TORONTO--(BUSINESS WIRE)--Oct. 26, 2004--Barrick Gold Corporation
(NYSE:ABX) (TSX:ABX) (LSE:ABX) (BOURSE:ABX) (SWX:ABX)
THIRD QUARTER REPORT 2004 - OCTOBER 26, 2004
Based on US GAAP and expressed in US dollars.
Highlights
-- Third quarter net income was $32 million, or $0.06 per share,
and cash flow from operations was $152 million, or $0.28 per
share.
-- Third quarter production was 1.23 million ounces of gold at an
average total cash cost of $218(1) per ounce, bringing
year-to-date production to 3.79 million ounces of gold at an
average total cash cost of $208 per ounce. The Company is on
track with its original guidance to produce between 4.9 - 5.0
million ounces of gold for the year at an average total cash
cost of $205 - $215 per ounce.
-- Steady progress continues to be made on the development of
Barrick's four new mines, with three of the mines planned to
enter production next year. Barrick's development pipeline is
driving a Company target of 6.8 - 7.0 million ounces of gold
production in 2007.
-- At Pascua-Lama, Barrick's fifth new mine that straddles the
Chilean and Argentine border, the mining protocol was signed
by both governments. The protocol resolves certain issues such
as border crossings by personnel and materials.
-- The Company is proceeding with the East Archimedes project,
located at the Ruby Hill mine site in Nevada.
-- The previously-announced $250-million project financing
facility for Veladero was finalized with a group of commercial
banks and export credit agencies. A total of $167 million has
been drawn under the facility at September 30, 2004.
-- The Company reduced its gold hedge position by 200,000 ounces
in the quarter to 13.7 million ounces, leaving 84% of the
Company's reserves(2) unhedged. To date in 2004, the Company
has reduced its hedge book by 1.85 million ounces and will
continue to opportunistically reduce its hedge position.
Barrick Gold Corporation today reported earnings of $32 million
($0.06 per share) and operating cash flow of $152 million for third
quarter 2004, compared to earnings of $35 million ($0.07 per share)
and operating cash flow of $187 million in the year-earlier period.
The Company's earnings in third quarter 2004 included a $9-million
after-tax non-hedge derivative gain and an after-tax opportunity cost
of $9 million through a voluntary reduction of the Company's hedge
position at realized prices below the average spot price. Third
quarter 2004 earnings were lower than the prior-year quarter due to
lower gold sales and higher total cash costs offset in part by higher
realized gold prices. As expected, in third quarter 2004 the Company
produced slightly fewer ounces than the first and second quarters at
total cash costs higher than full-year guidance, primarily due to mine
sequencing at Pierina, and processing lower-grade ore at Eskay Creek,
Hemlo and Bulyanhulu.
Year-to-date 2004 net income was $92 million ($0.17 per share) and
operating cash flow was $386 million, including an after-tax
opportunity cost of $67 million through a voluntary 1.85 million ounce
reduction of the Company's hedge position. This compares to net income
of $123 million ($0.23 per share) and operating cash flow of $379
million in the year-earlier period.
"Results for the quarter were steady and as expected, and we
continue to make progress on building mines," said Greg Wilkins,
President and Chief Executive Officer, "Although the industry has
faced significant inflationary pressure, we remain on track to meet
our production and total cash cost guidance for the year."
PRODUCTION AND COSTS
In third quarter 2004, Barrick produced 1.23 million ounces of
gold at an average total cash cost of $218 per ounce, compared to 1.48
million ounces at $180 per ounce for the prior-year quarter.
Year-to-date 2004 production was 3.79 million ounces of gold at an
average total cash cost of $208 per ounce, compared to 4.21 million
ounces at $186 per ounce for the prior-year period. The Company
continues to have the lowest cash costs of the senior gold producers.
The North American region had a solid production quarter, with
only a slight decrease in production over the second quarter 2004. As
expected, average total cash costs were higher than the first half due
to higher costs at Hemlo and Eskay Creek, but the region is expected
to meet its plan for full year 2004.
In the South American region, third quarter 2004 production from
Pierina was lower than in the first and second quarters and at higher
total cash costs due to planned mine sequencing changes implemented
during third quarter 2004. As previously indicated, full-year
production is expected to be slightly lower than the original guidance
for 2004 at slightly higher total cash costs.
The Australian/African region performed well, with third quarter
2004 production exceeding second quarter 2004 production. Lower total
cash costs at Kalgoorlie were offset by higher costs at Bulyanhulu.
The region is expected to exceed its production plan for the year.
Average total cash costs remained relatively constant in the third
quarter 2004 as compared to the second quarter 2004.
To mitigate the impact of rising fuel prices on total cash costs,
the Company has put in place a fuel hedge position for a total of 2.2
million barrels (93.5 million gallons) of oil. These contracts will
protect the equivalent of just under 50% of the Company's expected
requirements over the next three years.
The Company re-affirmed its expectations that 2004 production
should be between 4.9 - 5.0 million ounces at an average total cash
cost of $205 - $215 per ounce. Exploration, development and business
development expense is expected to be $135 - $140 million, $10 million
higher than the previous guidance, due primarily to additional
drilling activity at a number of exploration properties. The Company
expects to more than replace its reserves in 2004.
DEVELOPMENT PROJECTS UPDATE
Progress on all of Barrick's development projects is going well.
The projects achieved a number of important milestones during the
quarter keeping them on track for scheduled production commencement.
The projects are encountering some inflationary cost pressure and the
Company is working on a variety of fronts to mitigate the impact.
Construction capital at Veladero in Argentina is expected to
increase approximately 10 - 15% from the previous guidance of $475
million due to a number of factors including increases in commodity
prices, such as fuel, concrete and steel; exchange rate variations;
higher labor costs; increased winter operations costs and some
preliminary changes to scope of the project. Estimated future total
cash costs are also being affected by similar cost pressures. The
Company is currently evaluating a number of alternatives, which will
mitigate a good portion of the cost increases, but may require some
additional capital investment.
The project completed its first winter season successfully with
overall mine development approximately 50% complete. Production is
expected to commence in late 2005. Construction of the plant
facilities is well advanced and preparation of the valley fill leach
facility embankment commenced during the quarter. The mining
operations are ramping up and unanticipated ore was encountered in the
waste cap. Resource drilling is showing some favorable results
suggesting that the reserve has the potential to continue to increase.
To date, Barrick has drawn down $167 million on its $250-million
Veladero project financing with commercial banks and export credit
agencies.
Progress continues on schedule and on budget at the Lagunas Norte
deposit in the Alto Chicama district in Peru, with overall mine
development 55% complete. Production is expected to commence in the
second half of 2005.
The Company's Cowal project in Australia is progressing well. The
project remains on budget and production is expected to commence in
first quarter 2006.
At the 70%-owned Tulawaka joint venture in Tanzania, construction
is proceeding according to schedule. Site preparation and construction
is progressing well, with start-up expected in first quarter 2005.
Early in third quarter 2004, the Company announced that it was
proceeding with the development of the Pascua-Lama project. Also
during the quarter, the mining protocol for the Pascua-Lama project
that straddles the Chilean and Argentine border was signed by the two
governments. The protocol provides the framework for resolving issues
such as border crossings by personnel and materials. Efforts at
Pascua-Lama have been focused on community and government relations,
permitting, protocol implementation and tax stability. Work continues
on updating the environmental impact assessments which are expected to
be filed by year end.
A decision was made in September 2004 to proceed with the East
Archimedes project, located at the Ruby Hill mine site in Nevada. An
expected two-year construction phase will begin once permitting has
been secured. East Archimedes reserves are comprised of proven
reserves of 13.99 million tons at an average grade of 0.061 ounces per
ton and probable reserves of 2.58 million tons at an average grade of
0.057 ounces per ton.
In Nevada, Barrick has received all principal permits for the
115-megawatt natural gas-fired power plant that will supply its
Goldstrike property. Early in fourth quarter 2004, an agreement was
entered into with Wartsila to provide a turnkey power facility. Site
preparation will commence in early November and delivery of the first
engines is anticipated early in second quarter 2005. The plant is
expected to commence operation in fourth quarter 2005.
MANAGEMENT APPOINTMENTS
In a move to continue to strengthen its management team, Barrick
recently announced several executive appointments. John McDonough, a
20-year veteran with Barrick, has been named Vice President,
Chile/Argentina and will focus on the development of Veladero and
Pascua-Lama, as well as managing the regional business unit. John
Shipp, a 36-year industry veteran was promoted to Vice President,
Australia/Africa. He will focus on growing the regional business unit
and optimizing the existing assets and development projects. George
Potter joins the Company as Vice President, Capital Projects and will
have oversight responsibility for Barrick's management of scoping,
pre-feasibility, feasibility and development of major capital
projects. Ron Kettles joins Barrick as Project Director, Pascua-Lama,
and will be directly responsible for successful development of the
project and will oversee the team charged with engineering and
construction of this project.
GOLD SALES CONTRACTS
During the quarter, Barrick reduced its gold hedge position by
200,000 ounces, bringing the year-to-date reduction to 1.85 million
ounces, exceeding its target of 1.5 million ounces. At quarter end,
the Company's gold hedge position was 13.7 million ounces, leaving 84%
of the Company's reported proven and probable gold reserves unhedged.
The Company has also reduced its silver hedge position to 15.9
million ounces, or about one year of silver production, at the end of
third quarter 2004.
EXPLORATION UPDATE
During third quarter 2004, Barrick had drill programs underway on
23 properties(3). Early stage exploration was carried out in all
regions during the quarter, with less activity in Chile and Argentina
due to winter conditions.
In North America, drill programs continued at Goldstrike at the
North and South Pit targets designed to convert existing resources to
reserves as well as add new resources. Results continue to be
positive, with significant open pit grade intersections encountered in
80% of the holes drilled to date. In addition, the Betze Drift project
commenced in the third quarter. In addition to operating efficiencies,
the strategic positioning of the drift will provide a drill base along
the strike length of the North Post ore-body for resource definition
and upgrade as well as provide a drill base for exploration drilling
to the west of the drift and deep drilling. The drift is expected to
be complete by the end of first quarter 2005. On the Rossi and Dee
properties, an underground drill program to better define the Storm
resource continued during the quarter, and a pre-feasibility study is
in progress. A drill program commenced at Ruby Deeps, exploring for
deeper, higher-grade mineralization below East Archimedes. At Gold
Hill, the Phase II drill program was completed and results confirmed
the geologic model. Metallurgical testwork is in progress and a
resource update is planned for year end.
In Peru, drill programs are in progress in the Alto Chicama
District at Lagunas Sur and Alto La Bandera, located just south of
Lagunas Norte. Geotechnical studies and testwork are planned at
Lagunas Sur in the fourth quarter. Regional exploration is
prioritizing areas for follow up.
During the third quarter, regional compilation work was completed
for the Frontera District in Chile/Argentina. Target areas were
prioritized and a field program will be carried out in the fourth
quarter, followed by an extensive drill program in 2005, including the
Veladero and Pascua-Lama concessions as well as close proximity drill
targets.
In Africa, the Phase II drill program at Buzwagi (formerly
Chocolate Reef), located about 80 kilometers south of Bulyanhulu, was
completed during the quarter, with positive results. Additional
drilling will be carried out to further evaluate extensions to the
mineralization and a pre-feasibility study is underway to convert
existing resources to reserve (for Canadian reporting purposes) as
well as add resources. Exploration is also ongoing on properties in
the Lake Victoria Goldfield and the Golden Ridge area, with drilling
planned on some of the properties in the fourth quarter.
Barrick's mission is to be the world's best gold company by
finding, developing and producing quality gold reserves in a
profitable and socially responsible manner. Barrick's shares are
traded on the Toronto, New York, London and Swiss stock exchanges and
the Paris Bourse.
(1) For an explanation of non-GAAP performance measures, refer to
pages 27 - 30 of the Management's Discussion and Analysis found in the
Third Quarter Report 2004.
(2) Based on reserves calculated as at December 31, 2003 using an
assumed price of $325 per ounce for gold and $4.75 per ounce for
silver, except with respect to the Pascua-Lama project where reserves
have been calculated as at June 30, 2004 using an assumed gold price
of $350 per ounce and an assumed silver price of $5.50 per ounce and
the East Archimedes project where reserves have been calculated as at
September 30, 2004 using an assumed gold price of $350 per ounce.
Reserve calculations have been performed by employees of Barrick under
the supervision of Rene Marion, P.Eng., Vice President Technical
Services of Barrick, and Alexander J. Davidson, P.Geo., Executive Vice
President Exploration of Barrick. For additional information on
reserves, see the most recent Annual Information Form / Form 40-F.
(3) Barrick's exploration programs are designed and conducted
under the supervision of Alexander J. Davidson, P. Geo., Executive
Vice President, Exploration of Barrick. For information on the
geology, exploration activities generally, and drilling and analysis
procedures on Barrick's material properties, see Barrick's most recent
Annual Information Form on file with Canadian provincial securities
regulatory authorities and the US Securities and Exchange Commission.
THIRD QUARTER REPORT 2004
CONTENTS PAGE
---------------------------------------------------------------------
Key Statistics 6
Production and Cost Summary 7
Operating and Financial Summary
Financial Results 8
Regional Operating and Developing Segments 9
Consolidated Statements of Income 14
Consolidated Statements of Cash Flows 15
Consolidated Balance Sheets 16
Consolidated Statements of Shareholders'
Equity and Comprehensive Income 17
Management's Discussion and Analysis 18
Income Statement 18
Gold Production and Sales 18
Cost of Sales and Other Operating Expenses 18
Currency Hedging 18
Fuel Hedging 18
Amortization 19
Administration 19
Exploration, Development and Business Development Expense 19
Interest Expense 19
0ther Income/Expense 20
Non-Hedge Derivative Gains and Losses 20
Income Taxes 20
Statement of Comprehensive Income 20
Cash Flow Statement 21
Liquidity and Capital Resources 21
Capital Structure 21
Operating Activities 21
Investing Activities 21
Financing Activities 22
Critical Accounting Policies and Estimates 22
Off-Balance Sheet Arrangements 22
Forward Gold Sales Contracts 22
Contractual Obligations and Commitments 26
Quarterly Information 26
Canadian Supplement 26
Outstanding Share Data 26
Non-GAAP Performance Measures 27
Notes to Unaudited Interim Consolidated Financial Statements 31
Mine Statistics 56
Key Statistics
Three months ended Nine months ended
(in United States dollars) September 30, September 30,
---------------------------------------------------------------------
(Unaudited) 2004 2003 2004 2003
---------------------------------------------------------------------
Operating Results
Gold production (thousands of
ounces) 1,232 1,479 3,789 4,209
Gold sold (thousands of ounces) 1,267 1,505 3,736 4,193
Per Ounce Data
Average spot gold price $ 401 $ 364 $ 401 $ 354
Average realized gold price 395 365 383 358
Cash operating costs (3) 205 168 196 174
Total cash costs (1), (3) 218 180 208 186
Amortization (3) 89 85 90 88
Total production costs (3) 307 265 298 274
---------------------------------------------------------------------
Financial Results (millions)
Gold sales $ 500 $ 549 $ 1,431 $ 1,499
Net income 32 35 92 123
Operating cash flow 152 187 386 379
Per Share Data (dollars)
Net income (basic and diluted) 0.06 0.07 0.17 0.23
Operating cash flow 0.28 0.35 0.72 0.71
Weighted average common shares
outstanding (millions) (2) 533 534 535 534
---------------------------------------------------------------------
As at As at
September 30, December 31,
----------------------------
2004 2003
-------------------------------------------------------------
Financial Position (millions)
Cash and equivalents $ 775 $ 970
Non-cash working capital (32) 45
Long-term debt 867 719
Shareholders' equity 3,380 3,494
-------------------------------------------------------------
(1) Comprises cash operating costs, royalties and production taxes.
(2) Fully diluted, includes shares issuable upon exchange of BGI
(Barrick Gold Inc.) exchangeable shares.
(3) For an explanation of the use of non-GAAP performance measures
refer to pages 27 to 30 of Management's Discussion and Analysis.
Production and Cost Summary
Production (attributable ounces)
---------------------------------------------------------------------
Three months ended Nine months ended
September 30, September 30,
---------------------------------------------------------------------
(Unaudited) 2004 2003 2004 2003
---------------------------------------------------------------------
North America
Open Pit 356,498 494,782 1,008,609 1,234,510
Underground 140,015 143,127 427,512 404,465
---------------------------------------------------------------------
Goldstrike Property Total 496,513 637,909 1,436,121 1,638,975
Eskay Creek 59,835 87,377 216,240 268,683
Round Mountain 105,903 92,464 297,501 301,590
Hemlo 53,537 73,056 181,046 202,958
Holt-McDermott 15,149 24,099 54,578 66,312
Marigold 11,943 12,634 31,639 34,443
---------------------------------------------------------------------
742,880 927,539 2,217,125 2,512,961
---------------------------------------------------------------------
South America
Pierina 133,132 215,237 551,861 705,871
---------------------------------------------------------------------
Australia/Africa
Plutonic 72,259 96,420 230,604 245,714
Darlot 42,160 37,452 112,304 117,641
Lawlers 28,916 25,154 81,779 71,868
Kalgoorlie 128,873 109,306 334,201 320,600
---------------------------------------------------------------------
272,208 268,332 758,888 755,823
Bulyanhulu 83,347 67,940 261,303 234,814
---------------------------------------------------------------------
355,555 336,272 1,020,191 990,637
---------------------------------------------------------------------
Total 1,231,567 1,479,048 3,789,177 4,209,469
---------------------------------------------------------------------
Total Cash Costs (US$/oz)
---------------------------------------------------------------------
---------------------------------------------------------------------
Three months ended Nine months ended
September 30, September 30,
---------------------------------------------------------------------
(Unaudited) 2004 2003 2004 2003
---------------------------------------------------------------------
North America
Open Pit $ 247 $ 212 $ 254 $ 227
Underground 279 262 264 251
---------------------------------------------------------------------
Goldstrike Property Total 255 222 257 234
Eskay Creek 63 9 40 62
Round Mountain 201 170 207 168
Hemlo 268 211 243 226
Holt-McDermott 157 202 197 248
Marigold 202 173 199 165
---------------------------------------------------------------------
229 195 225 207
---------------------------------------------------------------------
South America
Pierina 118 81 99 81
---------------------------------------------------------------------
Australia/Africa
Plutonic 221 179 214 192
Darlot 193 163 199 159
Lawlers 247 201 245 242
Kalgoorlie 224 195 228 207
---------------------------------------------------------------------
221 186 221 198
Bulyanhulu 279 277 270 229
---------------------------------------------------------------------
237 203 233 205
---------------------------------------------------------------------
Total $ 218 $ 180 $ 208 $ 186
---------------------------------------------------------------------
Total Production Costs (US$/oz)(1)
---------------------------------------------------------------------
Three months ended Nine months ended
September 30, September 30,
---------------------------------------------------------------------
(Unaudited) 2004 2003 2004 2003
---------------------------------------------------------------------
Direct mining costs at market
foreign exchange rates $ 251 $ 201 $ 244 $ 204
Gains realized on currency hedge
contracts (20) (11) (20) (10)
By-product credits (26) (22) (28) (20)
---------------------------------------------------------------------
Cash operating costs 205 168 196 174
Royalties 10 9 10 9
Production taxes 3 3 2 3
---------------------------------------------------------------------
Total cash costs 218 180 208 186
Amortization 89 85 90 88
---------------------------------------------------------------------
Total production costs $ 307 $ 265 $ 298 $ 274
---------------------------------------------------------------------
(1) For an explanation of the use of non-GAAP performance measures
refer to pages 27 to 30 of Management's Discussion and Analysis.
OPERATING AND FINANCIAL SUMMARY
For the periods ended September 30
(in millions of US dollars, except per share and per ounce data)
--------------------------------------------------------------------
Three months Nine months
ended ended
2004 2003 2004 2003
--------------------------------------------------------------------
Gold production
Ounces (thousands) 1,232 1,479 3,789 4,209
Total cash costs (dollars)(A),(C) $ 218 $ 180 $ 208 $ 186
Gold sales
Ounces (thousands) 1,267 1,505 3,736 4,193
$ millions $ 500 $ 549 $ 1,431 $ 1,499
Spot gold price (dollars)(A) 401 364 401 354
Realized gold price (dollars)(A) 395 365 383 358
Net income 32 35 92 123
Net income per share(B) 0.06 0.07 0.17 0.23
Operating cash flow 152 187 386 379
--------------------------------------------------------------------
(A) Per ounce weighted average.
(B) Basic and diluted.
(C) For an explanation of the use of non-GAAP performance measures,
refer to pages 27 to 30 of Management's Discussion and Analysis.
Financial Results
Gold sales volumes, realized gold prices, total cash costs per
ounce, non-hedge derivative gains/losses, and gains on asset sales
each had a significant effect on earnings for third quarter 2004,
compared with the prior-year quarter.
Gold production for third quarter 2004 was in line with plan, but
17% lower than the prior-year quarter mainly due to the planned
processing of lower-grade ore at Goldstrike Open Pit, Eskay Creek and
Pierina. Total cash costs per ounce for third quarter 2004 were
slightly higher than plan, and $38 per ounce higher than the
prior-year quarter. The increase over the prior-year quarter was
primarily due to the expected mining of lower-grade ore at Goldstrike
Open Pit, Eskay Creek and Pierina, combined with the effect of changes
in currency hedge rates on the Australian mines. The Company expects
to meet its guidance for full year production of 4.9-5.0 million
ounces at total cash costs of $205-$215 per ounce.
In third quarter 2004, as a result of a 16% decrease in ounces
sold due to the lower production levels that was partly offset by
higher realized gold prices, revenues decreased by $49 million when
compared to the prior-year quarter. Realized gold prices were $395 per
ounce, an increase of $30 per ounce over third quarter 2003,
reflecting higher market gold prices. Realized gold prices in third
quarter 2004 reflect the voluntary delivery of a portion of production
into long-term gold hedge contracts at prices lower than prevailing
market prices. In third quarter 2004, the gold hedge position was
reduced by 0.2 million ounces to 13.7 million ounces as Barrick
continued to deliver a portion of its gold production against hedge
contracts in order to continue to reduce its hedge position.
In third quarter 2004, the Company recorded a non-hedge derivative
gain of $8 million ($9 million after tax), compared to a loss of $21
million ($22 million after tax) in the prior-year quarter. The
gains/losses arose mainly on non-hedge interest rate contracts due to
the effect of movements in US dollar interest rates and gold lease
rates.
Third quarter 2004 earnings included $2 million in after-tax gains
on asset sales versus after-tax gains of $8 million in third quarter
2003.
Operating cash flow was lower in third quarter 2004 than the
prior-year quarter primarily due to the combined effect of lower gold
sales volumes and higher total cash costs, partly offset by higher
realized gold prices.
Earnings in both years included various items that significantly
impacted the comparability of results. These items are summarized
below to assist the reader in understanding the effect of the items on
earnings and more information on the items is included within
Management's Discussion and Analysis.
Effect on earnings increase (decrease)
---------------------------------------------------------------------
($millions) Three months ended Nine months ended
September 30 September 30
2004 2003 2004 2003
---------------------------------------------------------------------
Pre- Post- Pre- Post- Pre- Post- Pre- Post-
tax tax tax tax tax tax tax tax
---------------------------------------------------------------------
Non-hedge derivative
gains (losses) $ 8 $ 9 $ (21) $ (22) $ (1) $ 3 $ 25 $ 23
Gains on asset sales 2 2 12 8 5 4 29 20
Gains (losses) on
investments - - 5 5 1 1 (3) (3)
Impairment charge
on royalty
interest (8) (5) - - (8) (5) - -
Severance costs - - (3) (2) (1) (1) (8) (6)
Change in asset
retirement
obligation
estimates (3) (2) (4) (4) (3) (2) (4) (4)
Impact of changes
in reserve
estimates at Dec.
