatives (16) 36
Cash flow hedges 18 78
Fair value hedges 1 -
---------------------------------------------------------------------
End of period $ 292 (1) $ 127
---------------------------------------------------------------------
(1)Included on the balance sheet as follows: $117 million in other
current assets; $268 million in non-current assets as unrealized
fair value of derivative contracts; $13 million in other current
liabilities; and $80 million in other long-term obligations.
The fair values of recorded derivative assets and liabilities
reflect the netting of the fair values of individual derivative
instruments, and amounts due to/from counterparties that arise from
derivative instruments, when the conditions of FIN No. 39, Offsetting
of Amounts Related to Certain Contracts, have been met. Amounts
receivable from counterparties that have been offset against
derivative liabilities totaled $16 million at March 31, 2004.
D Change in gains (losses) accumulated in OCI for cash flow
hedge contracts
---------------------------------------------------------------------
Foreign Interest
Commodity currency rate
contracts contracts contracts Total
---------------------------------------------------------------------
2004 2003 2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
At January 1 $(1) $9 $280 $26 $9 $14 $288 $49
Changes in fair
value - 7 8 63 10 8 18 78
Hedge gains
transferred to
earnings -(1) (3)(1) (30)(2) (8)(2) (3)(3) (3)(3) (33) (14)
Hedge
ineffectiveness
transferred to
earnings - - (1) - - - (1) -
---------------------------------------------------------------------
At March 31 $(1) $13 $257 $81 $16 $19 $272 $113
---------------------------------------------------------------------
1. Included under revenues and by-product credits
2. Included under operating expenses
3. Included under interest income
Based on the fair value of cash flow hedge contracts at March 31,
2004, in the next twelve months, we expect to transfer hedge gains of
$129 million from OCI to earnings, to be matched with the related
hedged items. These gains will be reflected as a reduction in cash
operating costs, and as a component of interest income.
E Non-hedge derivative gains (losses)
---------------------------------------------------------------------
For the three months ended March 31 2004 2003
---------------------------------------------------------------------
Change in fair value of non-hedge derivatives
Commodity contracts $(12) $ 1
Currency contracts - 1
Interest and lease rate contracts (4) 34
---------------------------------------------------------------------
(16) 36
Hedge ineffectiveness recorded in earnings(1) 1 -
---------------------------------------------------------------------
$(15) $ 36
---------------------------------------------------------------------
1. During first quarter 2004, we determined that certain Australian
dollar hedge contracts designated as hedges of forecasted capital
expenditures no longer met the FAS 133 qualifying hedge criteria
due to changes in the expected timing of the forecasted
expenditures. On determining that these hedges were no longer
effective for accounting purposes, gains totaling $1 million on
these contracts were transferred out of OCI to earnings in first
quarter 2004 (2003 - $nil).
12 COMPONENTS OF OTHER NET OPERATING ACTIVITIES
---------------------------------------------------------------------
For the three months ended March 31 2004 2003
---------------------------------------------------------------------
Add (deduct):
Foreign currency translation (gains) losses $(2) $1
(Gains) losses on available-for-sale securities (2) 7
Cumulative effect of changes in accounting policies - 17
Accretion expense 4 4
Non-hedge derivative (gains) losses 15 (36)
Changes in operating assets and liabilities:
Accounts receivable (3) -
Inventories (5) 11
Accounts payable and accrued liabilities (1) (5)
Current income taxes accrued 18 11
Other assets and liabilities - 4
Cash payments:
Reclamation and closure costs (10) (6)
Income taxes (29) (35)
---------------------------------------------------------------------
Other net operating activities $(15) $(27)
---------------------------------------------------------------------
13 INVENTORIES, OTHER CURRENT ASSETS AND INVESTMENTS
---------------------------------------------------------------------
At March 31, 2004 At December 31, 2003
---------------------------------------------------------------------
Inventories
Gold in process and ore in
stockpiles $104 $ 99
Mine operating supplies 58 58
---------------------------------------------------------------------
$162 $ 157
---------------------------------------------------------------------
Other current assets
Derivative assets (note 11C) $117 $ 154
Prepaid expenses 8 15
---------------------------------------------------------------------
$125 $ 169
---------------------------------------------------------------------
Gold in process and ore in stockpiles excludes $67 million
(December 31, 2003 - $64 million) of stockpiled ore that we do not
expect to process in the following 12 months. This amount is included
in other assets.
