TORONTO, Feb 17, 2005 (BUSINESS WIRE) -- Barrick Gold Corporation
(NYSE:ABX)(TSX:ABX)(LSE:BGD)(SWX:ABX)(BOURSE:ABX)
YEAR-END REPORT 2004 - February 17, 2005
Based on US GAAP and expressed in US dollars
Gold Reserves Increase by 14% at Six Development Projects
Highlights
- Fourth quarter net income was $156 million, or $0.29 per share,
and full year net income was $248 million, or $0.46 per share. Fourth
quarter production was 1.2 million ounces of gold at total cash costs
of $221(1) per ounce. Full-year production was 5.0 million ounces at
total cash costs of $212(1) per ounce, meeting Barrick's original
2004 production and cost targets during a year of significant cost
pressures for the mining industry.
- Gold reserves as at December 31, 2004 stood at 89.1 million
ounces(2) based on a $375 gold price, the second largest reserve base
in the industry.
- Significant progress continues to be made on the development
projects. The first three full years of annual production are
expected to average approximately 1.8 million ounces of gold at total
cash costs of about $185 per ounce. First production from Tulawaka is
expected in the first quarter, and both Lagunas Norte and Veladero
are on schedule to begin producing in the third and fourth quarters
of this year, respectively. In 2005, these three mines are expected
to drive a 10% increase over 2004 production.
- The Company has allocated 6.5 million ounces of its existing
gold sales contracts to Pascua-Lama, or roughly 35% of currently
identified gold reserves at the project, to provide future financing
support. The Corporate gold sales contract position at year end,
which excluded the Pascua-Lama contracts, was 7.0 million ounces, or
approximately 10% of the Company's non-Pascua-Lama reserves.
- During the fourth quarter, the Company raised $750 million
through the sale of long-term debt securities, the proceeds of which
will be used primarily for funding construction at Barrick's
development projects and for general corporate purposes.
Barrick Gold Corporation today reported earnings of $156 million
($0.29 per share) and operating cash flow of $120 million for the
fourth quarter 2004, compared to earnings of $77 million ($0.14 per
share) and operating cash flow of $134 million in the year-earlier
period.
The Company's fourth-quarter earnings included a $141-million tax
credit and a $15-million after-tax reversal of other accrued costs as
a result of a favorable resolution of the Peruvian tax assessment,
$48 million in other deferred tax credits, a $24-million after-tax
gain on asset sales and a $6-million after-tax non-hedge derivative
gain. These were partially offset by after-tax impairment charges
totaling $95 million, primarily at Eskay Creek and exploration
properties purchased as part of the Arequipa acquisition, and a
$15-million after-tax change in asset retirement obligation
estimates. Earnings in the prior-year quarter included $41 million in
deferred tax credits, a $3-million after-tax gain on asset sales and
a $37-million after-tax non-hedge derivative gain, partially offset
by $11 million in after-tax litigation costs, after-tax impairment
charges totaling $7 million, and a $6-million after-tax change in
asset retirement obligation estimates.
The higher earnings in fourth quarter 2004 were favorably
impacted by a $23-per-ounce higher realized gold price, compared to
the prior-year period, but were offset by lower gold sales and higher
total cash costs.
"Our fourth quarter operating results were in line with our
expectations," said Greg Wilkins, President and Chief Executive
Officer. "Looking ahead to 2005, we anticipate our operating
performance to benefit over the course of the year as our three new
development projects enter into production."
For 2004, net income was $248 million ($0.46 per share) and
operating cash flow was $506 million, compared to net income of $200
million ($0.37 per share) and operating cash flow of $519 million in
2003. Earnings in both years included various items that
significantly impacted the comparability of results. These items are
summarized in a table on page 15 of this report.
PRODUCTION AND COSTS
For the year, the Company produced 4.96 million ounces of gold at
total cash costs of $212 per ounce, compared to 5.51 million ounces
at total cash costs of $189 per ounce for 2003. The Company achieved
its original overall production and total cash cost guidance for the
year, despite the significant cost pressures faced by the mining
industry during the year. Barrick continues to have the lowest cash
costs of the senior gold producers.
In fourth quarter 2004, Barrick produced 1.2 million ounces of
gold at total cash costs of $221 per ounce, compared to 1.3 million
ounces at total cash costs of $199 per ounce for the prior-year
quarter.
The North American region performed well during the quarter with
an increase in production over the third quarter 2004 at lower total
cash costs. For the year, the region's production was in line with
guidance at slightly lower total cash costs.
In the South American region, fourth-quarter production at
Pierina was lower than the prior 2004 quarters and at higher total
cash costs. Production for the full year for the region was slightly
higher than guidance and, as previously announced, total cash costs
were higher than guidance due to mine sequencing changes implemented
in the second half of 2004.
The Australian/African region's production in the fourth quarter
was lower than the third quarter 2004 and at higher cash costs due to
lower production and higher costs from Plutonic and Bulyanhulu. For
the year, the region's production was higher than guidance and at
slightly higher total cash costs.
RESERVES
At year-end 2004, the Company had proven and probable reserves of
89.1 million ounces of gold based on a $375 per ounce gold price. The
Company met its objective of more than replacing reserves and added
8.6 million ounces prior to production depletion.
"The increase in our reserve base underscores the high-quality
assets Barrick has within its portfolio," said Peter Kinver,
Executive Vice President and Chief Operating Officer. "I believe
there is potential to grow our reserves further, especially in and
around our development projects."
Silver contained in Barrick's gold reserves at year end is 911
million ounces and is primarily derived from the Pascua-Lama deposit,
one of the largest silver resources in the world, which contains 643
million ounces of silver.
DEVELOPMENT PROJECTS UPDATE
Progress on all of Barrick's development projects is going well.
Total estimated capital for the four projects under construction -
Lagunas Norte, Veladero, Cowal and Tulawaka - is about $1.2 billion,
with the first full three years of annual production expected to
average approximately 1.8 million ounces of gold at total cash costs
of about $185 per ounce. The projects achieved a number of important
milestones during the quarter, keeping them on track for scheduled
production commencement.
Progress continues on schedule and on budget at the Lagunas Norte
deposit in the Alto Chicama district in Peru, with overall mine
development 70% complete. As previously announced, the Lagunas
Norte/Alto Chicama Legal Stability Agreement between Barrick and the
Peruvian government has been executed, providing greater certainty as
to the foreign exchange and fiscal administrative regime for 15
years. Production is expected to commence in the third quarter of
2005. The project's reserves increased by 2.0 million ounces, or 28%,
to 9.1 million ounces at year-end 2004.
At Veladero in Argentina, progress continues with overall mine
development over 65% complete. Total estimated construction capital
for the project is $540 million. Construction of the plant facilities
and crushers is well advanced, and the valley-fill leach facility
embankment was substantially completed earlier this year. Mining
activities steadily increased during the quarter due to greater
equipment availability and productivity improvements. Reserves
increased by 1.7 million ounces, or 16%, to 12.8 million ounces at
year-end 2004 largely due to a successful drill program during the
year. Drilling around the minesite has begun.
The Company's Cowal project in Australia is progressing well and
production is expected to commence in the first quarter 2006.
Construction capital, however, is expected to increase from previous
guidance to approximately $305 million due to factors including
increases in commodity and consumable prices, and the very
competitive construction labor market in Australia.
Mining has commenced at the 70%-owned Tulawaka joint venture in
Tanzania. The first gold pour is expected by the end of first quarter
2005.
At Barrick's Pascua-Lama project that straddles the Chilean and
Argentine border, the environmental impact assessments were filed
during the fourth quarter with approvals targeted by the end of 2005.
Work is ongoing on community and government relations, permitting,
protocol implementation and tax stability. The project's gold
reserves increased by 0.8 million ounces, or 5%, to 17.6 million
ounces at year-end 2004.
At the East Archimedes project located at the Ruby Hill mine site
in Nevada, designed as an open-pit, heap leach operation, the mining
fleet has been ordered and permitting work is ongoing. Construction
capital is estimated at approximately $75 million over an expected
two-year construction phase that begins once permitting is secured.
The first gold pour is targeted for mid-2007.
In Nevada, the power plant site preparation work was completed
earlier this year and work on the foundation has begun. Delivery of
the first engines is anticipated early in second quarter 2005. The
plant is expected to commence operation in fourth quarter 2005.
FINANCIAL POSITION
During the fourth quarter, the Company raised $750 million
through the sale of long-term debt securities, the proceeds of which
will be used primarily for funding construction at Barrick's
development projects and for general corporate purposes. At December
31, 2004, the Company had $1.4 billion in cash available to fund its
development projects without the need for any equity dilution.
Barrick has the gold mining industry's only A-rated balance sheet, as
rated by Standard & Poor's.
During the quarter, Barrick reduced its fixed-price gold forward
sales position by about 200,000 ounces, bringing the reduction for
the year to 2 million ounces, in excess of the targeted 1.5 million
ounces for 2004.
Barrick has also allocated 6.5 million ounces of its existing
gold sales contracts to Pascua-Lama during the quarter in support of
anticipated financing for the project. The Pascua-Lama gold sales
position represents just over 35% of currently identified gold
reserves at the project and does not impact any of the 643 million
ounces of silver contained within the gold reserves. Barrick expects
the allocation of these contracts will preclude any requirement by
lenders for any incremental gold sales contracts.
At quarter end, the Company's Corporate gold sales contract
position, which excludes Pascua-Lama contracts, was 7.0 million
ounces, representing just over one year of future expected gold
production and approximately 10% of the Company's reported
non-Pascua-Lama proven and probable gold reserves.
EXPLORATION UPDATE
During the quarter, Barrick had drill programs underway on 14
properties(3). Early stage exploration was carried out in all regions
during the quarter and is helping to identify focus areas for
detailed follow-up and drilling in 2005.
In North America, drill programs at Goldstrike at the North and
South Pit targets were completed and successfully converted existing
resources to reserves as well as added new resources. The Betze Drift
development continued and should be completed in first quarter 2005.
Once complete, a resource definition drill program will test the
strike length of the North Post orebody. On the Rossi and Dee
properties, the underground drill program to better define the Storm
resource as well as a pre-feasibility study were completed during the
quarter.
During the fourth quarter, fieldwork commenced in the Frontera
District in Chile/Argentina. Target areas, prioritized from the
regional compilation completed last quarter, were further evaluated
and an aggressive drill program to test initial targets in proximity
to Veladero/ Pascua-Lama is planned to commence early in 2005.
Fieldwork will be carried out on additional targets to focus on
specific targets for drill testing later in the year.
In Peru, drill programs were completed in the Alto Chicama
District at Lagunas Sur and Alto La Bandera, located just south of
Lagunas Norte. Results are being evaluated. Regional exploration
continues to focus and prioritize areas for follow-up in 2005 and
drill programs are planned for later in the year.
In Australia, a drill program commenced at the NW Telfer property
and exploration programs were underway in Western Australia.
In Africa, the Phase II drill program at Buzwagi, located about
80 kilometers south of Bulyanhulu, was completed during the quarter,
with positive results.
"We are extremely pleased with the progress made at Buzwagi
during the year. We were able to establish a significant resource and
meaningfully advance the project along the pipeline," said Alex
Davidson, Executive Vice President, Exploration.
A scoping study is underway at Buzwagi and additional drilling
will be carried out in 2005 to further evaluate extensions to the
mineralization and attempt to convert existing resources to reserves
as well as add resources.
Exploration is also ongoing on properties in the Lake Victoria
District, with drilling carried out in the Siga Hills area and
additional drilling planned on this and other properties in 2005.
Exploration programs were also carried out in Russia and Central
Asia during the quarter.
2005 OUTLOOK
As previously announced, the Company expects 2005 production of
5.4 - 5.5 million ounces at average total cash costs of $220-$230 per
ounce, and has a 40% targeted growth plan and gold production target
for 2007 of 6.8 - 7.0 million ounces at average total cash costs
slightly above $200 per ounce. Production in the second half of 2005
is expected to exceed the first half of the year as the Lagunas Norte
mine in the Alto Chicama District in Peru and the Veladero mine in
Argentina are targeted to commence production in the third and fourth
quarters, respectively. The first half of 2005 is expected to have
lower production and higher cash costs, with the second half
improving as Lagunas Norte and Veladero come on stream.
For the year, amortization is expected to be about $475 - $485
million, and administration expense is expected to be approximately
$90 million, including an estimated $15 million in costs on adoption
of new accounting rules that require the expensing of stock options
beginning in the second half of 2005. Exploration, development and
business development expense is expected to be approximately $150
million, with the possibility that positive results could lead to
additional exploration spending. Capital expenditures for 2005 are
anticipated to be approximately $743 million for development
(excluding capitalized interest) and $245 million for sustaining
capital.
(1) For an explanation of non-GAAP performance measures, refer to
pages 40-41 of Management's Discussion and Analysis found in the
Year-End Report 2004.
(2) For a breakdown of reserves by category and additional
information on reserves, see the tables and related footnotes on
pages 78-82.
(3) Barrick's exploration programs are designed and conducted
under the supervision of Alexander J. Davidson, P. Geo., Executive
Vice President, Exploration of Barrick. For information on the
geology, exploration activities generally, and drilling and analysis
procedures on Barrick's material properties, see Barrick's most
recent Annual Information Form / Form 40-F on file with Canadian
provincial securities regulatory authorities and the US Securities
and Exchange Commission.
Key Statistics
Three months ended Years ended
December 31, December 31,
(in United States dollars) --------------------------------------
(Unaudited) 2004 2003 2004 2003
---------------------------------------------------------------------
Operating Results
Gold production
(thousands of ounces) 1,169 1,301 4,958 5,510
Gold sold (thousands of ounces) 1,200 1,361 4,936 5,554
Per Ounce Data
Average spot gold price $ 434 $ 392 $ 409 $ 363
Average realized gold price 417 394 391 366
Total cash costs(1),(3) 221 199 212 189
Amortization(3) 76 93 86 90
Total production costs(3) 297 292 298 279
---------------------------------------------------------------------
Financial Results (millions)
Gold sales $ 501 $ 536 $ 1,932 $ 2,035
Net income 156 77 248 200
Operating cash flow 120 140 506 519
Per Share Data (dollars)
Net income (basic) 0.30 0.14 0.47 0.37
Net income (diluted) 0.29 0.14 0.46 0.37
Operating cash flow (basic) 0.23 0.25 0.95 0.97
Operating cash flow (diluted) 0.22 0.25 0.95 0.97
Weighted average common shares
outstanding (millions)(2) 534 535 534 535
---------------------------------------------------------------------
As at As at
December 31, December 31,
---------------------------------------------------------------------
2004 2003
---------------------------------------------------------------------
Financial Position (millions)
Cash and equivalents $ 1,398 $ 970
Non-cash working capital 141 34
Long-term debt 1,655 719
Shareholders' equity 3,563 3,494
---------------------------------------------------------------------
(1) Comprises cash operating costs, royalties and production taxes.
(2) Fully diluted, includes shares issuable upon exchange of BGI
(Barrick Gold Inc.) exchangeable shares.
(3) For an explanation of the use of non-GAAP performance measures
refer to pages 40 to 41 of Management's Discussion and Analysis.
Production and Cost Summary
Production (attributable ounces)
---------------------------------------
Three months ended Year ended
December 31, December 31,
------------------- -------------------
(Unaudited) 2004 2003 2004 2003
------------------------------------------------- -------------------
North America
Open Pit 372,706 324,951 1,381,315 1,559,461
Underground 133,833 147,199 561,345 551,664
------------------------------------------------- -------------------
Goldstrike Property Total 506,539 472,150 1,942,660 2,111,125
Eskay Creek 73,328 83,387 289,568 352,070
Round Mountain 83,983 91,059 381,484 392,649
Hemlo 66,394 64,930 247,440 267,888
Holt-McDermott - 23,203 54,578 89,515
Marigold 15,462 12,953 47,101 47,396
------------------------------------------------- -------------------
745,706 747,682 2,962,831 3,260,643
------------------------------------------------- -------------------
South America
Pierina 94,013 205,852 645,874 911,723
------------------------------------------------- -------------------
Australia/Africa
Plutonic 73,864 88,233 304,468 333,947
Darlot 27,931 37,336 140,235 154,977
Lawlers 28,595 27,355 110,374 99,223
Kalgoorlie 110,041 115,498 444,242 436,098
------------------------------------------------- -------------------
240,431 268,422 999,319 1,024,245
Bulyanhulu 88,562 78,737 349,865 313,551
------------------------------------------------- -------------------
328,993 347,159 1,349,184 1,337,796
------------------------------------------------- -------------------
Total 1,168,712 1,300,693 4,957,889 5,510,162
------------------------------------------------- -------------------
Total Cash Costs (US$/oz)
--------------------------------
Three months ended Year ended
December 31, December 31,
------------------ -------------
(Unaudited) 2004 2003 2004 2003
------------------------------------------------------- -------------
North America
Open Pit $228 $250 $247 $233
Underground 233 261 255 253
------------------------------------------------------- -------------
Goldstrike Property Total 230 253 249 238
Eskay Creek 7 20 31 52
Round Mountain 263 190 221 173
Hemlo 231 227 240 226
Holt-McDermott - 210 197 239
Marigold 193 187 197 171
------------------------------------------------------- -------------
211 219 221 209
------------------------------------------------------- -------------
South America
Pierina 146 89 106 83
------------------------------------------------------- -------------
Australia/Africa
Plutonic 251 196 223 193
Darlot 255 182 210 164
Lawlers 249 268 246 249
Kalgoorlie 241 215 231 209
------------------------------------------------------- -------------
246 208 227 200
Bulyanhulu 322 316 283 246
------------------------------------------------------- -------------
265 230 241 210
------------------------------------------------------- -------------
Total $221 $199 $212 $189
------------------------------------------------------- -------------
Total Production Costs (US$/oz)(1)
----------------------------------
Three months ended Year ended
December 31, December 31,
--------------------- ------------
(Unaudited) 2004 2003 2004 2003
-------------------------------------------------------- ------------
Direct mining costs at market
foreign exchange rates $265 $225 $248 $210
Gains realized on currency
hedge contracts (24) (18) (19) (12)
By-product credits (35) (21) (30) (21)
-------------------------------------------------------- ------------
Cash operating costs 206 186 199 177
Royalties 13 10 11 9
Production taxes 2 3 2 3
-------------------------------------------------------- ------------
Total cash costs 221 199 212 189
Amortization 76 93 86 90
-------------------------------------------------------- ------------
Total production costs $297 $292 $298 $279
-------------------------------------------------------- ------------
(1) For an explanation of the use of non-GAAP performance measures
refer to pages 40 - 41 of Management's Discussion and Analysis.
MANAGEMENT'S DISCUSSION AND ANALYSIS ("MD&A")
---------------------------------------------------------------------
---------------------------------------------------------------------
Core Business 7
Executive Overview and 2005 Outlook 8
Vision and Strategy 9
Capability to Deliver Results 9
Impact of Key Economic Trends 11
Results 14
Overview of 2004 versus 2003 14
Consolidated Gold Production and Sales 15
Results of Operating Segments 16
Other Costs and Expenses 22
Cash Flow 24
Overview of 2003 versus 2002 25
Balance Sheet 26
Quarterly Information 27
Off-Balance Sheet Arrangements 28
Liquidity 30
Critical Accounting Policies and Estimates 32
Non-GAAP Performance Measures 37
Cautionary Statement on Forward-Looking Information 38
Glossary of Technical Terms 42
This MD&A has been prepared as of February 9, 2005, and is
intended to supplement and complement our unaudited financial
statements and notes thereto for the year ended December 31, 2004
prepared in accordance with United States generally accepted
accounting principles, or US GAAP (collectively, our "Financial
Statements"). You are encouraged to review our Financial Statements
in conjunction with your review of this MD&A. Additional information
relating to the Company, including our Annual Information Form, is
available on SEDAR at www.sedar.com and on EDGAR at www.sec.gov. For
an explanation of terminology used in this MD&A that is unique to the
mining industry, readers should refer to the glossary on page 42.
All dollar amounts in this MD&A are in US dollars, unless otherwise
specified. Unless otherwise indicated, the financial information in
this MD&A has been prepared in accordance with US GAAP.
For the purposes of preparing this MD&A, we consider the
materiality of information. Information is considered material if:
(i) such information results in, and would reasonably be expected to
result in, a significant change in the market price or value of
Barrick Gold Corporation's shares; or (ii) there is a substantial
likelihood that a reasonable investor would consider it important in
making an investment decision, or if it would significantly alter the
total mix of information available to investors. Materiality is
evaluated by reference to all relevant circumstances, including
potential market sensitivity.
CORE BUSINESS
Barrick Gold Corporation ("Barrick") is one of the world's
largest gold producers in terms of market capitalization, annual gold
production and gold reserves. Our operations are concentrated in
three regions: North America, Australia/Africa and South America.
Over the next two years, after production begins at four of our
development projects, we are targeting our annual gold production to
grow to 6.8-7.0 million ounces, with South America contributing an
increasing proportion of our production. To grow our business, we
are also exploring for gold in areas of the world outside of our
three regions, particularly in Russia and Central Asia.
We generate revenue and cash flow from the production and sale of
gold in both bullion and concentrate form. We sell our gold
production through three primary distribution channels: gold bullion
is sold in either the gold spot market or under gold sales contracts
between Barrick and various third parties, and gold concentrate is
sold to independent smelting companies. Selling prices reflect the
market price for gold at the time an agreement is reached on pricing.
EXECUTIVE OVERVIEW AND 2005 OUTLOOK
Our share price appreciated by 6.65% in 2004, outperforming
senior gold producers Newmont Mining Corporation, Placer Dome Inc.,
Anglogold Ashanti Limited and Gold Fields Limited, while the spot
gold price appreciated by 5.54% over the same period.
In 2004, we produced 4.96 million ounces of gold at an average
total cash cost of $212(1) per ounce, achieving our original guidance
for the year. Higher gold production at Goldstrike Open Pit,
Goldstrike Underground and Pierina more than offset lower production
at the Plutonic, Round Mountain, Darlot and Eskay Creek mine sites.
Despite an environment of rising commodity prices, appreciation of
currencies against the US dollar, and increased royalty and mining
tax payments driven by higher market gold prices, we met our original
total cash costs per ounce guidance. Our currency and commodity
hedge programs enabled us to mitigate the impact of commodity prices
and currency exchange rates on total cash costs per ounce and
operating cash flow.
We had earnings of $248 million ($0.46 per share) and generated
operating cash flow of $506 million ($0.95 per share) in 2004. Our
2004 earnings and operating cash flow included an after-tax
opportunity cost of $89 million ($0.17 per share) due to the
voluntary reduction of our fixed-price gold sales contracts, with
deliveries into contracts at prices below the prevailing market gold
price, and corresponding lower revenues from gold sales. Earnings in
2004 also included tax credits totaling $227 million relating to the
resolution of a Peruvian tax assessment and a change in tax status in
Australia; as well as impairment charges recorded against long-lived
assets of $139 million pre-tax. In 2004, we exceeded our target (of
1.5 million ounces) for reducing our fixed-price gold sales contracts
with a reduction of 2 million ounces.