31, 2003 on
amoritization
expense 6 4 - - 19 14 - -
Cumulative effect
of accounting
changes - - - - - - (17) (17)
Tax credits 8 8 - - 38 38 21 21
Foreign currency
translation gains
(losses) 3 3 (1) (1) 4 4 (6) (6)
---------------------------------------------------------------------
Regional Operating and Developing Segments
North America
Total Cash
Costs - per
Gold Institute
Production Cost Total Cash
Production Standard(A) Costs - per
(attributable ounces) ($/oz) US GAAP ($/oz)
---------------------------------------------------------------------
For the three months
ended September 30 2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
Goldstrike
Open Pit 356,498 494,782 $ 247 $ 212 $ 248 $ 213
Underground 140,015 143,127 279 262 280 262
---------------------------------------------------------------------
Goldstrike
property total 496,513 637,909 255 222 256 223
Eskay Creek 59,835 87,377 63 9 64 10
Round Mountain
(50% owned) 105,903 92,464 201 170 205 174
Hemlo (50% owned) 53,537 73,056 268 211 269 212
Holt-McDermott 15,149 24,099 157 202 157 202
Marigold (33% owned) 11,943 12,634 202 173 202 173
---------------------------------------------------------------------
742,880 927,539 $ 229 $ 195 $ 231 $ 197
---------------------------------------------------------------------
---------------------------------------------------------------------
For the nine months
ended September 30 2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
Goldstrike
Open Pit 1,008,609 1,234,510 $ 254 $ 227 $ 256 $ 229
Underground 427,512 404,465 264 251 265 252
---------------------------------------------------------------------
Goldstrike
property total 1,436,121 1,638,975 257 234 259 235
Eskay Creek 216,240 268,683 40 62 41 62
Round Mountain
(50% owned) 297,501 301,590 207 168 212 172
Hemlo (50% owned) 181,046 202,958 243 226 244 227
Holt-McDermott 54,578 66,312 197 248 198 250
Marigold (33% owned) 31,639 34,443 199 165 200 167
---------------------------------------------------------------------
2,217,125 2,512,961 $ 225 $ 207 $ 227 $ 208
---------------------------------------------------------------------
(A) For an explanation of the use of non-GAAP performance measures,
refer to pages 27 to 30.
In third quarter 2004, production was in line with plan, but total
cash costs per ounce were slightly higher than plan primarily because
of higher costs at Goldstrike Underground and Hemlo. The region
produced 20% less gold in third quarter 2004 compared with the
prior-year quarter mainly because of planned mining of lower-grade ore
at the Goldstrike Open Pit. When compared to the prior-year quarter,
total cash costs per ounce were 17% higher as a result of the lower
production levels and planned mining of lower-grade ore at Goldstrike.
The region is expected to meet its production plan for the full year
2004, and be within the range of guidance for total cash costs as
lower costs at Eskay Creek are expected to be partly offset by
slightly higher costs at Hemlo.
Total cash costs for the North America Region were not
significantly affected by changes in market currency exchange rates or
fuel prices. The Company has protected substantially all of its total
cash costs that are denominated in Canadian dollars through its
currency hedge program, and a significant portion of its expected
consumption of fuel over the next two to three years through its fuel
hedge program.
Goldstrike, United States
Gold production at the open pit was higher than plan in third
quarter 2004, and total cash costs were in line with plan. The Company
processed more ore from the open pit as a substitute for ore from the
underground mine. With the planned mining of lower-grade ore during
2004, production was 28% lower and total cash costs were 17% higher
than the prior-year quarter.
At the underground mine, production was below plan due to lower
than planned availability of the Rodeo backfill raise, a change in the
mining sequence and a lower mining rate. Total cash costs per ounce
were 16% higher than plan due to the lower production volumes and
higher backfill haulage costs. Production was similar to the
prior-year quarter but total cash costs per ounce were 6% higher than
plan due to the lower volumes of ore processed.
The Goldstrike property is expected to achieve its production
plan for the full year.
Eskay Creek, Canada
Production for third quarter 2004 was lower than plan due to
mining in areas that had lower than expected ore grades. Total cash
costs per ounce were better than plan due to higher by-product credits
caused by the positive impact of higher silver prices on the value of
silver contained in ore processed. The mine is expected to be slightly
below plan for production for the year, but at lower total cash costs
because of higher than planned silver by-product credits. Compared to
the prior-year quarter, as expected, production was 32% lower because
the quantity of ore processed was 13% lower, and ore grades were 25%
lower. Total cash costs per ounce were lower in the prior-year quarter
because higher silver content in the ore led to higher by-product
credits in 2003.
Round Mountain, United States
Production and total cash costs were both higher than plan in
third quarter 2004. Production was positively impacted by the recovery
of gold from leach pads where ore was placed in prior years. Total
cash costs per ounce were impacted by higher than plan usage of
cyanide and other consumables. Round Mountain is expected to exceed
its production plan for the full year, at total cash costs within the
range of guidance. Compared to the prior-year quarter, gold production
was higher due to increased quantities of ore processed, partly offset
by an expected decline in ore grades. Total cash costs per ounce
increased by 18% compared to the prior-year quarter as a result of
mining lower-grade ore and higher cyanide and other consumables usage
in 2004. Also, in third quarter 2003, higher volumes of low-cost leach
pad ounces were mined in comparison with third quarter 2004 when the
mine processed greater quantities of low-grade stockpiled ore at
higher total cash costs per ounce.
Hemlo, Canada
Production was lower than plan and total cash costs were higher
than plan in third quarter 2004. Ground stability issues caused mining
to occur in lower grade areas of the mine. For the full year, the mine
is expected to marginally underperform against plan. The mine produced
27% less gold than the prior-year quarter due to a 25% decline in ore
grades, which also resulted in 27% higher total cash costs.
Holt-McDermott, Canada
In October 2004, Barrick closed the sale of the Holt-McDermott
mine, adjacent land holdings and the mill and mill-related facilities
to Newmont Canada Limited. Newmont will assume the asset retirement
and other environmental obligations associated with the mine. A gain
on disposal of $2 million will be recorded in fourth quarter 2004.
Nevada Power Plant
In Nevada, Barrick has received principal permits for the
115-megawatt natural gas-fired power plant that will supply its
Goldstrike property. Early in fourth quarter 2004, an agreement was
entered into with Wartsila to provide a turnkey power facility. Site
preparation will commence in early November and delivery of the first
engines is anticipated early in second quarter 2005. The plant is
expected to commence operation in fourth quarter 2005.
East Archimedes, United States
In September 2004, a decision was made to proceed with the East
Archimedes project at Ruby Hill. An expected two-year construction
phase will begin once permitting has been secured. Archimedes reserves
are comprised of proven reserves of 13.99 million tons at an average
grade of 0.061 ounces per ton and probable reserves of 2.58 million
tons at an average of 0.057 ounces per ton.
South America
Total Cash
Costs - per
Gold Institute
Pierina Mine Production Cost Total Cash
Production Standard(A) Costs - per
(attributable ounces) ($/oz) US GAAP ($/oz)
---------------------------------------------------------------------
For the periods ended
September 30 2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
Three months ended 133,132 215,237 $ 118 $ 81 $ 124 $ 84
---------------------------------------------------------------------
Nine months ended 551,861 705,871 $ 99 $ 81 $ 104 $ 84
---------------------------------------------------------------------
(A) For an explanation of the use of non-GAAP performance measures,
refer to pages 27 to 30.
Pierina, Peru
Production was in line with plan, but total cash costs were 16%
higher than plan in third quarter 2004 due to the processing of
lower-grade ore. Access to higher-grade areas of the ore body was
delayed due to a change in the mining plan to adjust for minor pit
slope instability in the west pit wall. Higher fuel prices and lower
by-product credits, due to lower quantities of silver contained in the
ore processed in 2004, also contributed to total cash costs per ounce
being slightly higher than plan. Production in 2004 is expected to be
slightly lower than plan at slightly higher total cash costs for the
full year. Compared to the prior-year quarter, as expected, production
was 38% lower and total cash costs per ounce were 46% higher, due to
the mining of lower-grade ore in 2004.
Lagunas Norte, Alto Chicama District in Peru
The project remains on schedule for its first gold pour in the
second half of 2005. Highlights during third quarter 2004 include:
-- Construction of the overall Project was about 55% complete,
with about 4,000 workers on-site.
-- Capital of $83 million was spent, of which $34 million relates
to the purchase of the mine fleet, main auxiliary mine
equipment and other mine equipment.
-- The leach pad construction is underway.
-- Access road construction was completed.
-- The power line construction is now about 70% complete and the
electric towers have been erected.
Veladero, Argentina
The project remains on schedule for its first gold pour in late
2005. Construction of the plant facilities is well advanced and
preparation of the valley fill leach facility embankment commenced
during the quarter. The mining operations are ramping up and
unanticipated ore was encountered in the waste cap. Construction
capital is expected to increase approximately 10 - 15% from the
previous guidance of $475 million due to a number of factors
including: increases in commodity prices, such as fuel, concrete and
steel; exchange rate variations; higher labor costs; increased winter
operations costs and some preliminary changes to the scope of the
project. Estimated future total cash costs are also being affected by
similar cost pressures. The Company is currently evaluating a number
of alternatives which will mitigate a good portion of the cost
increases, but may require some additional capital investment.
Highlights during third quarter 2004 include:
-- Capital of $65 million was spent and the overall project is
about 50% complete.
-- Internal mine road construction is now 68% complete.
-- Work on the interior of the truck shop building continued with
completion expected in fourth quarter 2004.
-- Concrete installation in the crushing facilities is
progressing on schedule.
-- Construction of the assay lab is almost complete.
-- Pre-strip activities are behind schedule due to poor weather,
delays in equipment deliveries and lower initial equipment
productivity. Plans have been implemented to address the
shortfall and the pre-strip is expected to be completed to
enable production start-up by late 2005.
-- The permit for the leach pad embankment was received with the
additional required sectoral permits expected in due course.
Pascua-Lama, Chile/Argentina
At Pascua-Lama, efforts have been focused on community/government
relations, permitting, protocol implementation and tax stability.
Highlights during third quarter 2004 include:
-- The mining protocol for the project that straddles the border
of Chile and Argentina was signed by both governments. The
protocol provides the framework for resolving certain issues
such as border crossings by personnel and materials.
-- Work continues on updating the environmental impact
assessments, which are expected to be filed by year end.
Australia/Africa
Total Cash
Costs - per
Gold Institute
Production Cost Total Cash
Production Standard(A) Costs - per
(attributable ounces) ($/oz) US GAAP ($/oz)
---------------------------------------------------------------------
For the three months ended
September 30 2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
Kalgoorlie (50% owned) 128,873 109,306 $ 224 $ 195 $ 233 $ 197
Plutonic 72,259 96,420 221 179 223 179
Darlot 42,160 37,452 193 163 194 163
Lawlers 28,916 25,154 247 201 249 202
---------------------------------------------------------------------
272,208 268,332 221 186 226 187
Bulyanhulu 83,347 67,940 279 277 280 279
---------------------------------------------------------------------
355,555 336,272 $ 237 $ 203 $ 241 $ 204
---------------------------------------------------------------------
---------------------------------------------------------------------
For the nine months ended
September 30 2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
Kalgoorlie (50% owned) 334,201 320,600 $ 228 $ 207 $ 232 $ 210
Plutonic 230,604 245,714 214 192 215 192
Darlot 112,304 117,641 199 159 199 159
Lawlers 81,779 71,868 245 242 246 243
---------------------------------------------------------------------
758,888 755,823 221 198 223 199
Bulyanhulu 261,303 234,814 270 229 299 230
---------------------------------------------------------------------
1,020,191 990,637 $ 233 $ 205 $ 242 $ 207
---------------------------------------------------------------------
(A) For an explanation of the use of non-GAAP performance measures,
refer to pages 27 to 30.
Gold production in third quarter 2004 was higher than plan mainly
due to the mining of higher-grade ore at Kalgoorlie. Total cash costs
per ounce were also higher than plan mainly due to higher costs at
Plutonic and Bulyanhulu. For the full year, the region is expected to
exceed its production plan, and total cash costs are expected to be at
the high end of the range of guidance. In third quarter 2004, gold
production was 6% higher than the prior-year quarter as higher
production at Kalgoorlie and Bulyanhulu was partly offset by lower
production from Plutonic. Total cash costs per ounce were 17% higher
than the prior-year quarter mainly because of the processing of
lower-grade ore at Plutonic, combined with the effect of changes in
Australian dollar currency hedge rates.
Total cash costs were not significantly affected by changes in
market currency exchange rates because they are protected through the
currency hedge program. However, total cash costs in 2004 increased
because the average rates under currency hedge contracts designated
for 2004 were higher than 2003. The average exchange rate under the
hedge contracts in third quarter 2004 was $0.57 compared to $0.55 in
third quarter 2003.
Kalgoorlie, Australia
Production and total cash costs were better than plan in third
quarter 2004 due to higher than expected ore grades. Kalgoorlie is
expected to produce more gold than plan for the full year, with total
cash costs at the low end of the range of guidance for the full year.
Compared with the prior-year quarter, gold production was 18% higher
due to the processing of more higher-grade open-pit ore. Although ore
grades were better in third quarter 2004, total cash costs per ounce
were 15% higher than third quarter 2003 primarily due to higher
maintenance costs, higher fuel prices, and the effect of currency
hedge rates.
Plutonic, Australia
Production during third quarter 2004 was lower than plan and total
cash costs were higher than plan primarily due to the mining of
greater quantities of lower-grade open-pit ore. Temporary problems
with ground conditions restricted mining of higher-grade ore in the
Timor underground area, and consequently the mine processed more
open-pit ore than planned. The mine is expected to achieve its
production plan for the year, but at slightly higher total cash costs
due to the mining of more lower-grade pit ore than plan. Compared with
the prior-year quarter, gold production was 25% lower mainly due to a
20% decrease in ore tons processed and 6% lower ore grades. In 2003,
ore tons processed were higher because a secondary mill was operating
but the secondary mill ceased operating in mid-2004. Total cash costs
were 23% higher than the prior-year quarter due to the combined effect
of processing lower-grade ore, higher fuel costs and the effect of
currency hedge rates.
Darlot, Australia
Gold production for third quarter 2004 was higher than plan due to
better than expected ore grades, combined with slightly higher
processing rates than plan, partly offset by slightly lower gold
recovery rates due to higher sulphide content in the ore. Total cash
costs were in line with plan. Darlot is expected to meet its plan for
the full year. Compared with the prior-year quarter, gold production
was 13% higher due to the processing of higher-grade ore in 2004.
Although ore grades were better in 2004, total cash costs per ounce
were 18% higher due to unscheduled maintenance of the site generator,
and the effect of currency hedge rates.
Bulyanhulu, Tanzania
Gold production in third quarter 2004 was lower than plan and
total cash costs were higher than plan. Both production and total cash
costs were impacted by higher ore dilution, which caused a 15% decline
in ore grades processed compared with plan. Bulyanhulu is expected to
slightly underperform against its plan for the full year due to the
higher ore dilution that has led to lower processed ore grades.
Compared with the prior-year quarter, gold production was 23% higher
mainly because increased quantities of ore were processed with
improved mill performance. Total cash costs per ounce in third quarter
2004 were slightly higher than the prior-year quarter as a result of
higher minesite administration costs, and underground maintenance
costs, partly offset by higher copper by-product credits due to higher
market copper prices.
Cowal, Australia
The Cowal project is targeted for its first gold pour in first
quarter 2006. Highlights during third quarter 2004 include:
-- Capital expenditures were $13 million. Capital expenditures of
$11 million originally expected to take place in 2006 have
been brought forward to 2005 to maximize construction
efficiencies.
-- The pipeline for water supply has been completed.
-- Bulk excavation of the process plant site has been completed
and backfilling has started.
-- Pit dewatering is progressing and the pipeline supply contract
for pit dewatering was awarded.
-- Engineering is progressing with the completion of detailed
drawings for the mills and leach tanks.
-- Purchase orders were placed for major mining equipment items.
-- The construction contract of the electricity transmission line
was awarded to a contractor and the construction of the
conductor and power poles has begun.
-- The principal authorizations necessary for construction of
Cowal have been obtained or are in process, with the
additional required sectoral permits expected in due course.
Tulawaka, Tanzania
The 70%-owned Tulawaka project is on schedule to begin production
in first quarter 2005. Highlights during third quarter 2004 include:
-- Capital expenditures were $12 million.
-- Earthworks are progressing well with completion of the main
access road and dams for water storage and storm water
management. Full clearance of the open-pit and waste rock
storage area, development of the process plant and ROM pad, as
well as ongoing earthworks at the tailings pond were also
completed.
-- The mining contract has been awarded to an external
contractor.
-- Following rain shortfalls, the drainage system to collect
rainwater has been expanded to ensure adequate water supply
for operations.
-- The principal authorizations necessary for construction of
Tulawaka have been obtained, with the additional required
sectoral permits expected in due course.
Consolidated Statements of Income
Three months ended Nine months ended
Barrick Gold Corporation September 30, September 30,
---------------------------------------------------------------------
(in millions of United States
dollars, except per share data)
(Unaudited) 2004 2003 2004 2003
---------------------------------------------------------------------
Gold sales (notes 4 and 5) $ 500 $ 549 $ 1,431 $1,499
---------------------------------------------------------------------
Costs and expenses
Cost of sales and other operating
expenses(1) (note 6) 298 290 841 824
Amortization (note 4) 117 134 352 390
Administration 18 21 57 63
Exploration, development and
business development 38 38 101 101
---------------------------------------------------------------------
471 483 1,351 1,378
---------------------------------------------------------------------
Other income/expense (note 7) 6 24 31 39
Interest expense (6) (12) (18) (36)
Non-hedge derivative gains (losses)
(note 11E) 8 (21) (1) 25
---------------------------------------------------------------------
Income before income taxes and
other items 37 57 92 149
Income tax expense (note 8) (5) (22) - (9)
---------------------------------------------------------------------
Income before cumulative effect of
changes in accounting principles 32 35 92 140
Cumulative effect of changes in
accounting principles (note 3) - - - (17)
---------------------------------------------------------------------
Net income for the period $ 32 $ 35 $ 92 $ 123
---------------------------------------------------------------------
Earnings per share data (note 9):
Income before cumulative effect of
changes in accounting principles
Basic and diluted $ 0.06 $ 0.07 $ 0.17 $ 0.26
Net income
Basic and diluted $ 0.06 $ 0.07 $ 0.17 $ 0.23
---------------------------------------------------------------------
(1) Exclusive of amortization (note 6).
The accompanying notes are an integral part of these unaudited
interim consolidated financial statements.
Consolidated Statements of Cash Flow
Three months ended Nine months ended
Barrick Gold Corporation September 30, September 30,
---------------------------------------------------------------------
(in millions of United States
dollars)(Unaudited) 2004 2003 2004 2003
---------------------------------------------------------------------
OPERATING ACTIVITIES
Net income for the period $ 32 $ 35 $ 92 $ 123
Amortization (note 4) 117 134 352 390
Non-hedge derivative (gains) losses (8) 21 1 (25)
Deferred income tax expense
(credit) (note 8) 2 (20) (33) (65)
Other items (note 12) 9 17 (26) (44)
---------------------------------------------------------------------
Net cash provided by operating
activities 152 187 386 379
---------------------------------------------------------------------
INVESTING ACTIVITIES
Property, plant and equipment
Capital expenditures (note 4) (218) (81) (536) (216)
Sales proceeds 3 23 11 38
Purchase of investments (note 13) - - (45) -
Other items (4) - (7) -
---------------------------------------------------------------------
Net cash used in investing
activities (219) (58) (577) (178)
---------------------------------------------------------------------
FINANCING ACTIVITIES
Capital stock
Proceeds from shares issued on
exercise of stock options 3 8 29 11
Repurchased for cash (note 17A) - (91) (95) (154)
Long-term debt
Proceeds (note 16) 167 - 167 -
Repayments - - (27) (9)
Dividends - - (59) (60)
Other items (16) - (16) -
---------------------------------------------------------------------
Net cash provided by (used in)
financing activities 154 (83) (1) (212)
---------------------------------------------------------------------
Effect of exchange rate changes on
cash and equivalents 3 1 (3) 6
Net increase (decrease) in cash and
equivalents 87 46 (192) (11)
Cash and equivalents at beginning
of period 685 992 970 1,044
---------------------------------------------------------------------
Cash and equivalents at end of
period $ 775 $ 1,039 $ 775 $ 1,039
---------------------------------------------------------------------
The accompanying notes are an integral part of these unaudited
interim consolidated financial statements.
Consolidated Balance Sheets
As at As at
Barrick Gold Corporation September 30, December 31,
(in millions of United States dollars)
(Unaudited) 2004 2003
---------------------------------------------------------------------
ASSETS
Current assets
Cash and equivalents $ 775 $ 970
Accounts receivable 75 69
Inventories (note 13) 183 157
Other current assets (note 13) 138 169
---------------------------------------------------------------------
1,171 1,365
Investments (note 13) 144 127
Property, plant and equipment (note 14) 3,326 3,131
Capitalized mining costs (note 15) 230 235
Unrealized fair value of derivative
contracts (note 11C) 207 256
Other assets 307 248
---------------------------------------------------------------------
Total assets $ 5,385 $ 5,362
---------------------------------------------------------------------
LIABILITIES AND SHAREHOLDERS' EQUITY
Current liabilities
Accounts payable $ 310 $ 245
Other current liabilities 118 105
---------------------------------------------------------------------
428 350
Long-term debt (note 16) 867 719
Other long-term obligations 546 569
Deferred income tax liabilities 164 230
---------------------------------------------------------------------
Total liabilities 2,005 1,868
---------------------------------------------------------------------
Shareholders' equity
Capital stock (note 17) 4,109 4,115
Deficit (721) (694)
Accumulated other comprehensive
income (loss) (note 10) (8) 73
---------------------------------------------------------------------
Total shareholders' equity 3,380 3,494
---------------------------------------------------------------------
Contingencies (note 19)
---------------------------------------------------------------------
Total liabilities and shareholders' equity $ 5,385 $ 5,362
---------------------------------------------------------------------
The accompanying notes are an integral part of these unaudited
interim consolidated financial statements.
Consolidated Statements of Shareholders' Equity
Barrick Gold Corporation
(in millions of United States dollars)
(Unaudited) 2004 2003
---------------------------------------------------------------------
Common shares (number in millions)
At January 1 535 542
Issued for cash/on exercise of stock options 2 1
Repurchased for cash (note 17A) (5) (9)
---------------------------------------------------------------------
At September 30 532 534
---------------------------------------------------------------------
Common shares (dollars in millions)
At January 1 $ 4,115 $ 4,148
Issued for cash/on exercise of stock options 29 16
Repurchased for cash (note 17A) (35) (67)
---------------------------------------------------------------------
At September 30 $ 4,109 $ 4,097
---------------------------------------------------------------------
Deficit
At January 1 $ (694) $ (689)
Net income 92 123
Dividends (59) (60)
Repurchase of common shares (1) (60) (87)
---------------------------------------------------------------------
At September 30 $ (721) $ (713)
---------------------------------------------------------------------
Accumulated other comprehensive loss (note 10) $ (8) $ (12)
---------------------------------------------------------------------
Total shareholders' equity at September 30 $ 3,380 $ 3,372
---------------------------------------------------------------------
(1) Represents the excess of cash paid over the average book value
repurchased as part of the share buyback plan (note 17A).
Consolidated Statements of Comprehensive Income
Three months ended Nine months ended
Barrick Gold Corporation September 30, September 30,
---------------------------------------------------------------------
(in millions of United States
dollars)(Unaudited) 2004 2003 2004 2003
---------------------------------------------------------------------
Net income $ 32 $ 35 $ 92 $ 123
Foreign currency translation
adjustments (note 10) - (4) - (5)
Transfers of hedge gains to
earnings (note 10) (19) (19) (55) (44)
Hedge ineffectiveness transferred
to earnings (note 10) - (3) (2) (7)
Change in fair value of cash flow
hedges (note 10) 48 2 (5) 149
Impairment charges on
available-for-sale securities
(note 10) - - 1 7
Change in fair value of
available-for-sale securities
(note 10) 7 10 (20) 13
---------------------------------------------------------------------
Comprehensive income $ 68 $ 21 $ 11 $ 236
---------------------------------------------------------------------
The accompanying notes are an integral part of these unaudited
interim consolidated financial statements.