Investments
In first quarter 2004, we purchased a further 7% interest in the
common shares of Highland Gold for cash consideration of $41 million.
Combined with an initial investment made in fourth quarter 2003, we
own a 17% interest in the outstanding common shares of Highland Gold.
The investment is being accounted for as an available-for-sale
security, with unrealized gains and losses recorded in other
comprehensive income.
14 PROPERTY, PLANT AND EQUIPMENT
At March 31, 2004, property acquisition and mine development
costs included various properties in the exploration and development
stage that are not presently being amortized. Details of the carrying
amounts for major properties and the years when we expect to put
these properties into production and begin amortization are:
---------------------------------------------------------------------
Carrying amount at Targeted timing of
Property March 31, 2004 production start up
---------------------------------------------------------------------
Veladero $ 132 2005
Cowal 69 2006
Alto Chicama 15 2005
Pascua-Lama 204 2008/2009
Other properties 216 -
---------------------------------------------------------------------
Total $ 636
---------------------------------------------------------------------
15 CAPITALIZED MINING COSTS
We charge most mine operating costs to inventory as incurred.
However, we capitalize and amortize certain mining costs associated
with open-pit deposits that have diverse ore grades and waste-to-ore
ton ratios over the mine life. These mining costs arise from the
removal of waste rock at our open-pit mines, and we commonly refer to
them as "deferred stripping costs". We charge to inventory
amortization of amounts capitalized based on a "stripping ratio"
using the units-of-production method.
This accounting method results in the smoothing of these costs
over the life of a mine. Instead of capitalizing these costs, some
mining companies expense them as incurred, which may result in the
reporting of greater volatility in period-to-period results of
operations. If we followed a policy of expensing these costs as
incurred, then using this alternative policy, our reported cost of
sales would have been $1 million lower for the three months ended
March 31, 2004 (2003 - $19 million decrease).
Capitalized mining costs represent the excess of costs
capitalized over amortization recorded, although it is possible that
a liability could arise if cumulative amortization exceeds costs
capitalized. The carrying amount of capitalized mining costs is
grouped with related mining property, plant and equipment for
impairment testing purposes.
Effective January 1, 2004, we revised the estimated stripping
ratios used for amortization purposes with a decrease in the
stripping ratio at Goldstrike Open Pit and an increase in the
stripping ratio at Pierina. In first quarter 2004 the effect of this
change was to reduce amortization of capitalized mining costs at
Goldstrike Open Pit by $nil, and increase amortization of capitalized
mining costs at Pierina by $1.6 million.
Average stripping ratios(1)
---------------------------------------------------------------------
For the three months ended March 31 2004 2003
---------------------------------------------------------------------
Goldstrike Open Pit 109:1 112:1
Pierina 60:1 48:1
---------------------------------------------------------------------
1. The stripping ratio is calculated as the ratio of total tons (ore
and waste) of material to be moved compared to total recoverable
ounces in proven and probable gold reserves.
The average remaining life of the open-pit mine operations where
we capitalize these types of mining costs is eight years. We expect
to expense all stripping costs by the end of the mine lives.
16 CAPITAL STOCK
A Share repurchase program
During the three-month period ended March 31, 2004, we
repurchased 4.47 million common shares for $95 million at an average
cost of $21.20 per share. This resulted in a reduction of common
share capital by $35 million, and a $60 million charge (being the
difference between the repurchase cost and the average historic book
value of shares repurchased) to retained earnings.
B Barrick Gold Inc. ("BGI") Exchangeable Shares
In connection with a 1998 acquisition, BGI, formerly Homestake
Canada Inc., issued 11.1 million BGI exchangeable shares. Each BGI
exchangeable share is exchangeable for 0.53 of a Barrick common share
at any time at the option of the holder and has essentially the same
voting, dividend (payable in Canadian dollars), and other rights as
0.53 of a Barrick common share. BGI is a subsidiary that holds our
interest in the Hemlo and Eskay Creek Mines.
At March 31, 2004, 1.5 million BGI exchangeable shares were
outstanding, which are equivalent to 0.8 million Barrick common
shares. The equivalent common share amounts are reflected in the
number of common shares outstanding.
At any time on or after December 31, 2008, or when fewer than 1.4
million BGI exchangeable shares are outstanding, we have the right to
require the exchange of each outstanding BGI exchangeable share for
0.53 of a Barrick common share. While there are exchangeable shares
outstanding, we are required to present summary consolidated
financial information relating to BGI for holders of exchangeable
shares.