At year-end, we had proven and probable reserves of 89.1 million
ounces of gold(2), based on a $375 gold price, after producing 5.5
million contained ounces. Reserve increases in 2004 were due to
exploration projects at operating mines and development projects, and
a lower cut-off grade as a result of a higher gold price assumption
in 2004.
We continue to effectively support and shape our growth profile,
including a focus on Russia and Central Asia. We made steady progress
on the construction of four new mines, with three of them planned to
enter production in 2005. Construction is proceeding on schedule for
Lagunas Norte in Peru, Veladero in Argentina, Tulawaka in Tanzania,
and Cowal in Australia. We are making progress in planning for our
Pascua-Lama Project, which straddles the Chilean and Argentine
border, our fifth development project, and East Archimedes which is
located in Nevada, our sixth development project.
We have the capital resources to fund our development projects
without the need for any equity dilution. During the year, we
entered into a nine-year commitment in Argentina for $250 million in
Veladero project financing and completed a $750 million public
debenture offering. We also continued to optimize our capital
structure through a share buyback program. At the same time, we have
the gold mining industry's only A-rated balance sheet, as rated by
Standard & Poor's.
During 2004, we implemented a number of initiatives to strengthen
our organization, including making changes to the composition of our
Board of Directors and governance practices as part of a commitment
towards improved corporate governance. An organizational redesign
was fully implemented in 2004. The new organizational design
consolidated life-of-mine accountabilities under our Chief Operating
Officer and established regional business units to add greater value
to the global enterprise.
We expect 2005 gold production to be between 5.4-5.5 million
ounces at an average total cash cost of $220-$230 per ounce, and we
remain committed to our 40% targeted growth plan and gold production
target for 2007 of 6.8-7.0 million ounces, at total cash costs
slightly above $200 per ounce(3). The first and second quarters of
2005 are expected to have lower production and higher cash costs,
with the second half of the year improving as Lagunas Norte and
Veladero come on stream.
For the year, amortization is expected to be about $475-$485
million, and administration expense is expected to be approximately
$90 million, including an estimated $15 million in costs on adoption
of new accounting rules that require the expensing of stock options
beginning in the second half of 2005. Exploration, development and
business development expense is expected to be approximately $150
million, with the possibility that positive results could lead to
additional exploration spending. Capital expenditures for 2005 are
anticipated to be approximately $743 million for development
excluding capitalized interest of $103 and $245 million for
sustaining capital.
VISION AND STRATEGY
Our vision is to be the world's best gold company by finding,
developing and producing quality reserves in a profitable and
socially responsible manner.
The overriding goal of our strategy is to create value for our
shareholders. To achieve this, cash flow from our mines is
consistently reinvested in exploration, development projects and
other strategic investments to work towards sustainable growth in
production and cash flow. It can take a number of years for a project
to move from the exploration stage through to mine construction and
production. Our business strategy reflects this long lead time, but
shorter-term priorities are also set for current areas of focus.
We use strategic relationships to share risk and expertise.
Examples include joint venture arrangements for the Hemlo, Round
Mountain and Kalgoorlie mines, and also for exploration programs in
certain areas. We have investments in Highland Gold Mining PLC
("Highland Gold") and Celtic Resources Holdings PLC ("Celtic
Resources"), as well as strategic alliances with both companies, as
part of our plan to develop a business unit in Russia and Central
Asia.
---------------------------------------------------------------------
Long-term Strategy Focus Areas Measures
Elements
---------------------------------------------------------------------
Growth in reserves Growth at existing Additions to reserves
and production mine sites by finding new and resources.
resources and converting
to reserves. Consistent investment
in exploration
Growth through successful and development.
exploration focused
principally in key Growth in annual
exploration districts gold production.
(Goldstrike, Frontera,
Lake Victoria, Alto Size of gold reserves.
Chicama) and in Russia/
Central Asia. Construction progress
versus schedules.
Execute the development
and construction of Actual construction
Veladero, Lagunas costs.
Norte, Tulawaka, Cowal,
Pascua-Lama and East Status of regulatory
Archimedes. requirements.
Develop a business unit
in Russia/Central Asia
through investments in,
and strategic alliances
with Highland Gold and
Celtic Resources.
---------------------------------------------------------------------
Operational Control costs. Total cash costs per
excellence per ounce.(1)
Global supply chain
management. Amortization per
ounce.(1)
Continuous improvement
initiatives. Ore throughput.
Currency, interest rate Equipment utilization
and fuel/propane hedge statistics.
programs.
Optimize productivity Liquidity - operating
through continuous cash flow and
improvement credit rating.
initiatives.
Effective assessment Key balance sheet
and management of ratios.
risk.
Effective capital
allocation and
management.
Sourcing of funding for
capital needs
---------------------------------------------------------------------
Strengthen the Workforce - identify Talent review and
organization and develop talent. performance
management.
Leadership development Compliance with
and succession planning. Sarbanes- Oxley
Act.
Adopt best practices in
corporate governance,
including strengthening
internal controls.
---------------------------------------------------------------------
Responsible mining Reinforce health and Safety leadership and
safety culture. other training
initiatives.
Enhance environmental
performance, including Medical aid injury
use of innovative frequency.
technology to protect
the environment. Environmental
performance.
Maintain positive
community and
government relations.
---------------------------------------------------------------------
(1) Total cash costs per ounce and amortization per ounce are
non-GAAP performance measures. For more information see pages
40 to 41.
CAPABILITY TO DELIVER RESULTS
Resources and processes provide us with the capability to execute
our strategy and deliver results. Our critical resources and
processes are as follows:
Critical Non-Capital Resources and Processes
Experienced Management Team and Skilled Workforce
We have an experienced management team that has a proven track
record in the mining industry. Our management team is critical to the
achievement of our strategic goals, and we are focused on retaining
and developing key members. The team is focused on the execution of
our strategy and business plan. Strong leadership and governance are
critical to the successful implementation of our core strategy. We
are focusing on leadership development for key members of
executive-level and senior mine management.
A skilled workforce is one of our most significant non-capital
resources. Competition for appropriately trained and skilled
employees is high in the mining industry. Employee retention, the
ability to recruit skilled employees, and labor relations have a
significant impact on the effectiveness of our workforce, and
ultimately the efficiency and effectiveness of our operations. We
maintain training programs to develop the skills that certain
employees need to fulfill their roles and responsibilities. The
remote nature of many mine sites can present a challenge to us in
maintaining an appropriately skilled workforce. Priorities for our
Human Resources group include strengthening our workforce and
developing leadership and succession capabilities by focusing on
attracting and retaining the best people, as well as enhancing the
process for identifying and developing the leadership pool. We are
implementing Human Resources systems solutions to enhance our ability
to analyze and compare labor costs, productivity and other key
statistics to better manage the effect our workforce has on our
mining operations.
Health and Safety
As part of our commitment to corporate responsibility, we focus
on continuously improving health and safety, systems and resources to
help control workplace hazards. Continuous monitoring and
integration of health and safety into decision-making enables us to
operate effectively, while also focusing on health and safety. Key
areas of focus include safety leadership through training and risk
management practices; designing and enhancing processes and programs
to ensure safety requirements are met; and communicating a safety
culture as part of Company and personal core values.
Environmental
We are subject to extensive laws and regulations governing the
protection of the environment, endangered and protected species,
waste disposal and worker safety. We incur significant expenditures
each year to comply with such laws and regulations. We seek to
continuously implement operational improvements to enhance
environmental performance. We also integrate environmental
evaluation, planning, and design into the development stage of new
projects to ensure environmental matters are identified and managed
at an early stage.
Cost Control
Successful cost control depends upon our ability to obtain and
maintain equipment, consumables and supplies as required by our
operations at competitive prices. Through a culture of continuous
improvement, we are also focusing on identifying and implementing
steps to make our operations more effective and efficient.
Our Supply Chain group is focusing on improving long-term cost
controls and sourcing strategies for major consumables and supplies
used in our mining activities through global commodity purchasing
teams. They are also focusing on knowledge sharing across our global
business and implementing best practices in procurement. We are
developing strategies to help us analyze and source consumables and
supplies at the lowest cost over the life of a mine, as well as
long-term alliances with suppliers.
Maintenance is a significant component of our operating costs.
Our Global Maintenance team is working to reduce maintenance costs
and increase equipment utilization through an internal maintenance
community. Key areas of focus include setting standards for
maintenance to optimize usage of mine equipment and enable
cost-effective purchasing of mine equipment. They are implementing a
global maintenance system to facilitate sharing of best practices and
tracking of capital equipment statistics such as utilization,
availability and useful lives.
Technology
Our Information Technology group monitors significant risks, such
as security, the risk of failure of critical systems, risks relating
to the implementation of new applications, and the potential impact
of a systems failure. They are implementing strategies to manage
these risks, including ongoing enhancements to security; monitoring
of operating procedures; the effectiveness of system controls to
safeguard data; evaluating technology resources; and maintaining
disaster recovery plans. Other areas of focus include reducing
technology diversity through standardizing systems solutions, and
ongoing analysis of business needs and the potential benefits that
can be gained from new applications.
Internal Controls
We maintain a system of internal controls designed to safeguard
assets and ensure financial information is reliable. We undertake
ongoing evaluations of the effectiveness of internal controls and
implement control enhancements, where appropriate, to improve the
effectiveness of controls. In 2004 and 2003, we focused on the
design, testing and assessment of the effectiveness of internal
controls to enable us to meet the certification and attestation
requirements of the Sarbanes-Oxley Act. We presently file management
certifications annually under Section 302 and Section 906 and expect
to comply with the reporting requirements of Section 404 as required
by law.
We also maintain a system of disclosure controls and procedures
designed to ensure the reliability, completeness and timeliness of
the information we disclose in this MD&A and other public disclosure
documents.
Critical Capital Resources and Processes
We expect to fund capital requirements of about $2.5 billion over
the next four years to finish construction activities at our
development projects and for a power plant to supply our Goldstrike
mine. Adequate funding is in place or available for all our
development projects. We plan to put in place project financing for
a portion of the expected construction cost of Pascua-Lama, however,
if we are unable to do so because of unforeseen political or other
challenges, we expect to be able to fund the capital required through
a combination of existing capital resources and future operating cash
flow.
We may also invest capital in Russia and Central Asia in 2005 to
exercise certain rights we hold through agreements with Highland Gold
and Celtic Resources to acquire interests in various mineral
properties, and also to acquire future common shares of Celtic.
These rights are described in note 10 to the Financial Statements.
We expect that any capital required will be funded from a combination
of our existing cash position and operating cash flow in 2005.
IMPACT OF KEY ECONOMIC TRENDS
1 Higher Market Gold Prices
Market gold prices are subject to volatile price movements over
short periods of time, and are affected by numerous industry and
macroeconomic factors that are beyond our control. The US dollar gold
price has increased over the past few years, mainly due to the
weakening of the US dollar against most major currencies, a decline
in gold supply and an increase in demand for gold. The gold price
over the last few years has had a high correlation with the US
dollar, and we expect this correlation to continue.
With global financial markets experiencing significant
volatility, political and security issues in a state of uncertainty,
and with the US dollar - the "secure investment of choice" globally -
coming under pressure, the global investment community has
re-awakened to the potential for gold as an alternative investment
vehicle. The past few years have seen a resurgence in gold as an
investment vehicle, and we believe the prospects for gold to
experience further investment interest are good, particularly in
light of expected global economic/political uncertainties going
forward. We believe that the introduction of more readily accessible
and more liquid gold investment vehicles (such as gold exchange
traded funds - "ETFs") will further enhance gold's appeal to
investors.
Our revenues are significantly impacted by the market price of
gold. We have historically used fixed-price gold sales contracts to
provide protection in periods of low market gold prices, but since
2001 we have been focusing on reducing the level of outstanding
fixed-price gold sales contracts. In 2004, we reduced our
fixed-price gold sales contracts by 2 million ounces. The terms of
our fixed-price gold sales contracts enable us to deliver gold
whenever we choose over the primarily ten-year term of the contracts.
Our fixed-price gold sales contracts have allowed us to benefit from
higher market gold prices, while the flexibility implicit in contract
terms allows us to reduce the outstanding sales contracts over time.
Over the last three years, our realized gold sales prices have
largely tracked the rising market gold price. Periods when our
average realized price was below average market prices were primarily
caused by us voluntarily choosing to deliver into gold sales
contracts at prices lower than prevailing market prices to reduce
outstanding gold sales contracts. We view the outlook for market gold
prices to be positive due to our view of a declining US dollar and
the present supply/demand fundamentals. In the future, we expect to
be able to benefit from higher gold prices. The flexibility under our
fixed-price gold sales contracts will enable us to deliver gold at
market prices, however, if we choose to deliver a portion of our
production under gold sales contracts, the prices for those
deliveries may be below prevailing market prices.
2 Higher Market Silver Prices
Market silver prices are subject to volatile price movements over
short periods of time, and are affected by numerous industry and
macroeconomic factors that are beyond our control. Market silver
prices have increased since late 2003 mainly due to increasing
investment and industrial demand, along with higher world economic
growth in 2004. Market prices fluctuated in 2004 as higher prices
caused demand from jewelry and silverware fabrication to decrease. An
expected decline in the use of silver for photographic film due to
increases in digital photography may negatively impact market prices,
but this trend has been partly offset by increased demand for
photographic film in developing countries.
Market silver prices impact the value of silver produced as a
by-product at some of our mines. When the silver price increases,
by-product credits increase and our total cash costs per ounce
decrease. In the past, we have used silver sales contracts to sell a
portion of our annual silver production, which has helped to mitigate
the impact of volatility in market prices, and we may use such
contracts in the future. The flexibility under our silver sales
contracts allows us to benefit from higher market silver prices by
choosing to deliver silver production into the silver spot market. If
we choose to deliver a portion of our silver production under silver
sales contracts, the prices for those deliveries may be below
prevailing market prices.
3 Weakening of the US dollar Against Major Currencies
The US dollar significantly depreciated against many major
currencies in 2003 and 2004. The weakening of the US dollar was
largely due to a record US trade deficit and low interest rates that,
after taking into account inflation, provided negative real returns.
As these conditions remain, and as the United States seeks to improve
the competitiveness of its exports, further devaluation of the US
dollar may occur.
Results of our mining operations in Australia and Canada,
reported in US dollars, are affected by exchange rates between the
Australian and Canadian dollar and the US dollar, because a portion
of our annual expenditures are based in local currencies. A weaker
US dollar causes costs reported in US dollars to increase, because
local currency denominated expenditures have become more expensive in
US dollars. We have a currency hedge position as part of our
strategy to control costs by mitigating the impact of a weaker US
dollar on Canadian and Australian dollar-based expenditures. Over
the last three years, our currency hedge position has provided
benefits to us in the form of hedge gains when contract exchange
rates are compared to prevailing market exchange rates as follows:
2004 - $96 million; 2003 - $58 million; 2002 - $7 million. These
gains are included in our operating costs.
At December 31, 2004, we had hedged local currency-based
expenditures for about the next three years at average exchange rates
that are more favorable than market rates in early 2005. The average
rates for currency contracts designated against operating costs over
the next three years are $0.64 for Australian dollar contracts and
$0.72 for Canadian dollar contracts. Further details of our currency
hedge position are included in note 16 to the Financial Statements.
Beyond three years, most of our local currency denominated costs are
subject to market currency exchange rates. If the trend of a
weakening US dollar continues, we do not expect that this will
significantly impact our results of operations over the next three
years because of the protection we have under our currency hedge
position. Beyond the next three years, our results could be
affected, depending upon whether we add to our currency hedge
positions in the future.
4 Higher Energy Prices
Diesel Fuel and Propane
Prices of commodities, such as diesel fuel and propane, are
subject to volatile price movements over short periods of time and
are affected by factors that are beyond our control. Annually, we
consume about 1.3-1.7 million barrels of diesel fuel and 20-25
million gallons of propane at our mines. The cost of these
commodities affects our costs to produce gold.
Crude oil is refined into diesel fuel that is used by us at our
mines. Due mainly to global supply shortages and a weakening US
dollar, crude oil prices rose in 2004, with a corresponding rise in
diesel fuel prices. To control costs by mitigating the impact of
rising diesel fuel prices, we put in place a fuel hedge position of
2.4 million barrels, a portion of estimated future diesel fuel
consumption over the next three years with an average cap price of
$39 per barrel and participation to an average floor price of $29 per
barrel on about half the position. In 2004, we realized benefits in
the form of hedge gains totaling $4 million when contract prices were
compared to market prices. If the trend of increasing diesel fuel
prices continues, this could impact future gold production costs,
albeit mitigated by our present fuel hedge position. We also have a
propane hedge position of 29 million gallons at an average price of
$0.79 per gallon, that will help to control the cost of a portion of
propane consumption at our mining operations over the next two years,
and mitigate the impact of volatility in propane prices.
Electricity
Electricity prices have risen in recent years as a result of
diesel fuel price increases and natural gas demand, as well as excess
demand for electricity. Annually we consume about 1.3-1.5 billion
kilowatts of electricity at our mines. Fluctuations in electricity
prices or in electricity supply impact costs to produce gold. To
control electricity costs, we are building a 115-megawatt natural
gas-fired power plant in Nevada that will supply our Goldstrike mine,
and reduce the mine's dependence on the regulated utility in Nevada.
The sourcing of electricity from this power plant is expected to
reduce total cash costs by an average of about $10 per ounce at
Goldstrike over the remaining life of the mine, compared to recent
costs of obtaining power from the regulated power utility. The plant
is targeted to begin operating in fourth quarter 2005. We are also
entering into long-term power supply arrangements for some mines;
building powerlines to link into power grids; actively reviewing
alternative sources of supply of electricity; and looking at other
options across many of our larger mines and development projects.
5 Other Inflationary Cost Pressures
The mining industry has been experiencing significant
inflationary cost pressures with increasing costs of labor and prices
of consumables such as steel, concrete and tires. The cost of
consumables such as steel and concrete mainly impacts mine
construction costs. The costs of tires mainly impacts cash
production costs. For steel in particular, world demand in excess of
supply caused steel prices to increase significantly in 2004. We are
directly and indirectly impacted by rising steel prices through the
cost of new mine equipment and grinding media, as well as structural
steel used in mine construction. We are focusing on supply chain
management and continuous improvement initiatives to mitigate the
impact of higher steel prices, including controlling usage and
extending the life of plant and equipment, where possible.
6 Declining US dollar interest rates
US dollar interest rates have been relatively low by historic
standards over the past three years due mainly to ongoing weak
economic conditions; easy monetary policies; low inflation
expectations; and increasing demand for low-risk investments. This
lower interest-rate environment has enabled us to secure new sources
of financing in 2004 at relatively attractive interest rates.
Volatility in interest rates mainly affects interest receipts on
our cash balances ($1,398 million outstanding at the end of 2004),
and interest payments on variable-rate long-term debt ($411 million
outstanding at the end of 2004). Based on the relative amounts of
variable-rate financial assets and liabilities at the end of 2004,
declining interest rates would have a negative impact on our results.
In the future we expect these relative amounts to change as we
invest cash in our development projects. The amount of cash balances
may decrease from levels at December 31, 2004, subject to the amount
of operating cash flow we generate in the future, as well as other
sources of and uses for cash. In response to the volatility in
interest rates, we have used interest rate swaps to alter the
relative amounts of variable-rate financial assets and liabilities
and to mitigate the overall impact of changes in interest rates.
Management of interest-rate risk takes into account the term
structure of variable-rate financial assets and liabilities. On $300
million of our cash balances, we have fixed the interest rate through
2008 at 3.3%. On our Bulyanhulu project financing, we have fixed the
Libor-based rate for the remaining term of the debt at 4.45%. These
interest rate swaps have provided benefits to us in the form of hedge
gains, when rates under the swaps are compared to market interest
rates, totaling $16 million in 2004, $13 million in 2003 and $6
million in 2002. In the future we may alter the notional amounts of
interest rate swaps outstanding, as the relative amounts of
variable-rate assets and liabilities change, to attempt to manage our
exposure to interest rates.
Interest rates have historically been correlated with forward
gold prices compared to current market prices. In periods of higher
interest rates, forward gold prices have generally been higher.
Consequently in periods of higher interest rates we have been able to
secure more favorable future prices under fixed-price gold sales
contracts.
RESULTS
Selected Annual Information
For the years ended December 31
($ millions, except per share and per ounce data in dollars)
---------------------------------------------------------------------
Targets
for
2004(1) 2004 2003 2002
---------------------------------------------------------------------
4,900-
Gold production ('000s oz) 5,000 4,958 5,510 5,695
---------------------------------------------------------------------
Gold sales
'000s oz 4,936 5,554 5,805
$ millions $1,932 $2,035 $1,967
---------------------------------------------------------------------
Market gold price(3) 409 363 310
---------------------------------------------------------------------
Realized gold price(3) 391 366 339
---------------------------------------------------------------------
Total cash costs(3),(4) $ 205-215 $ 212 $189 $ 177
---------------------------------------------------------------------
Amortization 480-490 452 522 519
---------------------------------------------------------------------
Net income 248 200 193
---------------------------------------------------------------------
Net income per share
---------------------------------------------------------------------
Basic 0.47 0.37 0.36
---------------------------------------------------------------------
Diluted 0.46 0.37 0.36
---------------------------------------------------------------------
Dividends per share 0.22 0.22 0.22
---------------------------------------------------------------------
Cash inflow (outflow)
---------------------------------------------------------------------
Operating activities 506 519 588
---------------------------------------------------------------------
Capital expenditures (900)(2) (824) (322) (228)
---------------------------------------------------------------------
Financing activities 741 (266) (61)
---------------------------------------------------------------------
Total assets 6,274 5,358 5,261
---------------------------------------------------------------------
Total long-term financial
liabilities 1,707 789 819
---------------------------------------------------------------------
Gold reserves (millions of
contained oz) 89.1 85.9 86.9
---------------------------------------------------------------------
Fixed-price gold sales contracts
(millions of oz) 13.5 15.5 18.1
---------------------------------------------------------------------
(1) As disclosed in the 2003 Annual Report.
(2) As disclosed in the second quarter 2004 report.
(3) Per ounce weighted average
(4) For an explanation of the use of non-GAAP performance measures,
refer to pages 40 to 41 of Management's Discussion and Analysis.
OVERVIEW OF 2004 VERSUS 2003
Earnings
In 2004, higher cash production costs were offset by higher gold
selling prices, but earnings were impacted by lower gold sales
volumes. Based on the difference between average realized gold
prices and average total production costs per ounce, the impact of
lower sales volumes was to decrease pre-tax earnings by about $54
million.