Management's Discussion and Analysis
This portion of the Quarterly Report, in combination with the
Operating and Financial Summary, provides a discussion and analysis of
the financial condition and results of operations ("Management's
Discussion and Analysis") to enable a reader to assess material
changes in financial condition and results of operations as at and for
the three and nine month periods ended September 30, 2004, in
comparison to the corresponding prior-year periods. This Management's
Discussion and Analysis has been prepared as of October 20, 2004. The
unaudited consolidated interim financial statements prepared in
accordance with US generally accepted accounting principles (US GAAP)
are on pages 14 to 17. This Management's Discussion and Analysis is
intended to supplement and complement the unaudited interim
consolidated financial statements and notes thereto for the three and
nine month periods ended September 30, 2004 (collectively, the
"Financial Statements"), which are included in this Quarterly Report.
You are encouraged to review the Financial Statements in conjunction
with your review of this Management's Discussion and Analysis. This
Management's Discussion and Analysis should be read in conjunction
with both the annual audited consolidated financial statements for the
three years ended December 31, 2003, the related annual Management's
Discussion and Analysis included in the 2003 Annual Report, as well as
the first quarter 2004 and second quarter 2004 reports, and the most
recent Form 40-F/Annual Information Form on file with the US
Securities and Exchange Commission and Canadian provincial securities
regulatory authorities. Certain notes to the Financial Statements are
specifically referred to in this Management's Discussion and Analysis
and such notes are incorporated by reference herein. All dollar
amounts in this Management's Discussion and Analysis are in millions
of US dollars, unless otherwise specified.
INCOME STATEMENT
Gold Production and Sales
In third quarter 2004, production from Barrick's portfolio of
mines was in line with plan, but, as expected, 17% less than the
prior-year quarter, as lower production at Goldstrike, Pierina, Eskay
Creek, Hemlo and Plutonic was partly offset by higher production at
Bulyanhulu and Kalgoorlie. Ounces sold decreased by 16% compared to
the prior-year quarter due to the lower production levels. Beginning
in 2005 and through 2007, as its development projects commence
production, the Company is targeting its annual production profile to
rise to between 6.8 and 7.0 million ounces by 2007.
By choosing to deliver most of its gold production into the gold
spot market, Barrick realized an average price of $395 per ounce for
the quarter, compared to $365 per ounce in third quarter 2003 when
average market gold prices were lower (third quarter 2004 - $401 per
ounce, third quarter 2003 - $364 per ounce). The price realized for
gold sales for the remainder of 2004 will depend upon market
conditions and the selling prices of any gold sales contracts into
which the Company voluntarily delivers, and could be below average
spot market prices.
Cost of Sales and Other Operating Expenses
Total cash costs for the period ended Sept. 30 (dollars per ounce)
---------------------------------------------------------------------
Three months Nine months
2004 2003 2004 2003
---------------------------------------------------------------------
Cost of sales(A) $ 251 $ 201 $ 244 $ 204
Currency hedge gains (20) (11) (20) (10)
By-product credits (26) (22) (28) (20)
---------------------------------------------------------------------
Cash operating costs 205 168 196 174
Royalties 10 9 10 9
Production taxes 3 3 2 3
---------------------------------------------------------------------
Total cash costs(B) $ 218 $ 180 $ 208 $ 186
---------------------------------------------------------------------
(A) At market currency exchange rates.
(B) For an explanation of the use of non-GAAP performance measures,
refer to pages 27 to 30.
As expected, total cash costs for third quarter 2004 were higher
than the full-year guidance, primarily due to mine sequencing changes
at Pierina, and processing lower-grade ore at Eskay Creek, Hemlo, and
Bulyanhulu. Also as expected, total cash costs in third quarter 2004
were higher than the prior-year quarter, due to the processing of
lower-grade ore at Goldstrike Open Pit, Eskay Creek and Pierina,
combined with the effect of changes in currency hedge rates on the
Australian mines.
Currency Hedging
Like many other gold producers, the Company's operations in
Australia and Canada were affected by the performance of the
Australian and Canadian dollar against the US dollar because a portion
of its cash operating costs are denominated in local currencies. The
Company's currency hedge positions provide a level of protection for
its Australian and Canadian dollar operating costs and capital
expenditures for about the next two and a half years.
At September 30, 2004, the Company had approximately C$740 million
of its Canadian dollar exposures hedged at an average rate of $0.69
and approximately A$1.6 billion of its Australian dollar exposures
hedged at an average rate of $0.62. The Company may add to its
currency hedge position during the remainder of 2004, subject to
market conditions.
Fuel Hedging
Over the next three years the Company expects to consume about 1.3
- 1.7 million barrels of fuel annually at its operations. To protect
against the impact of rising fuel prices on the Company's total cash
costs, and also on construction activities, at its North and South
America operating mines and development projects, the Company has put
in place a fuel hedge position for a total of 2.2 million barrels, as
disclosed in note 11 to the Financial Statements. The fuel hedge
contracts will help protect the Company from the effect of rising oil
prices on total cash costs and construction costs over the next three
years. The Company may add to the fuel hedge position during the
remainder of 2004, subject to market conditions.
Amortization
Amortization expense mainly arises on property, plant and
equipment at Barrick's operating mines. The majority of these assets
are amortized on a units of production basis. Amortization expense is
affected by the overall quantity of gold produced and sold, changes in
reserve estimates, and the mix of production from its mines. The
combined effect of a 16% decrease in ounces sold, a change in
production mix, and reserve increases at the end of 2003 caused an
overall $17 million decrease in amortization expense in third quarter
2004 compared to the prior-year quarter. In third quarter 2004,
amortization was $89 per ounce, slightly higher than third quarter
2003 when the Company produced and sold more gold at the Goldstrike
Open Pit, which has a relatively low amortization expense on a per
ounce basis. For details of the impact of changes in reserve estimates
on amortization expense in 2004, refer to page 22. For an explanation
of how the Company calculates amortization per ounce, refer to page
30.
Administration
In third quarter 2004, administration costs were $3 million lower
than the prior-year quarter primarily due to the effect of severance
costs incurred in third quarter 2003.
Exploration, Development and Business
Development Expense
---------------------------------------------------------------------
Three months ended Nine months ended
September 30, September 30,
2004 2003 2004 2003
---------------------------------------------------------------------
Exploration costs
North America $ 7 $ 4 $ 19 $ 8
Australia/Africa 9 3 18 12
South America 4 5 14 13
Other countries 2 1 5 3
---------------------------------------------------------------------
22 13 56 36
---------------------------------------------------------------------
Mine development costs
Veladero - 7 - 18
Lagunas Norte - 7 9 21
Other projects 7 8 16 16
---------------------------------------------------------------------
7 22 25 55
---------------------------------------------------------------------
Mine start-up costs
Veladero 3 - 3 -
Lagunas Norte 2 - 2 -
---------------------------------------------------------------------
5 - 5 -
---------------------------------------------------------------------
Business development/other 4 3 15 10
---------------------------------------------------------------------
$ 38 $ 38 $ 101 $ 101
---------------------------------------------------------------------
In third quarter 2004, Barrick spent more on its exploration
program than in the prior-year quarter. Higher activity at the Rossi
property and various targets at Goldstrike, Eskay Creek and Round
Mountain led to an increase in North America. Higher activity in
Tanzania, primarily at the Buzwagi project, led to an increase in
Australia/Africa.
Under US GAAP, mine development costs are not capitalized until
after mineralization is classified as a proven and probable reserve in
accordance with SEC rules. The Company expensed mine development costs
at Veladero until October 1, 2003, and at Lagunas Norte until April
30, 2004, when the projects achieved the criteria needed to classify
material as a reserve under SEC rules. In 2004, mine development costs
at Veladero have been capitalized. At Lagunas Norte, the Company
capitalized mine development costs from May 1, 2004 onwards.
Exploration, development and business development expense is now
expected to be about $135-$140 million for the full year, $10 million
higher than the previous guidance, due primarily to additional
activity at a number of exploration properties. This guidance reflects
present funding plans for various exploration projects. Barrick may
spend more or less on these projects, depending on the results of
ongoing exploration activities, and may also fund other exploration
projects not presently included in its plans.
Interest Expense
Barrick incurred $12 million in interest costs in both third
quarter 2004 and third quarter 2003. Following the decision to proceed
with the Pascua-Lama project, the Company began capitalizing interest
on this project in third quarter 2004. In third quarter 2004, the
Company capitalized $6 million of interest at Veladero, Cowal, Lagunas
Norte, Pascua-Lama and Tulawaka, and expensed $6 million. In third
quarter 2003 all interest costs were expensed.
Barrick uses interest rate swaps to manage the effective rates of
interest it pays on its long-term debt. Barrick has taken advantage of
low floating market interest rates to convert the fixed 7.5% interest
rate on its $500 million debenture to floating rates, and also to fix
the interest rate on its Bulyanhulu financing for the remaining term
at a rate of about 7.8%.
The Company finalized project financing for Veladero in third
quarter 2004, and expects to issue further new long-term debt
obligations by the end of 2004, as described on page 21. The Company
expects that the earnings impact of any extra interest it incurs on
any new debt obligations in 2004 will be largely offset by extra
interest income, and interest capitalized at Pascua-Lama in the second
half of 2004. The actual amount of interest incurred and expensed
could vary due to any changes in the planned timing and amount of new
debt issued, as well as changes in market interest rates.
Other Income/Expense
In third quarter 2004, Barrick earned interest income of $7
million, $2 million lower than in third quarter 2003, primarily due to
lower average cash balances in third quarter 2004. Through the use of
interest-rate swaps, the Company earned a fixed rate of 3.4% in third
quarter 2004 on most of its cash balances, with any excess cash
balances earning interest at market interest rates.
In third quarter 2004, the Company recorded pre-tax gains of $2
million on the sale of various assets, compared to pre-tax gains of
$17 million on various assets and investments in the prior-year
quarter. Barrick may dispose of all or a part of its interests in
certain assets in 2004, including various land parcels in the United
States. These potential transactions could give rise to gains or
losses on disposal that would generally be reflected in earnings of
the period in which a transaction closes. In August 2004, the Company
entered into an agreement to sell a parcel of timber land in the
United States for $27 million that, subject to fourth quarter closing,
would lead to the recognition of an estimated pre-tax gain of $27
million in fourth quarter 2004. The Company is also discussing a
potential earn-in arrangement on the Kabanga Nickel project with
Falconbridge that may result in a small gain to be recorded in
earnings on closing.
Non-Hedge Derivative Gains and Losses
Non-hedge derivative gains and losses arise on derivative
instruments, used in Barrick's risk management strategy, that do not
qualify for hedge accounting treatment. The gains and losses occur
primarily because of changes in commodity prices, currency exchange
rates and interest rates. Non-hedge derivative gains and losses do not
include any unrealized mark-to-market gains or losses on the Company's
forward gold and silver sales contracts. Non-hedge derivative gains of
$8 million in third quarter 2004, and losses of $21 million in the
prior-year quarter, related primarily to the impact of changes in US
dollar interest rates and gold lease rates on non-hedge interest rate
contracts.
Income Taxes
Income tax expense of $5 million in third quarter 2004 was lower
than third quarter 2003 mainly due to the higher levels of pre-tax
income in third quarter 2003, as well as the impact of non-hedge
derivative gains and losses in a low tax-rate jurisdiction, and tax
credits recorded in third quarter 2004.
The Company's underlying effective tax rate of 28% was higher in
2004 than in 2003 primarily due to higher market gold prices. Should
spot gold prices for 2004 average about $400 per ounce, the Company
expects its underlying effective tax rate in 2004 to be about 28%. The
expected underlying tax rate excludes the effect of gains and losses
on non-hedge derivatives; the effect of delivering into forward gold
sales contracts at prices below prevailing market prices; the effect
of any tax credits arising from the change in Australian tax regime
and the release of deferred tax valuation allowances.
Income tax expense is affected by changes in the level of
valuation allowances recorded against deferred tax assets. Valuation
allowances are recorded where there is substantial uncertainty over
the realization of a tax asset. Among other things, a continued
positive trend in gold prices may result in further releases of
valuation allowances with corresponding tax credits recorded in
earnings. In particular, the Company may be able to utilize
alternative minimum tax credits in the United States in a higher gold
price environment, which could result in the release of a portion of a
deferred tax valuation allowance that was set up in prior years
against the full tax benefit of these credits.
At the end of third quarter 2004, a Peruvian Tax Court issued a
decision in the Company's favor with respect to a tax assessment in
2002 that was being appealed by the Company. The Peruvian tax
authority, SUNAT, has until early January 2005, to appeal the Tax
Court's decision. If this litigation is ultimately resolved in
Barrick's favor, a gain would be recorded in earnings in the period
that it is resolved, as disclosed in note 8 to the Financial
Statements.
STATEMENT OF COMPREHENSIVE INCOME
Comprehensive income consists of net income or loss, together with
certain other economic gains and losses that collectively are
described as "other comprehensive income", and excluded from the
income statement.
In third quarter 2004, other comprehensive income mainly included
gains of $48 million on hedge contracts designated for future periods
caused primarily by changes in currency exchange rates and fuel
prices; hedge gains totaling $19 million on hedge contracts designated
for third quarter 2004 that were transferred to earnings; and a $7
million increase in unrealized mark-to-market gains on investments.
Included in other comprehensive income at September 30, 2004 were
unrealized pre-tax gains on currency hedge contracts totaling $198
million, based on September 30, 2004 market foreign exchange rates.
The related hedge contracts are designated against operating costs and
capital expenditures primarily over the next three years, and are
expected to help protect against the impact of strengthening of the
Australian and Canadian dollar against the US dollar. The hedge gains
are expected to be recorded in earnings at the same time as the
corresponding hedged operating costs and amortization of capital
expenditures are also recorded in earnings.
CASH FLOW STATEMENT
Liquidity and Capital Resources
In previous years, Barrick's main sources of liquidity have been
cash inflows from operating activities, its large cash position, and
various debt-financing facilities. In the last three fiscal years,
Barrick has generated in total an operating cash inflow of about $1.7
billion. The Company expects to continue to generate significant
operating cash flow over the next few years, providing it can maintain
present production levels, and also providing that there is no
material decline in the spot price of gold.
Current debt facilities include Barrick's publicly traded
debentures, the Bulyanhulu and Veladero project financings.
Alternatives for sourcing Barrick's future capital needs include
the Company's significant cash position, its $1 billion credit
facility, future operating cash flow, project financings and public
debt financings. These alternatives are always being evaluated to
determine the optimal mix of capital resources for the Company's
needs.
The Company expects that, absent a material adverse change in a
combination of its sources of liquidity, present levels of liquidity
will be adequate to meet its expected capital needs. If the Company is
unable to access project financing due to unforeseen political or
other problems, Barrick expects that it will be able to access public
debt markets as an alternative source of financing.
Capital structure
Barrick regularly reviews its capital structure with an overall
goal of lowering its cost of capital, while preserving the balance
sheet strength and flexibility that is important due to the cyclical
nature of commodity markets, and to ensure access to cash for
strategic purposes.
Following a review of its capital structure during 2003, in view
of the high levels of operating cash flow being generated at current
gold prices, the high levels of liquidity that exist in the capital
markets presently, and its belief that the then current share price
represented an attractive buying opportunity, the Company concluded
that a share buyback program would be consistent with these overall
goals. The share buyback program was completed in first quarter 2004,
and the Company has no current plans to buy back any further common
shares.
Operating Activities
Operating cash flow is significantly affected by the volume of
gold sales, realized gold prices, cash operating costs and changes in
non-cash working capital. In third quarter 2004, operating cash flow
benefited from a $30 per ounce increase in the average realized gold
price, offset by a $38 per ounce increase in total cash costs,
compared to the prior-year quarter. The net effect of these variances,
combined with a 16% decrease in the volume of ounces sold, was a $54
million decrease in operating cash flow compared to the prior-year
quarter. Third quarter 2004 operating cash flow was also impacted by
other items, such as the level of income tax instalments and changes
in working capital, which caused a net increase of operating cash flow
by $16 million compared to third quarter 2003.
Investing Activities
The most significant ongoing investing activities are capital
expenditures at the Company's development projects. Barrick expects to
spend approximately $2.6 billion through the end of 2009 on the
construction of its Veladero, Cowal, Lagunas Norte, Tulawaka and
Pascua-Lama development projects, of which $0.5 billion had been spent
at September 30, 2004. The vast majority of estimated mine
construction costs will qualify for capitalization under US GAAP, but
a small amount for various start-up activities will be expensed under
exploration, development and business development costs. The Company
also expects to spend about $100 million at the Nevada Power Plant and
between $100 and $200 million per year for sustaining capital at its
operating mines.
The increase in capital expenditures in third quarter 2004
compared to the prior-year quarter mainly related to $181 million
spent at the Company's development projects - principally for
construction activity at Veladero and Lagunas Norte. Capital
expenditures for the full year are expected to be approximately $900
million, principally for construction activity at the development
projects.
Financing Activities
The Company finalized a $250-million Veladero project financing in
third quarter 2004 with a group of commercial banks and export credit
agencies. The most significant financing activity in third quarter
2004 was a drawdown of funds under the Veladero project financing.
CRITICAL ACCOUNTING POLICIES AND ESTIMATES
Accounting Policy Changes
There were no changes in accounting policies in third quarter 2004
that significantly impacted Barrick's earnings. As disclosed in note
3D to the Financial Statements, the Company may be required to change
its accounting policy for stripping costs once the EITF has completed
its deliberations and approved EITF Abstract No. 04-6.
Critical Accounting Estimates
Critical accounting estimates, which represent estimates that are
highly uncertain, and for which changes in those estimates could
materially impact the Company's financial statements include the
following:
-- Amortization of property, plant and equipment and capitalized
mining costs;
-- Impairment assessments of long-lived assets and investments;
-- Asset retirement obligations;
-- The measurement of deferred income tax assets and liabilities
and assessments of the amounts of valuation allowances
recorded;
-- The valuation of derivative instruments and measurement of
hedge gains and losses that are recorded in other
comprehensive income; and
-- Contingencies.
Amortization of Capitalized Mining Costs
Effective January 1, 2004, the Company reduced the stripping ratio
at the Goldstrike Open Pit from 112:1 to 109:1 and increased the
stripping ratio at Pierina from 48:1 to 60:1. The effect of these
changes in estimates on amortization of capitalized mining costs was a
net increase of $1 million in third quarter 2004, and a net increase
of $4 million in the first nine months of 2004.
Amortization Expense
Barrick amortizes a large portion of its property, plant and
equipment using the units of production method, based on proven and
probable reserves. Changes in reserve estimates are generally
calculated at the end of the year and cause amortization expense to
increase or decrease prospectively. The mines listed below each had
reserve estimate changes (other than production) of greater than 10%
at the end of 2003.
Impact of Changes in Reserve Estimates on Amortization
(in millions of dollars, except reserves which are in millions of
contained ounces)
---------------------------------------------------------------------
Reserves Amortization
increase increase (decrease) for the
(decrease) period ended Sept. 30/04
---------------------------------------------------------------------
At Dec. 31/03 Three months Nine months
---------------------------------------------------------------------
Goldstrike
Underground 0.2 $ (2) $ (6)
Open Pit 1.5 (2) (5)
Plutonic 0.5 - (1)
Eskay Creek (0.1) 1 3
Kalgoorlie 0.9 (1) (2)
Pierina 0.3 (2) (8)
---------------------------------------------------------------------
3.3 $ (6) $ (19)
---------------------------------------------------------------------
Impairment Assessment of Long-Lived Assets and Investments
The Company monitors possible indicators of impairment of
long-lived assets on an ongoing basis. Events or circumstances that
could possibly lead to an impairment occurring are in many cases
outside the Company's control, and could occur with little advance
notice. Such events or circumstances include, but are not limited to:
a significant deterioration in market gold prices; changes in
Barrick's planned use of an asset; the results of exploration
activity; and a prolonged decline in the market value of an
investment. On determination that an event or circumstance has
occurred that suggests a long-lived asset may be impaired, the Company
conducts a formal impairment assessment, which may or may not result
in the Company recording an impairment charge.
OFF-BALANCE SHEET ARRANGEMENTS
Forward Gold Sales Contracts
Prior to the adoption of a No-Hedge policy in fourth quarter 2003,
Barrick historically entered into fixed-price forward sales contracts
as part of a gold hedging program designed to manage exposure to
market gold prices and protect its earnings and cash flow from
declining gold prices. Following the adoption of its No-Hedge policy,
no new gold hedge contracts will be added, and the Company is pursuing
opportunities to reduce its gold hedge position. In third quarter
2004, the hedge position was reduced by 0.2 million ounces to 13.7
million ounces, which represents 16%(1) of the Company's year-end
reserves. Barrick's forward gold sales contracts permit the Company to
sell its gold production in the gold spot market at the higher spot
price, or deliver under the contract at the contract price. The
Company has taken advantage of declines in the market gold price over
the first nine months of 2004 to exceed its targeted 1.5 million ounce
hedge book reduction for the full year. The Company remains optimistic
on gold prices and may opportunistically reduce its gold hedge
position further by the end of 2004.
In addition to the fixed-price forward gold sales contracts,
Barrick has floating spot-price gold sales contracts under which it is
committed to deliver 0.7 million ounces of gold over the next ten
years at spot prices, less an average adjustment of $45 per ounce at
the delivery date. These floating spot-price contracts were previously
fixed-price contracts, which, under the price-setting mechanisms in
its Master Trading Agreements (MTAs), the Company elected to receive a
price based on the floating gold spot-price adjusted by the difference
between the spot price and the contract price at the time of such
election.
(1) Based on reserves calculated as at December 31, 2003 using an
assumed price of $325 per ounce for gold and $4.75 per ounce for
silver, except with respect to the Pascua-Lama project where reserves
have been calculated as at June 30, 2004 using an assumed gold price
of $350 per ounce and an assumed silver price of $5.50 per ounce and
the East Archimedes project where reserves have been calculated as at
September 30, 2004, using an assumed gold price of $350 per ounce. For
additional information on reserves, see the most recent Annual
Information Form / Form 40-F.
Fixed-price Forward Gold Sales Contracts ("The Gold Hedge Position")
(as of September 30, 2004)
---------------------------------------------------------------------
Gold ounces hedged 13.7 million ounces (or the equivalent
of less than 2.5 years of expected
future production)
---------------------------------------------------------------------
Current termination date
of gold sales contracts 2014 in most cases
---------------------------------------------------------------------
Average estimated realizable
gold sales contract price
at 2014 termination date. $419/oz(A)
---------------------------------------------------------------------
Delivery obligations Barrick will deliver gold production
from operations against gold sales
contracts by the termination date
(which is currently 2014 in most cases).
However, Barrick may choose to settle
any gold sales contract in advance of
this termination date at any time, at
its discretion. Historically, delivery
has occurred in advance of the
contractual termination date. This
means Barrick can deliver gold at spot
prices, or prices under the hedge
contracts, until the termination date
of these contracts.
---------------------------------------------------------------------
Unrealized mark-to-market $1,711 million(B). The mark-to-market
loss at September 30, 2004 would approach zero (breakeven) at a
spot gold price of $294 per ounce,
assuming all other variables are
constant.
---------------------------------------------------------------------
(A) Approximate estimated value based on current market US dollar
interest rates and an average lease rate assumption of 1%.
Accelerating gold deliveries would likely lead to reduced
contango that would otherwise have built up over time.
(B) At a spot gold price of $418 per ounce. Includes floating
spot-price contracts.
Barrick's fixed-price gold sales contracts are agreements to sell
gold in the future at prices set under the terms of the MTAs. The
estimation of a "break-even" price on any contract involves a
comparison of the present value of the fixed price under the contract
to the theoretical market price at which no mark-to-market gain or
loss would occur. Barrick provides two prices in its disclosure:
1. $419/oz - the estimated price at the contract termination date
(2014 in most cases);
2. $294/oz - the estimated price if the contract had been
voluntarily settled at September 30,2004.
The two numbers differ because the price on a gold sales contract
varies depending on when it is settled. Barrick has an obligation to
deliver gold by the termination date, but it has no obligation to
deliver gold at the present time. Barrick provides the $294/oz
voluntary settlement price and the $419/oz average estimated
realizable gold sales contract price at 2014 termination date for
information purposes only. These two prices are estimates that could
change over time due to a number of factors, including; but not
limited to: US dollar interest rates, gold lease rates, and extensions
of the termination date. These prices, which are an average for the
total gold hedge position, are not necessarily representative of the
prices that may be realized each quarter for actual deliveries into
forward gold sales contracts.