Summarized financial information for BGI
---------------------------------------------------------------------
For the three months ended March 31 2004 2003
---------------------------------------------------------------------
Total revenues and other income $ 52 $ 52
Costs and expenses (53) (53)
---------------------------------------------------------------------
Loss before taxes $ (1) $ (1)
---------------------------------------------------------------------
Net loss $ (3) $ (6)
---------------------------------------------------------------------
---------------------------------------------------------------------
At March 31, 2004 At December 31, 2003
---------------------------------------------------------------------
Assets
Current assets $ 59 $ 72
Non-current assets 220 233
---------------------------------------------------------------------
$ 279 $ 305
---------------------------------------------------------------------
Liabilities and shareholders' equity
Other current liabilities $ 15 $ 20
Intercompany notes payable 524 546
Other long-term liabilities 12 11
Deferred income taxes 63 67
Shareholders' equity (335) (339)
---------------------------------------------------------------------
$ 279 $ 305
---------------------------------------------------------------------
17 EMPLOYEE STOCK-BASED COMPENSATION
Common stock options
Stock option activity (shares in millions)
---------------------------------------------------------------------
Shares Average Shares Average
(number) price (C$) (number) price (US$)
---------------------------------------------------------------------
At January 1, 2004 21.5 2.3
Granted 0.3 $ 27.59 -
Exercised (0.7) $ 24.47 (0.2) $ 14.00
Canceled or expired (0.1) $ 26.19 -
---------------------------------------------------------------------
At March 31, 2004 21.0 2.1
---------------------------------------------------------------------
Under Accounting Principles Board Opinion No. 25 (Accounting for
Stock Issued to Employees) (APB 25), we recognize compensation cost
for stock options in earnings based on the excess, if any, of the
quoted market price of the stock at the grant date of the award over
the option exercise price. Generally, the exercise price for stock
options granted to employees equals the fair market value of our
common stock at the date of grant, resulting in no compensation cost.
FASB Statement No. 123 (Accounting for Stock-Based Compensation)
(FAS 123) encourages, but does not require, companies to record
compensation cost for stock-based employee compensation plans based
on the fair value of options granted. We have elected to continue to
account for stock-based compensation using the intrinsic value method
prescribed in APB 25 and its related interpretations, and to provide
disclosures of the pro forma effects of adoption had we recorded
compensation expense under the fair value method.
Stock option expense (per share amounts in dollars)
---------------------------------------------------------------------
For the three months ended March 31 2004 2003
---------------------------------------------------------------------
Pro forma effects
Net income, as reported $26 $ 29
Stock option expense (7) (6)
---------------------------------------------------------------------
Pro forma net income $19 $ 23
---------------------------------------------------------------------
Net income per share
As reported(1) $0.05 $ 0.05
Pro forma(1) $0.04 $ 0.04
---------------------------------------------------------------------
(1) basic and diluted
18 CONTINGENCIES
Certain conditions may exist as of the date the consolidated
financial statements are issued, which may result in a loss to the
Company but which will only be resolved when one or more future
events occur or fail to occur. Management and, where appropriate,
legal counsel, assess such contingent liabilities, which inherently
involves an exercise of judgment.
In assessing loss contingencies related to legal proceedings that
are pending against us or unasserted claims that may result in such
proceedings, the Company and its legal counsel evaluate the perceived
merits of any legal proceedings or unasserted claims as well as the
perceived merits of the amount of relief sought or expected to be
sought.
If the assessment of a contingency suggests that it is probable
that a loss has been incurred and the amount of the liability can be
estimated, then the estimated liability is accrued in the
consolidated financial statements. If the assessment suggests that a
potentially material loss contingency is not probable but is
reasonably possible, or is probable but cannot be estimated, then the
nature of the contingent loss, together with an estimate of the range
of possible loss, if determinable, is disclosed. Loss contingencies
considered remote are generally not disclosed unless they involve
guarantees, in which case we disclose the nature of the guarantee.