As expected, gold production in 2004 was lower than 2003, and
total cash costs per ounce were higher, mainly due to the expected
mining of lower ore grades in 2004. Higher spot gold prices enabled
us to realize higher selling prices for our gold production, and
mitigate the impact on revenue of 11% lower sales volumes. We sold
about 59% of our production into the spot market, and 41% into our
gold sales contracts at prices lower than prevailing market prices.
By voluntarily delivering into some of our gold sales contracts, we
reduced our fixed-price gold sales contracts by 2 million ounces, and
we accepted an $89 million opportunity cost, compared to delivering
all of our production at market prices, with corresponding lower
revenues from gold sales.
Earnings in 2004 benefited from $25 million lower pre-tax
interest expense, a $203 million income tax recovery, and pre-tax
gains on sale of assets totaling $34 million, partly offset by
pre-tax impairment charges totaling $139 million on long-lived
assets. Interest expense decreased by $25 million mainly due to
amounts capitalized at development projects in 2004. The $203
million income tax recovery in 2004 included a credit of $141 million
following the resolution of a tax assessment in Peru, and a credit of
$81 million due to a change in tax status in Australia following the
adoption of certain aspects of new tax legislation. Earnings in 2003
included a $60 million post-tax non-hedge derivative gain (2004 - $9
million post-tax) and deferred tax credits totaling $62 million,
partly offset by post-tax charges of $11 million on settlement of the
Inmet litigation and $17 million for the cumulative effect of
accounting changes.
---------------------------------------------------------------------
Special Items - Effect on
earnings increase (decrease)
($ millions)
For the years
ended December 31 2004 2003 2002
Pre- Post- Pre- Post- Pre- Post-
tax Tax tax Tax tax Tax
---------------------------------------------------------------------
Non-hedge derivative
gains (losses) $ 5 $ 9 $ 71 $ 60 $ (6) $ 6
---------------------------------------------------------------------
Inmet litigation costs - - (16) (11) - (5)
---------------------------------------------------------------------
Gains on asset sales 34 28 34 27 8 (11)
---------------------------------------------------------------------
Impairment charges on
long-lived assets (139) (96) (5) (3) (11) -
---------------------------------------------------------------------
Impairment charges on
investments (5) (5) (11) (11) - -
---------------------------------------------------------------------
Changes in asset retirement
obligation cost estimates (22) (17) (10) (10) - -
---------------------------------------------------------------------
Cumulative effect of
accounting changes - - (17) (17) - -
---------------------------------------------------------------------
Resolution of Peruvian
tax assessment
---------------------------------------------------------------------
Outcome of tax uncertainties - 141 - - - -
---------------------------------------------------------------------
Reversal of other accrued
costs 21 15 - - - -
---------------------------------------------------------------------
Deferred tax credits
---------------------------------------------------------------------
Change in Australian
tax status - 81 - - - -
---------------------------------------------------------------------
Release of valuation
allowances/outcome of
uncertainties - 5 - 62 - 22
---------------------------------------------------------------------
Total (106) 161 46 97 (9) 22
---------------------------------------------------------------------
Cash Flow
Our closing cash position at the end of 2004 increased by $428
million to $1,398 million. Operating cash flow decreased slightly in
2004 mainly due to the lower gold sales volumes and increases in
supplies inventory at our development projects, partly offset by
lower payments for income taxes. Capital expenditures increased by
$502 million to $824 million mainly due to construction activity at
our development projects. We received $974 million from new
financing put in place primarily to fund construction at our
development projects; we paid dividends totaling $118 million and we
spent $95 million on our share buyback program.
CONSOLIDATED GOLD PRODUCTION AND SALES
Gold production and production costs
By replacing gold reserves depleted by production year over year,
we can maintain production levels over the long term. If depletion
of reserves exceeded discoveries over the long term, then we may not
be able to sustain gold production levels. Reserves can be replaced
by expanding known orebodies or by locating new deposits. Once a
site with gold mineralization is discovered, it may take several
years from the initial phases of drilling until production is
possible, during which time the economic feasibility of production
may change. Substantial expenditures are required to establish
proven and probable reserves and to construct mining and processing
facilities. Given that gold exploration is speculative in nature,
some exploration projects may prove unsuccessful.
Our financial performance is affected by our ability to achieve
targets for production volumes and total cash costs. We prepare
estimates of future production and total cash costs of production for
our operations. These estimates are based on mine plans that reflect
the expected method by which we will mine reserves at each mine, and
the expected costs associated with the plans. Actual gold production
and total cash costs may vary from these estimates for a number of
reasons, including if the volume of ore mined and ore grade differs
from estimates, which could occur because of changing mining rates;
ore dilution; metallurgical and other ore characteristics; and
short-term mining conditions that require different sequential
development of ore bodies or mining in different areas of the mine.
Mining rates are impacted by various risks and hazards inherent at
each operation, including natural phenomena, such as inclement
weather conditions, floods, and earthquakes; and unexpected labor
shortages or strikes. Total cash costs per ounce are also affected
by changing waste-to-ore stripping ratios, ore metallurgy that
impacts gold recovery rates, labor costs, the cost of mining supplies
and services, and foreign currency exchange rates. In the normal
course of our operations, we attempt to manage each of these risks to
mitigate, where possible, the effect they have on our operating
results.
In 2004, production from our portfolio of mines was in line with
plan. As expected, production in 2004 was 10% lower than in 2003
primarily as a result of mining lower-grade ore at Goldstrike Open
Pit, Pierina and Eskay Creek, partly offset by higher production at
Bulyanhulu. Ounces sold decreased by 11% compared to 2003, consistent
with the lower production levels. As our development projects
commence production beginning in 2005, we are targeting annual gold
production to rise to between 6.8 and 7.0 million ounces by 2007 at
slightly above $200 per ounce total cash costs. In 2005, we expect to
produce about 5.4-5.5 million ounces at total cash costs of between
$220 and $230 per ounce.
Our Pierina and Eskay Creek mines produced about 17 million
ounces of silver by-products in 2004. The incidental revenue from
sales of silver is classified as a component of our reported "total
cash costs per ounce" statistics, which is one of the key performance
measures that we use to manage our business. At December 31, 2004,
the silver content in our gold reserves was about 911 million ounces.
After production begins at Pascua-Lama, we expect that our annual
silver production will increase significantly.
Consolidated total cash costs per ounce
For the years ended December 31 (in dollars per ounce)
Target
For 2004 2004 2003 2002
---------------------------------------------------------------------
Cost of sales(1) $ 248 $ 210 $ 191
Currency hedge gains (19) (12) (1)
By-product credits (30) (21) (20)
---------------------------------------------------------------------
Cash operating costs 199 177 170
---------------------------------------------------------------------
Royalties/mining taxes 13 12 7
---------------------------------------------------------------------
$205-
Total cash costs(2) 215 $ 212 $ 189 $ 177
---------------------------------------------------------------------
(1) At market currency exchanges rates.
(2) For an explanation of the use of non-GAAP performance measures,
refer to pages 40 to 41 of Management's Discussion and Analysis.
Total cash costs for 2004 were in line with the original
full-year guidance. As expected, total cash costs in 2004 were higher
than in 2003, primarily due to processing lower-grade ore at
Goldstrike Open Pit, Round Mountain and Pierina, combined with the
effect of changes in average currency hedge rates on total cash costs
at our Australian mines.
Revenue from gold sales
We realized an average selling price of $391 per ounce for our
gold production in 2004, compared to $366 per ounce in 2003, when
average market gold prices were lower. Our average realized price in
2004 reflects delivery of 59% of ounces sold into the spot market at
market prices, and 41% into gold sales contracts at selling prices
below prevailing market prices. We exceeded our target for reducing
our fixed-price gold sales contracts by 0.5 million ounces in 2004,
ending the year with a 2 million ounce reduction. The price realized
for gold sales in 2005 and beyond will depend upon spot market
conditions and the selling prices of any gold sales contracts into
which we voluntarily deliver, which could be below prevailing spot
market prices.
RESULTS OF OPERATING SEGMENTS
In our Financial Statements we present a measure of historical
segment income that reflects gold sales at average consolidated
realized gold prices, less segment operating costs and amortization
of segment property, plant and equipment. Our segments include:
producing mines, development projects and our corporate exploration
group. For each segment, factors influencing consolidated realized
gold prices apply equally to the segments, and therefore the factors
have not been repeated in the discussion of individual segment
results. We monitor segment operating costs using "total cash costs
per ounce" statistics that represent segment operating costs divided
by ounces of gold sold in each period. The discussion of results for
each segment focuses on this statistic in explaining changes in
segment operating costs. We also discuss significant variances from
prior public guidance for gold production and total cash costs per
ounce statistics for each segment.
Conducting mining activities in countries outside North America
subjects us to various risks and uncertainties that arise from
carrying on business in foreign countries including: uncertain
political and economic environments; war and civil disturbances;
changes in laws or fiscal policies; interpretation of foreign
taxation legislation; and tax implications on repatriation of foreign
earnings. We monitor these risks on an ongoing basis and mitigate
their effects where possible, but events or changes in circumstances
could materially impact our results and financial condition.
For development projects, we prepare estimates of capital
expenditures; reserves and costs to produce reserves. We also assess
the likelihood of obtaining key governmental permits, land rights and
other government approvals. Estimates of capital expenditures are
based on studies completed for each project, which also include
estimates of annual production and production costs. Adverse changes
in any of the key assumptions in these studies or other factors could
affect estimated capital expenditures, production levels and
production costs, and also the economic feasibility of a project. We
take steps to mitigate potentially adverse effects of changes in
assumptions or other factors. Prior to the commencement of
production, the segment results for development projects reflect
expensed mine development and mine start-up costs.
NORTH AMERICA
In 2004, production was at the low end of the original guidance
for the year and total cash costs were better than the original
guidance for the year. Total cash costs per ounce reflected lower
costs than plan at the Goldstrike Open Pit and Eskay Creek, partly
offset by higher costs at Round Mountain and Hemlo. Total cash costs
for the North America region in 2004 were not significantly affected
by the impact of a weakening US dollar on our Canadian mines or by
rising fuel prices, because we mitigated these exposures through our
currency and fuel hedge programs as part of our focus on controlling
costs.
The region produced 9% less gold in 2004 compared with 2003
mainly because of the expected mining of lower-grade ore at the
Goldstrike Open Pit and Eskay Creek. Compared to 2003, total cash
costs per ounce were 6% higher in 2004, as a result of the processing
of lower-grade ore.
In 2005, gold production from the North America region is
expected to decline by 5% to about 2.8 million ounces due to the
processing of lower-grade ore at Eskay Creek and following the
depletion of reserves at Holt-McDermott in 2004. Total cash costs for
the region are expected to increase by 10% to about $245 per ounce,
mainly due to the processing of lower-grade ore at Round Mountain and
Eskay Creek, as well as slightly higher costs at Goldstrike.
Goldstrike, United States
Segment income decreased by $1 million in 2004 from 2003 levels,
mainly due to 14% lower gold sales volumes and 5% higher total cash
costs, partly offset by 7% higher realized gold prices and 7% lower
amortization expense.
Gold production at the open pit was slightly higher than plan in
2004, and total cash costs per ounce were slightly lower than plan.
With the planned mining of lower-grade ore in 2004, partly offset by
better gold recovery rates, open-pit production was 11% lower and
total cash costs per ounce were 7% higher than in 2003. Revenues
decreased by 8%, with a 14% decrease in ounces sold, due to the lower
gold production levels in 2004, partly offset by a 7% increase in
realized gold prices.
At the underground mine, production was 5% below the low end of
the original range of guidance due to lower than expected
availability of the Rodeo backfill raise, changes to mine sequencing,
and higher maintenance costs due to unexpected repairs to electrical
transformers. Total cash costs per ounce were at the high end of the
original range of guidance for 2004 due to the lower production
volumes and higher backfill haulage costs. Production was slightly
higher than 2003 and total cash costs per ounce were similar to 2003,
mainly due to better gold recovery rates and processing of slightly
higher-grade ore in 2004.
Amortization expense decreased by $11 million in 2004 mainly due
to the effect of lower gold sales volumes, combined with the impact
of reserve increases at the beginning of 2004 that caused a $15
million decrease in amortization expense.
In 2004, the Nevada Public Utilities Commission approved our
proposal to build a 115-megawatt natural gas-fired power plant in
Nevada to supply our Goldstrike mine. The plant is targeted to
commence operations in fourth quarter 2005. Highlights include:
- The construction permit for the foundation and buried services
was received in fourth quarter 2004.
- Engineering work for the project is substantially complete and
site preparation commenced in fourth quarter 2004. Construction of
the power plant was subcontracted to a third-party contractor, and
$18 million was spent on construction in 2004.
- We expect to file an application for a building construction
permit in first quarter 2005.
- The natural gas supplier to the power plant is applying for
permits to enable the construction of a short extension from an
existing gas pipeline to the power plant site.
Eskay Creek, Canada
Segment income decreased by $13 million in 2004, mainly due to
18% lower gold sales volumes and 9% higher amortization expense,
partly offset by 40% lower total cash costs and 7% higher realized
gold prices. Revenues decreased by 14%, with an 18% decrease in
ounces sold, due to the lower gold production levels in 2004, partly
offset by a 7% increase in realized gold prices.
Production for 2004 was slightly lower than plan due to lower
than expected ore grades and unscheduled backfill plant maintenance.
Total cash costs per ounce were better than plan, mainly due to
higher by-product credits caused by higher silver prices, partly
offset by the impact of processing lower-grade ore and higher
maintenance costs. Compared to 2003, as expected, production
decreased by 18% because of a 4% decline in quantity of ore
processed, and an 18% decline in ore grade. Total cash costs per
ounce were 40% lower than 2003 mainly due to higher by-product
credits in 2004 caused by higher silver prices, partly offset by the
impact of lower ore grades.
Amortization expense increased by $4 million in 2004 mainly due
to the impact of downward revisions to reserve estimates in 2004 that
increased amortization rates, partly offset by the effect of lower
gold sales volumes.
In fourth quarter 2004, the Eskay Creek mine was tested for
impairment effective December 31, 2004. An impairment charge of $58
million was recorded, which is not included in the measure of segment
income. For further details see page 35.
Round Mountain (50% owned), United States
Segment income decreased by $5 million in 2004, mainly due to 28%
higher total cash costs, partly offset by 7% higher realized gold
prices. Revenues increased by 6% mainly due to 7% higher realized
gold prices.
Production was 4% higher than the high end of the original range
of guidance for 2004, but at slightly higher total cash costs per
ounce. Production was positively impacted by the continuing recovery
of gold from leach pads where ore was placed in prior years. Higher
total cash costs per ounce were mainly due to higher royalty costs,
caused by higher market gold prices, as well as higher purchase costs
and consumption of both cyanide and lime. Compared to 2003, gold
production was 3% lower due to an expected decline in ore grades
partly offset by an increase in quantities of ore processed. Total
cash costs per ounce increased by 28% over 2003 as a result of mining
lower-grade ore in 2004, higher royalties, and higher purchase costs
and consumption of both cyanide and lime. Higher recovery rates of
gold from leach pads in 2003 also contributed to the year on year
change in total cash costs per ounce.
Amortization expense decreased by $3 million mainly due to
slightly lower gold sales volumes combined with the effect of reserve
increases at the beginning of 2004 on amortization rates.
Hemlo (50% owned), Canada
Segment income decreased by $3 million in 2004, mainly due to 10%
lower gold sales volumes, combined with 6% higher total cash costs
per ounce, partly offset by 7% higher realized gold prices. Revenues
decreased by $5 million as 10% lower gold sales volumes were partly
offset by 7% higher realized gold prices.
In 2004, production was 10% lower than plan and total cash costs
per ounce were 13% higher than plan primarily because ground
stability issues caused mining to occur in lower-grade areas of the
mine. A decline in ore grades in 2004 was the primary reason for the
lower gold production and higher total cash costs per ounce compared
with 2003.
East Archimedes, United States
In September 2004, a decision was made to proceed with the East
Archimedes project at the Ruby Hill mine site in Nevada. The project
is an open-pit, heap leach operation exploiting the East Archimedes
deposit, a deeper continuation of the ore mined previously at Ruby
Hill. Construction capital is estimated at about $75 million over an
expected two-year construction phase that begins once permitting is
secured. The mining fleet has been ordered and permitting work is
ongoing. The project has an expected life-of-mine strip ratio of 9:1
and assumes an average mining rate of 100,000 tons per day. The
first gold pour is targeted for mid-2007.
SOUTH AMERICA
In 2004, all production was from the Pierina mine. Lagunas Norte
and Veladero are expected to begin production and contribute to the
South America region's results in the second half of 2005. In 2005,
we expect production to increase by about 90% to about 1.2 million
ounces, mainly due to the production start-up at Lagunas Norte and
Veladero. Total cash costs are expected to increase by 25% to about
$133 per ounce, mainly due to higher costs at Pierina following an
increase in the stripping ratio from 60:1 to 86:1 and the impact of
new production from Veladero and Lagunas Norte. The higher stripping
ratio at Pierina mainly reflects the updating of the mine plan to
incorporate additions to reserves at the end of 2004.
Pierina, Peru
Segment income decreased by $15 million in 2004 mainly due to 29%
lower gold sales volumes, combined with 26% higher total cash costs
per ounce, partly offset by 7% higher realized gold prices and lower
amortization rates. Revenues decreased by $81 million as 29% lower
gold sales volumes were partly offset by 7% higher realized gold
prices.
In 2004, production was slightly higher than plan, however total
cash costs were 15% higher than the upper end of the range of
guidance for the year. The ability to access higher-grade ore at the
mine was delayed due to a change in the mining plan to adjust for
minor pit slope instability in the west pit wall. Higher fuel prices
and lower by-product credits, due to lower quantities of silver
contained in the ore processed in 2004, as well as processing of
lower-grade ore, all contributed to higher total cash costs per
ounce. Compared to 2003, production was 29% lower and total cash
costs per ounce were 26% higher, due to the expected mining of
lower-grade ore. Higher labor costs in 2004 also contributed to the
increase in total cash costs over 2003.
Amortization expense decreased by $59 million mainly due to the
lower gold sales volumes, combined with the effect of reserve
increases at the beginning of the year that lowered amortization
rates and caused amortization expense to decrease in 2004 by $9
million.
Lagunas Norte, Peru
In 2004, the segment loss of $12 million represents expensed mine
development costs prior to May 1, 2004 when the project achieved the
criteria to classify mineralization as a reserve for US reporting
purposes, together with $3 million of expensed mine start-up costs.
In 2003, the segment loss of $29 million represented expensed mine
development costs for a full year.
The project remains on schedule for its first gold pour in the
third quarter of 2005. The first three full years of production at
Lagunas Norte are now expected to average approximately 800,000
ounces of gold annually at total cash costs of about $155 per ounce.
The project's reserves increased by 2.0 million ounces, or 28%, to
9.1 million ounces at year-end 2004. Higher gold prices have allowed
us to bring more ounces into production in the first three full
years, but due to the lower ore grades associated with these ounces,
our total cash costs per ounce have also increased. Highlights
include:
- The Lagunas Norte/Alto Chicama Legal Stability Agreement
between Barrick and the Peruvian Government was executed in January
2005. This agreement will provide greater certainty over the foreign
exchange and fiscal administrative regime for 15 years, including
real estate taxes, custom duties, VAT and excise taxes.
- Construction of the overall project was about 70% complete at
the end of 2004, with about 4,000 workers on-site.
- Construction costs of $182 million were spent in 2004, of which
$40 million relates to the purchase of the mine fleet, main auxiliary
mine equipment and other mine equipment.
- Approval of the Environmental Impact Statement and principal
construction permit was received in first quarter 2004.
- Overliner material is being placed on the leach pad.
- The power line was completed and energized in January 2005.
Veladero, Argentina
In 2004, the segment loss of $5 million represents expensed mine
start-up costs. In 2003, the segment loss of $18 million represented
expensed mine development costs prior to October 1, 2003 when the
project achieved the criteria to classify mineralization as a reserve
for US reporting purposes.
The project remains on schedule for its first gold pour in the
fourth quarter of 2005. The first three full years of production at
Veladero are now expected to average approximately 700,000 ounces of
gold annually at total cash costs of about $200(1) per ounce. The
project's reserves increased by 1.7 million ounces, or 16%, to 12.8
million ounces at year-end 2004. Higher gold prices have allowed us
to bring more ounces into production in the first three full years,
but due to the lower ore grades associated with these ounces, our
total cash costs per ounce have also increased. During 2004, we
revised our construction capital estimate upwards to about $540
million from our previous estimate of $475 million due to a number of
factors including: increases in prices for commodities, such as fuel,
concrete and steel; exchange rate variations; higher labor costs;
increased winter operations costs; and some preliminary changes to
the scope of the project. Estimated future total cash costs are also
being affected by similar cost pressures. We are evaluating a number
of alternatives to control the cost increases, which may require some
additional capital investment.
Highlights include:
- Construction costs of $284 million were spent in 2004 and the
project is about 65% complete.
- Internal mine road construction is complete.
- Work on the truck shop facility was complete in December 2004.
- Steel erection on the secondary crusher is progressing on
schedule and the main crusher components have been installed.
Construction of the other plant facilities is well advanced.
- The assay lab was commissioned in fourth quarter 2004.
- Construction of the valley-fill heap leach facility embankment
began in 2004 and was complete in February 2005.
- Pre-stripping activities have steadily improved in fourth
quarter 2004 due to improvements in equipment availability, blasting
techniques and the use of experienced shovel operators brought in to
assist with mining activities and to train others.
Pascua-Lama, Chile/Argentina
In 2004, we made a decision to proceed with the development of
the Pascua-Lama project in Chile/Argentina. The development is
contingent on obtaining the necessary permits, approvals and fiscal
regimes. Pascua-Lama is a large, low total cash cost, long-life
asset that is expected to contribute to our production, cash flow and
earnings for many years. We believe that few undeveloped gold
deposits exist in the world that are of comparable size and quality
to Pascua-Lama. Pascua-Lama is also expected to increase our
leverage to silver. Furthermore, development of the Pascua-Lama
project, combined with Veladero and the large associated land
holdings with regional exploration potential, presents an opportunity
to develop the area as one large gold district.
Annual production is estimated between 750,000-775,000 ounces of
gold and about 30 million ounces of silver over the first ten years
at estimated total cash costs of about $130-1401 per ounce. The
project's gold reserves increased by 0.8 million ounces, or 5%, to
17.6 million ounces at year-end 2004. Pre-production construction
costs are estimated at about $1.4-1.5 billion, excluding capitalized
interest. A further $0.3 billion of capital is expected to be spent
in the three years after production start-up for a plant expansion
and flotation circuit to increase capacity from 33,000 to 44,000
metric tons per day. The permitting phase of the Pascua-Lama project
is expected to be completed by the end of 2005. An expected
three-year construction phase will begin once permitting has been
completed and other fiscal and taxation matters have been finalized,
with production targeted to commence in 2009.
In 2004, the segment loss of $4 million represents expensed mine
start-up costs. In 2003, all project costs incurred were
capitalized, resulting in no segment income or loss. We incurred
capital expenditures of $35 million in 2004.