Impact of US dollar interest rates on the estimated future price
at the termination date of the forward gold sales contracts ($419/oz):
Barrick typically fixes the price of gold under its forward gold
sales contracts to a date that is earlier than the termination date of
the contract (referred to as the "interim price-setting date"). The
actual realized price on the contract termination date (2014 in most
cases) depends upon the gold market forward premium ("contango")
between the interim price-setting date and the termination date. The
gold market forward premium is typically closely correlated with the
difference between US dollar interest rates and gold lease rates. All
other things being equal, an increase or decrease in US dollar
interest rates would generally lead to a corresponding increase or
decrease in the gold market forward premium, and therefore the
estimated future price of the contract at the termination date.
Furthermore, the greater the time period between the interim
price-setting date and the termination date, the greater the
sensitivity of the final realized price to the gold market forward
premium.
Impact of interest rates on the estimated price if the forward
gold sales contracts had been voluntarily settled on September 30,
2004 ($294/oz):
The present value of a fixed cash flow is generally sensitive to
interest rates. The price that could have been realized on a voluntary
settlement of a forward gold sales contract prior to the termination
date is a function of the fixed price at the interim price-setting
date, and a discount factor. This discount factor is largely affected
by changes in US dollar interest rates. If US dollar interest rates
were to increase, and therefore the discount factor were to decrease,
the "breakeven price" of a contract (if voluntarily settled today)
would decrease, and vice versa.
A short-term spike in gold lease rates would not have a material
negative impact on Barrick because it is not exposed under its
fixed-price forward gold sales contracts to short-term gold lease rate
variations. A prolonged rise in gold lease rates could result in lower
contango (or negative contango i.e. "backwardation") and therefore a
smaller gold market forward premium (or backwardation) under its
contracts. Gold lease rates have historically tended to be low, and
any spikes short-lived, because of the large amount of Central Bank
gold available for lending relative to demand.
Fixed-price Forward Silver Sales Contracts ("The Silver Hedge
Position")
(as of September 30, 2004)
---------------------------------------------------------------------
Silver ounces hedged 15.9 million ounces
---------------------------------------------------------------------
Current termination date
of silver sales contracts 2014 in most cases
---------------------------------------------------------------------
Average estimated
realizable silver sales
contract price at 2014
termination date. $7.91/oz(A)
---------------------------------------------------------------------
Delivery obligations Barrick will deliver silver production
from operations against silver sales
contracts by the termination date
(which is currently 2014 in most cases).
However, Barrick may choose to settle
any silver sales contract in advance of
this termination date at any time, at
its discretion. Historically, delivery
has occurred in advance of the
contractual termination date. This means
Barrick can deliver silver at spot
prices, or prices under the hedge
contracts, until the termination date
of these contracts.
---------------------------------------------------------------------
Unrealized mark-to-market $30 million(B). The mark-to-market would
loss at September 30, 2004 approach zero (breakeven) at a spot
silver price of $5.33 per ounce,
assuming all other variables are
constant.
---------------------------------------------------------------------
(A) Approximate estimated value based on current market US dollar
interest rates and an average lease rate assumption of 1%.
Accelerating silver deliveries could potentially lead to reduced
contango that would otherwise have built up over time.
(B) At a spot silver price of $6.88 per ounce.
In addition to the fixed-price forward silver sales contracts,
Barrick has floating spot-price silver sales contracts under which it
is committed to deliver 9 million ounces of silver over the next ten
years at spot prices, less an average adjustment of $0.76 per ounce at
the delivery date.
In all of the Company's MTAs, which govern the terms of its gold
and silver sales contracts with its 19 counterparties, the following
applies:
-- The counterparties do not have unilateral and discretionary
"right to break" provisions.
-- There are no credit downgrade provisions.
-- The Company is not subject to any margin calls - regardless of
the price of gold or silver.
-- The Company has the right to accelerate the delivery of gold
or silver at any time during the life of its contracts. This
flexibility is demonstrated by the terms that allow it to
deliver under its forward gold and silver sales contracts at
any time on two days notice, or keep these forward gold and
silver sales contracts outstanding for as long as 15 years.
This feature means that the Company, at its option, can sell
its gold or silver at the market price or the contract price,
whichever is higher, to the termination date of its contracts
(currently 2014 in most cases).
The Company's MTAs with its counterparties do provide for early
close out of certain transactions in the event of a material adverse
change in the ability of Barrick or its principal hedging subsidiary
to perform its gold and silver delivery and other obligations under
the trading agreements and related parent guarantees or a lack of gold
or silver market, and for customary events of default such as covenant
breaches, insolvency or bankruptcy. The principal financial covenants
are:
-- Barrick must maintain a minimum consolidated net worth of at
least $2 billion - currently, it is $3.4 billion.
-- Barrick must maintain a maximum long-term debt to consolidated
net worth ratio of 2:1 - currently, it is under 0.35:1.
-- Barrick's MTAs exclude unrealized mark-to-market valuations in
the calculation of consolidated net worth.
-- The foregoing information is a summary of certain aspects of
the Company's forward sales program and is not intended to be
comprehensive. For a more complete understanding, reference
should be made to pages 51 to 55 of the Company's 2003 Annual
Report and its website (www.barrick.com).
In most cases, under the terms of Barrick's MTAs, the period over
which it is required to deliver gold is extended annually by one year,
or kept "evergreen", regardless of the intended delivery dates, unless
otherwise notified by the counterparty. This means that, with each
year that passes, the termination date of most MTAs is extended into
the future by one year.
Fair Value of Derivative Instruments
---------------------------------------------------------------------
At Sept. 30/04 Gain/(Loss)
---------------------------------------------------------------------
Forward gold sales contracts(A) $ (1,711)
Forward silver sales contracts (30)
Foreign currency contracts 174
Interest rate contracts 26
Fuel contracts 12
---------------------------------------------------------------------
$ (1,529)
---------------------------------------------------------------------
(A) Based on the closing spot gold price of $418 per ounce and market
rates for LIBOR and gold lease rates on September 30, 2004.
As spot gold prices increase or decrease, the value of the
Company's gold mineral reserves and amount of potential operating cash
inflows generally increases or decreases. The unrealized
mark-to-market loss on its fixed-price forward gold sales contracts
also increases or decreases. The mark-to-market value represents the
replacement value of these contracts based on current market levels,
and does not represent an immediate economic obligation for payment by
Barrick. Barrick's obligations under the gold forward sales contracts
are to deliver an agreed upon quantity of gold at a contracted price
by the termination date of the contracts (currently 2014 in most
cases).
In accordance with hedge accounting rules, the positive
mark-to-market value of $212 million relating to the Company's
currency, interest rate and fuel hedge programs is recorded on the
balance sheet. The economic impact of these sales contracts is
reflected in the financial statements as the Company physically
delivers gold and silver under the contracts.
Change in the Fair Value of
Forward Sales Contracts Gold Silver
---------------------------------------------------------------------
Unrealized loss at January 1, 2004 $ 1,725 $ 17
Impact of change in spot price(A) 42 18
Contango earned in the period (90) (2)
Impact of change in valuation inputs(B) 101 (3)
Mark-to-market impact of deliveries
into sales contracts (67) -
---------------------------------------------------------------------
Unrealized loss at September 30, 2004 $ 1,711 $ 30
---------------------------------------------------------------------
(A) From $415 per ounce to $418 per ounce for gold, and $5.92 per
ounce to $6.88 per ounce for silver.
(B) Other than spot metal prices (i.e. interest rates and gold and
silver lease rates).
In third quarter 2004, the unrealized mark-to-market loss changed
primarily due to higher spot gold prices at quarter end (third quarter
2004 - $418 compared to second quarter 2004 - $393). The
mark-to-market value of the contracts would approach zero (breakeven)
at a spot gold price of approximately $294 per ounce, assuming all
other variables are constant.
Contractual Obligations and Commitments
Purchase obligations for capital expenditures include only those
items where binding commitments have been entered into. They do not
include the full amount of future capital expenditures required to
complete construction of the Company's development projects, because
commitments have yet to be made for a large portion of these estimated
future capital costs. Significant changes to the December 31, 2003,
contractual obligations and commitments include $383 million of
capital commitments at the development projects, including the Nevada
Power Plant, for expenditures that the Company expects to incur mainly
in 2004 and 2005.
QUARTERLY INFORMATION
(in millions, except per share and per ounce data)
---------------------------------------------------------------------
Sep Jun Mar Dec Sep Jun Mar Dec
30 30 31 31 30 30 31 31
2004 2004 2004 2003 2003 2003 2003 2002
---------------------------------------------------------------------
Gold sales $ 500 $ 454 $ 477 $ 536 $ 549 $ 491 $ 459 $ 526
Average spot gold
price per ounce 401 393 408 392 364 347 352 323
Average realized gold
price per ounce 395 372 382 394 365 352 355 343
Net income 32 34 26 77 35 59 29 54
Net income per
share(A) 0.06 0.06 0.05 0.14 0.07 0.11 0.05 0.10
Operating cash flow 152 108 126 134 187 62 130 195
---------------------------------------------------------------------
(A) Basic and diluted.
CANADIAN SUPPLEMENT
In note 20 to the Financial Statements, the Company has provided a
reconciliation between Canadian and US GAAP, including a description
of the material differences affecting the balance sheet, income
statement and statement of cash flows. The principal continuing
reconciling differences relate to the amortization of property, plant
and equipment and intangible assets recorded under Canadian GAAP.
These differences arise due to differences in the carrying amounts of
assets, and amortization methods under Canadian GAAP when compared to
US GAAP, as described in note 20 to the Financial Statements.
The Company expects to see continuing differences in accounting
for exploration and development expenditures, where some expenditures
qualify for capitalization under Canadian GAAP, but are expensed under
US GAAP. Until May 1, 2004, when mineralization at the Lagunas Norte
project qualified as a reserve under SEC rules, it was the most
significant project in 2004 that was affected by this GAAP difference.
Other projects affected by this GAAP difference in 2004 include
Kabanga and Buzwagi.
The Company was required to adopt a new accounting standard under
Canadian GAAP in first quarter 2004 for reclamation and closure costs.
The adoption of this accounting standard, to a large extent, conforms
the Company's accounting policy to FAS 143 under US GAAP. The Company
also adopted a new accounting standard under Canadian GAAP in first
quarter 2004 for Stock-Based Compensation, which will result in
differences between US and Canadian GAAP throughout 2004. The other
GAAP differences that affected the reconciliation of earnings under US
GAAP compared with Canadian GAAP were primarily due to facts and
circumstances related to the years presented and are not necessarily
indicative of continuing trends that will cause material GAAP
differences in future years.
OUTSTANDING SHARE DATA
As at October 15, 2004, 531.8 million common shares ("Common
Shares") and one special voting share ("Special Voting Share") in the
capital of Barrick were issued and outstanding. Computershare Trust
Company of Canada ("Computershare"), the holder of the Special Voting
Share, is entitled to cast the number of votes equal to the number of
BGI Exchangeable Shares (as defined below) outstanding (excluding
those owned by Barrick and its subsidiaries), multiplied by 0.53, for
which it receives voting instructions from holders of such BGI
Exchangeable Shares.
In connection with Barrick's acquisition of Homestake Mining
Company effective December 14, 2001, the outstanding exchangeable
shares ("BGI Exchangeable Shares") of Homestake Canada Inc. (now
renamed Barrick Gold Inc.) became exchangeable at any time for 0.53 of
a Common Share. Each BGI Exchangeable Share entitles the holder to
exercise the same voting rights as a holder of 0.53 of a Common Share.
Generally, a holder of a BGI Exchangeable Share may exercise his or
her voting right by either providing voting instructions to
Computershare or attending a meeting of holders of Common Shares and
voting in person. As at October 15, 2004, there were 1.4 million BGI
Exchangeable Shares outstanding that were not owned by Barrick, which
would entitle the holders of the BGI Exchangeable Shares to cast 0.7
million votes at a meeting of holders of Common Shares. For further
information regarding the BGI Exchangeable Shares, please refer to the
Company's current Management Information Circular and Proxy Statement.
As at October 15, 2004, options to purchase 20.2 million Common
Shares were outstanding under Barrick's option plan. In addition, as
at October 15, 2004, options to purchase 2.1 million Common Shares
were outstanding under certain option plans inherited by Barrick in
connection with prior acquisitions.
NON-GAAP PERFORMANCE MEASURES
(in millions, except per ounce information)
---------------------------------------------------------------------
Three months Nine months
ended ended
September 30, September 30,
2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs - per
US GAAP(A) $ 280 $ 274 $ 795 $ 787
Accretion expense and reclamation
costs at the operating mines (4) (3) (15) (7)
---------------------------------------------------------------------
Total cash production costs - per
Gold Institute Production Cost
Standard $ 276 $ 271 $ 780 $ 780
---------------------------------------------------------------------
Ounces sold (thousands) 1,267 1,505 3,736 4,193
Total cash costs- per US
GAAP (dollars)(B) $ 221 $ 182 $ 213 $ 188
Total cash costs - per Gold
Institute Production Cost
Standard (dollars)(B) $ 218 $ 180 $ 208 $ 186
---------------------------------------------------------------------
(A) Equal to cost of sales and other operating expenses less
accretion expense and reclamation costs at non-operating mines.
(B) Per ounce weighted average.
Barrick has included total cash costs per ounce data because it
understands that certain investors use this information to assess the
Company's performance. The inclusion of total cash costs per ounce
statistics enables investors to better understand year-on-year changes
in production costs, which in turn affect profitability and the
ability to generate operating cash flow for use in investing and other
activities. Barrick reports total cash costs per ounce data calculated
in accordance with The Gold Institute Production Cost Standard (the
"Standard"). Adoption of the Standard is voluntary, but the Company
understands that most senior gold producers follow the Standard when
reporting cash cost per ounce data. The data does not have a meaning
prescribed by US GAAP and therefore amounts presented may not be
comparable to data presented by gold producers who do not follow the
Standard. Total cash costs per ounce are derived from amounts included
in the Statements of Income and mine site operating costs such as
mining, processing, administration, royalties and production taxes,
but exclude amortization, reclamation costs, financing costs, and
capital, development and exploration costs. A GAAP measure of costs
per ounce has also been presented as required by securities
regulations that govern non-GAAP performance measures. Commentary
within this Management's Discussion and Analysis is focused on the
"total cash costs" measure as defined by the Standard, but the most
directly comparable financial measure calculated and presented in
accordance with GAAP is also provided throughout.
The data is intended to provide additional information and should
not be considered in isolation or as a substitute for measures of
performance prepared in accordance with GAAP. The measures are not
necessarily indicative of operating profit or cash flow from
operations as determined under GAAP.
Reconciliation of Total Cash Costs Per Ounce to Financial Statements
---------------------------------------------------------------------
Goldstrike- Goldstrike-
Open Pit Underground
---------------------------------------------------------------------
For the three months ended September 30 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs -
per US GAAP(1) $ 89.4 $ 109.3 $ 35.1 $ 35.7
Accretion expense and reclamation
costs at operating mines (0.6) (0.6) (0.1) (0.2)
---------------------------------------------------------------------
Total cash production costs per Gold
Institute Production Cost Standard $ 88.8 $ 108.7 $ 35.0 $ 35.5
---------------------------------------------------------------------
Ounces sold (thousands) 360 514 125 136
Total cash costs per ounce sold
per US GAAP (dollars)(3) $ 248 $ 213 $ 280 $ 262
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production
Cost Standard (dollars)(4) $ 247 $ 212 $ 279 $ 262
---------------------------------------------------------------------
---------------------------------------------------------------------
Eskay Creek(2) Round Mountain
---------------------------------------------------------------------
For the three months ended September 30 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs -
per US GAAP(1) $ 3.9 $ 0.9 $ 20.8 $ 16.1
Accretion expense and reclamation
costs at operating mines (0.1) (0.1) (0.4) (0.4)
---------------------------------------------------------------------
Total cash production costs per Gold
Institute Production Cost Standard $ 3.8 $ 0.8 $ 20.4 $ 15.7
---------------------------------------------------------------------
Ounces sold (thousands) 60 87 102 93
Total cash costs per ounce sold
per US GAAP (dollars)(3) $ 64 $ 10 $ 205 $ 174
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production
Cost Standard (dollars)(4) $ 63 $ 9 $ 201 $ 170
---------------------------------------------------------------------
---------------------------------------------------------------------
---------------------------------------------------------------------
Hemlo Holt-McDermott
---------------------------------------------------------------------
For the three months ended September 30 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs -
per US GAAP(1) $ 14.9 $ 15.9 $ 3.8 $ 4.8
Accretion expense and reclamation
costs at operating mines (0.1) (0.1) - -
---------------------------------------------------------------------
Total cash production costs per Gold
Institute Production Cost Standard $ 14.8 $ 15.8 $ 3.8 $ 4.8
---------------------------------------------------------------------
Ounces sold (thousands) 55 75 24 24
Total cash costs per ounce sold
per US GAAP (dollars)(3) $ 269 $ 212 $ 157 $ 202
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production
Cost Standard (dollars)(4) $ 268 $ 211 $ 157 $ 202
---------------------------------------------------------------------
---------------------------------------------------------------------
Total
Marigold North America
---------------------------------------------------------------------
For the three months ended September 30 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs -
per US GAAP(1) $ 2.4 $ 2.4 $ 170.3 $185.1
Accretion expense and reclamation
costs at operating mines - (0.1) (1.3) (1.5)
---------------------------------------------------------------------
Total cash production costs per Gold
Institute Production Cost Standard $ 2.4 $ 2.3 $ 169.0 $183.6
---------------------------------------------------------------------
Ounces sold (thousands) 12 13 738 941
Total cash costs per ounce sold
per US GAAP (dollars)(3) $ 202 $ 173 $ 231 $ 197
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production
Cost Standard (dollars)(4) $ 202 $ 173 $ 229 $ 195
---------------------------------------------------------------------
---------------------------------------------------------------------
Total
Pierina South America
---------------------------------------------------------------------
For the three months ended September 30 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs -
per US GAAP(1) $ 19.0 $ 18.5 $ 19.0 $ 18.5
Accretion expense and reclamation
costs at operating mines (0.9) (0.8) (0.9) (0.8)
---------------------------------------------------------------------
Total cash production costs per Gold
Institute Production Cost Standard $ 18.1 $ 17.7 $ 18.1 $ 17.7
---------------------------------------------------------------------
Ounces sold (thousands) 153 220 153 220
Total cash costs per ounce sold
per US GAAP (dollars)(3) $ 124 $ 84 $ 124 $ 84
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production
Cost Standard (dollars)(4) $ 118 $ 81 $ 118 $ 81
---------------------------------------------------------------------
---------------------------------------------------------------------
Plutonic Darlot
---------------------------------------------------------------------
For the three months ended September 30 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs -
per US GAAP(1) $ 16.3 $ 16.6 $ 8.3 $ 6.0
Accretion expense and reclamation
costs at operating mines (0.1) - (0.1) -
---------------------------------------------------------------------
Total cash production costs per Gold
Institute Production Cost Standard $ 16.2 $ 16.6 $ 8.2 $ 6.0
---------------------------------------------------------------------
Ounces sold (thousands) 73 93 43 37
Total cash costs per ounce sold
per US GAAP (dollars)(3) $ 223 $ 179 $ 194 $ 163
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production
Cost Standard (dollars)(4) $ 221 $ 179 $ 193 $ 163
---------------------------------------------------------------------
(1) Represents cost of sales and other operating costs (excluding
amortization and accretion expense and reclamation costs for
non-operating mines).
(2) Eskay Creek's total cash costs in third quarter 2004 are impacted
by higher silver prices which the Company treats as by-product.
Total cash costs on a co-product basis are: third quarter 2004 -
gold $221 per ounce, silver $3.69 per ounce (2003 third quarter -
gold $163 per ounce, silver $2.25 per ounce).
(3) Represents total cash production costs per US GAAP divided by
ounces sold.
(4) Represents total cash production costs per Gold Institute
Production Cost Standard divided by ounces sold.
---------------------------------------------------------------------
Lawlers Kalgoorlie
---------------------------------------------------------------------
For the three months ended September 30 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs -
per US GAAP(1) $ 7.4 $ 5.1 $ 29.4 $ 24.3
Accretion expense and reclamation
costs at operating mines (0.1) - (1.1) (0.2)
---------------------------------------------------------------------
Total cash production costs per Gold
Institute Production Cost Standard $ 7.3 $ 5.1 $ 28.3 $ 24.1
---------------------------------------------------------------------
Ounces sold (thousands) 30 25 126 123
Total cash costs per ounce sold
per US GAAP (dollars)(3) $ 249 $ 202 $ 233 $ 197
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production
Cost Standard (dollars)(4) $ 247 $ 201 $ 224 $ 195
---------------------------------------------------------------------
---------------------------------------------------------------------
Total
Bulyanhulu Australia/Africa
---------------------------------------------------------------------
For the three months ended September 30 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs -
per US GAAP(1) $ 29.1 $ 18.1 $ 90.5 $ 70.1
Accretion expense and reclamation
costs at operating mines (0.1) (0.1) (1.5) (0.3)
---------------------------------------------------------------------
Total cash production costs per Gold
Institute Production Cost Standard $ 29.0 $ 18.0 $ 89.0 $ 69.8
---------------------------------------------------------------------
Ounces sold (thousands) 104 65 376 344
Total cash costs per ounce sold
per US GAAP (dollars)(3) $ 280 $ 279 $ 241 $ 204
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production
Cost Standard (dollars)(4) $ 279 $ 277 $ 237 $ 203
---------------------------------------------------------------------
---------------------------------------------------------------------
Goldstrike- Goldstrike-
Open Pit Underground
---------------------------------------------------------------------
For the nine months ended September 30 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs -
per US GAAP(1) $ 251.1 $ 284.4 $ 104.9 $ 107.9
Accretion expense and reclamation
costs at operating mines (1.7) (1.7) (0.2) (0.1)
---------------------------------------------------------------------
Total cash production costs per Gold
Institute Production Cost Standard $ 249.4 $ 282.7 $ 104.7 $ 107.8
---------------------------------------------------------------------
Ounces sold (thousands) 979 1,243 396 429
Total cash costs per ounce sold
per US GAAP (dollars)(3) $ 256 $ 229 $ 265 $ 252
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production
Cost Standard (dollars)(4) $ 254 $ 227 $ 264 $ 251
---------------------------------------------------------------------
---------------------------------------------------------------------
Eskay Creek(2) Round Mountain
---------------------------------------------------------------------
For the nine months ended September 30 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs -
per US GAAP(1) $ 8.8 $ 16.9 $ 60.3 $ 49.7
Accretion expense and reclamation
costs at operating mines (0.2) (0.2) (1.2) (1.2)
---------------------------------------------------------------------
Total cash production costs per Gold
Institute Production Cost Standard $ 8.6 $ 16.7 $ 59.1 $ 48.5
---------------------------------------------------------------------
Ounces sold (thousands) 216 271 285 289
Total cash costs per ounce sold
per US GAAP (dollars)(3) $ 41 $ 62 $ 212 $ 172
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production
Cost Standard (dollars)(4) $ 40 $ 62 $ 207 $ 168
---------------------------------------------------------------------
---------------------------------------------------------------------
Hemlo Holt-McDermott
---------------------------------------------------------------------
For the nine months ended September 30 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs -
per US GAAP(1) $ 43.9 $ 45.2 $ 12.3 $ 16.5
Accretion expense and reclamation
costs at operating mines (0.2) (0.2) (0.1) (0.1)
---------------------------------------------------------------------
Total cash production costs per Gold
Institute Production Cost Standard $ 43.7 $ 45.0 $ 12.2 $ 16.4
---------------------------------------------------------------------
Ounces sold (thousands) 180 199 62 66
Total cash costs per ounce sold
per US GAAP (dollars)(3) $ 244 $ 227 $ 198 $ 250
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production
Cost Standard (dollars)(4) $ 243 $ 226 $ 197 $ 248
---------------------------------------------------------------------
---------------------------------------------------------------------
Total
Marigold North America
---------------------------------------------------------------------
For the nine months ended September 30 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs -
per US GAAP(1) $ 6.3 $ 5.8 $ 487.6 $ 526.4
Accretion expense and reclamation
costs at operating mines (0.1) (0.1) (3.7) (3.6)
---------------------------------------------------------------------
Total cash production costs per Gold
Institute Production Cost Standard $ 6.2 $ 5.7 $ 483.9 $ 522.8
---------------------------------------------------------------------
Ounces sold (thousands) 31 35 2,149 2,531
Total cash costs per ounce sold
per US GAAP (dollars)(3) $ 200 $ 167 $ 227 $ 208
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production
Cost Standard (dollars)(4) $ 199 $ 165 $ 225 $ 207
---------------------------------------------------------------------
(1) Represents cost of sales and other operating costs (excluding
amortization and accretion expense and reclamation costs for
non-operating mines).