Litigation and claims
Bre-X Minerals
On April 30, 1998, we were added as a defendant in a class action
lawsuit initiated against Bre-X Minerals Ltd., certain of its
directors and officers or former directors and officers and others in
the United States District Court for the Eastern District of Texas,
Texarkana Division. The class action alleges, among other things,
that statements made by us in connection with our efforts to secure
the right to develop and operate the Busang gold deposit in East
Kalimantan, Indonesia were materially false and misleading and
omitted to state material facts relating to the preliminary due
diligence investigation undertaken by us in late 1996.
On July 13, 1999, the Court dismissed the claims against us and
several other defendants on the grounds that the plaintiffs had
failed to state a claim under United States securities laws. On
August 19, 1999, the plaintiffs filed an amended complaint restating
their claims against us and certain other defendants and on June 14,
2000 filed a further amended complaint, the Fourth Amended Complaint.
On March 31, 2001, the Court granted in part and denied in part
our Motion to Dismiss the Fourth Amended Complaint. As a result, we
remain a defendant in the case. We believe that the remaining claims
against us are without merit. We filed our formal answer to the
Fourth Amended Complaint on April 27, 2001 denying all relevant
allegations of the plaintiffs against us. Discovery in the case has
been stayed by the Court pending the Court's decision on whether or
not to certify the case as a class action. The amount of potential
loss, if any, which we may incur arising out of the plaintiffs'
claims is not presently determinable.
On March 31, 2003, the Court denied all of the Plaintiffs'
motions to certify the case as a class action. Plaintiffs have not
filed an interlocutory appeal of the Court's decision denying class
certification to the Fifth Circuit Court of Appeals. On June 2, 2003,
the Plaintiffs submitted a proposed Trial and Case Management Plan,
suggesting that the Plan would cure the defects in the Plaintiffs'
motions to certify the class. The Court has taken no action with
respect to the proposed Trial and Case Management Plan. The
Plaintiffs' case against the Defendants may now proceed in due
course, but not on behalf of a class of Plaintiffs but only with
respect to the specific claims of the Plaintiffs named in the
lawsuit. Having failed to certify the case as a class action, we
believe that the likelihood of any of the named Defendants succeeding
against Barrick with respect to their claims for securities fraud is
remote.
Blanchard complaint
On January 7, 2003, we were served with a Complaint for
Injunctive Relief by Blanchard and Company, Inc. ("Blanchard"), and
Herbert Davies ("Davies"). The complaint, which is pending in the U.
S. District Court for the Eastern District of Louisiana, also names
J. P. Morgan Chase & Company ("J.P. Morgan") as a defendant, along
with an unspecified number of additional defendants to be named
later. The complaint, which has been amended several times, alleges
that we and bullion banks with which we entered into spot deferred
contracts have manipulated the price of gold, in violation of U.S.
antitrust laws and the Louisiana Unfair Trade Practices and Consumer
Protection Law. Blanchard alleges that it has been injured as a
seller of gold due to reduced interest in gold as an investment.
Davies, a customer of Blanchard, alleges injury due to the reduced
value of his gold investments. The complaint seeks damages and an
injunction terminating certain of our trading agreements with J. P.
Morgan and other bullion banks. In September 2003 the Court issued an
Order granting in part and denying in part Barrick's motions to
dismiss this action. Discovery has commenced in the case and a trial
date has been tentatively set for February 2005. We intend to defend
the action vigorously.
Wagner complaint
On June 12, 2003, a complaint was filed against Barrick and
several of its current or former officers in the U.S. District Court
for the Southern District of New York. The complaint is on behalf of
Barrick shareholders who purchased Barrick shares between February
14, 2002 and September 26, 2002. It alleges that Barrick and the
individual defendants violated U.S. securities laws by making false
and misleading statements concerning Barrick's projected operating
results and earnings in 2002. The complaint seeks an unspecified
amount of damages. Other parties on behalf of the same proposed class
of Barrick shareholders filed several other complaints, making the
same basic allegations against the same defendants. In September
2003, the cases were consolidated into a single action in the
Southern District of New York. The plaintiffs filed a Consolidated
and/or Amended Complaint on November 5, 2003. On January 14, 2004
Barrick filed a motion to dismiss the Wagner complaint. The
plaintiffs filed an opposition to Barrick's motion to dismiss on
March 12, 2004. On April 2, 2004, Barrick filed its reply to the
plaintiff's opposition. We intend to defend the action vigorously.