Recent focus has been on community/government relations,
permitting, protocol implementation and tax stability. A mining
protocol for the project, which straddles the border of Chile and
Argentina, was signed by both governments. The protocol provides the
framework for resolving certain issues such as border crossings by
personnel and materials. Environmental impact assessments were filed
by the end of 2004 and approval is sought by the end of 2005.
(1) Subject to exchange rate fluctuations and applicable export
duties
AUSTRALIA/AFRICA
Gold production in 2004 was slightly higher than plan mainly due
to the mining of higher-grade ore at Kalgoorlie, partly offset by
slightly lower production than plan at Plutonic and Bulyanhulu. Total
cash costs per ounce were 3% higher than the upper end of the range
of original guidance for the year mainly due to higher costs at
Plutonic and Bulyanhulu. Changes in market currency exchange rates in
2004 did not significantly impact total cash costs per ounce because
we mitigated this exposure through our currency hedge program.
In 2004, gold production was 1% higher than 2003 as higher
production at Kalgoorlie and Bulyanhulu was partly offset by lower
production at Plutonic. Total cash costs per ounce were 14% higher
than 2003 mainly because of the processing of lower-grade ore at
Plutonic, combined with the effect of increases in average Australian
dollar currency hedge rates. The average rates of currency hedge
contracts vary year on year, which impacts reported total cash costs
per ounce. The average exchange rate of hedge contracts in 2004 was
$0.58 compared to $0.55 in 2003, which caused total cash costs per
ounce to increase slightly in 2004.
In 2005, production from the Australia/Africa region is expected
to increase by 7% to about 1.4 million ounces, mainly due to the
production start-up at Tulawaka in first quarter 2005. Total cash
costs per ounce are expected to increase by 7% to about $257 per
ounce, mainly due to a 5% increase in the average exchange rate of
Australian currency hedge contracts designated for 2005, but the
average exchange rate remains significantly better than current spot
exchange rates.
Kalgoorlie (50% owned), Australia
Segment income increased by $10 million in 2004, mainly due to
the combined effect of 12% higher gold sales volumes and 7% higher
realized gold prices, partly offset by 11% higher total cash costs
per ounce.
Production was higher than plan in 2004 due to
better-than-expected ore grades and gold recovery rates. Total cash
costs per ounce were at the low end of the range of the guidance for
the year as better ore grades and recovery rates were partly offset
by higher than expected maintenance costs. Gold production was
consistent with 2003 as ore tons processed and ore grades were
similar to 2003. Total cash costs per ounce were 11% higher than
2003 primarily due to higher maintenance and labor costs, higher fuel
prices, and the year on year effect of average exchange rates of
currency hedge contracts.
Plutonic, Australia
Segment income decreased by $6 million in 2004 as 4% lower gold
sales volumes, combined with 7% higher total cash costs, were partly
offset by 7% higher realized gold prices. Revenues were higher in
2004 as 7% higher realized gold prices were partly offset by 4% lower
gold sales volumes.
Production in 2004 was slightly lower than plan and total cash
costs per ounce were 15% higher than the upper end of the range of
guidance for the year primarily due to the mining of greater
quantities of lower-grade open-pit ore. Temporary problems with
ground conditions restricted mining of higher-grade ore in the Timor
underground area for part of the year, and consequently the mine
processed more open-pit ore than planned. Compared with 2003, gold
production was 9% lower mainly due to a 12% decrease in ore tons
processed. In 2003, ore tons processed were higher because a
secondary mill was operating but this mill ceased operating in
mid-2004. Total cash costs per ounce were 7% higher than 2003 mainly
due to the combined effect of higher fuel, haulage and maintenance
costs and the year on year effect of average rates of currency hedge
contracts.
Bulyanhulu, Tanzania
Segment income was $6 million higher in 2004 as 14% higher gold
sales volumes, combined with 7% higher realized gold prices, were
partly offset by 15% higher total cash costs per ounce. Revenues were
24% higher in 2004 reflecting the higher gold sales volumes and
realized gold prices.
Gold production in 2004 was slightly lower than plan and total
cash costs per ounce were 9% higher than the upper end of the range
of guidance for the year. Both production and total cash costs per
ounce were impacted by higher ore dilution, which caused a 6% decline
in the grade of ore processed compared with plan. Compared with
2003, gold production was 12% higher mainly due to a 15% increase in
the tons of ore processed due to improved mill performance. Total
cash costs per ounce were 15% higher than 2003 due to higher costs of
mine site administration and underground maintenance, partly offset
by higher copper by-product credits due to higher market copper
prices.
Cowal, Australia
In 2004, the segment loss of $1 million represents expensed mine
start-up costs. In 2003, all project costs incurred were
capitalized, resulting in no segment income or loss.
The Cowal project in Australia is progressing well and production
is expected to commence in first quarter 2006. The first full three
years of production at Cowal are expected to be approximately 230,000
ounces of gold annually at total cash costs of about $240(1) per
ounce. During 2004, we revised our construction capital estimate up
to approximately $305 million due to factors including increases in
commodity and consumable prices, and the very competitive
construction labor market in Australia. Expected total cash costs
per ounce are also being affected by similar cost pressures.
Highlights include:
- Capital expenditures were $73 million, slightly higher than
plan as expenditures, originally expected to occur in 2006, were
brought forward to 2005 to realize construction efficiencies.
- The pipeline for water supply is complete.
- Bulk excavation for the primary crusher is substantially
complete.
- Drilling of pit dewatering bores is complete and the design of
additional bores for water supply is underway.
- Purchase orders have been placed for major mining equipment
items.
- The construction contract for the electricity transmission line
was awarded to a contractor. The contractor started construction on
permitted sections in early 2005 and the timing of completion of the
entire line is dependent upon receipt of the remaining permits.
- Earthworks is progressing with the northern tailings facility
80% complete and the tailings return pipeline substantially complete.
- The principal authorizations necessary for construction of
Cowal have been obtained or are in process, with the additional
required sectoral permits expected in due course.
Tulawaka (70% owned), Tanzania
In 2004, development costs were capitalized from January 1, 2004,
when the project achieved the criteria to classify mineralization as
a reserve for US reporting purposes, resulting in no segment income
or loss. In 2003, all mine development costs were expensed as
incurred.
The Tulawaka project is on schedule for its first gold pour in
first quarter 2005. Our economic share under the terms of the joint
venture of the first full three years of production at Tulawaka is
expected to average about 90,000 ounces of gold annually at total
cash costs of approximately $180 per ounce. Highlights include:
- Construction capital of $48 million (100% basis) was spent in
2004.
- Earthworks and site preparation were near completion at the end
of 2004.
- The mining contract has been awarded to an external contractor.
- Process plant construction is well underway with the completion
of power plant installation and commissioning, substantial completion
of the SAG mill, concrete and structured steel installation and other
site infrastructure buildings.
- Plant handover is expected in first quarter 2005.
(1) Subject to exchange rate fluctuations.
OTHER COSTS AND EXPENSES
Exploration, Development and Business Development Expense
For the years ended December 31
($ millions) 2004 2003 2002
---------------------------------------------------------------------
Exploration costs
North America $ 30 $ 22 $ 16
Australia/Africa 40 22 15
South America 20 19 7
Russia/Central Asia 5 4 4
Other countries 1 - -
---------------------------------------------------------------------
96 67 42
---------------------------------------------------------------------
Mine development costs
Veladero - 18 20
Lagunas Norte 9 29 29
Other projects 5 6 3
---------------------------------------------------------------------
14 53 52
---------------------------------------------------------------------
Mine start-up costs
Veladero 5 - -
Lagunas Norte 3 - -
Cowal 1 - -
Pascua-Lama 4 - -
---------------------------------------------------------------------
13 - -
---------------------------------------------------------------------
Business development/other 18 17 10
---------------------------------------------------------------------
141 137 104
---------------------------------------------------------------------
In 2004, we spent more than both plan and the prior year on our
exploration program as part of our strategy to grow our reserves.
Higher activity at Goldstrike, Eskay Creek and Round Mountain led to
an increase in expenditures for North America. Higher activity in
Tanzania, primarily at the Buzwagi project, led to the increase in
Australia/Africa.
Development costs are expensed until mineralization is classified
as proven and probable reserves for US reporting purposes. At
Lagunas Norte, we expensed development costs until May 1, 2004, and
at Veladero, we expensed development costs until October 1, 2003,
which are the dates when the projects achieved the criteria to
classify mineralization as a reserve for US reporting purposes.
In 2005, we expect to spend $150 million on exploration,
development and business development. Our exploration expense
reflects our planned funding of our various exploration projects. We
may spend more or less on these projects depending on the results of
ongoing exploration activities, and we may also fund further
exploration projects in addition to the presently planned projects
for 2005.
Other Income Statement Variances
For the years ended December 31
($ millions, except per ounce data and percentages)
2004 2003 % change Comments
---------------------------------------------------------------------
Amortization
---------------------------------------------------------------------
Absolute $ 452 $ 522 -13% 11% lower sales volumes ,
amount combined with lower
amortization rates per
ounce. For 2005,
amortization expense will
reflect an expected 8-10%
increase in gold sales
volumes and a further
expected decline in rates
per ounce.
---------------------------------------------------------------------
Per ounce 86 90 -4% Reserve increases effective
(dollars) Jan.1, 2004 caused rates
per ounce to decrease. For
2005, rates per ounce are
expected to decrease to
between $80 and $85 due to
reserve additions at the
end of 2004, and the
effect of an impairment
charge recorded at Eskay
Creek in 2004.
---------------------------------------------------------------------
Administration 71 73 -3% Severance costs of $9
million were incurred in
2003. Higher regulatory
compliance costs impacted
2004. Costs in 2005 will
increase due to the
expensing of stock options
in the second half of the
year, which is estimated to
add about $15 million to
costs.
---------------------------------------------------------------------
Interest income 25 31 -19% The decrease in 2004 is due
to lower average cash
balances in 2004 compared
to 2003. In 2005, interest
income is expected to
increase due to higher
expected average cash
balances.
---------------------------------------------------------------------
Interest costs
---------------------------------------------------------------------
Incurred 60 49 22% The impact of new
financings in second half
of 2004 caused
an increase over 2003.
Interest incurred is
expected to increase to
between $115 to $120
million in 2005 due to new
financing put in place
in 2004.
---------------------------------------------------------------------
Capitalized (41) (5) 720% Higher amounts were
capitalized at development
projects due to
construction costs
capitalized in 2004, and
capitalization at Pascua-
Lama from July 1, 2004. In
2005, we expect to
capitalize about $103
million at our
development projects.
---------------------------------------------------------------------
Expensed 19 44 -57%
---------------------------------------------------------------------
Other (Income) Expense
For the years ended December 31
($ millions) 2004 2003 Comments
Non-hedge
derivative gains $ (5) $ (71) Gains in 2003 included $32 million
on gold lease rate swaps (2004 -
$16 million); and $18 million on
currency hedge contracts
that became ineffective for hedge
accounting purposes.
---------------------------------------------------------------------
Impairment charge
- Eskay Creek 58 - See page 54.
---------------------------------------------------------------------
Impairment charge
- Peruvian exploration
properties 67 - See page 54.
---------------------------------------------------------------------
Gains on asset sales (34) (34) Gains in 2004 and 2003 reflect the
sale of various assets.
---------------------------------------------------------------------
Accretion expense 43 55
and environmental
remediation costs
at closed mines
---------------------------------------------------------------------
Litigation costs - 16 Costs in 2003 relate to the
settlement of the Inmet litigation.
---------------------------------------------------------------------
(Gains) losses on (1) 7 Losses in 2003 mainly related to
investments investments under a deferred
compensation plan.
---------------------------------------------------------------------
Other items 30 23
---------------------------------------------------------------------
$ 158 $ (4)
---------------------------------------------------------------------
Income Taxes
---------------------------------------------------------------------
For the years ended December 31 2004
---------------------------------------------------------------------
($ millions, except percentages) Income Tax
Effective income tax rates Pre-Tax Effective expense
on elements of income income tax rate (recovery)
---------------------------------------------------------------------
Net income excluding elements
below $ 118 28% $ 33
Deliveries into gold sales
contracts(1) (89) -
Non-hedge derivative gains
(losses) (5) (80%) (4)
Other items 21 30% 6
---------------------------------------------------------------------
$ 45 78% $ 35
---------------------------------------------------------------------
Tax only items:
Change in Australian tax status - (180%) (81)
Outcome of tax uncertainties - (313%) (141)
Release of deferred tax valuation
allowances recorded in prior years - (11%) (5)
Other items - (25%) (11)
---------------------------------------------------------------------
$ 45 (451%) $(203)
---------------------------------------------------------------------
(1) Impact of deliveries in a low tax-rate jurisdiction at contract
prices below prevailing market prices.
---------------------------------------------------------------------
For the years ended Dec.31 2003
---------------------------------------------------------------------
($ millions, except percentages) Income Tax
Effective income tax rates Pre-Tax Effective expense
on elements of income income tax rate (recovery)
---------------------------------------------------------------------
Net income excluding elements
below $ 116 20% $ 23
Deliveries into gold sales
contracts(1) - -
Non-hedge derivative gains
(losses) 71 15% 11
Other items 35 34% 12
---------------------------------------------------------------------
$ 222 21% $ 46
---------------------------------------------------------------------
Tax only items:
Change in Australian tax status - - -
Outcome of tax uncertainties - - -
Release of deferred tax valuation
allowances recorded in prior years - (17%) (36)
Other items $ - (2%) (5)
---------------------------------------------------------------------
$ 222 2% $ 5
---------------------------------------------------------------------
(1)Impact of deliveries in a low tax-rate jurisdiction.
Our income tax expense or recovery is a function of an underlying
effective tax rate applied to income plus the effect of other items
that we track separately. The underlying effective rate increased to
28% in 2004 reflecting the higher market gold price environment, with
an average market gold price of $409 per ounce. In 2005, we expect
our underlying effective tax rate to decrease to about 22% due to a
change in the geographic mix of gold production and therefore taxable
income by jurisdiction. As gold prices increase, this underlying tax
rate also increases, reaching a high of about 25% with market gold
prices at or above $475 per ounce. The underlying rate excludes
deferred tax credits from changes in valuation allowances; taxes on
non-hedge derivative gains and losses; and the impact of deliveries
into gold sales contracts in a low tax rate jurisdiction.
Deliveries into gold sales contracts in a low tax rate
jurisdiction can distort the overall effective tax rate if market
gold prices differ from the contract prices, but do not affect the
absolute amount of income tax expense.
We record deferred tax charges or credits if changes in facts or
circumstances affect the estimated tax basis of assets and therefore
the amount of deferred tax assets or liabilities or because of
changes in valuation allowances reflecting changing expectations in
our ability to realize deferred tax assets. In 2004, we recorded a
credit of $141 million on final resolution of a Peruvian tax
assessment in our favor. We also recorded credits of $81 million due
to a change in tax status in Australia following an election that
resulted in a revaluation of assets for tax purposes; and also an
election to file tax returns from 2004 onwards in US dollars, rather
than Australian dollars. As well, $5 million of valuation allowance
was released in Australia in 2004.
The interpretation of tax regulations and legislation and their
application to our business is complex and subject to change. We
have significant amounts of deferred tax assets, including tax loss
carry forwards, and also deferred tax liabilities. Potential changes
to any of these amounts, as well as our ability to realize deferred
tax assets, could significantly affect net income or cash flow in
future periods. For more information on tax valuation allowances,
see page 37.
CASH FLOW
Operating Activities
Operating cash flow decreased by $13 million in 2004 to $506
million. The key factors that contributed to the year over year
decrease are summarized in the table below.
Key drivers offactors affecting operating cash flow
For the years ended December 31
($ millions, except per Impact on
ounce data) operating
2004 2003 cash flow Comments
---------------------------------------------------------------------
Gold sales volumes 4,936 5,55 $ (109)
('000s oz) 4
---------------------------------------------------------------------
Realized gold prices $ 391 $ 123
($/oz) 366
---------------------------------------------------------------------
Total cash costs ($/oz)(1) 212 189 (114)
---------------------------------------------------------------------
Sub-total (100) Refer to pages 15
and 16 for
explanations of
changes in gold
production and
sales.
---------------------------------------------------------------------
Income tax payments 45 111 66 Payments in 2005
are expected to be
similar to 2004.
---------------------------------------------------------------------
Non-cash working capital 141 34 (107) Increases in
inventory
primarily reflect
supplies required
to support
construction at
development
projects.
Inventory is
expected to
increase again in
2005 at
development
projects
reflecting higher
ore in process
and in stockpiles.
Tax recoverable
increased in 2004
for goods and
services tax on
supplies and
material used in
construction at
development
projects. Amounts
are expected to
be recovered
after
production begins.
---------------------------------------------------------------------
Cost of Inmet - 86 86 Settlement reached
Settlement in 2003
---------------------------------------------------------------------
Interest expense 19 44 25 Increase in
amounts
capitalized to
development
projects in 2004.
---------------------------------------------------------------------
Effect of other factors 17
---------------------------------------------------------------------
Total $ (13)
---------------------------------------------------------------------
(1) Total cash costs per ounce is a non-GAAP performance measure.
For more information, see pages 40 to 41.
Investing Activities
For the years ended December 31
----------------------------------------
($ millions) 2005E 2004 2003 $ change Comments
---------------------------------------------------------------------
Growth capital
Expenditures(1)
---------------------------------------------------------------------
Veladero $ 208 $ 284 $ 68 $ 216 Full year of
construction
activity in 2004.
---------------------------------------------------------------------
Lagunas Norte 147 182 4 178 Construction
started in Q2,
2004.
---------------------------------------------------------------------
Tulawaka 3 48 1 47 Construction
started in Q1,
2004.
---------------------------------------------------------------------
Cowal 268 73 24 49 Construction
started in Q1,
2004.
---------------------------------------------------------------------
Pascua-Lama 93 35 9 26 Increased
development
activity and
capitalization of
interest from Q3,
2004.
---------------------------------------------------------------------
Nevada Power Plant 84 18 - 18 Construction
started in Q4,
2004.
---------------------------------------------------------------------
East Archimedes 43 - - - Construction
expected to start
in 2005.
---------------------------------------------------------------------
Sub-total $ 846 $ 640 $ 106 534
---------------------------------------------------------------------
Sustaining capital
expenditures
---------------------------------------------------------------------
North America $ 86 $ 80 $ 6
---------------------------------------------------------------------
Australia/Africa 83 115 (32) 2003 was higher
due to a
transition to
owner mining at
Plutonic that
resulted in
equipment
purchases.
---------------------------------------------------------------------
South America 8 17 (9)
---------------------------------------------------------------------
Other 7 4 3
---------------------------------------------------------------------
Sub-total $ 245 $ 184 $ 216 (32) The increase in
2005 mainly
reflects capital
planned for 2004
at Goldstrike
that was deferred
into 2005, and
sustaining
capital at
Lagunas Norte
after production
begins.
---------------------------------------------------------------------
Total $1,090 $824 $ 322 502
---------------------------------------------------------------------
(1)Includes construction costs and capitalized interest.
We plan to fund the expected capital expenditures for 2005 from a
combination of our $1,398 million cash position at the end of 2004,
and operating cash flow that we expect to generate in 2005.
Financing Activities
The most significant financing cash flows in 2004 were $974
million on issue of new long-term debt obligations, $49 million
received on the exercise of employee stock options, dividend payments
totaling $118 million, and $95 million spent repurchasing 4 million
common shares under our share buyback program. We also made scheduled
payments under our long-term debt obligations totaling $41 million in
2004.
OVERVIEW OF 2003 VERSUS 2002
Earnings
Earnings in 2003 were slightly higher than in 2002. We benefited
from higher spot gold prices, which enabled us to realize a $27 per
ounce higher selling price for our gold production (an increase in
revenue of $150 million in comparison to 2002). In a higher spot
gold price environment, we pay higher royalties, production taxes and
income taxes. Royalties and production taxes increased by $5 per
ounce, or $23 million, over the prior year, and our underlying
effective income tax rate increased from 3% in 2002 to 20% in 2003,
or an increase of $38 million.
As a result of the closure of five mines in 2002 on depletion of
their reserves, we produced and sold 3% fewer ounces in 2003 compared
to the prior year. These five closed mines generated a profit
contribution, before tax, of $42 million in 2002.
Excluding the closed mines, cash operating costs per ounce
excluding royalties and production taxes were $7 per ounce higher in
2003, mainly due to higher costs at Goldstrike Open Pit and
Bulyanhulu, which added $39 million to our cash operating costs.
We invested $33 million more in exploration, mine development and
business development in 2003 compared to 2002. Development costs are
expensed until mineralization is classified as proven and probable
reserves for US reporting purposes. In 2003, we expensed $54 million
of development costs, mainly at Veladero and Lagunas Norte, compared
with $52 million in 2002. A $24 million increase in exploration
costs to $62 million accounts for most of the increase in
exploration, development and business development expense year over
year.
Earnings in both 2003 and 2002 included various items that
significantly impacted the comparability of our results year on year.
In 2003, the major items included gains of $71 million on non-hedge
derivatives and gains totaling $34 million on the sale of various
assets, offset by a $19 million higher charge for reclamation and
closure costs following a change in accounting policy for these types
of costs.
We recorded tax credits of $62 million in 2003. We released
valuation allowances totaling $15 million in Argentina following the
decision to begin construction at Veladero and the classification of
mineralization there as a proven and probable reserve, $16 million in
Australia due to higher levels of taxable income in a higher gold
price environment, and $21 million in North America following a
corporate reorganization. In 2002, we recorded a credit of $22
million due to the outcome of various tax uncertainties. These
credits were offset by valuation allowances against unrecognized tax
losses.
Cash Flow
We generated $69 million less operating cash flow in 2003
compared to 2002. Excluding the $86 million settlement of the Inmet
litigation, our operating cash flow would have been $17 million
higher in 2003 than 2002. Higher realized gold selling prices in 2003
were partly offset by higher total cash costs per ounce and higher
payments of income taxes.
Both our cash expenditures for investing and financing activities
increased in 2003 compared to 2002. In part, this was a result of
increased capital spending with the construction start up at
Veladero, as well as $154 million spent on our share buyback program.
BALANCE SHEET
Key Balance Sheet Ratios
Year ended December 31 2004 2003
---------------------------------------------------------------------
Non-cash working capital ($ millions)(1) $ 141 $ 34
Net debt (cash) ($ millions)(2) $ 288 $ (210)
Net debt:equity ratio(3) 0.08:1 (0.06:1)
Current ratio(4) 4.68:1 3.75:1
---------------------------------------------------------------------
(1) Represents current assets, excluding cash and equivalents, less
current liabilities.
(2) Represents long-term debt less cash and equivalents.
(3) Represents net debt divided by shareholders' equity.
(4) Represents current assets divided by current liabilities.