(2) Eskay Creek's total cash costs in nine months ended September 30,
2004 are impacted by higher silver prices which the Company
treats as a by-product. Total cash costs on a co-product basis
are:
nine months ended September 30, 2004 - gold $200 per ounce,
silver $3.35 per ounce (nine months ended September 30, 2003 -
gold $176 per ounce, silver $2.31 per ounce).
(3) Represents total cash production costs per US GAAP divided by
ounces sold.
(4) Represents total cash production costs per Gold Institute
Production Cost Standard divided by ounces sold.
---------------------------------------------------------------------
Total
Pierina South America
---------------------------------------------------------------------
For the nine months ended September 30 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs -
per US GAAP(1) $ 57.2 $ 57.1 $ 57.2 $ 57.1
Accretion expense and reclamation
costs at operating mines (2.6) (2.4) (2.6) (2.4)
---------------------------------------------------------------------
Total cash production costs per Gold
Institute Production Cost Standard $ 54.6 $ 54.7 $ 54.6 $ 54.7
---------------------------------------------------------------------
Ounces sold (thousands) 553 675 553 675
Total cash costs per ounce sold
per US GAAP (dollars)(2) $ 104 $ 84 $ 104 $ 84
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production
Cost Standard (dollars)(3) $ 99 $ 81 $ 99 $ 81
---------------------------------------------------------------------
---------------------------------------------------------------------
Plutonic Darlot
---------------------------------------------------------------------
For the nine months ended September 30 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs -
per US GAAP(1) $ 51.0 $ 46.4 $ 22.7 $ 18.9
Accretion expense and reclamation
costs at operating mines (0.1) (0.1) - -
---------------------------------------------------------------------
Total cash production costs per Gold
Institute Production Cost Standard $ 50.9 $ 46.3 $ 22.7 $ 18.9
---------------------------------------------------------------------
Ounces sold (thousands) 238 242 114 119
Total cash costs per ounce sold
per US GAAP (dollars)(2) $ 215 $ 192 $ 199 $ 159
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production
Cost Standard (dollars)(3) $ 214 $ 192 $ 199 $ 159
---------------------------------------------------------------------
---------------------------------------------------------------------
Lawlers Kalgoorlie
---------------------------------------------------------------------
For the nine months ended September 30 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs -
per US GAAP(1) $ 21.1 $ 17.5 $ 78.7 $ 66.2
Accretion expense and reclamation
costs at operating mines (0.1) (0.1) (1.5) (0.8)
---------------------------------------------------------------------
Total cash production costs per Gold
Institute Production Cost Standard $ 21.0 $ 17.4 $ 77.2 $ 65.4
---------------------------------------------------------------------
Ounces sold (thousands) 86 72 339 316
Total cash costs per ounce sold
per US GAAP (dollars)(2) $ 246 $ 243 $ 232 $ 210
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production
Cost Standard (dollars)(3) $ 245 $ 242 $ 228 $ 207
---------------------------------------------------------------------
---------------------------------------------------------------------
Total
Bulyanhulu Australia/Africa
---------------------------------------------------------------------
For the nine months ended September 30 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash production costs -
per US GAAP(1) $ 76.8 $ 54.9 $ 250.3 $ 203.9
Accretion expense and reclamation
costs at operating mines (7.4) (0.3) (9.1) (1.3)
---------------------------------------------------------------------
Total cash production costs per Gold
Institute Production Cost Standard $ 69.4 $ 54.6 $ 241.2 $ 202.6
---------------------------------------------------------------------
Ounces sold (thousands) 257 238 1,034 987
Total cash costs per ounce sold
per US GAAP (dollars)(2) $ 299 $ 230 $ 242 $ 207
---------------------------------------------------------------------
Total cash costs per ounce sold -
per Gold Institute Production
Cost Standard (dollars)(3) $ 270 $ 229 $ 233 $ 205
---------------------------------------------------------------------
(1) Represents cost of sales and other operating costs (excluding
amortization and accretion expense and reclamation costs for
non-operating mines).
(2) Represents total cash production costs per US GAAP divided by
ounces sold.
(3) Represents total cash production costs per Gold Institute
Production Cost Standard divided by ounces sold.
Reconciliation of Amortization per Ounce to Financial Statements
---------------------------------------------------------------------
Three months ended Nine months ended
September 30, September 30,
2004 2003 2004 2003
---------------------------------------------------------------------
Amortization expense per
consolidated financial
statements $ 117 $ 134 $ 352 $ 390
Amortization expense recorded on
property, plant and equipment
not at operating mine sites 4 6 17 21
---------------------------------------------------------------------
Amortization expense for per
ounce calculation $ 113 $ 128 $ 335 $ 369
---------------------------------------------------------------------
Ounces sold (thousands) 1,267 1,505 3,736 4,193
---------------------------------------------------------------------
Amortization per ounce (dollars) $ 89 $ 85 $ 90 $ 88
---------------------------------------------------------------------
Notes to Unaudited Interim Consolidated Financial Statements
Tabular dollar amounts in millions of United States dollars,
unless otherwise indicated. References to C$ and A$ are to Canadian
and Australian dollars, respectively.
1 NATURE OF OPERATIONS
Barrick Gold Corporation ("Barrick" or the "Company") engages in
the production and sale of gold, including related mining activities
such as exploration, development, mining and processing. Our mining
activities are mainly located in the United States, Canada, Australia,
Peru, Tanzania, Chile, Argentina and Russia. They require specialized
facilities and technology, and we rely on those facilities to support
our production levels. The market price of gold, quantities of gold
mineral reserves and future gold production levels, future cash
operating costs, foreign currency exchange rates, market interest
rates and the level of exploration expenditures are some of the things
that could materially affect our operating cash flow and
profitability. Due to the global nature of our operations, we are also
affected by government regulations, political risk and the
interpretation of taxation laws and regulations. We seek to mitigate
these risks and, in particular, we use derivative instruments as part
of a risk management program that seeks to mitigate the effect of
volatility in commodity prices, interest rates and foreign currency
exchange rates. Many of the factors affecting these risks are beyond
our control and their effects could materially impact our consolidated
financial statements.
2 BASIS OF PREPARATION
The United States dollar is the principal currency of our
operations. We prepare our primary consolidated financial statements
in United States dollars and under United States generally accepted
accounting principles ("US GAAP"). The accompanying unaudited interim
consolidated financial statements have been prepared in accordance
with US GAAP for the preparation of interim financial information.
Accordingly, they do not include all of the information and
disclosures required by US GAAP for annual consolidated financial
statements. The accounting policies used in the preparation of the
accompanying unaudited interim consolidated financial statements are
the same as those described in our audited consolidated financial
statements and the notes thereto for the three years ended December
31, 2003.
In the opinion of management, all adjustments considered necessary
for fair presentation of results for the periods presented have been
reflected in these financial statements. These unaudited interim
consolidated financial statements should be read in conjunction with
the audited annual consolidated financial statements and the notes
thereto for the three years ended December 31, 2003.
The preparation of financial statements under US GAAP requires us
to make estimates and assumptions that affect:
-- the reported amounts of assets and liabilities;
-- disclosures of contingent assets and liabilities; and
-- revenues and expenses recorded in each reporting period.
The most significant estimates and assumptions that affect our
financial position and results of operations are those that use
estimates of proven and probable gold reserves; future estimates of
costs and expenses; and/or assumptions of future commodity prices,
interest rates and foreign currency exchange rates. Such estimates and
assumptions include:
-- decisions as to whether exploration and mine development costs
should be capitalized or expensed;
-- assessments of whether property, plant and equipment, ore in
stockpiles, capitalized mining costs and investments may be
impaired;
-- assessments of our ability to realize the benefits of deferred
income tax assets;
-- the useful lives of long-lived assets and the rate at which we
record amortization in earnings;
-- the estimated fair value of asset retirement obligations;
-- the timing and amounts of forecasted future expenditures that
represent the hedged items underlying hedging relationships
for our cash flow hedge contracts;
-- the estimated fair values of derivative instruments;
-- the value of slow-moving and obsolete inventories (which are
stated at the lower of average cost and net realizable value);
and
-- assessments of the likelihood and amounts of contingencies.
We regularly review the estimates and assumptions that affect our
financial statements; however, what actually happens could differ from
those estimates and assumptions.
The consolidated financial statements include the accounts of
Barrick Gold Corporation and other entities in which we have a
controlling financial interest. Our ownership interests in the Round
Mountain, Hemlo and Kalgoorlie mines are held through unincorporated
joint ventures. Under long-standing practice for extractive
industries, we include the assets, liabilities, revenues, expenses and
cash flows of unincorporated joint ventures in our financial
statements using the proportionate consolidation method. Intercompany
balances and transactions are eliminated on consolidation.
The usual condition for a controlling financial interest is
ownership of a majority of the voting interests of an entity. However,
a controlling financial interest may also exist in entities through
arrangements that do not involve voting interests, where the entities
are variable interest entities (VIEs) as defined under the principles
of FIN 46R.
A VIE is defined as an entity that: lacks enough equity investment
at risk to permit the entity to finance its activities without
additional subordinated financial support from other parties; has
equity owners who are unable to make decisions about the entity,
and/or; has equity owners that do not have the obligation to absorb or
right to receive the entity's expected losses and residual returns.
VIEs could arise from a variety of entities or legal structures.
FIN 46R requires a variable interest holder (ie. a counterparty to
a VIE) to consolidate the VIE if that party will absorb a majority of
the expected losses of the VIE, receive a majority of the residual
returns of the VIE, or both. This party is considered the primary
beneficiary of the entity. The determination of whether a company
meets the criteria to be considered the primary beneficiary of a VIE
requires an evaluation of all transactions with the entity. The
foundation for this evaluation is a calculation prescribed by FIN 46R.
3 ACCOUNTING CHANGES
A FAS 143, Accounting for asset retirement obligations
On January 1, 2003, we adopted FAS 143 and changed our accounting
policy for recording obligations relating to the retirement of
long-lived assets. This accounting change is described in note 2B of
our audited annual consolidated financial statements for the three
years ended December 31, 2003. On adoption of FAS 143 in first quarter
2003, we recorded on our balance sheet an increase in property, plant
and equipment of $39 million; an increase in other long-term
obligations of $32 million; and an increase in deferred income tax
liabilities of $3 million. We recorded in our income statement a $4
million credit for the cumulative effect of this accounting change.
B Amortization of underground development costs
On January 1, 2003, we changed our accounting policy for
amortization of underground mine development costs to exclude
estimates of future underground development costs. This accounting
change is described in note 2B of our audited annual consolidated
financial statements for the three years ended December 31, 2003. On
adoption of this change on January 1, 2003, we decreased property,
plant and equipment by $19 million, and increased deferred income tax
liabilities by $2 million. We recorded in our income statement a $21
million charge for the cumulative effect of this accounting change.
C EITF Issue No. 03-1, The Meaning of Other-Than-Temporary
Impairment and Its Application to Certain Investments
EITF 03-1, was issued in 2004 and establishes guidance to be used
in determining when an investment is considered impaired, whether that
impairment is other than temporary, and the measurement of an
impairment loss. Under the application of our previous accounting
policy for impairment of investments, an impairment on a specific
investment was recorded in earnings on determination that the
impairment was other than temporary or after an investment had been
impaired for six months, whichever is the earlier. Under EITF 03-1,
there is no requirement to automatically record an impairment loss in
earnings after a six-month period, instead the recognition of
impairment losses in earnings is based on the assessment of whether
the loss is other than temporary. The adoption of the measurement
requirements of EITF 03-1 in third quarter 2004 had no effect on
impairment losses recorded in earnings.
EITF 03-1 also provides the guidance on accounting subsequent to
the recognition of an other-than-temporary impairment and requires
certain disclosures about impairment losses included in other
comprehensive income that have not been recorded in earnings. The
measurement requirements of EITF 03-1 were effective for the fiscal
quarter ended September 30, 2004, but the disclosure requirements are
not effective until fiscal 2005.
D EITF Issue No. 04-6, Accounting for Stripping Costs Incurred
during Production in the Mining Industry
In the mining industry, companies may be required to remove
overburden and other mine waste materials to access mineral deposits.
The costs of removing overburden and waste materials are often
referred to as "stripping costs". During the development of a mine
(before production begins), it is generally accepted in practice that
stripping costs are capitalized as part of the depreciable cost of
building, developing, and constructing the mine. Those capitalized
costs are typically amortized over the productive life of the mine
using the units-of-production method. A mining company may continue to
remove overburden and waste materials, and therefore incur stripping
costs, during the production phase of the mine. Questions have been
raised about the appropriate accounting for stripping costs incurred
during the production phase, and diversity in practice exists. In
response to these questions, the EITF has undertaken a project to
develop an Abstract to address the questions and clarify the
appropriate accounting treatment for stripping costs under US GAAP.
The EITF is in the process of deliberating these questions and upon
completion of their deliberations they will issue EITF 04-6, which
will represent an authorative US GAAP pronouncement for stripping
costs. Our accounting policy for stripping costs is disclosed in note
15. EITF 04-6 is expected to be approved and issued in fourth quarter
2004, following which we may be required to change our accounting
policy for stripping costs.
E Changes in estimates
Classification of mineralization at Lagunas Norte as a reserve
We capitalize mine development costs on our properties after
proven and probable reserves have been found. Before finding proven
and probable reserves, development costs are considered exploration
costs, which are expensed as incurred. Effective May 1, 2004, we
determined that Lagunas Norte's mineral reserves met the definition of
proven and probable reserves for United States reporting purposes.
Following this determination, we began capitalizing mine development
costs at the Lagunas Norte project prospectively for future periods.
The effect of this change was to capitalize $83 million of mine
development costs for the three month period ended September 30, 2004,
and $105 million for the nine month period ended September 30, 2004.
Amortization of property, plant and equipment
Effective December 31, 2003, we updated our estimates of proven
and probable gold mineral reserves. Following the update of these
estimates, we revised our calculations of amortization of property,
plant and equipment. The effect of the change in reserve estimates on
amortization of property, plant and equipment for the three months
ended September 30, 2004 was a decrease in this expense by
approximately $6 million for mines with a greater than 10% change
(other than ounces produced) in the reserve estimates, and for the
nine months ended September 30, 2004, a decrease in amortization of
property, plant and equipment of $19 million.
Amortization of capitalized mining costs
Effective December 31, 2003, we updated our estimates of proven
and probable gold mineral reserves. Following the update of these
estimates, in 2004, we revised the estimated stripping ratios used in
the calculation of amortization of capitalized mining costs with a
decrease in the stripping ratio at Goldstrike Open Pit and an increase
in the stripping ratio at Pierina. See note 15 for a description of
the effect of these changes in estimates.
4 SEGMENT INFORMATION
We operate in the gold mining industry and our operations are
managed on a regional basis. Our three primary regions are North
America, Australia/Africa, and South America, which includes Peru,
Chile and Argentina. In 2003, we changed the composition of our
reportable segments by the addition of our development projects. We
also changed our determination of which costs are charged to segments.
Prior periods have been restated to conform to the current
presentation. Our chief operating decision maker reviews financial
information on all our individual mines and development projects
regularly and, accordingly, our definition of a business segment
includes each of our operating mines and development projects. Our
development projects are not presently generating revenue and
therefore the measure of segment loss represents expensed start-up
costs as well as expensed exploration and development costs for
periods in which mineralization at the projects does not meet the
definition of proven and probable reserves for United States reporting
purposes.
Income statement information
--------------------------------------------------------------------
Total cash Segment income
production (loss) before
Gold sales costs(1) income taxes
--------------------------------------------------------------------
For the three months
ended September 30, 2004 2003 2004 2003 2004 2003
--------------------------------------------------------------------
Operating mines
Goldstrike $ 190 $ 235 $ 124 $ 145 $ 27 $ 47
Pierina 60 79 18 18 17 21
Bulyanhulu 44 23 29 18 3 (4)
Kalgoorlie 50 46 28 24 15 17
Eskay Creek 24 32 4 1 7 19
Hemlo 21 28 15 16 3 9
Plutonic 29 34 16 16 10 15
Round Mountain 40 35 20 16 15 14
Other operating mines 42 37 22 17 14 12
Development projects
Veladero - - - - (3) (7)
Lagunas Norte - - - - (2) (7)
Cowal - - - - (1) -
Pascua-Lama - - - - - -
Tulawaka - - - - - -
--------------------------------------------------------------------
Segment total $ 500 $ 549 $ 276 $ 271 $ 105 $ 136
--------------------------------------------------------------------
(1)Includes cost of sales, by-product revenues, royalty expenses and
production taxes (note 6). Excludes accretion expense, other
reclamation and closure costs, and amortization.
--------------------------------------------------------------------
Total cash Segment income
production (loss)before
Gold sales costs(1) income taxes
--------------------------------------------------------------------
For the nine months
ended September 30, 2004 2003 2004 2003 2004 2003
--------------------------------------------------------------------
Operating mines
Goldstrike $ 525 $ 598 $ 354 $ 390 $ 60 $ 90
Pierina 210 241 55 55 64 63
Bulyanhulu 102 86 69 55 5 2
Kalgoorlie 131 114 77 65 38 34
Eskay Creek 82 96 9 17 36 43
Hemlo 68 71 44 45 15 18
Plutonic 91 87 51 46 32 35
Round Mountain 109 103 59 49 34 39
Other operating mines 113 103 62 58 32 26
Development projects
Veladero - - - - (3) (18)
Lagunas Norte - - - - (11) (21)
Cowal - - - - (1) -
Pascua-Lama - - - - - -
Tulawaka - - - - - -
--------------------------------------------------------------------
Segment total $ 1,431 $ 1,499 $ 780 $ 780 $ 301 $ 311
--------------------------------------------------------------------
(1)Includes cost of sales, by-product revenues, royalty expenses and
production taxes (note 6). Excludes accretion expense, other
reclamation and closure costs, and amortization.
Asset information
Amortization
--------------------------------------------------------------------
Three months ended Nine months ended
September 30, September 30,
2004 2003 2004 2003
--------------------------------------------------------------------
Operating mines
Goldstrike $ 39 $ 43 $ 111 $ 118
Pierina 25 40 91 123
Bulyanhulu 12 9 28 29
Kalgoorlie 7 5 16 15
Eskay Creek 13 12 37 36
Hemlo 3 3 9 8
Plutonic 3 3 8 6
Round Mountain 5 5 16 15
Other operating mines 6 8 19 19
Development projects
Veladero - - - -
Lagunas Norte - - - -
Cowal - - - -
Pascua-Lama - - - -
Tulawaka - - - -
--------------------------------------------------------------------
Segment total 113 128 335 369
Other amortization
outside operating
segments 4 6 17 21
--------------------------------------------------------------------
--------------------------------------------------------------------
$ 117 $ 134 $ 352 $ 390
--------------------------------------------------------------------
Segment capital expenditures
--------------------------------------------------------------------
Three months ended Nine months ended
September 30, September 30,
2004 2003 2004 2003
--------------------------------------------------------------------
Operating mines
Goldstrike $ 10 $ 12 $ 39 $ 40
Pierina - 4 2 9
Bulyanhulu 8 8 26 27
Kalgoorlie 2 10 7 12
Eskay Creek 1 1 5 4
Hemlo 2 2 5 7
Plutonic 3 15 11 40
Round Mountain 2 3 4 5
Other operating mines 3 6 18 25
Development projects
Veladero 65 12 207 19
Lagunas Norte 83 - 115 2
Cowal 13 6 44 16
Pascua-Lama 8 1 18 7
Tulawaka 12 - 27 -
--------------------------------------------------------------------
Segment total 212 80 528 213
Other capital
expenditures
outside operating
segments 6 1 8 3
--------------------------------------------------------------------
$ 218 $ 81 $ 536 $ 216
--------------------------------------------------------------------
Reconciliation of segment income to enterprise net income
---------------------------------------------------------------------
Three months ended Nine months ended
September 30, September 30,
2004 2003 2004 2003
---------------------------------------------------------------------
Segment income $ 105 $ 136 $ 301 $ 311
Accretion expense, reclamation,
closure and other costs (22) (19) (61) (44)
Amortization outside operating
segments (4) (6) (17) (21)
Exploration and business development
costs outside operating segments (32) (24) (86) (62)
Administration (18) (21) (57) (63)
Other income/expense 6 24 31 39
Interest expense (6) (12) (18) (36)
Non-hedge derivative gains (losses) 8 (21) (1) 25
Income tax expense (5) (22) - (9)
Cumulative effect of changes in
accounting principles - - - (17)
---------------------------------------------------------------------
Net income $ 32 $ 35 $ 92 $ 123
---------------------------------------------------------------------
5 REVENUE RECOGNITION AND COMMODITY CONTRACTS
Gold contracts
We have fixed-price forward gold sales contracts with various
counterparties for 13.7 million ounces of future gold production. The
terms of the contracts are governed by master trading agreements that
we have in place with the counterparties to the contracts. Contract
prices are established at inception through to an interim date, which
may be materially in advance of the termination date (2014 in most
cases) of the master trading agreements. If we choose not to deliver
at this interim date, a new interim date is set. The price for the new
interim date is determined in accordance with the master trading
agreements, which have contractually agreed price adjustment
mechanisms based on the market gold price. The master trading
agreements have both fixed and floating price mechanisms. The
fixed-price mechanism represents the market price at the start date
(or previous interim date) of the contract plus a premium, which is
commonly referred to as contango, (in most cases) based on the
difference between the forward price of gold and the current market
price of gold. For the majority of fixed-price forward gold sales
contracts, selling prices are fixed through 2006. The contracts have
final delivery dates primarily in approximately 10 years, but we have
the right to settle these contracts at any time over these periods. If
at an interim date we opt for a floating price, the floating price
represents the spot market price of gold plus or minus the difference
between the previously fixed price and the market gold price at that
interim date. Forward gold market prices are principally influenced by
the current market price of gold, gold lease rates and US dollar
interest rates. The final realized selling price under a contract will
depend on the timing of the actual future delivery date, the market
price of gold at the start of the contract and the actual amount of
the premium of the forward price of gold over the spot price of gold
for the periods that fixed selling prices are set. The largest single
counterparty as of September 30, 2004 made up 11% of the ounces of
outstanding forward gold sales contracts.
We use gold lease rate swap contracts to manage our gold lease
rate exposure. Because historic short-term gold lease rates have
tended to be lower than longer-term gold lease rates, and also because
fixed-price forward gold sales contracts have fixed gold lease rates,
we have used these gold lease rate swap contracts to economically
achieve a more optimal term structure for gold lease costs. Under
these swaps, we receive a fixed gold lease rate, and pay a floating
gold lease rate, on a notional 2.1 million ounces of gold spread from
2004 to 2014. The swaps are associated with forward gold sales
contracts with expected delivery dates beyond 2006. These gold lease
rate swap contracts are accounted for as non-hedge derivatives (see
note 11B).
We also have floating spot price sales contracts to sell 0.7
million ounces of gold and 9 million ounces of silver spread over
approximately 10 years (0.5 million ounces of gold and nil ounces of
silver at December 31, 2003). These contracts were previously
fixed-price forward sales contracts for which, in accordance with the
terms of our master trading agreements, we have elected to receive
floating spot gold and silver prices, adjusted by the difference
between the spot price and the contract price at the time of such
election. Floating prices were elected for these contracts so that
Barrick could economically regain spot gold price leverage under the
terms of delivery into these contracts. Because these are sales
contracts, Barrick did not financially close out the contracts, but
rather intends to deliver production against them at some time before
the termination date (2014 in most cases). Furthermore, floating price
mechanisms were elected for these contracts at a time when the then
current market price was higher than the fixed price in the contract.