Other
From time to time, we are involved in various claims, legal
proceedings and complaints arising in the ordinary course of
business. We are also subject to reassessment for income and mining
taxes for certain years. We do not believe that adverse decisions in
any pending or threatened proceedings related to any potential tax
assessments or other matters, or any amount which we may be required
to pay by reason thereof, will have a material adverse effect on our
financial condition or future results of operations.
Mine Statistics
UNITED STATES
---------------------------------------------------------------------
(Unaudited) Goldstrike Round
Three months Open Pit Underground Total Mountain
ended March 31 2004 2003 2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined
(thousands) 34,086 37,480 438 410 34,524 37,890 4,786 7,319
Tons processed
(thousands) 2,661 2,602 452 407 3,113 3,009 9,609 7,464
Average grade
(ounces per
ton) 0.144 0.136 0.383 0.418 0.179 0.174 0.016 0.019
Recovery rate
(percent) 82.8% 80.5% 89.0% 87.0% 83.7% 82.7% n/a n/a
---------------------------------------------------------------------
Production
(thousands of
ounces) 318 285 154 148 472 433 93 96
Production costs
per ounce
Cash operating
costs $250 $247 $230 $194 $243 $229 $174 $149
Royalties and
production
taxes 17 19 23 24 19 20 33 19
---------------------------------------------------------------------
Total cash
costs 267 266 253 218 262 249 207 168
Amortization 63 60 120 117 82 80 60 57
---------------------------------------------------------------------
Total production
costs $330 $326 $373 $335 $344 $329 $267 $225
---------------------------------------------------------------------
Capital
expenditures
(US$ millions) $3 $6 $6 $6 $9 $12 $- $1
---------------------------------------------------------------------
AUSTRALIA
---------------------------------------------------------------------
Three months Plutonic Darlot Lawlers Kalgoorlie
ended March 31 2004 2003 2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined
(thousands) 2,613 3,338 212 221 401 535 11,680 11,195
Tons processed
(thousands) 694 778 218 210 208 186 1,600 1,637
Average grade
(ounces per
ton) 0.132 0.101 0.162 0.210 0.131 0.116 0.073 0.067
Recovery rate
(percent) 90.5% 89.0% 97.2% 97.6% 97.0% 96.0% 87.4% 85.6%
---------------------------------------------------------------------
Production
(thousands of
ounces) 83 70 34 43 27 21 102 94
Production costs
per ounce
Cash operating
costs $186 $184 $201 $133 $229 $303 $217 $208
Royalties and
production
taxes 8 8 7 8 7 8 6 8
---------------------------------------------------------------------
Total cash
costs 194 192 208 141 236 311 223 216
Amortization 31 18 48 49 45 21 39 52
---------------------------------------------------------------------
Total production
costs $225 $210 $256 $190 $281 $332 $262 $268
---------------------------------------------------------------------
Capital
expenditures
(US$ millions) $2 $5 $2 $2 $1 $9 $2 $1
---------------------------------------------------------------------
Mine Statistics
CANADA
---------------------------------------------------------------------
(Unaudited)
Three months Hemlo Eskay Creek Holt-McDermott
ended March 31 2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined
(thousands) 890 990 65 68 139 144
Tons processed
(thousands) 477 455 60 66 135 139
Average grade
(ounces per
ton) 0.137 0.158 1.145 1.437 0.150 0.160
Recovery rate
(percent) 94.1% 95.0% 93.2% 93.4% 92.6% 94.5%
---------------------------------------------------------------------
Production
(thousands of
ounces) 61 68 66 84 19 21
Production costs
per ounce
Cash operating
costs $217 $220 $(25) $65 $238 $280
Royalties and
production
taxes 10 7 6 4 - 1
---------------------------------------------------------------------
Total cash
costs 227 227 (19) 69 238 281
Amortization 40 37 179 136 145 123
---------------------------------------------------------------------
Total
production
costs $267 $264 $160 $205 $383 $404
---------------------------------------------------------------------
Capital
expenditures
(US$ millions) $1 $3 $1 $2 $- $-
---------------------------------------------------------------------
PERU TANZANIA
---------------------------------------------------------------------
Pierina Bulyanhulu
Three months ended March 31 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 10,323 8,544 284 241
Tons processed (thousands) 4,038 3,622 272 259
Average grade (ounces per ton) 0.049 0.083 0.337 0.399
Recovery rate (percent) - - 88.4% 87.3%
---------------------------------------------------------------------
Production (thousands of ounces) 232 231 81 90
Production costs per ounce
Cash operating costs $82 $85 $263 $181
Royalties and production taxes - - 13 11
---------------------------------------------------------------------
Total cash costs 82 85 276 192
Amortization 165 183 107 117
---------------------------------------------------------------------
Total production costs $247 $268 $383 $309
---------------------------------------------------------------------
Capital expenditures (US$
millions) $2 $1 $8 $10
---------------------------------------------------------------------
CORPORATE OFFICE TRANSFER AGENTS AND REGISTRARS
Barrick Gold Corporation CIBC Mellon Trust Company
BCE Place, Canada Trust Tower, P.O. Box 7010, Adelaide Street
Suite 3700 Postal Station
161 Bay Street, P.O. Box 212 Toronto, Ontario M5C 2W9
Toronto, Canada M5J 2S1 Tel: (416) 643-5500
Tel: (416) 861-9911 Toll-free throughout North
Fax: (416) 861-0727 America: 1-800-387-0825
Toll-free within Canada and Fax: (416) 643-5501
United States: 1-800-720-7415 Email: inquiries@cibcmellon.ca
Email: investor@barrick.com Web site: www.cibcmellon.com
Web site: www.barrick.com
SHARES LISTED (ABX) Mellon Investor Services L.L.C.