We regularly review our capital structure with an overall goal of
lowering our cost of capital, while preserving the balance sheet
strength and flexibility that is important due to the cyclical nature
of commodity markets, and ensuring that we have access to cash for
strategic purposes. Following a review of our capital structure
during 2003, we concluded that a share buyback program was consistent
with this goal. In 2004, we repurchased 4 million shares at a total
cost of $95 million which was in addition to repurchasing 9 million
shares at a total cost of $154 million in 2003. The combined impact
of new financing secured in 2004 to fund our development projects,
and activity under the share buyback program in 2004, caused an
increase in our net debt:equity ratio at the end of 2004.
Non-cash working capital increased in 2004 mainly due to a
build-up of supplies inventory at our development projects to support
normal operating activities, combined with an increase in tax
recoverable that relates to goods and services taxes on various
elements of mine construction costs that will be recoverable after
production begins.
Our net cash position at the end of 2003 changed to net debt at
the end of 2004 mainly because our investment in capital expenditures
in 2004 exceeded operating cash flow.
Shareholders' Equity
Outstanding Share Data
As at February 9, 2005, 532.9 million of our common shares, one
special voting share and 3.5 million Exchangeable Shares
(exchangeable into 1.8 million of our common shares) were issued and
outstanding. As at February 9, 2005, options to purchase 24.1
million common shares were outstanding under our option plans, as
well as options to purchase 1.3 million common shares under certain
option plans inherited by us in connection with prior acquisitions.
For further information regarding the outstanding shares and stock
options, please refer to the Financial Statements and our 2005
Management Information Circular and Proxy Statement.
Dividend Policy
In each of the last three years, we paid a total cash dividend of
$0.22 per share - $0.11 in mid-June and $0.11 in mid-December. The
amount and timing of any dividends is within the discretion of our
Board of Directors. The Board of Directors reviews the dividend
policy semi-annually based on the cash requirements of our operating
assets, exploration and development activities, as well as potential
acquisitions, combined with our current and projected financial
position.
Comprehensive Income
Comprehensive income consists of net income or loss, together
with certain other economic gains and losses that collectively are
described as "other comprehensive income", and excluded from the
income statement.
In 2004, the other comprehensive loss of $15 million mainly
included gains of $147 million on hedge contracts designated for
future periods caused primarily by changes in currency exchange rates
and fuel prices; offset by reclassification adjustments totaling $132
million for gains on hedge contracts designated for 2004 that were
transferred to earnings in 2004; and a $32 million decrease in the
fair value of investments.
Included in other comprehensive income at December 31, 2004 were
unrealized pre-tax gains on currency hedge contracts totaling $321
million, based on December 31, 2004 market foreign exchange rates.
The related hedge contracts are designated against operating costs
and capital expenditures primarily over the next three years, and are
expected to help protect against the impact of strengthening of the
Australian and Canadian dollar against the US dollar. The hedge gains
are expected to be recorded in earnings at the same time as the
corresponding hedged operating costs and amortization of capital
expenditures are also recorded in earnings.
QUARTERLY INFORMATION ($ millions, except where indicated)
2004 2003
-------------------------- -------------------------
Q4 Q3 Q2 Q1 Q4 Q3 Q2 Q1
Gold
production
('000s oz) 1,169 1,232 1,279 1,278 1,301 1,479 1,467 1,263
---------------------------------------------------------------------
Gold
sales
('000s oz) 1,199 1,267 1,222 1,247 1,362 1,505 1,395 1,292
---------------------------------------------------------------------
Gold
sales $ 501 $ 500 $ 454 $ 477 $ 536 $ 549 $ 491 $ 459
---------------------------------------------------------------------
Income
(loss)
before
taxes (47) 37 15 40 73 57 44 48
---------------------------------------------------------------------
Income
tax
recovery
(expense) 203 (5) 19 (14) 4 (22) 15 (2)
---------------------------------------------------------------------
Net income 156 32 34 26 77 35 59 29
---------------------------------------------------------------------
Net income per
share - basic
(dollars) 0.30 0.06 0.06 0.05 0.14 0.07 0.11 0.05
---------------------------------------------------------------------
Per ounce
statistics
(dollars)
---------------------------------------------------------------------
Average spot
gold
price 434 401 393 408 392 364 347 352
---------------------------------------------------------------------
Average
realized
gold price 417 395 372 382 394 365 352 355
---------------------------------------------------------------------
Total
cash
costs(1) 221 218 209 199 199 180 185 194
---------------------------------------------------------------------
Cash inflow
(outflow) from
---------------------------------------------------------------------
Operating
Activities 120 152 108 126 134 187 62 130
---------------------------------------------------------------------
Investing
activities (242) (219) (194) (164) (149) (58) (59) (61)
---------------------------------------------------------------------
Financing
activities 742 154 (73) (82) (54) (83) (130) 1
---------------------------------------------------------------------
(1) For an explanation of the use of non-GAAP performance measures,
refer to pages 40 to 41.
Our financial results for the last eight quarters reflect the
following general trends: rising spot gold prices with a
corresponding rise in prices realized from gold sales; and declining
gold production, sales volumes, and rising total cash costs per ounce
as a number of our mines were processing lower grade ore. These
historic trends are discussed elsewhere in this MD&A. The quarterly
trends are consistent with explanations for annual trends over the
last two years. Beginning in the second half of 2005, we expect that
the historic trend in gold production, sales volumes, and total cash
costs per ounce will reverse as our lower cost mines in development
begin production. Net income in each quarter also reflects the timing
of various special items that are presented in the table on page 15.
FOURTH QUARTER RESULTS
Revenue for fourth quarter 2004 was $501 million on gold sales of
1.2 million ounces, compared to $536 million in revenue on gold sales
of 1.36 million ounces for the prior-year quarter. During the
quarter, spot gold prices averaged $434 per ounce. We realized an
average price of $417 per ounce during the quarter compared to $394
per ounce in the prior-year quarter.
For the quarter, we produced 1.17 million ounces at total cash
costs of $221 per ounce compared to 1.30 million ounces at total cash
costs of $199 per ounce in the prior-year quarter.
Earnings for fourth quarter 2004 were $156 million ($0.30 per
share) as compared to earnings of $77 million ($0.14 per share) in
the prior-year quarter. This increase in earnings over the
prior-year quarter reflects a $23 per ounce higher realized gold
price, a $141 million tax recovery on final resolution of the
Peruvian tax assessment and a $48 million deferred tax credit due to
a change in tax status in Australia. These increases were partly
offset by higher total cash costs, and an impairment charge for
certain long-lived assets of $131 million pre-tax.
Effect on earnings increase (decrease)
---------------------------------------------------------------------
Three months ended December 31
($ millions) 2004 2003
---------------------------------------------------------------------
Pre-tax Post-tax Pre-tax Post-tax
---------------------------------------------------------------------
Non-hedge derivative gains $ 6 $ 6 $ 46 $ 37
---------------------------------------------------------------------
Gains on asset sales 29 24 5 3
---------------------------------------------------------------------
Litigation costs - - (16) (11)
---------------------------------------------------------------------
Impairment charges on
long-lived assets (131) (91) (5) (3)
---------------------------------------------------------------------
Impairment charges on
investments (4) (4) (4) (4)
---------------------------------------------------------------------
Change in asset retirement
obligation estimates (19) (15) (6) (6)
---------------------------------------------------------------------
Resolution of Peruvian tax
assessment
---------------------------------------------------------------------
Outcome of tax uncertainties - 141 - -
---------------------------------------------------------------------
Reversal of other accrued costs 21 15 - -
---------------------------------------------------------------------
Deferred tax credits
---------------------------------------------------------------------
Change in Australian tax status - 48 - -
---------------------------------------------------------------------
Release of valuation allowances - - - 41
---------------------------------------------------------------------
Total $(98) $ 124 $ 20 $ 57
---------------------------------------------------------------------
In the quarter, we generated operating cash flow of $120 million
as compared to operating cash flow of $134 million in the prior-year
period. Lower operating cash flow in the quarter primarily relates to
the combined effect of lower gold sales volumes and higher total cash
costs per ounce, partly offset by higher realized gold prices.
OFF-BALANCE SHEET ARRANGEMENTS
Gold Sales Contracts
We have historically used gold sales contracts as a means of
selling a portion of our annual gold production. The contracting
parties are bullion-banking counterparties whose business includes
entering into contracts to purchase gold from gold mining companies.
Since 2001, we have been focusing on reducing the level of
outstanding gold sales contracts. In 2004, spot market sales made up
the majority of our consolidated gold sales. The contracting parties
are bullion-banking counterparties whose business includes entering
into contracts to purchase gold from gold mining companies.
Fixed-Price Gold Sales Contracts
Allocation of Gold Sales Contracts to Support Pascua-Lama
Financing and Construction
In July 2004, we announced a decision to proceed with the
Pascua-Lama project ("Pascua-Lama") subject to receiving required
permits and clarification of the applicable fiscal regimes from the
governments of Argentina and Chile.
We currently expect to put in place third-party financing for up
to $750 million of the expected $1.4-$1.5 billion initial
construction cost of Pascua-Lama. In anticipation of building
Pascua-Lama and in support of any related financing, we allocated 6.5
million ounces of existing fixed-price gold sales contracts
specifically to Pascua-Lama (the "Pascua-Lama Gold Sales Contracts")
in fourth quarter 2004. The allocation of these contracts will help
reduce gold price risk at Pascua-Lama and will help secure the
financing for its construction. We expect the allocation of these
contracts to eliminate any requirement by lenders to add any
incremental gold sales contracts in the future to support the
financing of Pascua-Lama.
Key Aspects of Pascua-Lama Gold Sales Contracts
(as of December 31, 2004)
---------------------------------------------------------------------
Expected delivery dates.(1) 2009-2017, the term of the
expected financing.
---------------------------------------------------------------------
Future estimated average $372/oz(2)
realizable selling price.
---------------------------------------------------------------------
Mark-to-market value ($949) million(3)
at December 31, 2004.
---------------------------------------------------------------------
(1) The contract termination dates are 2014-2017 in most cases, but
we expect to deliver Pascua-Lama production against these
contracts starting in 2009.
(2) Upon delivery of production from 2009-2017, the term of expected
financing. Approximate estimated value based on current market US
dollar interest rates and an average lease rate assumption of 1%.
(3) At a spot gold price of $436 per ounce and market interest rates.
The allocation of 6.5 million ounces of gold sales contracts to
Pascua-Lama involves: i) the identification of contracts, in
quantities, and for terms that mitigate gold price risk for
Pascua-Lama during the term of the expected financing (contracts were
chosen where the existing termination dates are spread between 2009,
the targeted first year of production, and 2017, the expected
retirement of financing for the project); ii) the segregation of
these contracts from the remaining non-Pascua-Lama gold sales
contracts (the "Corporate Gold Sales contracts"); iii) the eventual
settlement of proceeds from these contracts for the benefit of
Pascua-Lama production.
Barrick will continue to guarantee the Pascua-Lama Gold Sales
Contracts, and the remaining Corporate Gold Sales Contracts. The
Barrick guarantee is a critical component in allocating long-term
contracts with termination dates out to 2009-2017 to support the
future Pascua-Lama financing.
Through allocation of these gold sales contracts to Pascua-Lama,
we significantly reduce capital risk. It protects the gold price
during the term of the forecasted financing, while leaving the
remaining reserves fully levered to spot gold prices. The contracts
represent just over 35% of the 17.6 million ounces of gold reserves
at Pascua-Lama, and do not impact any of the 643 million ounces of
silver contained in gold reserves at Pascua-Lama.
These Pascua-Lama Gold Sales Contracts, while allocated to Pascua
production, retain all the benefits of our gold sales Master Trading
Agreements (MTAs) and are not subject to margining, downgrade or
unilateral and discretionary "right to break" provisions.
Furthermore, as part of our MTAs, these Pascua-Lama Gold Sales
Contracts are not subject to any provisions regarding any final
go-ahead decisions with Pascua-Lama construction, or any possible
delay or change in the Pascua-Lama project.
Corporate Gold Sales Contracts
In addition to the gold sales contracts allocated against
Pascua-Lama, we have Corporate Gold Sales Contracts, which at
December 31, 2004 totaled 7.0 million ounces of fixed-price gold
sales contracts. This represents slightly over one year of expected
future gold production and approximately 10% of our proven and
probable reserves, excluding Pascua-Lama.
Key Aspects of Corporate Gold Sales Contracts
(as of December 31, 2004)
---------------------------------------------------------------------
Current termination date of 2014 in most cases.
contracts.
---------------------------------------------------------------------
Average estimated realizable $426/oz(1)
selling price in 2014
---------------------------------------------------------------------
Mark-to-market value at ($975) million(2).
December 31, 2004.
---------------------------------------------------------------------
(1) Approximate estimated value based on current market US dollar
interest rates and an average lease rate assumption of 1%.
Accelerating gold deliveries would likely lead to reduced
contango that would otherwise have built up over time. Barrick
may choose to settle any gold sales contract in advance of this
termination date at any time, at its discretion. Historically,
delivery has occurred in advance of the contractual termination
date.
(2) At a spot gold price of $436 per ounce, and market interest rates.
We also have an obligation to deliver gold by the termination
date (currently 2014 in most cases). However, because we typically
fix the price of gold under our gold sales contracts to a date that
is earlier than the termination date of the contract (referred to as
the "interim price-setting date"), the actual realized price on the
contract termination date depends upon the actual gold market forward
premium ("contango") between the interim price-setting date and the
termination date. Therefore, the $426/oz price estimate could change
over time due to a number of factors, including but not limited to:
US dollar interest rates, gold lease rates, spot gold prices, and
extensions of the termination date. This price, which is an average
for the total Corporate Gold Sales Contract position, is not
necessarily representative of the prices that may be realized each
quarter for actual deliveries into gold sales contracts, in
particular if we choose to settle any gold sales contract in advance
of the termination date (which we have the right to do at our
discretion). If we chose to accelerate gold deliveries, this would
likely lead to reduced contango that would otherwise have built up
over time (and therefore a lower realized price).
The gold market forward premium, or contango, is typically
closely correlated with the difference between US dollar interest
rates and gold lease rates. An increase or decrease in US dollar
interest rates would generally lead to a corresponding increase or
decrease in contango, and therefore an increase or decrease in the
estimated future price of the contract at the termination date.
Furthermore, the greater the time period between the interim
price-setting date and the termination date, the greater the
sensitivity of the final realized price to US dollar interest rates.
A short-term spike in gold lease rates would not have a material
negative impact on us because we are not significantly exposed under
our fixed-price gold sales contracts to short-term gold lease rate
variations. A prolonged rise in gold lease rates could result in
lower contango (or negative contango i.e. "backwardation"). Gold
lease rates have historically tended to be low, and any spikes
short-lived, because of the large amount of gold available for
lending relative to demand.
In addition to the Corporate Gold Sales Contracts, we also have
floating spot-price gold sales contracts under which we are committed
to deliver 0.5 million ounces of gold over the next ten years at spot
prices, less an average fixed-price adjustment of $52 per ounce.
These floating spot-price contracts were previously fixed-price
contracts, for which, under the price-setting mechanisms of the MTAs,
we elected to receive a price based on the market gold spot price at
the time of delivery adjusted by the difference between the spot
price and the contract price at the time of such election.
Fixed-Price Silver Sales Contracts
(as of December 31, 2004)
---------------------------------------------------------------------
Millions of silver ounces 12.4
---------------------------------------------------------------------
Current termination date of silver sales
contracts 2014 in most cases.
---------------------------------------------------------------------
Average estimated realizable selling price at
2014 termination date $8.50/oz(1)
---------------------------------------------------------------------
Mark-to-market value at December 31, 2004 ($14) million(2)
---------------------------------------------------------------------
(1) Approximate estimated value based on current market US dollar
interest rates and an average lease rate assumption of 1%.
Accelerating silver deliveries could potentially lead to reduced
contango that would otherwise have built up over time. Barrick
may choose to settle any silver sales contract in advance of this
termination date at any time, at its discretion. Historically,
delivery has occurred in advance of the contractual termination
date.
(2) At a spot silver price of $6.82 per ounce.
We also have floating spot-price silver sales contracts under
which we are committed to deliver 12 million ounces of silver over
the next ten years at spot prices, less an average fixed-price
adjustment of $0.96 per ounce. These floating spot-price contracts
were previously fixed-price contracts, for which, under the
price-setting mechanisms of the MTAs, we elected to receive a price
based on the market silver spot price at the time of delivery
adjusted by the difference between the spot price and the contract
price at the time of such election.
Key terms of Gold and Silver Sales Contracts
In all of our MTAs, which govern the terms of gold and silver
sales contracts with our 19 counterparties, the following applies:
- The counterparties do not have unilateral and discretionary
"right to break" provisions.
- There are no credit downgrade provisions.
- We are not subject to any margin calls - regardless of the
price of gold or silver.
- We have the right to settle our gold and silver sales contracts
on two days notice at any time during the life of the contracts, or
keep these forward gold and silver sales contracts outstanding for up
to 15 years.
- At our option, we can sell gold or silver at the market price
or the contract price, whichever is higher, up to the termination
date of the contracts (currently 2014 in most cases).
The MTAs with our counterparties do provide for early close out
of certain transactions in the event of a material adverse change in
our ability or that of our principal hedging subsidiary's ability to
perform our or its gold and silver delivery and other obligations
under the trading agreements and related parent guarantees or a lack
of gold or silver market, and for customary events of default such as
covenant breaches, insolvency or bankruptcy. The principal financial
covenants are:
- We must maintain a minimum consolidated net worth of at least
$2 billion; currently, it is $3.6 billion. The MTAs exclude
unrealized mark-to-market valuations in the calculation of
consolidated net worth.
- We must maintain a maximum long-term debt to consolidated net
worth ratio of 2:1; currently it is 0.51:1.
In most cases, under the terms of the MTAs, the period over which
we are required to deliver gold is extended annually by one year, or
kept "evergreen", regardless of the intended delivery dates, unless
otherwise notified by the counterparty. This means that, with each
year that passes, the termination date of most MTAs is extended into
the future by one year.
As spot gold prices increase or decrease, the value of our gold
mineral reserves and amount of potential operating cash inflows
generally increases or decreases. The unrealized mark-to-market loss
on our fixed-price forward gold sales contracts also increases or
decreases. The mark-to-market value represents the cancellation value
of these contracts based on current market levels, and does not
represent an immediate economic obligation for payment by us. Our
obligations under the gold forward sales contracts are to deliver an
agreed upon quantity of gold at a contracted price by the termination
date of the contracts (currently 2014 in most cases). Gold sales
contracts are not recorded on our balance sheet. The economic impact
of these contracts is reflected in our Financial Statements within
gold sales based on selling prices under the contracts at the time we
record revenue from the physical delivery of gold and silver under
the contracts.
Change in the Fair Value of
Gold and Silver Sales Contracts
($ millions) Gold(1) Silver
---------------------------------------------------------------------
Unrealized loss at
January 1, 2004 $ 1,725 $ 20
---------------------------------------------------------------------
Impact of change in spot price(2) 288 11
---------------------------------------------------------------------
Contango earned in the period (119) (1)
---------------------------------------------------------------------
Impact of change in valuation inputs(3) 136 2
---------------------------------------------------------------------
Mark-to-market impact of deliveries into
contracts (89) (6)
---------------------------------------------------------------------
Unrealized loss at December 31, 2004 $ 1,941 $ 26
---------------------------------------------------------------------
(1) Includes both the Pascua-Lama Gold Sales Contracts and the
Corporate Gold Sales Contracts.
(2) From $415 per ounce to $436 per ounce for gold, and $5.92 per
ounce to $6.82 per ounce for silver.
(3) Other than spot metal prices (i.e. interest rates and gold and
silver lease rates).
Fair Value of Derivative Positions
At December 31 2004 Unrealized
($ millions) Gain/(Loss)
---------------------------------------------------------------------
Corporate Gold Sales Contracts $ (949)
---------------------------------------------------------------------
Pascua-Lama Gold Sales Contracts (966)
---------------------------------------------------------------------
Floating Spot-Price Gold Sales Contracts (26)
---------------------------------------------------------------------
Silver Sales Contracts (14)
---------------------------------------------------------------------
Floating Spot-Price Silver Sales Contracts (12)
---------------------------------------------------------------------
Foreign currency contracts 298
---------------------------------------------------------------------
Interest rate contracts 45
---------------------------------------------------------------------
Fuel contracts 4
---------------------------------------------------------------------
$ (1,620)
---------------------------------------------------------------------
LIQUIDITY
Liquidity Management
Liquidity is managed dynamically, and factors that could impact
liquidity are regularly monitored. The primary factors that affect
liquidity include gold production levels, realized gold sales prices,
cash production costs, future capital expenditure requirements,
scheduled repayments of long-term debt obligations, our credit
capacity and expected future debt market conditions. Working capital
requirements have not historically had a material effect on
liquidity. Counterparties to the financial instruments and gold sales
contracts that we hold do not have unilateral and discretionary
rights to accelerate settlement of financial instruments or gold
sales contracts, and we are not subject to any margin calls.
We consider our liquidity profile to be sound, as there are no
reasonably foreseeable trends, demands, commitments, events or
circumstances expected to prevent us from funding the capital needed
to implement our strategy.
Capital Resources(1)
($ millions) 2004 2003 2002
---------------------------------------------------------------------
Opening capital resource $ 1,977 $ 2,044 $ 1,733
New sources
Operating cash flow 506 519 588
New financing facilities(2) 1,056 - -
---------------------------------------------------------------------
3,539 2,563 2,321
---------------------------------------------------------------------
Allocations
Growth capital(3) (627) (107) (29)
Sustaining capital(4) (184) (215) (199)
Dividends/share buyback (213) (272) (119)
Other (37) 1 70
---------------------------------------------------------------------
Closing capital resources $ 2,478 $ 1,970 $ 2,044
---------------------------------------------------------------------
Components of closing capital resources
Cash and equivalents $ 1,398 $ 970 $ 1,044
Unutilized credit facilities 1,080 1,000 1,000
---------------------------------------------------------------------
Total $ 2,478 $ 1,970 $ 2,044
---------------------------------------------------------------------
(1) Capital resources include cash balances and sources of financing
that have been arranged but not utilized.
(2) Includes the $250 million Veladero financing $750 million bond
offering, and $56 million lease facility for Lagunas Norte.
(3) Growth capital represents capital invested in new projects to
bring new mines into production.
(4) Sustaining capital represents capital required at existing
mining operations.
Credit rating
Credit ratings at December 31, 2004, from major rating agencies
---------------------------------------------------------------------
Standard and Poor's A
---------------------------------------------------------------------
Moody's Baa1
---------------------------------------------------------------------
DBRS A
---------------------------------------------------------------------
Our ability to access unsecured debt markets and the related cost
of debt financing is, in part, dependent upon maintaining an
acceptable credit rating. A deterioration in our credit rating would
not adversely affect existing debt securities or the terms of gold
sales contracts, but could impact funding costs for any new debt
financing. The key factors that are important to our credit rating
include the following: our market capitalization; the strength of our
balance sheet, including the amount of net debt and our
debt-to-equity ratio; our net cash flow, including cash generated by
operating activities and expected capital expenditure requirements;
the quantity of our gold reserves; and our geo-political risk profile.