The mark-to-market on these contracts (at September 30, 2004) was
negative $37 million, which is included in the mark-to-market value of
our total forward gold and silver sales contract positions. The $37
million equates to an average reduction to the future spot sales price
of approximately $45 per ounce on gold and $0.76 per ounce on silver
when we deliver gold and silver at spot prices against these
contracts.
Silver contracts
Forward silver sales contracts have similar delivery terms and
pricing mechanisms as forward gold sales contracts. At September 30,
2004, we had fixed-price commitments to deliver 15.9 million ounces of
silver over periods primarily of up to approximately 10 years.
6 COST OF SALES AND OTHER OPERATING EXPENSES
---------------------------------------------------------------------
Three months ended Nine months ended
September 30, September 30,
2004 2003 2004 2003
---------------------------------------------------------------------
Cost of sales(1) $ 292 $ 286 $ 836 $ 818
By-product revenues (33) (33) (103) (86)
Royalty expenses 13 14 37 36
Production taxes 4 4 10 12
Accretion expense 6 5 14 13
Payroll tax expense(2) - - 7 -
Reclamation and closure costs/other 15 13 37 28
Pension expense 1 1 3 3
---------------------------------------------------------------------
$ 298 $ 290 $ 841 $ 824
---------------------------------------------------------------------
(1) Cost of sales includes all costs that are capitalized to
inventory, except for amortization of property, plant and
equipment. The amount of amortization excluded from cost of
sales, and presented separately on the income statement, was $13
million in the three months ended September 30, 2004 (2003 -
$128 million), and $335 million for the nine months ended
September 30, 2004 (2003 - $369 million).
(2) In second quarter 2004, a $7 million payroll tax adjustment was
recorded. The adjustment relates to periods prior to 2004.
Pension Expense
---------------------------------------------------------------------
Three months ended Nine months ended
September 30, September 30,
2004 2003 2004 2003
---------------------------------------------------------------------
Expected return on plan assets $ (3) $ (3) $ (8) $ (8)
Interest cost on benefit obligation 4 4 10 11
Actuarial losses - - 1 -
---------------------------------------------------------------------
$ 1 $ 1 $ 3 $ 3
---------------------------------------------------------------------
7 OTHER INCOME/EXPENSE
---------------------------------------------------------------------
Three months ended Nine months ended
September 30, September 30,
2004 2003 2004 2003
---------------------------------------------------------------------
Interest income $ 7 $ 9 $ 23 $ 25
Gains on sale of long-lived assets 2 12 5 29
Foreign currency translation gains
(losses) 3 (1) 4 (6)
Realized gains on sale of
available-for-sale securities - 5 2 4
Impairment charge on
available-for-sale
securities - - (1) (7)
Impairment charge on royalty interest (8) - (8) -
Other items 2 (1) 6 (6)
---------------------------------------------------------------------
$ 6 $ 24 $ 31 $ 39
---------------------------------------------------------------------
8 INCOME TAX EXPENSE
---------------------------------------------------------------------
Three months ended Nine months ended
September 30, September 30,
Income tax expense 2004 2003 2004 2003
---------------------------------------------------------------------
Current $ 3 $ 42 $ 33 $ 74
Deferred 10 (20) 5 (44)
---------------------------------------------------------------------
13 22 38 30
Recognition of deferred tax assets (8) - (38) -
Release of deferred tax valuation
allowances recorded in prior years - - - (21)
---------------------------------------------------------------------
$ 5 $ 22 $ - $ 9
---------------------------------------------------------------------
---------------------------------------------------------------------
For the three months ended
September 30, 2004 2003
---------------------------------------------------------------------
Effective
income Income Income
tax rates Pre-tax Effective tax tax
on elements income tax rate expense Pre-tax Effective expense
of income (recovery) income tax rate (recovery)
---------------------------------------------------------------------
Net income
excluding
elements
set out below $ 40 28% $ 11 $ 61 25% $ 15
Impact of
deliveries
into forward
gold sales
contracts in
a low tax-rate
jurisdiction (8) - - - - -
Non-hedge
derivative
gains (losses) 8 (12%) (1) (21) 1% -
Other items (3) 33% (1) 17 41% 7
---------------------------------------------------------------------
$ 37 24% $ 9 $ 57 39% $ 22
Tax only items:
Recognition of
deferred tax
assets - (20%) (8) - - -
Other items - 10% 4 - - -
---------------------------------------------------------------------
Actual income
tax rate $ 37 14% $ 5 $ 57 39% $ 22
---------------------------------------------------------------------
---------------------------------------------------------------------
For the nine
months ended
September 30, 2004 2003
---------------------------------------------------------------------
Effective
income Income Income
tax rates tax tax
on elements Pre-tax Effective expense Pre-tax Effective expense
of income income tax rate(recovery) income tax rate (recovery)
---------------------------------------------------------------------
Net income
excluding
elements
set out below $ 158 28% $ 44 $ 90 20% $ 18
Impact of
deliveries
into forward
gold sales
contracts in
a low tax-rate
jurisdiction (67) - - - - -
Non-hedge
derivative gains
(losses) (1) 400% (4) 25 1% -
Other items 2 (50%) (1) 34 35% 12
---------------------------------------------------------------------
$ 92 42% $ 39 $ 149 20% $ 30
Tax only items:
Recognition of
deferred tax
assets - (41%) (38) - - -
Release of
deferred tax
valuation
allowances
recorded in
prior years - - - - (14%) (21)
Other items - (1%) (1) - - -
---------------------------------------------------------------------
Actual income
tax rate $ 92 - $ - $ 149 6% $ 9
---------------------------------------------------------------------
Peruvian tax assessment
In 2002, one of our Peruvian subsidiaries received a revised
income tax assessment of $32 million, excluding interest and
penalties, from the Peruvian tax authority, SUNAT. The tax assessment
related to a tax audit of our Pierina Mine for the 1999 and 2000
fiscal years. The assessment mainly related to the revaluation of the
Pierina mining concession for the purpose of determining its tax
basis. Under the valuation proposed by SUNAT, the tax basis of the
Pierina assets would change from what we previously assumed with a
resulting increase in current and deferred income taxes. The full life
of mine effect on our current and deferred income tax liabilities was
fully recorded at December 31, 2002, as were other related payments of
about $21 million due for periods through 2003.
We believe that the tax assessment is incorrect and appealed the
assessment to the Tax Court. On September 30, 2004 the Tax Court
issued its decision in our favor. SUNAT has until early January 2005
to appeal the Tax Court's decision. If we are successful and our
original valuation is confirmed as the appropriate tax basis of the
Pierina assets, we would benefit from a $141 million reduction in
current and deferred tax liabilities. The effect of this contingent
gain, if any, will be recorded in the period the contingency is fully
resolved, once all avenues of appeal have been explored by either
Barrick or SUNAT.
In the event SUNAT successfully appeals the September 30, 2004 Tax
Court ruling, Peruvian law will not require us to make payment of the
disputed current taxes for the years covered by the tax assessment,
pending the outcome of any final appeal process, a process which can
take several years. Currently, the amount of income taxes potentially
payable is $83 million.
We have not provided for $65 million of potential interest and
penalties on the income tax assessed. Even if SUNAT were to prevail on
appeal, we believe that we will prevail on the interest and penalties
part, because the assessment runs counter to applicable law and
previous Peruvian tax audits. The potential amount of interest and
penalties will continue to increase over time while we contest the tax
assessment. A liability for interest and penalties will only be
recorded should it become probable that SUNAT's position on interest
and penalties will be upheld on appeal.
Change in Australian tax regime
A new consolidation tax law has been enacted in Australia that
allows wholly-owned groups of companies resident in Australia to elect
to be treated as a single entity and to file consolidated tax returns.
This new regime is elective and the election is irrevocable. An
election is filed with a company's income tax returns, which are due
by July 1 after each fiscal year and effective from January 1 of the
applicable year covered by the tax return.
Under certain circumstances, the rules governing the election
allow for a choice to reset the tax cost basis of certain assets
within a consolidated group. We intend to file such an election for
the 2004 fiscal year. This election will result in an estimated upward
revaluation of the tax basis of our assets in Australia. We have
estimated that the amount of the upward revaluation will be $101
million. The impact of recording this increase in the tax basis of our
Australian assets in second quarter 2004 was to record a $30 million
deferred tax asset and a corresponding deferred income tax credit.
9 EARNINGS PER SHARE
--------------------------------------------------------------------
Three months ended Nine months ended
($ millions, except shares in Septmeber 30, September 30,
millions and per share amounts) 2004 2003 2004 2003
--------------------------------------------------------------------
Income available to common
stockholders $ 32 $ 35 $ 92 $ 123
--------------------------------------------------------------------
Weighted average shares
outstanding - basic 532 536 533 540
Effect of dilutive stock options 1 2 2 -
--------------------------------------------------------------------
Weighted average shares outstanding
on assumed conversions 533 538 535 540
--------------------------------------------------------------------
Earnings per share
Basic and diluted $ 0.06 $ 0.07 $ 0.17 $ 0.23
--------------------------------------------------------------------
10 COMPREHENSIVE INCOME
Comprehensive income consists of net income and other gains and
losses that are excluded from net income. These other gains and
losses consist mainly of gains and losses on derivative instruments
accounted for as cash flow hedges; unrealized gains and losses on
available-for-sale securities; and foreign currency translation
adjustments.
Accumulated other comprehensive income (loss) (OCI)
--------------------------------------------------------------------
2004 2003
--------------------------------------------------------------------
Pre-tax Tax Post-tax Pre-tax Tax Post-tax
amount effect amount amount effect amount
--------------------------------------------------------------------
Foreign currency
translation
adjustments
At January 1 $ (147) $ - $ (147) $ (144) $ - $ (144)
Translation
adjustments
recorded in
the period - - - (5) - (5)
---------------------------------------------------------------------
At September 30 $ (147) $ - $ (147) $ (149) $ - $ (149)
---------------------------------------------------------------------
Accumulated gains
on cash flow
hedges
At January 1 $ 288 $ (99) $ 189 $ 49 $ (17) $ 32
Changes in fair value
of cash flow
hedges (note 11D) (8) 3 (5) 230 (81) 149
Transfer of hedge
gains to earnings
(note 11D) (85) 30 (55) (62) 18 (44)
Hedge ineffectiveness
transferred to
earnings (note 11D) (2) - (2) (10) 3 (7)
---------------------------------------------------------------------
At September 30 $ 193 $ (66) $ 127 $ 207 $ (77) $ 130
---------------------------------------------------------------------
Unrealized gains
(losses) on
available-for-sale
securities
At January 1 $ 38 $ - $ 38 $ (6) $ - $ (6)
Changes in fair value
of securities (20) - (20) 13 - 13
Impairment charges
recorded in earnings
(note 7) 1 - 1 7 - 7
---------------------------------------------------------------------
At September 30 $ 19 $ - $ 19 $ 14 $ - $ 14
---------------------------------------------------------------------
Additional minimum
pension liability
At January 1 and
September 30 $ (7) $ - $ (7) $ (7) $ - $ (7)
---------------------------------------------------------------------
Total accumulated OCI
at September 30 $ 58 $ (66) $ (8) $ 65 $ (77) $ (12)
---------------------------------------------------------------------
11 DERIVATIVE INSTRUMENTS
A Use of derivative instruments
We use derivative instruments to mitigate the effects of certain
risks that are inherent in our business, and also to take advantage of
opportunities to secure attractive pricing for commodities, currencies
and interest rates. The inherent risks that we most often attempt to
mitigate by the use of derivative instruments occur from changes in
commodity prices (gold, silver and fuel), interest rates and foreign
currency exchange rates. Because we produce gold and silver, incur
costs in foreign currencies, and invest and borrow in US dollars and
are therefore subject to US interest rates, our derivative instruments
cover natural underlying asset or liability positions. The purpose of
the hedging elements of our derivative program is so that changes in
the values of cash flows from or fair values of hedged items are
offset by equivalent changes in the values of derivative instruments.
We do not hold derivatives for the purpose of speculation; our
risk management programs are designed to enable us to plan our
business effectively and, where possible, mitigate adverse effects of
future movements in gold, silver and fuel prices, interest rates and
foreign currency exchange rates. For a more detailed description of
the types of derivative instruments we use, and our accounting
policies for derivative instruments, refer to note 11 to our audited
consolidated financial statements for the three years ended December
31, 2003.
B Derivative instruments outstanding as at September 30, 2004
---------------------------------------------------------------------
Maturity 2004 2005 2006 2007 2008+ Total
---------------------------------------------------------------------
Interest rate contracts
Receive-fixed swaps
Notional amount (millions)$ 150 $ 75 $ 100 $ 725 $ 100 $ 1,150
Fixed rate (%) 3.6% 2.7% 3.0% 3.4% 4.1% 3.4%
Pay-fixed swaps
Notional amount (millions) - - - - $ 664 $ 664
Fixed rate (%) - - - - 5.5% 5.5%
Bond Forward Contract
Notional amount (millions) $ 50 - - - - $ 50
Fixed rate (%) 5.6% - - - - 5.6%
---------------------------------------------------------------------
Net notional position $ 100 $ 75 $ 100 $ 725 $(564) $ 436
---------------------------------------------------------------------
Foreign currency contracts
Canadian dollar forward
purchase contracts
C$ (millions) C$ 41 C$ 316 C$ 222 C$ 139 C$ 22 C$ 740
Average price (US cents) 0.67 0.67 0.73 0.69 0.68 0.69
Australian dollar forward
purchase contracts
A$ (millions) A$ 159 A$ 723 A$ 370 A$ 355 A$ 19 A$ 1,626
Average price (US cents) 0.60 0.63 0.63 0.63 0.53 0.62
---------------------------------------------------------------------
Fuel contracts
Min-max options
Barrels WTI (thousands) 90 504 648 - - 1,242
Cap $ 30 $ 36 $ 40 - - $ 38
Floor $ 23 $ 28 $ 30 - - $ 29
Forward purchase contracts
Barrels WTI (thousands) - 264 340 378 - 982
Average price - $ 41 $ 38 $ 37 - $ 39
---------------------------------------------------------------------
Classification of interest rate, foreign currency and fuel contracts
---------------------------------------------------------------------
Cash flow Fair value Non-
At September 30, 2004 hedge hedge hedge Total
---------------------------------------------------------------------
Interest rate contracts
Receive-fixed swaps on cash
balances $ 650 $ - $ - $ 650
Receive-fixed swaps on debentures - 500 - 500
---------------------------------------------------------------------
$ 650 $ 500 $ - $ 1,150
---------------------------------------------------------------------
Pay-fixed swaps on Bulyanhulu
project financing $ 164 $ - $ - $ 164
Pay-fixed swaps on lease rate
swaps - - 150 150
Pay-fixed swaps on expected debt
issuance(1) 350 - - 350
Bond forward on expected debt
issuance(1) 50 - - 50
---------------------------------------------------------------------
$ 564 $ - $ 150 $ 714
---------------------------------------------------------------------
---------------------------------------------------------------------
Canadian dollar contracts
Operating costs and expenses C$ 740 C$ - C$ (15) C$ 725
Capital expenditures 15 - - 15
---------------------------------------------------------------------
C$ 755 C$ - C$ (15) C$ 740
---------------------------------------------------------------------
Australian dollar contracts
Operating costs and expenses A$ 1,241 A$ - A$ 13 A$ 1,254
Capital expenditures 372 - - 372
---------------------------------------------------------------------
A$ 1,613 A$ - A$ 13 A$ 1,626
---------------------------------------------------------------------
Fuel contracts (Barrels WTI
thousands)
Operating costs and expenses 2,066 - 158 2,224
---------------------------------------------------------------------
(1) In anticipation of issuing long-term debt obligations in fourth
quarter 2004, we have entered into interest rate contracts for a
total notional amount of $400 million that are designated as
interest rate hedges and fix the underlying treasury interest
rate component of the obligations.
We also held gold lease rate swaps at September 30, 2004 that are
based on a notional amount of 2.1 million ounces of gold spread from
2004 to 2014 (see note 5). These gold lease rate contracts are
classified as non-hedge derivatives.
C Unrealized fair value of derivative instruments (excluding normal
sales contracts)
---------------------------------------------------------------------
Three months ended Nine months ended
September 30, September 30,
2004 2003 2004 2003
---------------------------------------------------------------------
Beginning of period $ 166 $ 262 $ 337 $ 29
Derivative instruments settled (34) (25) (101) (55)
Change in fair value of
derivative instruments:
Non-hedge derivatives 8 (25) (3) 15
Cash flow hedges 76 11 (8) 230
Fair value hedges 4 (3) (5) 1
---------------------------------------------------------------------
End of period $ 220(1) $ 220 $ 220 $ 220
---------------------------------------------------------------------
(1) Recorded on the balance sheet as follows: $101 million in other
current assets; $207 million in non-current assets as unrealized
fair value of derivative contracts; $27 million in other current
liabilities; and $61 million in other long-term obligations.
The fair values of recorded derivative assets and liabilities
reflect the netting of the fair values of individual derivative
instruments, and amounts due to/from counterparties that arise from
derivative instruments, when the conditions of FIN No. 39, Offsetting
of Amounts Related to Certain Contracts, have been met. Amounts
receivable from counterparties that have been offset against
derivative liabilities totaled $16 million at September 30, 2004.
D Change in gains (losses) accumulated in OCI for cash flow hedge
contracts
--------------------------------------------------------------------
Commodity Foreign currency Interest rate
contracts contracts contracts
--------------------------------------------------------------------
2004 2003 2004 2003 2004 2003
--------------------------------------------------------------------
At January 1 $ - $ 9 $ 280 $ 26 $ 9 $ 14
Changes in fair
value - 3 (5) 216 (16) 11
Hedge gains
transferred to
earnings -(1) (10)(1) (75)(2) (41)(2) (8)(3) (11)(3)
Hedge ineffectiveness
transferred to
earnings - - (2) (9) - (1)
--------------------------------------------------------------------
At September 30 $ - $ 2 $ 198 $ 192 $ (15) $ 13
--------------------------------------------------------------------
(1) Included under revenues and by-product credits.
(2) Included under operating expenses.
(3) Included under interest income.
---------------------------------------------------------------------
Fuel Contracts Total
---------------------------------------------------------------------
2004 2003 2004 2003
---------------------------------------------------------------------
At January 1 $ (1) $ - $ 288 $ 49
Changes in fair value 13 - (8) 230
Hedge gains transferred to earnings (2)(2) -(2) (85) (62)
Hedge ineffectiveness transferred
to earnings - - (2) (10)
---------------------------------------------------------------------
At September 30 $ 10 $ - $ 193 $ 207
---------------------------------------------------------------------
(1) Included under revenues and by-product credits.
(2) Included under operating expenses.
(3) Included under interest income.
Based on the fair value of cash flow hedge contracts at September
30, 2004, in the next twelve months we expect to transfer hedge gains
of $116 million from OCI to earnings, to be matched with the related
hedged items. These gains primarily will be reflected as a reduction
in cash operating costs and as a component of interest income.
E Non-hedge derivative gains (losses)
---------------------------------------------------------------------
Three months ended Nine months ended
September 30, September 30,
2004 2003 2004 2003
---------------------------------------------------------------------
Change in fair value of
non-hedge derivatives
Commodity contracts $ 2 $ (6) $ (7) $ -
Currency contracts 3 (2) (7) 4
Interest and lease rate
contracts 3 (17) 11 11
---------------------------------------------------------------------
8 (25) (3) 15
Hedge ineffectiveness recorded
in earnings (1) - 4 2 10
---------------------------------------------------------------------
$ 8 $ (21) $ (1) $ 25
---------------------------------------------------------------------
(1) During 2004, we determined that certain Australian dollar hedge
contracts designated as hedges of forecasted capital expenditures
no longer met the FAS 133 qualifying hedge criteria due to
changes in the expected timing of the forecasted expenditures.
On determining that these hedges were no longer effective for
accounting purposes, gains totaling $nil on these contracts were
transferred out of OCI to earnings for the three months ended
September 30, 2004 (2003 - $4 million) and $2 million for the
nine months ended September 30, 2004 (2003 - $10 million).
12 COMPONENTS OF OTHER NET OPERATING ACTIVITIES
---------------------------------------------------------------------
Three months ended Nine months ended
September 30, September 30,
2004 2003 2004 2003
---------------------------------------------------------------------
Add (deduct):
Foreign currency translation
(gains) losses excluding the
effect of exchange rate changes
on cash and equivalents $ (12) $ 12 $ (7) $ 12
(Gains) losses on
available-for-sale securities
recorded in earnings - (5) (1) 3
Gains on sale of long-lived
assets (2) (12) (5) (29)
Cumulative effect of changes
in accounting policies - - - 17
Accretion expense 6 5 14 13
Changes in capitalized mining
costs 2 18 5 34
Changes in operating assets and
liabilities:
Accounts receivable (1) - (6) 5
Inventories - (1) (26) (3)
Accounts payable and accrued
liabilities 11 13 31 (13)
Current income taxes accrued 3 42 33 74
Other assets and liabilities (2) (21) - (18)
Cash payments:
Reclamation and closure costs (7) (2) (24) (20)
Income taxes refunds (payments) 11 (32) (40) (119)
---------------------------------------------------------------------
Other net operating activities $ 9 $ 17 $ (26) $ (44)
---------------------------------------------------------------------
13 INVENTORIES, OTHER CURRENT ASSETS AND INVESTMENTS
---------------------------------------------------------------------
At September 30, 2004 At December 31, 2003
---------------------------------------------------------------------
Inventories
Gold in process and ore
in stockpiles $ 112 $ 99
Mine operating supplies 71 58
---------------------------------------------------------------------
$ 183 $ 157
---------------------------------------------------------------------
Other current assets
Derivative assets (note 11C) $ 101 $ 154
Income taxes recoverable 11 -
Prepaid expenses 26 15
---------------------------------------------------------------------
$ 138 $ 169
---------------------------------------------------------------------
Gold in process and ore in stockpiles excludes $81 million
(December 31, 2003 - $64 million) of stockpiled ore that we do not
expect to process in the following 12 months. This amount is included
in other assets.
Investments
In first quarter 2004, we purchased a further 7% interest in the
common shares of Highland Gold for cash consideration of $41 million.
Combined with an initial investment made in fourth quarter 2003, we
own a 17% interest in the outstanding common shares of Highland Gold.
The investment is being accounted for as an available-for-sale
security, with unrealized gains and losses recorded in other
comprehensive income.
14 PROPERTY, PLANT AND EQUIPMENT
At September 30, 2004, property acquisition and mine development
costs included various properties in the exploration and development
stage that are not presently being amortized. Details of the carrying
amounts for major properties and the years we have targeted to put
these properties into production and begin amortization are:
---------------------------------------------------------------------
Carrying amount at Carrying amount at Targeted timing of
Property September 30, 2004 December 31, 2003 production start up
---------------------------------------------------------------------
Veladero $ 275 $ 68 2005
Lagunas Norte 129 9 2005
Cowal 93 49 2006
Pascua-Lama 207 189 2009
Other properties 240 213 -
---------------------------------------------------------------------
Total $ 944 $ 528
---------------------------------------------------------------------
Capital commitments
In addition to entering into various operational commitments in
the normal course of business, the Company has entered into a
commitment of $70 million to be paid during 2004 and 2005 for the
construction of a power plant for the Goldstrike mine.
15 CAPITALIZED MINING COSTS
We charge most mine operating costs to inventory as incurred.
However, we capitalize and amortize certain mining costs associated
with open-pit deposits that have diverse ore grades and waste-to-ore
ton ratios over the mine life. These mining costs arise from the
removal of waste rock at our open-pit mines, and we commonly refer to
them as "stripping costs". We charge to inventory amortization of
amounts capitalized based on a "stripping ratio" using the
units-of-production method.
This accounting method results in the smoothing of these costs
over the life of a mine. Instead of capitalizing these costs, some
mining companies expense them as incurred, which may result in the
reporting of greater volatility in period-to-period results of
operations. If we followed a policy of expensing these costs as
incurred, then using this alternative policy, our reported cost of
sales would have been $3 million lower for the three months ended
September 30, 2004 (2003 - $18 million lower), and $6 million lower
for the nine months ended September 30, 2004 (2003 - $34 million
lower).