The Toronto Stock Exchange 85 Challenger Road, Overpeck
The New York Stock Exchange Center
The London Stock Exchange Ridgefield Park, New Jersey 07660
The Swiss Stock Exchange Tel: (201) 329-8660
La Bourse de Paris Toll-free within the United
States:
1-800-589-9836
Web site: www.mellon-investor.com
INVESTOR CONTACTS: MEDIA CONTACT:
Darren Blasutti Vincent Borg
Vice President, Vice President,
Investor Relations Corporate Communications
Tel: (416) 307-7341 Tel: (416) 307-7477
Email: dblasutti@barrick.com Email: vborg@barrick.com
Mary Ellen Thorburn
Senior Manager,
Investor Relations
Tel: (416) 307-7363
Email: mthorburn@barrick.com
Barrick's exploration programs are designed and conducted under
the supervision of Alexander J. Davidson, P. Geo., Executive Vice
President, Exploration of Barrick. For information on the geology,
exploration activities generally, and drilling and analysis
procedures on Barrick's material properties, see Barrick's most
recent Annual Information Form on file with Canadian provincial
securities regulatory authorities and the U.S. Securities and
Exchange Commission.
Certain statements included herein, including those regarding
production, costs and other statements that express management's
expectations or estimates of future performance, constitute
"forward-looking statements" within the meaning of the United States
Private Securities Litigation Reform Act of 1995. The words "believe",
"expect", "anticipate", "contemplate", "target", "plan", "intends",
"continue", "budget", "estimate", "may", "will", "schedule", and
similar expressions identify forward-looking statements.
Forward-looking statements are necessarily based upon a number of
estimates and assumptions that, while considered reasonable by
management are inherently subject to significant business, economic
and competitive uncertainties and contingencies. In particular, the
Management's Discussion and Analysis includes many such
forward-looking statements and the Company cautions the reader that
such forward-looking statements involve known and unknown risks,
uncertainties and other factors that may cause the actual financial
results, performance or achievements of Barrick to be materially
different from the Company's estimated future results, performance or
achievements expressed or implied by those forward-looking statements
and the forward-looking statements are not guarantees of future
performance. These risks, uncertainties and other factors include, but
are not limited to: changes in the worldwide price of gold or certain
other commodities (such as silver, copper and electricity) and
currencies; legislative, political or economic developments in the
jurisdictions in which Barrick carries on business; operating or
technical difficulties in connection with mining or development
activities; the speculative nature of gold exploration and
development, including the risks of diminishing quantities or grades
of reserves; and the risks involved in the exploration, development
and mining business. These factors are discussed in greater detail in
Barrick's Management's Discussion and Analysis contained in its 2003
Annual Report and its most recent Form 40-F/Annual Information Form on
file with the U.S. Securities and Exchange Commission and Canadian
provincial securities regulatory authorities.
Barrick expressly disclaims any intention or obligation to update
or revise any forward-looking statements whether as a result of new
information, events or otherwise.
CONTACT: Barrick Gold Corporation
Vincent Borg, 416-307-7477
fax: (416) 861-1509
media@barrick.com
SOURCE: Barrick Gold Corporation