Contractual Obligations and Commitments
---------------------------------------------------------------------
($ millions) Payments due
---------------------------------------------------------------------
At December 31, 2004 2005 2006 2007 2008
---------------------------------------------------------------------
Contractual obligations
---------------------------------------------------------------------
Long-term debt (1) $ 31 $ 58 $ 580 $ 72
---------------------------------------------------------------------
Asset retirement obligations (2) 35 28 17 41
---------------------------------------------------------------------
Capital leases 1 4 - -
---------------------------------------------------------------------
Operating leases 16 16 16 17
---------------------------------------------------------------------
Post-retirement benefits 16 15 16 16
---------------------------------------------------------------------
Other post-retirement benefits 2 2 2 2
---------------------------------------------------------------------
Royalty arrangements (3) 61 66 66 67
---------------------------------------------------------------------
Purchase obligations for supplies
and consumables 11 3 1 1
---------------------------------------------------------------------
Power contracts (4) 6 5 1 5
---------------------------------------------------------------------
Capital commitments (5) 314 8 - -
---------------------------------------------------------------------
493 205 699 221
---------------------------------------------------------------------
Contractual Obligations and Commitments
($ millions)
2010 and
At December 31, 2004 2009 thereafter Total
---------------------------------------------------------------------
Contractual obligations
---------------------------------------------------------------------
Long-term debt (1) $ 17 $ 903 $ 1,661
---------------------------------------------------------------------
Asset retirement obligations (2) 33 190 344
---------------------------------------------------------------------
Capital leases - - 5
---------------------------------------------------------------------
Operating leases 5 6 76
---------------------------------------------------------------------
Post-retirement benefits 16 89 168
---------------------------------------------------------------------
Other post-retirement benefits 2 9 19
---------------------------------------------------------------------
Royalty arrangements (3) 60 510 837
---------------------------------------------------------------------
Purchase obligations for supplies
and consumables - - 16
---------------------------------------------------------------------
Power contracts (4) 2 - 19
---------------------------------------------------------------------
Capital commitments (5) - - 322
---------------------------------------------------------------------
142 1,707 3,467
Contractual Obligations
(1) Long-term debt
Our debt obligations do not include any subjective acceleration
clauses or other clauses that enable the holder of the debt to call
for early repayment, except in the event that we breach any of the
terms and conditions of the debt or for other customary events of
default. The Bulyanhulu and Veladero project financings are secured
by assets at the Bulyanhulu Mine and Veladero project respectively.
Other than this security, we are not required to post any collateral
under any debt obligations. The terms of our debt obligations would
not be affected by a deterioration in our credit rating.
(2) Asset retirement obligations
Amounts presented in the table represent the undiscounted future
payments for the expected cost of asset retirement obligations.
(3) Royalties
Virtually all of the royalty arrangements give rise to
obligations as we produce gold. In the event that we do not produce
gold at our mining properties, we have no payment obligation to the
royalty holders. The amounts disclosed are based on expected future
gold production, using a $425 gold price assumption. The most
significant royalty agreements are disclosed in note 5 to our
Financial Statements.
(4) Power contracts
We enter into contracts to purchase power at each of our
operating mines. These contracts provide for fixed prices, which, in
certain circumstances, are adjusted for inflation. Some agreements
obligate us to purchase fixed quantities per hour, seven days a week,
while others are based on a percentage of actual consumption. These
contracts extend through various dates in 2005 to 2009.
In addition to the purchase obligations set out in the table, we
purchase about 1 billion kilowatt-hours annually at market rates.
Under the terms of the Goldstrike Power contract, we purchase power
based on actual consumption; this contract has an exit fee that we
will pay when we commence commercial operation of our Nevada Power
Plant and leave the utility.
(5) Capital commitments
Purchase obligations for capital expenditures include only those
items where binding commitments have been entered into. Commitments
at the end of 2004 mainly related to construction at our development
projects and also the power plant in Nevada.
Capital expenditures not yet committed
We expect to incur about $2.5 billion to complete the
development/construction of our present development projects over the
next five years (Veladero, Lagunas Norte, Tulawaka, Cowal,
Pascua-Lama and East Archimedes) and the Nevada Power Plant, as well
as an average of approximately $175 million per year in sustaining
capital at our producing mines over the same time period. A total of
$322 million of these amounts had been committed at the end of 2004,
with the remainder not yet committed.
Payments to maintain land tenure and mineral property rights
In the normal course of business, we are required to make annual
payments to maintain title to certain of our properties and to
maintain our rights to mine gold at certain of our properties. If we
choose to abandon a property or discontinue mining operations, the
payments relating to that property can be suspended, resulting in our
rights to the property lapsing. The validity of mining claims can be
uncertain and may be contested. Although we have attempted to
acquire satisfactory title to our properties, some risk exists that
some titles, particularly title to undeveloped properties, may be
defective.
Contingencies - Litigation
We are currently subject to various litigation as disclosed in
note 23 to the Financial Statements, and we may be involved in
disputes with other parties in the future that may result in
litigation. If we are unable to resolve these disputes favorably, it
may have a material adverse impact on our financial condition, cash
flow and results of operations.
CRITICAL ACCOUNTING POLICIES AND ESTIMATES
Management has discussed the development and selection of our
critical accounting estimates with the Audit Committee of the Board
of Directors, and the Audit Committee has reviewed the disclosure
relating to such estimates in conjunction with its review of this
MD&A. The accounting policies and methods we utilize determine how
we report our financial condition and results of operations, and they
may require management to make estimates or rely on assumptions about
matters that are inherently uncertain.
Our financial condition and results of operations are reported
using accounting policies and methods prescribed by US GAAP. In
certain cases, US GAAP allows accounting policies and methods to be
selected from two or more alternatives, any of which might be
reasonable yet result in our reporting materially different amounts.
Management exercises judgment in selecting and applying our
accounting policies and methods to ensure that, while US GAAP
compliant, they reflect our judgment of an appropriate manner in
which to record and report our financial condition and results of
operations.
Accounting Policy Changes
There were no changes in accounting policies in 2004 that
significantly impacted our Financial Statements. As disclosed in
note 2B to the Financial Statements, in 2005 we are required to adopt
FAS 123R, Accounting for Stock-based Compensation, and we may be
required to change our accounting policy for stripping costs once the
Emerging Issues Task Force has completed its deliberations on EITF
04-6.
Critical Accounting Estimates
Certain accounting estimates have been identified as being
"critical" to the presentation of our financial condition and results
of operations because they require management to make particularly
subjective and/or complex judgments about matters that are inherently
uncertain; and there is a reasonable likelihood that materially
different amounts could be reported under different conditions or
using different assumptions and estimates. Critical accounting
estimates include:
- Reserve estimates used to measure amortization of property,
plant and equipment;
- Stripping ratios used to measure amortization of capitalized
mining costs;
- Impairment assessments of long-lived assets;
- The fair value of asset retirement obligations; and
- The measurement of deferred income tax assets and liabilities
and assessments of the amounts of valuation allowances recorded.
Reserve Estimates Used to Measure Amortization of Property, Plant
and Equipment
We record amortization expense based on the estimated useful
economic lives of long-lived assets. The estimate that most
significantly affects the measurement of amortization is quantities
of proven and probable gold reserves, because we amortize a large
portion of property, plant and equipment using the
units-of-production method. Reserves are estimated in accordance
with the principles in Industry Guide No. 7, issued by the SEC. The
estimation of quantities of gold reserves is complex, requiring
significant subjective assumptions that arise from the evaluation of
geological, geophysical, engineering and economic data for a given
ore body. This data could change over time as a result of numerous
factors, including new information gained from development
activities, evolving production history and a reassessment of the
viability of production under different economic conditions. Changes
in data and/or assumptions could cause reserve estimates to
substantially change from period to period. Because mineral reserves
are estimates, there is a risk that actual gold production could
differ from expected gold production from our reserves. Factors that
could cause actual gold production to differ include adverse changes
in gold or silver prices, which could make the reserve uneconomic to
mine; and variations in actual ore grade and gold and silver recovery
rates from estimates.
A key trend that could reasonably impact reserve estimates is
rising market gold prices. As market gold prices rise, the gold
price assumption used in reserve estimation also rises. This
assumption is closely related to the trailing three-year average
market price. As this assumption rises, this could result in an
upward revision to reserve estimates as material not previously
classified as a reserve becomes economic at higher gold prices.
Changes in reserve estimates are generally calculated at the end of
each year and cause amortization expense to increase or decrease
prospectively.
In general, amortization expense is more significantly impacted
by changes in reserve estimates at underground mines than open-pit
mines due to the following factors:
- Underground development costs incurred to access ore at
underground mines are significant and amortized using the
units-of-production method; and
- Reserves at underground mines are often more sensitive to gold
price assumptions and changes in production costs. Production costs
at underground mines are impacted by factors such as dilution, which
can significantly impact mining and processing costs per ounce.
The mines where amortization expense is most sensitive to changes
in reserve estimates are: Pierina, Goldstrike Underground, Eskay
Creek and Bulyanhulu. These mines have significant carrying amounts
of property, plant and equipment that are amortized using the
units-of-production method and make up a significant proportion of
property, plant and equipment at our operating mines.
Impact of Historic Changes in Reserve Estimates on Amortization
For the years ended
Dec.31 2004 2003
($ millions, except
reserves in
millions of Reserves Amortization Reserves Amortization
contained oz) increase increase increase increase
(decrease)(1) (decrease) (decrease)(1) (decrease)
--------------------------------------------------------------------
Goldstrike
Underground 0.2 $ (8) 0.6 $(10)
--------------------------------------------------------------------
Open Pit 1.5 (7) 1.3 (6)
--------------------------------------------------------------------
Plutonic 0.5 (2) 1.3 (4)
--------------------------------------------------------------------
Eskay Creek (0.1) 4 - -
--------------------------------------------------------------------
Kalgoorlie 0.9 (3) - -
--------------------------------------------------------------------
Pierina 0.3 (9) - -
--------------------------------------------------------------------
(1) Each year we updated our reserve estimates as at the end of the
year as part of our normal business cycle. Reserve changes
presented were calculated at the beginning of the applicable
fiscal year and are in millions of contained ounces.
Stripping Ratios Used to Measure Amortization of Capitalized
Mining Costs
Amortization of capitalized mining costs is recorded in the cost
of inventory produced using a "stripping ratio". The stripping ratio
is calculated as the total tons of ore and waste that must be mined
compared to recoverable proven and probable gold reserves.
Both reserve estimates and the estimated tons of ore and waste
that must be mined to produce reserves are estimates that are highly
uncertain. The assumptions and uncertainty relating to reserve
estimates are described on page 33 under "Reserve Estimates Used to
Measure Amortization of Property, Plant and Equipment". The
estimated tons of ore and waste that must be mined to produce
reserves are calculated based on a mine plan that contemplates a
design for the open pit relating to the mining of reserves. As
reserve estimates change, the design of the open pit also changes,
and both of these factors impact the stripping ratio.
Changes in this ratio affect the amortization of capitalized
mining costs to inventory, and ultimately cost of sales when the
inventory is sold. In general, stripping ratios are higher at
open-pit mines where the ore body is deep below the surface of the
earth.
Impact of Historic Changes in Stripping Ratios
Amortization increase
($ millions, Stripping Ratio used in (decrease)(1)
except ratios) 2005 2004 2003 2005 2004 2003
--------------------------------------------------------------------
Goldstrike
Open Pit 127:1 109:1 112:1 $ 5 $ (1) $ -
--------------------------------------------------------------------
Pierina 89:1 60:1 48:1 20 7 -
--------------------------------------------------------------------
(1) Impact of the year on year change in the stripping ratio used to
amortize capitalized mining costs.
Stripping ratios are updated annually at the same time as reserve
estimates are updated. At the end of 2004, the stripping ratios for
Goldstrike Open-Pit and Pierina were updated to reflect the updated
reserves at the end of 2004. The amount presented represents the
estimated impact on annual amortization caused by these changes,
based on production levels and sales volumes in 2004.
Impairment Assessments of Operating Mines, Development Projects
and Exploration Stage Properties
We review and test the carrying amounts of assets when events or
changes in circumstances suggest that the carrying amount may not be
recoverable. We group assets at the lowest level for which
identifiable cash flows are largely independent of the cash flows of
other assets and liabilities. For operating mines and development
projects, all assets are included in one group. If there are
indications that an impairment may have occurred, we prepare
estimates of expected future cash flows for each group of assets.
Expected future cash flows are based on a probability-weighted
approach applied to potential outcomes.
Estimates of expected future cash flow reflect:
- Estimated sales proceeds from the production and sale of
recoverable ounces of gold contained in proven and probable reserves;
- Expected future commodity prices and currency exchange rates
(considering historical and current prices, price trends and related
factors). In impairment assessments conducted in 2004 we used an
expected future market gold price of $400 per ounce, and an expected
future market US$:A$ exchange rate of $0.70 and US$:C$ exchange rate
of $0.82;
- Expected future operating costs and capital expenditures to
produce proven and probable gold reserves based on mine plans that
assume current plant capacity, but exclude the impact of inflation;
- Expected cash flows associated with value beyond proven and
probable reserves, which includes the expected cash outflows required
to develop and extract the value beyond proven and probable reserves;
and
- Environmental remediation costs excluded from the measurement
of asset retirement obligations.
We record a reduction of a group of assets to fair value as a
charge to earnings if expected future cash flows are less than the
carrying amount. We estimated fair value by discounting the expected
future cash flows using a discount factor that reflects the risk-free
rate of interest for a term consistent with the period of expected
cash flows.
Expected future cash flows are inherently uncertain, and could
materially change over time. They are significantly affected by
reserve estimates, together with economic factors such as gold and
silver prices, and currency exchange rates, estimates of costs to
produce reserves and future sustaining capital. The assessment and
measurement of impairment excludes the impact of derivatives
designated in a cash flow hedge relationship for future cash flows
arising from operating mines and development projects.
Because of the significant capital investment that is required at
many mines, if an impairment occurs, it could materially impact
earnings. Due to the long-life nature of many mines, the difference
between total estimated undiscounted net cash flows and fair value
can be substantial. An impairment is generally only recorded when the
carrying amount of a long-lived asset exceeds the total estimated
undiscounted net cash flows. Therefore, although the value of a mine
may decline gradually over multiple reporting periods, the
application of impairment accounting rules could lead to recognition
of the full amount of the decline in value in one period. Due to the
highly uncertain nature of future cash flows, the determination of
when to record an impairment charge can be very subjective.
Management makes this determination using available evidence taking
into account current expectations for each mining property.
For acquired exploration-stage properties, the purchase price is
capitalized, but post-acquisition exploration expenditures are
expensed. The future economic viability of exploration stage
properties largely depends upon the outcome of exploration activity,
which can take a number of years to complete for large properties.
Management monitors the results of exploration activity over time to
assess whether an impairment may have occurred. The measurement of
any impairment is made more difficult because there is not an active
market for exploration properties, and because it is not possible to
use discounted cash flow techniques due to the very limited
information that is available to accurately model future cash flows.
In general, if an impairment occurs at an exploration stage property,
it would probably have minimal value and most of the acquisition cost
may have to be written down.
Impairment charges are recorded in other income/expense and
impact earnings in the year they are recorded. Prospectively, the
impairment could also impact the calculation of amortization of an
asset. In fourth quarter 2004, we performed detailed impairment
assessments for three groups of assets; the Eskay Creek mine in North
America; various exploration-stage properties in Peru; and the Cowal
mine in Australia.
For the Eskay Creek mine, the requirement to complete an
impairment test was due to the following combination of factors:
downward revisions to reserves in 2004; the continued weakening of
the US dollar that impacts Canadian dollar operating costs measured
at market rates; and upward revisions in asset retirement obligations
at the end of 2004. On completion of this test, we concluded that
the mine was impaired at the end of 2004, and we recorded a pre-tax
impairment charge of $58 million.
For a group of Peruvian exploration-stage properties acquired as
part of the Arequipa acquisition in 1996, we completed an impairment
test in fourth quarter 2004 following the finalization of the
exploration program for the year and based on an updated assessment
of future plans for the properties. On completion of this test, we
concluded that the properties were impaired at the end of 2004 and we
recorded a pre-tax impairment charge of $67 million.
For the Cowal development project, an impairment test was
completed following upward revisions to estimated capital and
operating costs for the project; and the continued weakening of the
US dollar that impacts the amounts reported in US dollars for
Australian dollar expenditures, measured at market prices. On
completion of this test we concluded that the mine was not impaired
at the end of 2004.
We completed these impairment tests using a $400 average future
gold price assumption. If a significant adverse change in the market
gold price occurred that caused us to revise this price assumption
downwards, the amount by which the Eskay Creek mine is impaired could
increase and the conclusion on the Cowal impairment test could
change, subject to the effect of changes in other factors and
assumptions. The revised gold price assumption would have no impact
on the Peruvian exploration-stage properties because the properties
were fully written down at the end of 2004.
Fair Value of Asset Retirement Obligations (AROs)
AROs arise from the acquisition, development, construction and
normal operation of mining property, plant and equipment, due to
government controls and regulations that protect the environment on
the closure and reclamation of mining properties. We record the fair
value of an ARO in our Financial Statements when it is incurred and
capitalize this amount as an increase in the carrying amount of the
related asset. At operating mines, the effect is recorded as an
adjustment to the corresponding asset carrying amount and results in
a prospective increase or decrease in amortization expense. At
closed mines, the adjustment is charged directly to earnings.
The fair values of AROs are measured by discounting the expected
cash flows using a discount factor that reflects the risk-free rate
of interest. We prepare estimates of the timing and amounts of
expected cash flows when an ARO is incurred, which are updated to
reflect changes in facts and circumstances, or if we are required to
submit updated mine closure plans to regulatory authorities. In the
future, changes in regulations or laws or enforcement could adversely
affect our operations; and any instances of noncompliance with laws
or regulations that result in fines or injunctions or delays in
projects, or any unforeseen environmental contamination at, or
related to, our mining properties could result in us suffering
significant costs. We mitigate these risks through environmental and
health and safety programs under which we monitor compliance with
laws and regulations and take steps to reduce the risk of
environmental contamination occurring. We maintain insurance for
some environmental risks, however, for some risks coverage cannot be
purchased at a reasonable cost. Our coverage may not provide full
recovery for all possible causes of loss. The principal factors that
can cause expected cash flows to change are: the construction of new
processing facilities; changes in the quantities of material in
reserves and a corresponding change in the life of mine plan;
changing ore characteristics that ultimately impact the environment;
changes in water quality that impact the extent of water treatment
required; and changes in laws and regulations governing the
protection of the environment. In general, as the end of the mine
life becomes nearer, the reliability of expected cash flows
increases, but earlier in the mine life, the estimation of an ARO is
inherently more subjective. Significant judgments and estimates are
made when estimating the fair value of AROs. Expected cash flows
relating to AROs could occur over periods up to 40 years and the
assessment of the extent of environmental remediation work is highly
subjective. Considering all of these factors, the fair value of AROs
can materially change over time.
In 2004, we recorded charges in AROs totaling $54 million, of
which $32 million was recorded as an adjustment to the corresponding
asset and $22 million was recorded as a charge to earnings. The $22
million charge to earnings mainly reflects increases in the expected
cost of water treatment at certain closed mines. In 2003, we
recorded revisions to AROs totaling $10 million for various closed
mines, that were charged to earnings, and mainly reflect increases in
the expected cost of water treatment.
AROs at December 31, 2004
($ millions)
Operating mines $ 204
Closed mines 148
Development projects 15
--------------------------------------------------------------------
Total $ 367
--------------------------------------------------------------------
At our operating mines, it is reasonably possible that
circumstances could arise by the end of the mine life that will
require material revisions to AROs. In particular, the extent of
water treatment can have a material effect on the fair value of AROs,
and the expected water quality at the end of the mine life, which is
the primary driver of the extent of water treatment, can change
significantly. We periodically prepare updated studies for certain
mines, following which it may be necessary to adjust the fair value
of AROs.
At one closed mine, the principal uncertainty that could impact
the fair value of ARO is the manner in which a tailings facility will
need to be remediated. In measuring the ARO, we have concluded that
there are two possible methods that could be used. We have recorded
the ARO using the more costly method, which we believe to be the most
probable, but it is reasonably possible that a less costly method may
ultimately prove to be technically feasible, in which case the ARO
may decrease and this revision to the ARO would be recorded in
earnings in the period of change.
The period of time over which we have assumed that water quality
monitoring and treatment will be required also have a significant
impact on AROs at closed mines. The amount of AROs recorded reflects
the expected cost taking into account the probability of particular
scenarios. The difference between the upper end of the range of
these assumptions and the lower end of the range is significant, and
consequently changes in these assumptions could have a material
effect on the fair value of ARO's and future earnings in a period of
change.
Deferred Tax Assets and Liabilities
Measurement of Timing Differences
We are periodically required to estimate the tax basis of assets
and liabilities. Where applicable tax laws and regulations are
either unclear or subject to varying interpretations, it is possible
that changes in these estimates could occur that materially affect
the amounts of deferred income tax assets and liabilities recorded in
our Financial Statements. Changes in deferred tax assets and
liabilities generally have a direct impact on earnings in the period
of changes. The most significant such estimate is the tax basis of
certain Australian assets following elections in 2004 under new tax
regimes in Australia. These elections resulted in the revaluation of
certain assets in Australia for income tax purposes. Part of the
revalued tax basis of these assets was estimated based on a valuation
completed for tax purposes. This valuation is under review by the
Australian Tax Office ("ATO") and the amount finally accepted by the
ATO may differ from the assumption used to measure deferred tax
balances at the end of 2004.
Valuation Allowances
Each period, we evaluate the likelihood of whether some portion
or all of each deferred tax asset will not be realized. This
evaluation is based on historic and future expected levels of taxable
income, the pattern and timing of reversals of taxable temporary
timing differences that give rise to deferred tax liabilities, and
tax planning initiatives. Levels of future taxable income are
affected by, among other things, market gold prices, production
costs, quantities of proven and probable gold reserves, interest
rates and foreign currency exchange rates. If we determine that it
is more likely than not (a likelihood of more than 50%) that all or
some portion of a deferred tax asset will not be realized, then we
record a valuation allowance against the amount we do not expect to
realize. Changes in valuation allowances are recorded as a component
of income tax expense or recovery for each period. The most
significant recent trend impacting expected levels of future taxable
and valuation allowances has been rising gold prices. A continuation
of this trend could lead to the release of some of the valuation
allowances recorded, with a corresponding effect on earnings in the
period of release.
We released valuation allowances totaling $5 million in 2004 and
$62 million in 2003. In 2004, the release was as a consequence of an
election to consolidate our Australian operations into one tax group.