Capitalized mining costs represent the excess of costs capitalized
over amortization recorded, although it is possible that a liability
could arise if cumulative amortization exceeds costs capitalized. The
carrying amount of capitalized mining costs is grouped with related
mining property, plant and equipment for impairment testing purposes.
Effective January 1, 2004, we revised the estimated stripping
ratios used for amortization purposes with a decrease in the stripping
ratio at Goldstrike Open Pit and an increase in the stripping ratio at
Pierina. The effect of this change in the three months ended September
30, 2004 was to reduce amortization of capitalized mining costs at
Goldstrike Open Pit by $1 million, and increase amortization of
capitalized mining costs at Pierina by $2 million. The effect of this
change in the nine months ended September 30, 2004 was to reduce
amortization of capitalized mining costs at Goldstrike Open Pit by $2
million, and increase amortization of capitalized mining costs at
Pierina by $6 million.
The average remaining life of the open-pit mine operations where
we capitalize these types of mining costs is eight years. We expect to
expense all stripping costs by the end of the mine lives.
Average stripping ratios(1)
---------------------------------------------------------------------
Three months ended Nine months ended
September 30, September 30,
2004 2003 2004 2003
---------------------------------------------------------------------
Goldstrike Open Pit 109:1 112:1 109:1 112:1
Pierina 60:1 48:1 60:1 48:1
---------------------------------------------------------------------
(1) The stripping ratio is calculated as the ratio of total tons (ore
and waste) of material to be moved compared to total recoverable
ounces in proven and probable gold reserves.
16 LONG-TERM DEBT
Project financing - Veladero
One of our wholly-owned subsidiaries, Minera Argentina Gold S.A.
in Argentina has a limited recourse amortizing loan for $250 million.
We have guaranteed the loan until completion occurs. After completion,
the loan will become non-recourse. The loan is insured for political
risks by branches of the Canadian and German governments. The first
drawdown on the loan occurred on August 31, 2004. The total drawdown
as of September 30, 2004 was $167 million. The effective interest rate
for third quarter 2004, including amortization of debt-issue costs and
political risk insurance, was 5%. Scheduled repayments for each of the
next five years are 2004 - $nil, 2005 - $nil, 2006 - $30 million, 2007
- $58 million, 2008 - $47 million, 2009 and thereafter - $115 million.
17 CAPITAL STOCK
A Share repurchase program
During the three-month period ended March 31, 2004, we repurchased
4.47 million common shares for $95 million at an average cost of
$21.20 per share. This resulted in a reduction of common share capital
by $35 million, and a $60 million charge (being the difference between
the repurchase cost and the average historic book value of shares
repurchased) to retained earnings. We did not repurchase any common
shares in the remaining six-month period ended September 30, 2004.
B Barrick Gold Inc. ("BGI") Exchangeable Shares
In connection with a 1998 acquisition, BGI, formerly Homestake
Canada Inc., issued 11.1 million BGI exchangeable shares. Each BGI
exchangeable share is exchangeable for 0.53 of a Barrick common share
at any time at the option of the holder and has essentially the same
voting, dividend (payable in Canadian dollars), and other rights as
0.53 of a Barrick common share. BGI is a subsidiary that holds our
interest in the Hemlo and Eskay Creek Mines.
At September 30, 2004, 1.4 million BGI exchangeable shares were
outstanding, (excluding those held by Barrick and its subsidiaries)
which are equivalent to 0.7 million Barrick common shares. The
equivalent common share amounts are reflected in the number of common
shares outstanding.
At any time on or after December 31, 2008, or when fewer than 1.4
million BGI exchangeable shares are outstanding, we have the right to
require the exchange of each outstanding BGI exchangeable share for
0.53 of a Barrick common share. While there are exchangeable shares
outstanding, we are required to present summary consolidated financial
information relating to BGI for holders of exchangeable shares.
Summarized financial information for BGI
---------------------------------------------------------------------
Three months ended Nine months ended
September 30, September 30,
2004 2003 2004 2003
---------------------------------------------------------------------
Total revenues and other income $ 46 $ 60 $ 158 $ 165
Costs and expenses (65) (59) (149) (175)
---------------------------------------------------------------------
Income (loss) before taxes $ (19) $ 1 $ 9 $ (10)
---------------------------------------------------------------------
Net income (loss) $ (22) $ (4) $ 1 $ (24)
---------------------------------------------------------------------
---------------------------------------------------------------------
At September 30, 2004 At December 31, 2003
---------------------------------------------------------------------
Assets
Current assets $ 100 $ 72
Non-current assets 189 233
---------------------------------------------------------------------
$ 289 $ 305
---------------------------------------------------------------------
Liabilities and shareholders' equity
Other current liabilities $ 35 $ 20
Intercompany notes payable 543 546
Other long-term liabilities 12 11
Deferred income tax liabilities 53 67
Shareholders' equity (354) (339)
---------------------------------------------------------------------
$ 289 $ 305
---------------------------------------------------------------------
18 EMPLOYEE STOCK-BASED COMPENSATION
Common stock options
Stock option activity (options in millions)
---------------------------------------------------------------------
Options Average Options Average
(number) price (C$) (number) price (US$)
---------------------------------------------------------------------
At January 1, 2004 21.5 2.3
Granted 0.8 $ 27.62 - $ -
Exercised (1.1) $ 24.89 (0.5) $ 14.36
Canceled or expired (0.9) $ 27.93 (0.1) $ 35.07
---------------------------------------------------------------------
At September 30, 2004 20.3 1.7
---------------------------------------------------------------------
Under Accounting Principles Board Opinion No. 25 (Accounting for
Stock Issued to Employees) (APB 25), we record a compensation cost for
stock options in earnings based on the excess, if any, of the quoted
market price of the stock at the grant date of the award over the
option exercise price. Generally, the exercise price for stock options
granted to employees equals the fair market value of our common stock
at the date of grant, resulting in no compensation cost.
FASB Statement No. 123 (Accounting for Stock-Based Compensation)
(FAS 123) encourages, but does not require, companies to record
compensation cost for stock-based employee compensation plans based on
the fair value of options granted. We have elected to continue to
account for stock-based compensation using the intrinsic value method
prescribed in APB 25 and its related interpretations, and to provide
disclosures of the pro forma effects of adoption had we recorded
compensation expense under the fair value method.
Stock option expense (per share amounts in dollars)
---------------------------------------------------------------------
Three months ended Nine months ended
September 30, September 30,
2004 2003 2004 2003
---------------------------------------------------------------------
Pro forma effects
Net income, as reported $ 32 $ 35 $ 92 $ 123
Stock option expense (8) (6) (22) (18)
---------------------------------------------------------------------
Pro forma net income $ 24 $ 29 $ 70 $ 105
---------------------------------------------------------------------
Net income per share
As reported(1) $ 0.06 $ 0.07 $ 0.17 $ 0.23
Pro forma(1) $ 0.04 $ 0.05 $ 0.13 $ 0.19
---------------------------------------------------------------------
(1)Basic and diluted.
19 CONTINGENCIES
Certain conditions may exist as of the date the consolidated
financial statements are issued, which may result in a loss to the
Company but which will only be resolved when one or more future events
occur or fail to occur. Management and, where appropriate, legal
counsel, assess such contingent liabilities, which inherently involves
an exercise of judgment.
In assessing loss contingencies related to legal proceedings that
are pending against us or unasserted claims that may result in such
proceedings, the Company and its legal counsel evaluate the perceived
merits of any legal proceedings or unasserted claims as well as the
perceived merits of the amount of relief sought or expected to be
sought.
If the assessment of a contingency suggests that it is probable
that a loss has been incurred and the amount of the liability can be
estimated, then the estimated liability is accrued in the consolidated
financial statements. If the assessment suggests that a potentially
material loss contingency is not probable, but is reasonably possible,
or is probable, but cannot be estimated, then the nature of the
contingent loss, together with an estimate of the range of possible
loss, if determinable, is disclosed. Loss contingencies considered
remote are generally not disclosed unless they involve guarantees, in
which case we disclose the nature of the guarantee.
Litigation and claims
Bre-X Minerals
On April 30, 1998, we were added as a defendant in a class action
lawsuit initiated against Bre-X Minerals Ltd., certain of its
directors and officers or former directors and officers and others in
the United States District Court for the Eastern District of Texas,
Texarkana Division. The class action alleges, among other things, that
statements made by us in connection with our efforts to secure the
right to develop and operate the Busang gold deposit in East
Kalimantan, Indonesia were materially false and misleading and omitted
to state material facts relating to the preliminary due diligence
investigation undertaken by us in late 1996.
On July 13, 1999, the Court dismissed the claims against us and
several other defendants on the grounds that the plaintiffs had failed
to state a claim under United States securities laws. On August 19,
1999, the plaintiffs filed an amended complaint restating their claims
against us and certain other defendants and on June 14, 2000 filed a
further amended complaint, the Fourth Amended Complaint.
On March 31, 2001, the Court granted in part and denied in part
our Motion to Dismiss the Fourth Amended Complaint. As a result, we
remain a defendant in the case. We believe that the remaining claims
against us are without merit. We filed our formal answer to the Fourth
Amended Complaint on April 27, 2001 denying all relevant allegations
of the plaintiffs against us. Discovery in the case has been stayed by
the Court pending the Court's decision on whether or not to certify
the case as a class action. The amount of potential loss, if any,
which we may incur arising out of the plaintiffs' claims is not
presently determinable.
On March 31, 2003, the Court denied all of the Plaintiffs' motions
to certify the case as a class action. Plaintiffs have not filed an
interlocutory appeal of the Court's decision denying class
certification to the Fifth Circuit Court of Appeals. On June 2, 2003,
the Plaintiffs submitted a proposed Trial and Case Management Plan,
suggesting that the Plan would cure the defects in the Plaintiffs'
motions to certify the class. The Court has taken no action with
respect to the proposed Trial and Case Management Plan. The
Plaintiffs' case against the Defendants may now proceed in due course,
but not on behalf of a class of Plaintiffs but only with respect to
the specific claims of the Plaintiffs named in the lawsuit. Having
failed to certify the case as a class action, we believe that the
likelihood of any of the named Defendants succeeding against Barrick
with respect to their claims for securities fraud is remote.
Blanchard complaint
On January 7, 2003, we were served with a Complaint for Injunctive
Relief by Blanchard and Company, Inc. ("Blanchard"), and Herbert
Davies ("Davies"). The complaint, which is pending in the US District
Court for the Eastern District of Louisiana, also names J.P. Morgan
Chase & Company ("J.P. Morgan") as a defendant, along with an
unspecified number of additional defendants to be named later. The
complaint, which has been amended several times, alleges that we and
bullion banks with which we entered into spot deferred contracts have
manipulated the price of gold, in violation of US antitrust laws and
the Louisiana Unfair Trade Practices and Consumer Protection Law.
Blanchard alleges that it has been injured as a seller of gold due to
reduced interest in gold as an investment. Davies, a customer of
Blanchard, alleges injury due to the reduced value of his gold
investments. The complaint seeks damages and an injunction terminating
certain of our trading agreements with J.P. Morgan and other bullion
banks. In September 2003, the Court issued an Order granting in part
and denying in part Barrick's motions to dismiss this action. The
discovery process between the parties is continuing and a trial date
has been set for April 2005, but may be delayed. We intend to defend
the action vigorously.
McKenzie complaint
On September 21, 2004, a putative class action complaint was filed
in the U.S. District Court for the Eastern District of Louisiana
against Barrick and J.P. Morgan. The plaintiffs, Dr. Gregg McKenzie,
H.B.A. and H.B.I.A. AJM Corporation, and A.J. Miller, are alleged
purchasers of gold and gold derivatives. The complaint alleges
violations of the U.S. anti-trust laws and also of the Commodity
Exchange Act, based upon the same conduct as alleged in the Blanchard
complaint. The complaint seeks damages and an injunction terminating
certain of our trading agreements with J.P. Morgan. Barrick has not
been served with the complaint. If plaintiffs serve the complaint upon
Barrick, we will defend the action vigorously.
Wagner complaint
On June 12, 2003, a complaint was filed against Barrick and
several of its current or former officers in the US District Court for
the Southern District of New York. The complaint is on behalf of
Barrick shareholders who purchased Barrick shares between February 14,
2002 and September 26, 2002. It alleges that Barrick and the
individual defendants violated US securities laws by making false and
misleading statements concerning Barrick's projected operating results
and earnings in 2002. The complaint seeks an unspecified amount of
damages. Other parties on behalf of the same proposed class of Barrick
shareholders filed several other complaints, making the same basic
allegations against the same defendants. In September 2003, the cases
were consolidated into a single action in the Southern District of New
York. The plaintiffs filed a Consolidated and/or Amended Complaint on
November 5, 2003. On January 14, 2004 Barrick filed a motion to
dismiss the Wagner complaint. On September 29, 2004, the Court issued
an order granting in part and denying in part Barrick's motion to
dismiss the action. The Court granted plaintiffs leave to file a
Second Amendment Complaint by October 20, 2004. We intend to defend
the action vigorously.
Wilcox complaint
On September 8, 2004, two of our U.S. subsidiaries, Homestake
Mining Company of California ("Homestake California") and Homestake
Mining Company ("Homestake") were served with a First Amended
Complaint by persons alleging to be current or former residents of a
rural area near the former Grants Uranium Mill, which was owned, at
different times, by various partnerships in which Homestake California
held interests or directly by Homestake California. The Complaint was
filed in the U.S. District Court for the District of New Mexico. The
Complaint identifies 26 plaintiffs. Homestake and Homestake
California, along with an unspecified number of unidentified
defendants, are named as defendants. The plaintiffs allege that they
have suffered a variety of physical, emotional and financial injuries
as a result of exposure to radioactive and other hazardous substances.
The Complaint seeks an unspecified amount of damages. We intend to
defend the action vigorously.
Other
From time to time, we are involved in various claims, legal
proceedings and complaints arising in the ordinary course of business.
We are also subject to reassessment for income and mining taxes for
certain years. We do not believe that adverse decisions in any pending
or threatened proceedings related to any potential tax assessments or
other matters, or any amount which we may be required to pay by reason
thereof, will have a material adverse effect on our financial
condition or future results of operations.
20 DIFFERENCES FROM CANADIAN GENERALLY ACCEPTED ACCOUNTING
PRINCIPLES
These unaudited consolidated interim financial statements have
been prepared in accordance with US GAAP. A reconciliation of our
income statement, cash flow statement and balance sheet between US
GAAP and Canadian GAAP is presented below together with a description
of the significant measurement differences affecting these financial
statements.
A Business combinations
The acquisitions of Sutton Resources Ltd. ("Sutton") and Homestake
Mining Company ("Homestake"), which were accounted for using the
pooling-of-interests method under US GAAP, were accounted for as a
purchase under Canadian GAAP. Under US GAAP, the assets, liabilities
and shareholders' equity of Sutton and Homestake were combined with
the Company's own recorded amounts. Comparative figures were restated
for all periods presented prior to the acquisitions to include the
combined statements of income, cash flow and balance sheets of the
merged entities adjusted to conform to our US GAAP accounting
policies. Under Canadian GAAP, rules which existed at the time of the
Sutton and Homestake acquisitions prior to the effective date of CICA
1581, Business Combinations, allowed for two possible accounting
methods, the purchase method or the pooling-of-interests method. The
selection of the method of accounting used for business combinations
under the previous rules depended upon whether or not one of the
combining companies could be identified as an acquirer. In situations
where voting shares were issued or exchanged to effect the
combination, factors relating to control over the resultant combined
company were considered. Under these previous rules, due to the fact
that the Barrick shareholders (as a group) held more than 50% of the
voting shares of the combined company after the acquisitions of Sutton
and Homestake, Barrick was identified as the acquirer, thereby
requiring the purchase method to be used under Canadian GAAP. The
application of the purchase method under Canadian GAAP required that
identifiable assets and liabilities of the acquired entity be recorded
at fair values at the date of acquisition, with any excess purchase
price allocated to goodwill. This resulted in certain assets and
liabilities being recorded at different carrying amounts under
Canadian GAAP compared with US GAAP. These differences arise because
their fair values at the date of acquisition differed from historic
cost, which is the basis of accounting under the pooling-of-interests
method under US GAAP. The assets and liabilities most significantly
affected are: property, plant and equipment, intangible assets,
inventories, and goodwill.
B Exploration and development expenditures
For Canadian GAAP purposes, we capitalize mine development costs
on our properties after proven and probable reserves have been found.
We also capitalize costs on properties where we have found non-reserve
material that does not meet all the criteria required for
classification as proven or probable reserves. Management's
determination as to whether the existence of non-reserve material
should result in the capitalization of costs or the material should be
included in the amortization and recoverability calculations is based
on various factors, including, but not limited to: the existence and
nature of known mineralization; the location of the property (for
example, whether the presence of existing mines and ore bodies in the
immediate vicinity increases the likelihood of development of a mine
on the property); the existence of proven and probable reserves on the
property; whether the ore body is an extension of an existing
producing ore body on an adjacent property; the results of recent
drilling on the property; and the existence of a feasibility study or
other analysis to demonstrate that the ore is commercially
recoverable. Under US GAAP, exploration and development expenditures
incurred on properties where mineralization has not been classified as
a proven and probable reserve under SEC rules are expensed as
incurred. Accordingly, certain expenditures are capitalized for
Canadian GAAP purposes but expensed under US GAAP.
C Amortization of property, plant and equipment
Under Canadian GAAP, amortization of property, plant and equipment
using the units-of-production method is calculated using historical
capitalized costs plus future underground mine development costs for a
whole mine and proven and probable mineral reserves and non-reserve
material for the whole mine (when sufficient objective evidence exists
to support a conclusion that it is probable the non-reserve material
will be produced). For US GAAP purposes, amortization is calculated
using historical capitalized costs incurred to access specific ore
blocks or areas and only proven and probable reserves within the
specific block or area; infrastructure and other common costs which
have a useful life over the entire mine are amortized over total
accessible proven and probable reserves of the mine. These different
methods result in a different rate of amortization for Canadian GAAP.
In addition, a difference in the amount of amortization expense
results where differences exist in the carrying amounts of property,
plant and equipment between US GAAP and Canadian GAAP, due to the
historic effects of the application of GAAP to these items (for
example, arising from differences in business combinations accounting,
capitalization of exploration expenditures, and accounting for asset
retirement obligations).
D Amortization of intangible assets
In our Canadian GAAP financial statements, we have certain
intangible assets that arose from the application of purchase
accounting. These assets are not present in our US GAAP financial
statements. Under Canadian GAAP, we amortize the carrying amounts of
mining rights for proven and probable reserves as gold is produced
using the units of production method based on the estimated
recoverable ounces in proven and probable reserves. Amortization of
the carrying amounts of mining rights for mineralized material
commences when the mineralized material is converted into proven and
probable reserves. Intangible assets recorded under Canadian GAAP are
tested for impairment using the same method that is applied to
property, plant and equipment under Canadian GAAP.
E Goodwill
Under Canadian GAAP, on the acquisition of Homestake, goodwill was
identified and was allocated to reporting units by preparing estimates
of the fair value of each reporting unit and comparing this amount to
the fair value of assets and liabilities (including intangibles) in
the reporting unit.
We test goodwill for impairment annually in the fourth quarter of
our fiscal year, however, if there is indication of an impairment in
goodwill during the year, we will do an assessment at that time. This
impairment assessment involves estimating the fair value of each
reporting unit that includes goodwill. We compare this fair value to
the total carrying amount of the reporting unit (including goodwill).
If the fair value exceeds this carrying amount, we consider that
goodwill is not impaired. If the fair value is less than this carrying
amount, then we estimate the fair values of all identifiable assets
and liabilities in the reporting unit, and compare this net fair value
of assets less liabilities to the estimated fair value of the entire
reporting unit. The difference represents the fair value of goodwill,
and if necessary, we reduce the carrying amount of goodwill to this
fair value.
F Future income taxes
In accordance with Canadian GAAP, we implemented CICA Handbook
Section 3465 (Future income taxes) in 2000. Prior to the adoption of
this standard, Canadian GAAP did not require recognition of the tax
effects of temporary timing differences arising from acquisitions.
Under US GAAP, acquisitions occurring prior to January 1, 2000 have
been accounted for by grossing up assets and deferred tax liabilities
for the underlying tax effect of treating the purchase consideration
allocated to assets acquired that is not tax deductible as a temporary
taxable timing difference. Historically, under the transition
provisions of CICA 3465, the recorded amounts of assets acquired were
not restated to reflect differences in their carrying amounts at
acquisition for tax and accounting purposes. Consequently, under
Canadian GAAP, property, plant and equipment was $190 million lower
and future income tax liabilities were $94 million higher than the
amounts recorded under US GAAP.
Where assets and liabilities are recorded at different carrying
amounts for US GAAP and Canadian GAAP, due to differences in the
accounting policies that affect these assets and liabilities, a
difference also arises in the amount of temporary timing differences
that give rise to deferred tax assets and liabilities. Consequently,
the amounts of deferred tax assets and liabilities recorded under US
GAAP differ from the amounts of future income taxes recorded under
Canadian GAAP.
G Impairment evaluations for long-lived assets
In accordance with US GAAP, financing costs are excluded from the
evaluation of long-lived assets for impairment purposes. Historically,
under Canadian GAAP, financing costs are included, but where an asset
is impaired, the asset is reduced to its net recoverable amount,
calculated as the future estimated undiscounted net cash flow expected
to be generated by the asset. Under US GAAP, if assets are impaired, a
reduction in the carrying amount to estimated fair value is required.
Fair value is calculated by discounting the estimated future net cash
flows using a discount factor. The discount factor is our estimate of
the risk-adjusted rate used to determine the fair value of our mining
properties in a transaction between willing buyers and sellers.
Current Canadian GAAP treatment conforms with current US GAAP
treatment.
H Investments
Under US GAAP, investments which are considered to be "available
for sale" securities are recorded at fair value, with unrealized gains
or losses included in Comprehensive Income. Under Canadian GAAP, the
concept of Comprehensive Income does not exist and these investments
are recorded at cost.
I Derivative financial instruments
Under Canadian GAAP, derivative financial instruments that qualify
for hedge accounting treatment are recognized on the balance sheet
only to the extent that cash has been paid or received together with
adjustments necessary to offset recognized gains or losses arising on
the hedged items. Under US GAAP, such derivative financial instruments
are recognized on the balance sheet at fair value with a corresponding
charge or credit recorded in Other Comprehensive Income.
J Minimum pension liability
Under US GAAP, if the accumulated pension plan benefit obligation
exceeds the market value of plan assets, a minimum pension liability
for the excess is recognized to the extent that the liability recorded
in the balance sheet is less than the minimum liability. Any portion
of this additional liability that relates to unrecognized prior
service cost is recognized as an intangible asset while the remainder
is charged to Comprehensive Income. Canadian GAAP does not require us
to record a minimum liability and does not have the concept of
Comprehensive Income.
K Asset retirement obligations
Under US GAAP, a new policy was adopted effective January 1, 2003
based on a new standard published by the FASB, FAS 143 Asset
Retirement Obligations. Under Canadian GAAP, a similar standard was
effective for the Company's 2004 fiscal year, CICA 3110 - Asset
Retirement Obligations. CICA 3110 requires retroactive restatement of
financial statements for prior periods, and accordingly comparative
information now reflects the requirements of CICA 3110. Both of these
standards are established for the recognition and measurement of
liabilities for legal obligations associated with the retirement of a
long-lived asset that result from its acquisition, construction,
development or normal operation. A liability is recorded for such an
obligation at its fair value when incurred and a corresponding asset
retirement cost is added to the carrying amount of the related asset.
In subsequent periods, the carrying amount of the liability is
adjusted to reflect the passage of time and any changes in the timing
or amount of the underlying future cash flows. The asset retirement
cost is amortized to expense over the asset's useful life. Under the
original standards for Canadian and US GAAP prior to the adoption of
FAS 143 and CICA 3110, total expected reclamation and closure costs
(including legal and non-legal obligations) were recorded and charged
to earnings over the life of a mine using the units of production
method based on proven and probable reserves, and, for Canadian GAAP,
non-reserve material expected to be converted into reserves. Under US
GAAP, the effect of the adoption of FAS 143 was recorded in the income
statement for the three months ended March 31, 2003. Under Canadian
GAAP, the cumulative effect was recorded as an adjustment to the
opening retained earnings for the earliest period presented. Due to
the difference in timing of implementation of these standards, the
amount of amortization and accretion recorded may differ under US and
Canadian GAAP.