The $62 million release in 2003 was mainly a result of a corporate
reorganization for tax purposes in North America and the impact of
higher expected levels of taxable income in Australia and Argentina
caused by rising market gold prices.
A further continuation of the recent trend of rising gold prices
could lead to the release of some portion or all of the valuation
allowances in the United States and Argentina.
--------------------------------------------------------------------
Valuation allowances at December 31
($ millions) 2004 2003
--------------------------------------------------------------------
United States $ 189 $ 181
Chile 141 146
Argentina 75 73
Canada 73 72
Tanzania 89 68
Australia 3 8
--------------------------------------------------------------------
Other 8 6
--------------------------------------------------------------------
$578 $554
--------------------------------------------------------------------
United States: most of the valuation allowances relate to the
full amount of Alternative Minimum Tax credits, which have an
unlimited carry-forward period. Increasing levels of future taxable
income due to gold selling prices and other factors and circumstances
may result in an adjustment to these valuation allowances.
Chile: valuation allowances relate to the full amount of tax
assets in subsidiaries that do not have any present sources of
income. In the event that these subsidiaries have sources of income
in the future, we may release some or all of the allowances.
Argentina: a valuation allowance of $75 million has been set up
against certain deferred tax assets in Argentina. Historically, we
have had no income generating operations in Argentina, but following
the production start-up at Veladero in 2005, various factors will
affect future levels of taxable income in Argentina, including the
volume of gold produced and sold, gold selling prices and costs
incurred to produce gold. It is reasonably possible that an
adjustment to a $34 million portion of this valuation allowance that
relates to Veladero will be made in the near term.
Canada: substantially all of the valuation allowances relate to
capital losses that will only be utilized if any capital gains arise.
Tanzania: considering the local fiscal regime applicable to
mining companies and expected levels of future taxable income from
the Bulyanhulu mine, a valuation allowance exists against a portion
of the deferred tax assets. If we conclude that expected levels of
future taxable income from Bulyanhulu will be higher, we may release
some or all of the valuation allowance.
NON-GAAP PERFORMANCE MEASURES
For the years ended December 31
($ millions, except per ounce information) 2004 2003
--------------------------------------------------------------------
Total cash costs - per US GAAP(1) $ 1,064 $ 1,065
--------------------------------------------------------------------
Accretion expense and reclamation costs at
the operating mines (18) (14)
--------------------------------------------------------------------
Total cash costs per ounce - per Gold
Institute Production Cost Standard $ 1,046 $ 1,051
--------------------------------------------------------------------
Ounces sold (thousands) 4,936 5,554
--------------------------------------------------------------------
Total cash costs per ounce
- per US GAAP (dollars)(2) $ 216 $ 192
--------------------------------------------------------------------
Total cash costs - per Gold Institute
Production Cost Standard (dollars)(2) $ 212 $ 189
--------------------------------------------------------------------
(1) Equal to cost of sales and other operating expenses less
accretion expense and reclamation costs at non-operating mines.
(2) Per ounce weighted average.
We have included total cash costs per ounce data because these
statistics are a key performance measure that management uses to
monitor performance. We use these statistics to assess how well our
producing mines are performing compared to plan and also to assess
the overall effectiveness and efficiency of our mining operations.
The inclusion of these statistics in MD&A helps an investor to assess
performance "through the eyes of management". We understand that
certain investors also use these statistics to assess our
performance. The inclusion of total cash costs per ounce statistics
enables investors to better understand year on year changes in
production costs, which in turn affect profitability and the ability
to generate operating cash flow for use in investing and other
activities. We report total cash costs per ounce data calculated in
accordance with The Gold Institute Production Cost Standard (the
"Standard"). Adoption of the Standard is voluntary, but we
understand that most senior gold producers follow the Standard when
reporting cash cost per ounce data. The data does not have a meaning
prescribed by US GAAP and therefore amounts presented may not be
comparable to data presented by gold producers who do not follow the
Standard. Total cash costs per ounce are derived from amounts
included in the Statements of Income and mine site operating costs
such as mining, processing, administration, royalties and production
taxes, but exclude amortization, reclamation costs, financing costs,
and capital, development and exploration costs. A US GAAP measure of
costs per ounce has also been presented as required by securities
regulations that govern non-GAAP performance measures. Commentary
within this Management's Discussion and Analysis is focused on the
"total cash costs" measure as defined by the Standard.
The data is intended to provide additional information and should
not be considered in isolation or as a substitute for measures of
performance prepared in accordance with GAAP. The measures are not
necessarily indicative of operating profit or cash flow from
operations as determined under GAAP. As can be seen from the table
on page 38 reconciling the GAAP and non-GAAP measures, the GAAP and
non-GAAP measures are not significantly different.
CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION
Certain information contained or incorporated by reference in
this Year End Report 2004, including any information as to our future
financial or operating performance, constitutes "forward-looking
statements". All statements, other than statements of historical
fact, are forward-looking statements. The words "believe", "expect",
"anticipate", "contemplate", "target", "plan", "intends", "continue",
"budget", "estimate", "may", "will", "schedule" and similar
expressions identify forward-looking statements. Forward-looking
statements are necessarily based upon a number of estimates and
assumptions that, while considered reasonable by us, are inherently
subject to significant business, economic and competitive
uncertainties and contingencies. Known and unknown factors could
cause actual results to differ materially from those projected in the
forward-looking statements. Such factors include, but are not
limited to: fluctuations in the currency markets (such as the
Canadian and Australian dollars versus the U.S. dollar); fluctuations
in the spot and forward price of gold or certain other commodities
(such as silver, copper, diesel fuel and electricity); changes in
U.S. dollar interest rates or gold lease rates that could impact the
mark to market value of outstanding derivative instruments and
ongoing payments/receipts under interest rate swaps and variable rate
debt obligations; risks arising from holding derivative instruments
(such as credit risk, market liquidity risk and mark to market risk);
changes in national and local government legislation, taxation,
controls, regulations and political or economic developments in
Canada, the United States, Australia, Chile, Peru, Argentina,
Tanzania, Russia or Barbados or other countries in which we do or may
carry on business in the future; business opportunities that may be
presented to, or pursued by, us; our ability to successfully
integrate acquisitions; operating or technical difficulties in
connection with mining or development activities; the speculative
nature of gold exploration and development, including
the risks of obtaining necessary licenses and permits; diminishing
quantities or grades of reserves; adverse changes in our credit
rating; and contests over title to properties, particularly title to
undeveloped properties. In addition, there are risks and hazards
associated with the business of gold exploration, development and
mining, including environmental hazards, industrial accidents,
unusual or unexpected formations, pressures, cave-ins, flooding and
gold bullion losses (and the risk of inadequate insurance, or
inability to obtain insurance, to cover these risks). Many of these
uncertainties and contingencies can affect our actual results and
could cause actual results to differ materially from those expressed
or implied in any forward-looking statements made by, or on behalf
of, us. Readers are cautioned that forward-looking statements are
not guarantees of future performance. All of the forward-looking
statements made in this Year End Report 2004 are qualified by these
cautionary statements. Specific reference is made to Barrick's most
recent Form 40-F/Annual Information Form on file with the US
Securities and Exchange Commission and Canadian provincial securities
regulatory authorities for a discussion of some of the factors
underlying forward-looking statements.
We disclaim any intention or obligation to update or revise any
forward-looking statements whether as a result of new information,
future events or otherwise.
GLOSSARY OF TECHNICAL TERMS
AUTOCLAVE: Oxidation process in which high temperatures and
pressures are applied to convert refractory sulphide mineralization
into amenable oxide ore.
BACKFILL: Primarily waste sand or rock used to support the roof
or walls after removal of ore from a stope.
BY-PRODUCT: A secondary metal or mineral product recovered in the
milling process such as copper and silver.
CONCENTRATE: A very fine, powder-like product containing the
valuable ore mineral from which most of the waste mineral has been
eliminated.
CONTAINED OUNCES: Represents ounces in the ground before
reduction of ounces not able to be recovered by the applicable
metallurgical process.
CONTANGO: The positive difference between the spot market gold
price and the forward market gold price. It is often expressed as an
interest rate quoted with reference to the difference between
inter-bank deposit rates and gold lease rates.
DEVELOPMENT: Work carried out for the purpose of opening up a
mineral deposit. In an underground mine this includes shaft sinking,
crosscutting, drifting and raising. In an open pit mine, development
includes the removal of overburden.
DILUTION: The effect of waste or low-grade ore which is
unavoidably included in the mined ore, lowering the recovered grade.
DORE: Unrefined gold and silver bullion bars usually consisting
of approximately 90 percent precious metals that will be further
refined to almost pure metal.
EXPLORATION: Prospecting, sampling, mapping, diamond-drilling and
other work involved in searching for ore.
GRADE: The amount of metal in each ton of ore, expressed as troy
ounces per ton or grams per tonne for precious metals and as a
percentage for most other metals.
Cut-off grade: the minimum metal grade at which an orebody can be
economically mined (used in the calculation of ore reserves).
Mill-head grade: metal content of mined ore going into a mill for
processing.
Recovered grade: actual metal content of ore determined after
processing.
Reserve grade: estimated metal content of an orebody, based on
reserve calculations.
HEAP LEACHING: A process whereby gold is extracted by "heaping"
broken ore on sloping impermeable pads and continually applying to
the heaps a weak cyanide solution which dissolves the contained gold.
The gold-laden solution is then collected for gold recovery.
HEAP LEACH PAD: A large impermeable foundation or pad used as a
base for ore during heap leaching.
LIBOR: The London Inter-Bank Offered Rate for deposits.
MILL: A processing facility where ore is finely ground and
thereafter undergoes physical or chemical treatment to extract the
valuable metals.
MINERAL RESERVE: See page 84 - Gold Mineral Reserves and Mineral
Resources."
MINERAL RESOURCE: See page 84 - Gold Mineral Reserves and Mineral
Resources."
MINING CLAIM: That portion of applicable mineral lands that a
party has staked or marked out in accordance with applicable mining
laws to acquire the right to explore for and exploit the minerals
under the surface.
MINING RATE: Tons of ore mined per day or even specified time
period.
MINING SEQUENCE: Sequence by which ore is extracted from the mine
is based on the mine plan.
OPEN PIT: A mine where the minerals are mined entirely from the
surface.
ORE: Rock, generally containing metallic or non-metallic
minerals, which can be mined and processed at a profit.
OREBODY: A sufficiently large amount of ore that can be mined
economically.
OUNCES: Troy ounces of a fineness of 999.9 parts per 1,000 parts.
RECLAMATION: The process by which lands disturbed as a result of
mining activity are modified to support beneficial land use.
Reclamation activity may include the removal of buildings, equipment,
machinery and other physical remnants of mining, closure of tailings
storage facilities, leach pads and other mine features, and
contouring, covering and re-vegetation of waste rock and other
disturbed areas.
RECLAMATION AND CLOSURE COSTS: The cost of reclamation plus other
costs, including without limitation certain personnel costs,
insurance, property holding costs such as taxes, rental and claim
fees, and community programs associated with closing an operating
mine.
RECOVERY RATE: A term used in process metallurgy to indicate the
proportion of valuable material physically recovered in the
processing of ore. It is generally stated as a percentage of the
material recovered compared to the total material originally present.
REFINING: The final stage of metal production in which impurities
are removed from the molten metal.
ROASTING: The treatment of ore by heat and air, or oxygen
enriched air, in order to remove sulphur, carbon, antimony or arsenic.
STRIPPING: Removal of overburden or waste rock overlying an ore
body in preparation for mining by open pit methods. Expressed as the
total number of tons mined or to be mined for each ounce of gold.
TAILINGS: The material that remains after all economically and
technically recoverable precious metals have been removed from the
ore during processing.
Reconciliation of Total Cash Costs Per Ounce to Financial Statements
---------------------------------------------------------------------
Goldstrike- Goldstrike- Eskay Round
Open Pit Underground Creek(2) Mountain
---------------------------------------------------------------------
For the years
ended
December 31 2004 2003 2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash
production
costs - per
US GAAP(1) $336.5 $380.6 $141.2 $152.1 $9.3 $18.6 $84.5 $67.2
Accretion
expense and
reclamation
costs at
operating
mines (2.5) (2.5) (0.2) - (0.2) (0.3) (1.6) (1.6)
---------------------------------------------------------------------
Total cash
production
costs per
Gold Institute
Production
Cost Standard $334.0 $378.1 $141.0 $152.1 $9.1 $18.3 $82.9 $65.6
---------------------------------------------------------------------
Ounces sold
(thousands) 1,352 1,625 554 600 290 354 375 379
Total cash
costs per
ounce sold
per US GAAP
(dollars)(3) $249 $234 $256 $253 $32 $53 $225 $177
---------------------------------------------------------------------
Total cash
costs per
ounce sold -
per Gold
Institute
Production
Cost Standard
(dollars)(4) $247 $233 $255 $253 $31 $52 $221 $173
---------------------------------------------------------------------
---------------------------------------------------------------------
Hemlo Holt- Marigold Total
McDermott North
America
---------------------------------------------------------------------
For the years
ended
December 31 2004 2003 2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash
production
costs - per
US GAAP(1) $57.6 $60.4 $12.1 $20.9 $9.1 $8.1 $650.3 $707.9
Accretion
expense and
reclamation
costs at
operating
mines (0.2) (0.2) (0.1) (0.1) (0.1) (0.1) (4.9) (4.8)
---------------------------------------------------------------------
Total cash
production
costs per
Gold
Institute
Production
Cost Standard $57.4 $60.2 $12.0 $20.8 $9.0 $8.0 $645.4 $703.1
---------------------------------------------------------------------
Ounces sold
(thousands) 239 266 62 87 46 47 2,918 3,358
Total cash
costs per
ounce sold
per US GAAP
(dollars)(3) $241 $227 $195 $240 $198 $172 $223 $211
---------------------------------------------------------------------
Total cash
costs per
ounce sold -
per Gold
Institute
Production
Cost Standard
(dollars)(4) $240 $226 $197 $239 $197 $171 $221 $209
---------------------------------------------------------------------
---------------------------------------------------------------------
Total
South
Pierina America Plutonic Darlot
---------------------------------------------------------------------
For the years
ended
December 31 2004 2003 2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash
production
costs - per
US GAAP(1) $72.2 $78.9 $72.2 $78.9 $69.2 $62.6 $30.0 $25.4
Accretion
expense and
reclamation
costs at
operating
mines (3.5) (3.2) (3.5) (3.2) (0.1) (0.2) (0.1) (0.1)
---------------------------------------------------------------------
Total cash
production
costs per
Gold
Institute
Production
Cost Standard $68.7 $75.7 $68.7 $75.7 $69.1 $62.4 $29.9 $25.3
---------------------------------------------------------------------
Ounces sold
(thousands) 649 911 649 911 310 324 142 154
Total cash
costs per
ounce sold
per US GAAP
(dollars)(3) $111 $87 $111 $87 $223 $193 $211 $165
---------------------------------------------------------------------
Total cash
costs per
ounce sold -
per Gold
Institute
Production
Cost Standard
(dollars)(4) $106 $83 $106 $83 $223 $193 $210 $164
---------------------------------------------------------------------
(1) Represents cost of sales and other operating costs (excluding
amortization and accretion expense and reclamation costs for non-
operating mines).
(2) Eskay Creek's total cash costs in 2004 are impacted by higher
silver prices which the Company treats as a by-product. Total cash
costs on a co-product basis are: 2004 - gold $202 per ounce, silver
$3.36 per ounce (2003 - gold $175 per ounce, silver $2.37 per ounce).
(3) Represents total cash production costs per US GAAP divided by
ounces sold.
(4) Represents total cash production costs per Gold Institute
Production Cost Standard divided by ounces sold.
---------------------------------------------------------------------
Total
Australia/
Lawlers Kalgoorlie Bulyanhulu Africa
---------------------------------------------------------------------
For the years
ended
December 31 2004 2003 2004 2003 2004 2003 2004 2003
---------------------------------------------------------------------
Total cash
production
costs - per
US GAAP(1) $28.3 $23.8 $108.5 $88.1 $103.2 $77.1 $339.2 $277.0
Accretion
expense and
reclamation
costs at
operating
mines (0.1) (0.1) (1.5) (1.5) (7.5) (4.1) (9.3) (6.0)
---------------------------------------------------------------------
Total cash
production
costs per
Gold Institute
Production
Cost Standard $28.2 $23.7 $107.0 $86.6 $95.7 $73.0 $329.9 $271.0
---------------------------------------------------------------------
Ounces sold
(thousands) 115 95 463 415 339 297 1,369 1,285
Total cash
costs per
ounce sold
per US GAAP
(dollars)(2) $247 $250 $234 $212 $304 $260 $248 $216
---------------------------------------------------------------------
Total cash
costs per
ounce sold -
per Gold
Institute
Production
Cost Standard
(dollars)(3) $246 $249 $231 $209 $283 $246 $241 $210
---------------------------------------------------------------------
(1) Represents cost of sales and other operating costs (excluding
amortization and accretion expense and reclamation costs for non-
operating mines).
(2) Represents total cash production costs per US GAAP divided by
ounces sold.
(3) Represents total cash production costs per Gold Institute
Production Cost Standard divided by ounces sold.
Reconciliation of Amortization Costs per Ounce to Financial Statements
---------------------------------------------------------------------
For the years ended December 31 2004 2003 2002
---------------------------------------------------------------------
Amortization expense per consolidated
financial statements $452 $522 $519
Amortization expense recorded on
property, plant and equipment not at
operating mine sites (27) (25) (26)
---------------------------------------------------------------------
Amortization expense for per ounce calculation $425 $497 $493
---------------------------------------------------------------------
Ounces sold (thousands) 4,936 5,554 5,805
---------------------------------------------------------------------
Amortization per ounce (dollars) $86 $90 $85
---------------------------------------------------------------------
Consolidated Statements of Income
Barrick Gold Corporation
For the years ended December 31,
(in millions of United States dollars, except per share data)
(Unaudited)
---------------------------------------------------------------------
2004 2003 2002
---------------------------------------------------------------------
Gold sales (notes 3 and 4) $ 1,932 $ 2,035 $ 1,967
---------------------------------------------------------------------
Costs and expenses
Cost of sales(1) (note 5) 1,071 1,072 1,070
Amortization (note 3) 452 522 519
Administration 71 73 50
Exploration, development
and business development 141 137 104
Other (income) expense (note 6) 158 (4) 16
---------------------------------------------------------------------
1,893 1,800 1,759
---------------------------------------------------------------------
Interest income 25 31 26
Interest expense (note 16B) (19) (44) (57)
---------------------------------------------------------------------
Income before income taxes and other items 45 222 177
Income tax recovery (expense) (note 7) 203 (5) 16
---------------------------------------------------------------------
Income before cumulative effect of
changes in accounting principles 248 217 193
Cumulative effect of changes in
accounting principles (note 2B) - (17) -
---------------------------------------------------------------------
Net income for the year $ 248 $ 200 $ 193
---------------------------------------------------------------------
Earnings per share data (note 8):
Income before cumulative effect of
changes in accounting principles
Basic $ 0.47 $ 0.40 $ 0.36
Diluted $ 0.46 $ 0.40 $ 0.36
Net income
Basic $ 0.47 $ 0.37 $ 0.36
Diluted $ 0.46 $ 0.37 $ 0.36
---------------------------------------------------------------------
(1) Exclusive of amortization (note 5).
The accompanying notes are an integral part of these consolidated
financial statements.
Consolidated Statements of Cash Flow
Barrick Gold Corporation
For the years ended December 31,
(in millions of United States dollars)(Unaudited)
---------------------------------------------------------------------
2004 2003 2002
---------------------------------------------------------------------
OPERATING ACTIVITIES
---------------------------------------------------------------------
Net income $ 248 $ 200 $ 193
Amortization 452 522 519
Deferred income taxes (note 18) (225) (49) (75)
Inmet litigation settlement (note 6) - (86) -
Gains on sale of long-lived assets (note 6) (34) (34) (4)
Other items (note 9) 65 (34) (45)
---------------------------------------------------------------------
Net cash provided by operating activities 506 519 588
---------------------------------------------------------------------
INVESTING ACTIVITIES
Property, plant and equipment
Capital expenditures (note 3) (824) (322) (228)
Sales proceeds 43 40 8
Investments (note 10)
Purchases (47) (60) -
Sales proceeds 9 8 3
Proceeds on maturity of term deposits - - 159
---------------------------------------------------------------------
Net cash used in investing activities (819) (334) (58)
---------------------------------------------------------------------
FINANCING ACTIVITIES
Capital stock
Proceeds from shares issued on exercise
of stock options 49 29 83
Repurchased for cash (note 19A) (95) (154) -
Long-term debt (note 16B)
Proceeds 974 - -
Repayments (41) (23) (25)
Dividends (note 19A) (118) (118) (119)
Other items (28) - -
---------------------------------------------------------------------
Net cash provided by (used in) financing
activities 741 (266) (61)
---------------------------------------------------------------------
Effect of exchange rate changes on cash
and equivalents - 7 1
Net increase (decrease) in cash
and equivalents 428 (81) 469
Cash and equivalents at beginning
of year (note 16A) 970 1,044 574
---------------------------------------------------------------------
Cash and equivalents at end
of year (note 16A) $ 1,398 $ 970 $ 1,044
---------------------------------------------------------------------
The accompanying notes are an integral part of these consolidated
financial statements.
Consolidated Balance Sheets
Barrick Gold Corporation
At December 31,
(in millions of United States dollars)(Unaudited)
---------------------------------------------------------------------
2004 2003
---------------------------------------------------------------------
ASSETS
Current assets
Cash and equivalents (note 16A) $ 1,398 $ 970
Accounts receivable (note 11) 58 56
Inventories (note 11) 215 164
Other current assets (note 11) 286 178
---------------------------------------------------------------------
1,957 1,368
Investments (note 10) 134 130
Property, plant and equipment (note 12) 3,391 3,128
Capitalized mining costs (note 13) 226 235
Other assets (note 14) 566 497
---------------------------------------------------------------------
Total assets 6,274 $ 5,358
---------------------------------------------------------------------
LIABILITIES AND SHAREHOLDERS' EQUITY
Current liabilities
Accounts payable $ 335 $ 245
Other current liabilities (note 15) 83 119
---------------------------------------------------------------------
418 364
Long-term debt (note 16B) 1,655 719
Other long-term obligations (note 17) 499 464
Deferred income tax liabilities (note 18) 139 317
---------------------------------------------------------------------
Total liabilities 2,711 1,864
---------------------------------------------------------------------
Shareholders' equity
Capital stock (note 19) 4,129 4,115
Deficit (624) (694)
Accumulated other comprehensive income (note 20) 58 73
---------------------------------------------------------------------
Total shareholders' equity 3,563 3,494
---------------------------------------------------------------------
Contingencies and commitments (notes 12D, 16 and 23)
---------------------------------------------------------------------
Total liabilities and shareholders' equity 6,274 $ 5,358
---------------------------------------------------------------------
The accompanying notes are an integral part of these consolidated
financial statements.