L Foreign currency
Under US GAAP, translation adjustments that arise on the
translation of financial statements of entities whose functional
currency is not the US dollar are reported as a component of
Comprehensive Income. Under Canadian GAAP, the concept of
Comprehensive Income does not exist and these translation adjustments
are reported as a separate component of shareholders' equity, called
"cumulative translation adjustments".
M Revenue
Under Canadian GAAP purchase accounting rules, Homestake gold
sales contracts existing at the date of acquisition were recorded at
fair value and any previous deferred revenue balances eliminated. As
these contracts are delivered into, the revenue recorded under
Canadian GAAP is reduced to the extent of the original fair value
adjustment. Under US GAAP pooling rules, existing Homestake deferred
revenue balances were carried forward and recorded in the period of
delivery. Differences between Canadian and US GAAP revenue arise from
these different business combination accounting practices.
N Other comprehensive income
Under US GAAP, certain assets and liabilities are remeasured at
fair value, with changes in fair value recorded in Other Comprehensive
Income. Under Canadian GAAP, these assets and liabilities are recorded
at cost and they are not remeasured to fair value prior to the date
they are realized or settled. The assets and liabilities affected are:
investments, and derivative assets and liabilities that qualify for
hedge accounting treatment.
O Stock-based compensation
Under US GAAP, FAS 123 (Accounting for Stock-Based Compensation),
encourages, but does not require, companies to record compensation
cost for stock-based compensation plans based on the fair value of
options granted. We have elected to continue to account for
stock-based compensation using the intrinsic value method under APB
25. Companies that follow this method are required to disclose the pro
forma effect of recording compensation expense under the fair value
method. Under Canadian GAAP, effective January 1, 2004, a new standard
was applicable that requires the use of the fair value method of
accounting for stock-based compensation. This standard is CICA 3870,
Stock-Based Compensation and other Stock-Based payments. CICA 3870
requires us to record a compensation expense in our income statement
based on the fair value of options granted. The cumulative amount of
compensation expense is recorded within contributed surplus in the
balance sheet under Canadian GAAP, and the carrying amount is
transferred out of contributed surplus into capital stock as stock
options are exercised. We have elected to adopt CICA 3870
retroactively with restatement of prior periods to include an expense
of the type that was previously included under the pro forma note
disclosure.
P Consolidated Balance Sheets
---------------------------------------------------------------------
At September 30 At December 31
---------------------------------------------------------------------
2004 2003
---------------------------------------------------------------------
Can- Can-
US Adjus- adian US Adjus- adian
Notes GAAP tments GAAP GAAP tments GAAP(1)
---------------------------------------------------------------------
ASSETS
Current assets
Cash and equivalents $ 775 $ - $ 775 $ 970 $ - $ 970
Accounts receivable 75 - 75 69 - 69
Inventories A 183 2 185 157 3 160
Other current assets I, M 138 (74) 64 169 (112) 57
---------------------------------------------------------------------
1,171 (72) 1,099 1,365 (109) 1,256
Investments H 144 (19) 125 127 (38) 89
Property, plant A, B,
and equipment C, F, K 3,326 701 4,027 3,131 648 3,779
Capitalized mining
costs, net 230 - 230 235 - 235
Intangible assets A, D - 655 655 - 683 683
Goodwill A, E - 1,081 1,081 - 1,081 1,081
Unrealized fair
value of derivative
contracts I 207 (207) - 256 (256) -
Other assets A, I, M 307 25 332 248 31 279
---------------------------------------------------------------------
Total assets $ 5,385 $2,164 $7,549 $5,362 $2,040 $ 7,402
---------------------------------------------------------------------
LIABILITIES AND
SHAREHOLDERS' EQUITY
Accounts payable $ 310 $ - $ 310 $ 245 $ - $ 245
Other current
liabilities I, K 118 (15) 103 105 14 119
---------------------------------------------------------------------
428 (15) 413 350 14 364
Long-term debt I 867 3 870 719 (1) 718
Other long-term
obligations I, J, K 546 (37) 509 569 (43) 526
Deferred income tax
liabilities F 164 158 322 230 118 348
---------------------------------------------------------------------
Total liabilities 2,005 109 2,114 1,868 88 1,956
---------------------------------------------------------------------
Capital stock A 4,109 869 4,978 4,115 874 4,989
Retained earnings
(deficit) A (721) 1,175 454 (694) 1,162 468
Accumulated other
comprehensive income
(loss) N (8) 8 - 73 (73) -
Contributed surplus O - 27 27 - 13 13
Cumulative translation
adjustments L - (24) (24) - (24) (24)
---------------------------------------------------------------------
Total shareholders'
equity 3,380 2,055 5,435 3,494 1,952 5,446
---------------------------------------------------------------------
Total liabilities and
shareholders' equity $ 5,385 $2,164 $7,549 $5,362 $2,040 $7,402
---------------------------------------------------------------------
(1) Effective January 1, 2004, we adopted CICA 3870 and CICA 3110 and
changed our accounting policies for stock options and asset
retirement obligations. These pronouncements were adopted
retroactively with restatement of prior periods.
Q Reconciliation of Consolidated Net Income
---------------------------------------------------------------------
Three months ended Six months ended
September 30 September 30
---------------------------------------------------------------------
Notes 2004 2003(4) 2004 2003(4)
---------------------------------------------------------------------
Net income - US GAAP $ 32 $ 35 $ 92 $ 123
Amortization of property,
plant and equipment C 12 20 35 49
Exploration and development
expenditures B 5 17 20 44
Amortization of intangible assets D (10) (10) (28) (29)
Cumulative effect of accounting
changes under US GAAP C, K - - - 17
Gains on asset sales(1) A - (3) (1) (8)
Future income tax expense(2) F (2) (6) (7) (14)
Deferred revenue M - (8) - (22)
Stock-based compensation expense O (6) (3) (16) (9)
Homestake inventory(3) A - - (1) (1)
Other 2 2 4 3
---------------------------------------------------------------------
Net income - Canadian GAAP $ 33 $ 44 $ 98 $ 153
---------------------------------------------------------------------
Net income per share (dollars)
Basic and fully diluted $ 0.06 $ 0.09 $ 0.18 $ 0.29
---------------------------------------------------------------------
(1) The gain on sale under Canadian GAAP is different from US GAAP
due to the fact that the carrying amount of assets sold was
higher under Canadian GAAP.
(2) The adjustment to future tax expense reflects the reversal of
temporary timing differences under Canadian GAAP caused by other
adjustments that were made to reconcile US GAAP net income to
Canadian GAAP income. The adjustment also reflects other
differences in accounting for income taxes as described in note
F.
(3) Certain ore in stockpile and in process inventory held by
Homestake, which was adjusted to fair value at the date of
acquisition, caused an adjustment to cost of sales when the
inventory was processed and sold.
(4) Effective January 1, 2004, we adopted CICA 3870 and CICA 3110
and changed our accounting policies for stock options and asset
retirement obligations. These pronouncements were adopted
retroactively with restatement of prior periods.
R Consolidated Statements of Cash Flow under Canadian GAAP
---------------------------------------------------------------------
Three months ended Nine months ended
September 30 September 30
---------------------------------------------------------------------
2004 2003(2) 2004 2003(2)
OPERATING ACTIVITIES
Net income $ 33 $ 44 $ 98 $ 153
Add (deduct):
Amortization 115 124 345 370
Non-hedge derivative
(gains) losses (8) 21 1 (25)
Change in capitalized
mining costs 2 18 5 34
Future income taxes 4 (14) (26) (51)
Gains on sale of long-lived assets (2) (9) (4) (21)
Foreign currency translation
(gains) losses (13) 12 (8) 12
Accretion expense 7 5 15 14
Stock-based compensation expense 6 3 16 9
(Gains) losses on investments - (5) (1) 3
Changes in operating assets
and liabilities:
Accounts receivable (1) - (6) 5
Inventories - (1) (25) (2)
Accounts payable and
accrued liabilities 11 13 31 (13)
Current income taxes accrued 3 42 33 74
Other assets and liabilities (3) (15) (2) 2
Cash payments:
Reclamation and closure costs (7) (2) (24) (20)
Income taxes 11 (32) (40) (119)
---------------------------------------------------------------------
Net cash provided by operating
activities (1) 158 204 408 425
---------------------------------------------------------------------
INVESTING ACTIVITIES
Property, plant and equipment
Capital expenditures (224) (98) (558) (262)
Sales proceeds 3 23 11 38
Purchase of investments - - (45) -
Other items (4) - (7) -
---------------------------------------------------------------------
Net cash used in investing
activities (1) (225) (75) (599) (224)
---------------------------------------------------------------------
FINANCING ACTIVITIES
Capital stock
Proceeds from shares issued on
exercise of stock options 3 8 29 11
Repurchased for cash - (91) (95) (154)
Long-term debt proceeds 167 - 167 -
Long-term debt repayments - - (27) (9)
Dividends - - (59) (60)
Other items (16) - (16) -
---------------------------------------------------------------------
Net cash used in financing
activities 154 (83) (1) (212)
---------------------------------------------------------------------
Effect of foreign exchange
rate changes on cash 3 1 (3) 6
Net increase (decrease) in
cash and equivalents 87 46 (192) (11)
Cash and equivalents at
beginning of period 685 992 970 1,044
---------------------------------------------------------------------
Cash and equivalents at end
of period $ 775 $ 1,039 $ 775 $ 1,039
---------------------------------------------------------------------
(1) Exploration and development expenditures, and interest expense,
that were capitalized under Canadian GAAP, but expensed under US
GAAP were $6 million for the three months ended September 30,
2004 (2003 - $17 million), and $22 million for the nine months
ended September 30, 2004 (2003 - $46 million). These amounts
represent the differences in cash flows from operating and
investing activities between US GAAP and Canadian GAAP.
(2) Effective January 1, 2004, we adopted CICA 3870 and CICA 3110
and changed our accounting policies for stock options and asset
retirement obligations. These pronouncements were adopted
retroactively with restatement of prior periods.
Mine Statistics
UNITED STATES
---------------------------------------------------------------------
Open Pit Underground
Three months ended September 30, 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 34,432 35,714 365 426
Tons processed (thousands) 2,697 2,433 378 410
Average grade (ounces per ton) 0.153 0.244 0.412 0.390
Recovery rate (percent) 86.7% 83.3% 90.0% 89.5%
---------------------------------------------------------------------
Production (thousands of ounces) 356 495 140 143
Production costs per ounce
Cash operating costs $ 229 $ 194 $ 257 $ 245
Royalties and production taxes 18 18 22 17
---------------------------------------------------------------------
Total cash costs 247 212 279 262
Amortization 60 49 134 132
---------------------------------------------------------------------
Total production costs $ 307 $ 261 $ 413 $ 394
---------------------------------------------------------------------
Capital expenditures (US$ millions) $ 2 $ 6 $ 8 $ 6
---------------------------------------------------------------------
Goldstrike Total Round Mountain
Three months ended September 30, 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 34,797 36,140 4,925 5,116
Tons processed (thousands) 3,075 2,843 8,910 7,688
Average grade (ounces per ton) 0.185 0.265 0.014 0.015
Recovery rate (percent) 87.4% 84.6% n/a n/a
---------------------------------------------------------------------
Production (thousands of ounces) 496 638 106 92
Production costs per ounce
Cash operating costs $ 236 $ 204 $ 178 $ 143
Royalties and production taxes 19 18 23 27
---------------------------------------------------------------------
Total cash costs 255 222 201 170
Amortization 80 66 52 55
---------------------------------------------------------------------
Total production costs $ 335 $ 288 $ 253 $ 225
---------------------------------------------------------------------
Capital expenditures (US$ millions) $ 10 $ 12 $ 2 $ 3
---------------------------------------------------------------------
Open Pit Underground
Nine months ended September 30, 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 104,266 108,545 1,200 1,211
Tons processed (thousands) 8,109 7,596 1,221 1,199
Average grade (ounces per ton) 0.147 0.198 0.392 0.384
Recovery rate (percent) 84.6% 82.3% 89.3% 87.9%
---------------------------------------------------------------------
Production (thousands of ounces) 1,009 1,235 427 404
Production costs per ounce
Cash operating costs $ 237 $ 209 $ 242 $ 232
Royalties and production taxes 17 18 22 19
---------------------------------------------------------------------
Total cash costs 254 227 264 251
Amortization 61 52 129 123
---------------------------------------------------------------------
Total production costs $ 315 $ 279 $ 393 $ 374
---------------------------------------------------------------------
Capital expenditures (US$ millions) $ 19 $ 20 $ 20 $ 20
---------------------------------------------------------------------
Goldstrike Total Round Mountain
Nine months ended September 30, 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 105,466 109,756 15,007 19,829
Tons processed (thousands) 9,330 8,795 28,059 22,637
Average grade (ounces per ton) 0.179 0.223 0.015 0.018
Recovery rate (percent) 85.2% 83.6% n/a n/a
---------------------------------------------------------------------
Production (thousands of ounces) 1,436 1,639 298 302
Production costs per ounce
Cash operating costs $ 239 $ 215 $ 179 $ 148
Royalties and production taxes 18 19 28 20
---------------------------------------------------------------------
Total cash costs 257 234 207 168
Amortization 81 70 56 53
---------------------------------------------------------------------
Total production costs $ 338 $ 304 $ 263 $ 221
---------------------------------------------------------------------
Capital expenditures (US$ millions) $ 39 $ 40 $ 4 $ 5
---------------------------------------------------------------------
Mine Statistics
AUSTRALIA
---------------------------------------------------------------------
Plutonic Darlot
Three months ended September 30, 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 4,227 4,222 241 227
Tons processed (thousands) 596 768 226 220
Average grade (ounces per ton) 0.130 0.139 0.197 0.176
Recovery rate (percent) 90.2% 90.2% 94.6% 96.4%
---------------------------------------------------------------------
Production (thousands of ounces) 72 96 42 37
Production costs per ounce
Cash operating costs $ 212 $ 172 $ 185 $ 157
Royalties and production taxes 9 7 8 6
---------------------------------------------------------------------
Total cash costs 221 179 193 163
Amortization 34 34 48 53
---------------------------------------------------------------------
Total production costs $ 255 $ 213 $ 241 $ 216
---------------------------------------------------------------------
Capital expenditures (US$ millions) $ 3 $ 15 $ 1 $ 2
---------------------------------------------------------------------
Nine months ended September 30, 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 10,155 11,481 679 665
Tons processed (thousands) 2,018 2,279 646 655
Average grade (ounces per ton) 0.127 0.120 0.181 0.185
Recovery rate (percent) 89.9% 89.5% 96.1% 96.9%
---------------------------------------------------------------------
Production (thousands of ounces) 231 246 112 118
Production costs per ounce
Cash operating costs $ 206 $ 184 $ 191 $ 152
Royalties and production taxes 8 8 8 7
---------------------------------------------------------------------
Total cash costs 214 192 199 159
Amortization 32 24 50 50
---------------------------------------------------------------------
Total production costs $ 246 $ 216 $ 249 $ 209
---------------------------------------------------------------------
Capital expenditures (US$ millions) $ 11 $ 40 $ 6 $ 5
---------------------------------------------------------------------
Lawlers Kalgoorlie
Three months ended September 30, 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 904 208 10,549 13,177
Tons processed (thousands) 229 191 1,839 1,883
Average grade (ounces per ton) 0.132 0.138 0.079 0.069
Recovery rate (percent) 95.2% 95.6% 88.2% 83.8%
---------------------------------------------------------------------
Production (thousands of ounces) 29 25 129 109
Production costs per ounce
Cash operating costs $ 240 $ 195 $ 216 $ 189
Royalties and production taxes 7 6 8 6
---------------------------------------------------------------------
Total cash costs 247 201 224 195
Amortization 42 44 57 40
---------------------------------------------------------------------
Total production costs $ 289 $ 245 $ 281 $ 235
---------------------------------------------------------------------
Capital expenditures (US$ millions) $ - $ 3 $ 2 $ 10
---------------------------------------------------------------------
Lawlers Kalgoorlie
Nine months ended September 30, 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 3,115 952 34,028 36,229
Tons processed (thousands) 649 597 5,272 5,327
Average grade (ounces per ton) 0.131 0.125 0.073 0.071
Recovery rate (percent) 96.2% 95.9% 86.9% 85.1%
---------------------------------------------------------------------
Production (thousands of ounces) 82 72 334 321
Production costs per ounce
Cash operating costs $ 238 $ 235 $ 220 $ 199
Royalties and production taxes 7 7 8 8
---------------------------------------------------------------------
Total cash costs 245 242 228 207
Amortization 48 37 47 47
---------------------------------------------------------------------
Total production costs $ 293 $ 279 $ 275 $ 254
---------------------------------------------------------------------
Capital expenditures (US$ millions) $ 2 $ 13 $ 7 $ 12
---------------------------------------------------------------------
CANADA
---------------------------------------------------------------------
Hemlo Eskay Creek Holt-McDermott
Three months ended
September 30, 2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 1,172 1,050 69 71 106 132
Tons processed (thousands) 520 528 61 71 107 133
Average grade (ounces
per ton) 0.109 0.145 1.050 1.387 0.152 0.192
Recovery rate (percent) 94.0% 95.3% 92.1% 93.7% 93.6% 94.5%
---------------------------------------------------------------------
Production (thousands of
ounces) 54 73 60 87 15 24
Production costs per ounce
Cash operating costs $ 259 $ 202 $ 57 $ 4 $ 156 $ 202
Royalties and production
taxes 9 9 6 5 1 -
---------------------------------------------------------------------
Total cash costs 268 211 63 9 157 202
Amortization 54 41 220 139 83 134
---------------------------------------------------------------------
Total production costs $ 322 $ 252 $ 283 $ 148 $ 240 $ 336
---------------------------------------------------------------------
Capital expenditures (US$
millions) $ 2 $ 2 $ 1 $ 1 $ - $ -
---------------------------------------------------------------------
---------------------------------------------------------------------
Hemlo Eskay Creek Holt-McDermott
Nine months ended
September 30, 2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 3,533 3,139 201 208 380 415
Tons processed (thousands) 1,512 1,457 193 211 394 409
Average grade (ounces
per ton) 0.127 0.147 1.194 1.417 0.149 0.172
Recovery rate (percent) 94.2% 95.0% 93.0% 93.6% 93.1% 94.5%
---------------------------------------------------------------------
Production (thousands of
ounces) 181 203 216 269 55 66
Production costs per ounce
Cash operating costs $ 234 $ 218 $ 35 $ 58 $ 197 $ 248
Royalties and production
taxes 9 8 5 4 - -
---------------------------------------------------------------------
Total cash costs 243 226 40 62 197 248
Amortization 48 41 171 132 114 127
---------------------------------------------------------------------
Total production costs $ 291 $ 267 $ 211 $ 194 $ 311 $ 375
---------------------------------------------------------------------
Capital expenditures (US$
millions) $ 5 $ 7 $ 5 $ 4 $ - $ -
---------------------------------------------------------------------
PERU TANZANIA
---------------------------------------------------------------------
Pierina Bulyanhulu
Three months ended September 30, 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 9,933 11,067 292 215
Tons processed (thousands) 4,571 - 283 213
Average grade (ounces per ton) 0.029 0.070 0.332 0.360
Recovery rate (percent) - - 88.5% 88.6%
---------------------------------------------------------------------
Production (thousands of ounces) 133 215 83 68
Production costs per ounce
Cash operating costs $ 118 $ 81 $ 268 $ 265
Royalties and production taxes - - 11 12
---------------------------------------------------------------------
Total cash costs 118 81 279 277
Amortization 165 183 116 136
---------------------------------------------------------------------
Total production costs $ 283 $ 264 $ 395 $ 413
---------------------------------------------------------------------
Capital expenditures (US$ millions) $ - $ 4 $ 8 $ 8
---------------------------------------------------------------------
Pierina Bulyanhulu
Nine months ended September 30, 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 30,568 29,395 860 687
Tons processed (thousands) 12,498 - 849 719
Average grade (ounces per ton) 0.037 0.075 0.348 0.371
Recovery rate (percent) - - 88.4% 88.0%
---------------------------------------------------------------------
Production (thousands of ounces) 552 706 261 235
Production costs per ounce
Cash operating costs $ 99 $ 81 $ 258 $ 218
Royalties and production taxes - - 12 11
---------------------------------------------------------------------
Total cash costs 99 81 270 229
Amortization 165 183 109 122
---------------------------------------------------------------------
Total production costs $ 264 $ 264 $ 379 $ 351
---------------------------------------------------------------------
Capital expenditures (US$ millions) $ 2 $ 9 $ 26 $ 27
---------------------------------------------------------------------
CORPORATE OFFICE TRANSFER AGENTS AND REGISTRARS
Barrick Gold Corporation CIBC Mellon Trust Company
BCE Place, Canada Trust Tower, P.O. Box 7010,
Suite 3700 Adelaide Street Postal Station
161 Bay Street, P.O. Box 212 Toronto, Ontario M5C 2W9
Toronto, Canada M5J 2S1 Tel: (416) 643-5500
Tel: (416) 861-9911 Toll-free throughout
Fax: (416) 861-0727 North America: 1-800-387-0825
Toll-free within Canada and Fax: (416) 643-5501
United States: 1-800-720-7415 Email: inquiries@cibcmellon.ca
Email: investor@barrick.com Website: www.cibcmellon.com
Website: www.barrick.com
SHARES LISTED (ABX) Mellon Investor Services L.L.C.
The Toronto Stock Exchange 85 Challenger Road,
The New York Stock Exchange Overpeck Center
The London Stock Exchange Ridgefield Park, New Jersey
The Swiss Stock Exchange 07660
La Bourse de Paris Tel: (201) 329-8660
Toll-free within the
United States:
1-800-589-9836
Website: www.mellon-investor.com
INVESTOR CONTACT:
Darren Blasutti
Vice President,
Investor Relations
Tel: (416) 307-7341
Email: dblasutti@barrick.com
MEDIA CONTACT:
Vincent Borg
Vice President,
Corporate Communications
Tel: (416) 307-7477
Email: vborg@barrick.com
Certain statements included herein, including those regarding
production, costs, timing of permitting, construction or production,
and other statements that express management's expectations or
estimates of future performance, constitute "forward-looking
statements" within the meaning of the United States Private Securities
Litigation Reform Act of 1995. The words "believe", "expect",
"anticipate", "contemplate", "target", "plan", "intends", "continue",
"budget", "estimate", "may", "will", "schedule", and similar
expressions identify forward-looking statements. Forward-looking
statements are necessarily based upon a number of estimates and
assumptions that, while considered reasonable by management are
inherently subject to significant business, economic and competitive
uncertainties and contingencies. In particular, the Management's
Discussion and Analysis includes many such forward-looking statements
and the Company cautions the reader that such forward-looking
statements involve known and unknown risks, uncertainties and other
factors that may cause the actual financial results, performance or
achievements of Barrick to be materially different from the Company's
estimated future results, performance or achievements expressed or
implied by those forward-looking statements and the forward-looking
statements are not guarantees of future performance. These risks,
uncertainties and other factors include, but are not limited to:
changes in the worldwide price of gold or certain other commodities
(such as silver, copper, fuel and electricity) and currencies; changes
in interest rates or gold lease rates that could impact realized
prices under our forward sales program; legislative, political or
economic developments in the jurisdictions in which Barrick carries on
business; operating or technical difficulties in connection with
mining or development activities; the speculative nature of gold
exploration and development, including the risks of diminishing
quantities or grades of reserves; and the risks involved in the
exploration, development and mining business. These factors are
discussed in greater detail in Barrick's Management's Discussion and
Analysis contained in its 2003 Annual Report and its most recent Form
40-F/Annual Information Form on file with the US Securities and
Exchange Commission and Canadian provincial securities regulatory
authorities.
Barrick expressly disclaims any intention or obligation to update
or revise any forward-looking statements whether as a result of new
information, events or otherwise.
CONTACT: Barrick Gold Corporation
Vincent Borg, 416-307-7477
fax: 416-861-1509
media@barrick.com