Consolidated Statements of Shareholders' Equity
Barrick Gold Corporation
For the years ended December 31,
(in millions of United States dollars)(Unaudited)
---------------------------------------------------------------------
2004 2003 2002
---------------------------------------------------------------------
Common shares (number in millions)
At January 1 535 542 536
Issued on exercise of stock options
(note 21A) 3 2 6
Repurchased (note 19A) (4) (9) -
---------------------------------------------------------------------
At December 31 534 535 542
---------------------------------------------------------------------
Common shares
At January 1 $ 4,115 $ 4,148 $ 4,062
Issued on exercise of stock options
(note 21A) 49 34 86
Repurchased (note 19A) (35) (67) -
---------------------------------------------------------------------
At December 31 $ 4,129 $ 4,115 $ 4,148
---------------------------------------------------------------------
Deficit
At January 1 $ (694) $ (689) $ (763)
Net income 248 200 193
Adjustment on repurchase of common
shares (note 19A) (60) (87) -
Dividends (note 19A) (118) (118) (119)
---------------------------------------------------------------------
At December 31 $ (624) $ (694) $ (689)
---------------------------------------------------------------------
Accumulated other comprehensive income
(loss) (note 20) $ 58 $ 73 $ (125)
---------------------------------------------------------------------
Total shareholders' equity
at December 31 3,563 $ 3,494 $ 3,334
---------------------------------------------------------------------
Consolidated Statements of Comprehensive Income
---------------------------------------------------------------------
2004 2003 2002
---------------------------------------------------------------------
Net income $ 248 $ 200 $ 193
Other comprehensive income (loss),
net of tax (note 20) (15) 198 (18)
---------------------------------------------------------------------
Comprehensive income $ 233 $ 398 $ 175
---------------------------------------------------------------------
The accompanying notes are an integral part of these consolidated
financial statements.
NOTES TO UNAUDITED CONSOLIDATED FINANCIAL STATEMENTS
Barrick Gold Corporation. Tabular dollar amounts in millions of
United States dollars, unless otherwise shown. References to C$, A$
and EUR are to Canadian dollars, Australian dollars and Euros,
respectively.
1. NATURE OF OPERATIONS
Barrick Gold Corporation ("Barrick" or the "Company") engages in
the production and sale of gold from underground and open-pit mines,
including related activities such as exploration and mine
development. Our operations are mainly located in North America,
South America, Australia and Africa.
2. SIGNIFICANT ACCOUNTING POLICIES
A Basis of preparation
These financial statements are prepared under United States
generally accepted accounting principles ("US GAAP"). We also include
financial statements prepared under Canadian GAAP in our Proxy
Statement that we file with various Canadian regulatory authorities.
To ensure comparability of financial information, certain prior-year
amounts have been reclassified to conform with the current year
presentation.
Consolidation policy
These financial statements reflect consolidation of the accounts
of Barrick and other entities in which we have a controlling
financial interest. The usual condition for a controlling financial
interest is ownership of a majority of the voting interests of an
entity. However, a controlling financial interest may also exist in
entities through arrangements that do not involve voting interests,
where the entities are variable interest entities (VIEs) under the
principles of FIN 46R. Intercompany balances and transactions are
eliminated on consolidation.
A VIE is defined as an entity that by design either lacks enough
equity investment at risk to permit the entity to finance its
activities without additional subordinated financial support from
other parties; has equity owners who are unable to make decisions
about the entity; or has equity owners that do not have the
obligation to absorb the entity's expected losses or the right to
receive the entity's expected residual returns. VIEs can arise from
a variety of entities or legal structures.
FIN 46R requires a variable interest holder (i.e. a counterparty
to a VIE) to consolidate the VIE if that party will absorb a majority
of the expected losses of the VIE, receive a majority of the residual
returns of the VIE, or both. This party is considered the primary
beneficiary of the entity. The determination of whether a variable
interest holder meets the criteria to be considered the primary
beneficiary of a VIE requires an evaluation of all transactions by
the entity. The foundation for this evaluation is a calculation
prescribed by FIN 46R.
We hold our interests in the Round Mountain, Hemlo, Marigold and
Kalgoorlie mines through unincorporated joint ventures. Under
long-standing practice for extractive industries, we use the
proportionate consolidation method to account for our interests in
these unincorporated joint ventures.
Our 70% interest in the Tulawaka development project is held
through an unincorporated joint venture. In years prior to 2004 we
used the proportionate consolidation method to account for our
interest. In 2004, we entered into an agreement to finance the other
joint venture partner's share of mine construction costs, which
caused us to reconsider whether this joint venture is a VIE. We
concluded that the joint venture is in fact a VIE, and that Barrick
is the primary beneficiary. From June 2004 onwards, we consolidated
this joint venture using the principles of FIN 46R. The creditors of
this VIE have no recourse to the general credit of Barrick.
Foreign currency translation
In 2003, various changes in economic facts and circumstances led
us to conclude that the functional currency of our Argentinean
operations is the United States dollar rather than the Argentinean
Peso. These changes included the completion of the Veladero mine
feasibility study, the expected denomination of selling prices for
future gold production and the occurrence of higher amounts of US
dollar expenditures.
Following this change the functional currency of all our
operations is the US dollar. We re-measure non-US dollar balances as
follows:
- non-monetary assets and liabilities using historical rates;
- monetary assets and liabilities using period-end exchange
rates; and
- income and expenses using average exchange rates, except for
expenses related to assets and liabilities re-measured at historical
exchange rates.
Gains and losses arising from re-measurement of foreign currency
balances and transactions are recorded in earnings.
Use of estimates
The preparation of these financial statements requires us to make
estimates and assumptions. The most significant estimates and
assumptions are quantities of proven and probable gold reserves;
expected value of mineral resources not considered proven and
probable reserves; expected future costs and expenses to produce
proven and probable reserves; expected future commodity prices and
foreign currency exchange rates; and expected costs to meet asset
retirement obligations. Critical estimates and assumptions include:
- decisions as to whether mine development costs should be
capitalized or expensed;
- assessments of whether groups of long-lived assets are impaired
and the fair value of those groups of assets that are the basis for
measuring impairment charges;
- assessments of our ability to realize the benefits of deferred
income tax assets;
- the useful lives of long-lived assets and the measurement of
amortization recorded in earnings; and
- the fair value of asset retirement obligations.
We regularly review estimates and assumptions that affect our
financial statements; however, actual outcomes could differ from
estimates and assumptions.
B Accounting changes
Effect of accounting changes on earnings
Earnings increase (decrease)
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Changes in accounting policies
Cumulative effect
Adoption of FAS 143(1) (note 17A) $ - $ 4 $ -
Amortization of underground development
costs(2) (note 12A) - (21) -
---------------------------------------------------------------------
- (17) -
Pro forma effect (excluding tax effects)
Adoption of FAS 143(3) - - (4)
---------------------------------------------------------------------
Total $ - $ (17) $ (4)
---------------------------------------------------------------------
(1) On adoption of FAS 143 in first quarter 2003 (see note 17A), we
recorded on our balance sheet an increase in property, plant and
equipment of $39 million; an increase in other long-term
obligations of $32 million; and an increase in deferred income
tax liabilities of $3 million; as well as a $4 million credit in
earnings for the cumulative effect of this change.
(2) On January 1, 2003, we changed our accounting policy for
amortization of underground mine development costs to exclude
estimates of future underground development costs (see note 12A).
On adoption of this change, we decreased property, plant and
equipment by $19 million, and increased deferred income tax
liabilities by $2 million. We recorded in our income statement
a $21 million charge for the cumulative effect of this accounting
change.
(3) FAS 143 was followed in the preparation of financial results for
2004 and 2003. For 2002, because prior years were not restated,
the amount disclosed is the pro forma effect of following FAS
143.
Emerging Issues Task Force ("EITF") Issue No. 04-2: Whether
Mineral Rights are Tangible or Intangible Assets (EITF 04-2)
EITF 04-2 was issued in 2004 and concludes that mineral rights,
which are defined as the legal right to explore, extract and retain
at least a portion of the benefits from mineral deposits, are
tangible assets. EITF 04-2 was effective in third quarter 2004, and
had no impact on the classification of such assets in our financial
statements.
EITF Issue No. 04-3, Mining Assets: Impairment and Business
Combinations (EITF 04-3)
EITF 04-3 was issued in 2004 and establishes guidance for the
inclusion of the expected value of mineralization not considered
proven and probable reserves when allocating the purchase price in a
business combination and also when testing a mining asset for
impairment. The principles of EITF 04-3 are required to be adopted
prospectively and were effective in second quarter 2004.
C Accounting developments
EITF Issue No. 03-1, The Meaning of Other-Than-Temporary
Impairment and Its Application to Certain Investments (EITF 03-1)
EITF 03-1 was issued in 2004 and establishes guidance to be used
in determining when an investment is considered impaired, whether
that impairment is other than temporary, and the measurement of an
impairment loss. Under the application of our previous accounting
policy for impairment of investments, an impairment on a specific
investment was recorded in earnings on determination that the
impairment was other than temporary or after an investment had been
impaired for six months, whichever is the earlier. Under EITF 03-1,
there is no requirement to automatically record an impairment loss in
earnings after a six-month period; instead the recognition of
impairment losses in earnings is based on the assessment of whether
the loss is other than temporary. The adoption of the measurement
requirements of EITF 03-1 in third quarter 2004 had no effect on
impairment charges recorded in earnings.
EITF 03-1 also provides guidance on accounting subsequent to the
recognition of an other-than-temporary impairment and requires
certain disclosures about impairment losses included in other
comprehensive income that have not been recorded in earnings. The
measurement requirements of EITF 03-1 were effective for the fiscal
quarter ended September 30, 2004, but the disclosure requirements are
not effective until fiscal 2005.
EITF Issue No. 04-6, Accounting for Stripping Costs Incurred
during Production in the Mining Industry (EITF 04-6)
In the mining industry, companies may be required to remove
overburden and other mine waste materials to access mineral deposits.
The costs of removing overburden and waste materials are often
referred to as "stripping costs." During the development of a mine
(before production begins), it is generally accepted in practice that
stripping costs are capitalized as part of the depreciable cost of
building, developing, and constructing the mine. Those capitalized
costs are typically amortized over the productive life of the mine
using the units-of-production method. A mining company may continue
to remove overburden and waste materials, and therefore incur
stripping costs, during the production phase of the mine. Questions
have been raised about the appropriate accounting for stripping costs
incurred during the production phase, and diversity in practice
exists. In response to these questions, the EITF has undertaken a
project to develop an Abstract to address the questions and clarify
the appropriate accounting treatment for stripping costs under US
GAAP. The EITF is in the process of deliberating these questions and
upon completion of their deliberations they are expected to issue
EITF 04-6, which will represent an authorative US GAAP pronouncement
for stripping costs. Our accounting policy for stripping costs is
disclosed in note 13. EITF 04-6 may require us to change our
accounting policy for stripping costs in future periods.
FAS 123R, Accounting for Stock-Based Compensation (FAS 123R)
In December 2004, the FASB issued FAS 123R. FAS 123R is
applicable to transactions in which an entity exchanges its equity
instruments for goods and services. It focuses primarily on
transactions in which an entity obtains employee services in
share-based payment transactions. FAS 123R requires that the fair
value of such equity instruments is recorded as an expense as
services are performed. Prior to FAS 123R, only certain pro forma
disclosures of accounting for these transactions at fair value were
required. FAS 123R will be effective for our third quarter 2005
financial statements, and permits varying transition methods
including: retroactive adjustment of prior periods as far back as
1995 to give effect to the fair value based method of accounting for
awards granted in those prior periods; retrospective application to
all interim periods in 2005; or prospective application to future
periods beginning in third quarter 2005. We are presently evaluating
the effect of the varying methods of adopting FAS 123R. We expect to
adopt FAS 123R using the modified prospective method effective July
1, 2005. Under this method we will begin recording stock option
expense based on a similar method to the one used for pro forma
purposes that is disclosed in note 21, starting in the third quarter
of 2005.
FAS 151, Inventory Costs (FAS 151)
FAS 151 was issued in November 2004 as an amendment to ARB No.
43. FAS 151 specifies the general principles applicable to the
pricing and allocation of certain costs to inventory. Under FAS 151,
abnormal amounts of idle facility expense, freight, handling costs
and wasted materials are recognized as current period charges rather
than capitalized to inventory. FAS 151 also requires that the
allocation of fixed production overhead to the cost of inventory be
based on the normal capacity of production facilities. FAS 151 will
be effective for inventory costs incurred beginning in our 2006
fiscal year. We are presently evaluating the impact of FAS 151 on
our financial statements.
FAS 153, Exchanges of Non-Monetary Assets (FAS 153)
FAS 153 was issued in December 2004 as an amendment to APB
Opinion No. 29. FAS 153 provides guidance on the measurement of
exchanges of non-monetary assets, with exceptions for exchanges that
do not have commercial substance. Under FAS 153, a non-monetary
exchange has commercial substance if, as a result of the exchange,
the future cash flows of an entity are expected to change
significantly.
Under FAS 153, a non-monetary exchange is measured based on the
fair values of the assets exchanged. If fair value is not
determinable, the exchange lacks commercial substance or the exchange
is to facilitate sales to customers, a non-monetary exchange is
measured based on the recorded amount of the non-monetary asset
relinquished. FAS 153 will be effective for non-monetary exchanges
that occur in fiscal periods beginning after June 15, 2005.
D Other significant accounting policies
---------------------------------------------------------------------
Note Page
---------------------------------------------------------------------
---------------------------------------------------------------------
Segment information 3
Revenue and gold sales contracts 4
Cost of sales 5
Other (income) expense 6
Income tax (recovery) expense 7
Earnings per share 8
Supplemental cash flow information 9
Investments 10
Accounts receivable, inventories and
other current assets 11
Property, plant and equipment 12
Capitalized mining costs 13
Other assets 14
Other current liabilities 15
Financial instruments 16
Other long-term obligations 17
Deferred income taxes 18
Capital stock 19
Other comprehensive income (loss) 20
Stock-based compensation 21
Post-retirement benefits 22
Contingencies, litigation and claims 23
Joint ventures 24
Differences from Canadian GAAP 25
3. SEGMENT INFORMATION
Our operations are managed on a regional basis. Our three
regional business units are North America, Australia/Africa and South
America. Financial information for each of our operating mines,
development projects and our exploration group is reviewed regularly
by our chief operating decision maker.
Segment income for operating segments comprises segment revenues
less segment operating costs and segment amortization in the format
that internal management reporting is presented to the chief
operating decision maker. For internal management reporting
purposes, we measure segment revenues and income using the average
consolidated realized gold selling price for each period. Segment
operating costs represent our internal presentation of costs incurred
to produce gold at each operating mine, and exclude the following
costs that we do not allocate to operating segments: accretion
expense; environmental remediation costs at closed mines; regional
business unit overhead; amortization of corporate assets; business
development costs; administration costs; other income/expense; and
the costs of financing their activities. Segment operating costs for
development projects and the exploration group represent expensed
exploration, mine development and mine start-up costs.
Income statement information
---------------------------------------------------------------------
Gold sales
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Goldstrike $ 745 $ 813 $ 678
Round Mountain 148 139 132
Eskay Creek 112 130 121
Hemlo 93 98 97
Other 42 50 177
---------------------------------------------------------------------
North America 1,140 1,230 1,205
---------------------------------------------------------------------
Plutonic 122 120 105
Kalgoorlie 183 153 124
Cowal - - -
Bulyanhulu 135 109 134
Tulawaka - - -
Other 101 91 89
---------------------------------------------------------------------
Australia/Africa 541 473 452
---------------------------------------------------------------------
Pierina 251 332 303
Veladero - - -
Pascua-Lama - - -
Lagunas Norte - - -
Other - - 7
---------------------------------------------------------------------
South America 251 332 310
---------------------------------------------------------------------
Exploration group - - -
---------------------------------------------------------------------
---------------------------------------------------------------------
Segment total $ 1,932 $ 2,035 $ 1,967
---------------------------------------------------------------------
---------------------------------------------------------------------
Segment operating costs
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Goldstrike $ 475 $ 531 $ 436
Round Mountain 83 66 73
Eskay Creek 9 18 14
Hemlo 57 60 64
Other 21 29 96
---------------------------------------------------------------------
North America 645 704 683
---------------------------------------------------------------------
Plutonic 69 62 57
Kalgoorlie 107 87 82
Cowal 1 - -
Bulyanhulu 96 73 78
Tulawaka - 2 3
Other 60 53 45
---------------------------------------------------------------------
Australia/Africa 333 277 265
---------------------------------------------------------------------
Pierina 69 76 72
Veladero 5 18 20
Pascua-Lama 4 - -
Lagunas Norte 12 29 29
Other 3 - 5
---------------------------------------------------------------------
South America 93 123 126
---------------------------------------------------------------------
Exploration group 96 67 42
---------------------------------------------------------------------
---------------------------------------------------------------------
Segment total $ 1,167 $ 1,171 $ 1,116
---------------------------------------------------------------------
---------------------------------------------------------------------
Segment income (loss)
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Goldstrike $ 121 $ 122 $ 95
Round Mountain 48 53 38
Eskay Creek 52 65 59
Hemlo 24 27 23
Other 11 7 56
---------------------------------------------------------------------
North America 256 274 271
---------------------------------------------------------------------
Plutonic 42 48 37
Kalgoorlie 56 46 23
Cowal (1) - -
Bulyanhulu 5 (1) 16
Tulawaka - (2) (3)
Other 27 26 33
---------------------------------------------------------------------
Australia/Africa 129 117 106
---------------------------------------------------------------------
Pierina 75 90 70
Veladero (5) (18) (20)
Pascua-Lama (4) - -
Lagunas Norte (12) (29) (29)
Other (3) - 2
---------------------------------------------------------------------
South America 51 43 23
---------------------------------------------------------------------
Exploration group (96) (67) (42)
---------------------------------------------------------------------
---------------------------------------------------------------------
Segment total $ 340 $ 367 $ 358
---------------------------------------------------------------------
Geographic information
---------------------------------------------------------------------
Assets Gold sales
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2004 2003 2002
---------------------------------------------------------------------
United States $ 1,976 $ 1,835 $ 911 $ 970 $ 906
Canada 492 480 229 260 299
---------------------------------------------------------------------
North America 2,468 2,315 1,140 1,230 1,205
---------------------------------------------------------------------
Australia 838 552 406 364 318
Tanzania 774 707 135 109 134
---------------------------------------------------------------------
Australia/Africa 1,612 1,259 541 473 452
---------------------------------------------------------------------
Peru 811 757 251 332 303
Argentina 645 219 - - -
Chile 120 90 - - -
---------------------------------------------------------------------
South America 1,576 1,066 251 332 303
---------------------------------------------------------------------
Other 618 718 - - 7
---------------------------------------------------------------------
$6,274 $5,358 $1,932 $ 2,035 $1,967
---------------------------------------------------------------------
Reconciliation of segment income
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Segment income $ 340 $ 367 $ 358
Accretion expense at producing mines (11) (10) -
Environmental remediation costs - - (34)
Other expenses at producing mines (16) (11) (14)
Amortization of corporate assets (27) (25) (26)
Business development costs (18) (17) (10)
Administration (71) (73) (50)
Interest income 25 31 26
Interest expense (19) (44) (57)
Other income (expense) (158) 4 (16)
---------------------------------------------------------------------
Income before income taxes and
other items $ 45 $ 222 $ 177
---------------------------------------------------------------------
Asset information
---------------------------------------------------------------------
Segment assets Amortization
---------------------------------------------------------------------
For the years ended
Dec.31 2004 2003 2004 2003 2002
---------------------------------------------------------------------
Goldstrike $ 1,290 $1,372 $ 149 $ 160 $ 147
Round Mountain 67 75 17 20 21
Eskay Creek 91 203 51 47 48
Hemlo 63 65 12 11 10
Other operating segments 28 29 10 14 25
---------------------------------------------------------------------
North America 1,539 1,744 239 252 251
---------------------------------------------------------------------
Plutonic 92 84 11 10 11
Kalgoorlie 277 250 20 20 19
Cowal 130 49 - - -
Bulyanhulu 566 539 34 37 40
Tulawaka 70 22 - - -
Other operating segments 89 84 14 12 11
---------------------------------------------------------------------
Australia/Africa 1,224 1,028 79 79 81
---------------------------------------------------------------------
Pierina 269 434 107 166 161
Veladero 456 88 - - -
Pascua-Lama 273 236 - - -
Lagunas Norte 220 9 - - -
---------------------------------------------------------------------
South America 1,218 767 107 166 161
---------------------------------------------------------------------
---------------------------------------------------------------------
Segment total 3,981 3,539 425 497 493
Cash and equivalents 1,398 970 - - -
Other items not allocated
to segments 895 849 27 25 26
---------------------------------------------------------------------
---------------------------------------------------------------------
Enterprise total $ 6,274 $ 5,358 $ 452 $ 522 $ 519
---------------------------------------------------------------------
---------------------------------------------------------------------
---------------------------------------------------------------------
Segment capital expenditures
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Goldstrike $ 72 $ 51 $ 46
Round Mountain 5 6 8
Eskay Creek 7 5 8
Hemlo 8 10 6
Other operating segments 12 8 19
---------------------------------------------------------------------
North America 104 80 87
---------------------------------------------------------------------
Plutonic 15 44 20
Kalgoorlie 10 14 14
Cowal 73 24 13
Bulyanhulu 46 36 56
Tulawaka 48 1 -
Other operating segments 12 21 14
---------------------------------------------------------------------
Australia/Africa 204 140 117
---------------------------------------------------------------------
Pierina 8 17 5
Veladero 284 68 -
Pascua-Lama 35 9 11
Lagunas Norte 182 4 5
---------------------------------------------------------------------
South America 509 98 21
---------------------------------------------------------------------
---------------------------------------------------------------------
Segment total 817 318 225
Cash and equivalents - - -
Other items not allocated
to segments 7 4 3
---------------------------------------------------------------------
---------------------------------------------------------------------
Enterprise total $ 824 $ 322 $ 228
---------------------------------------------------------------------
---------------------------------------------------------------------
4. REVENUE AND GOLD SALES CONTRACTS
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Gold bullion sales
Gold sales contracts $ 709 $ 1,504 $ 1,401
Spot market sales 1,111 426 460
---------------------------------------------------------------------
1,820 1,930 1,861
Concentrate sales 112 105 106
---------------------------------------------------------------------
$ 1,932 $ 2,035 $ 1,967
---------------------------------------------------------------------
We record revenue when the following conditions are met:
persuasive evidence of an arrangement exists; delivery has occurred
under the terms of the arrangement; the price is fixed or
determinable; and collectability is reasonably assured.
Bullion sales
We record revenue from gold and silver bullion sales at the time
of delivery and transfer of title to the gold or silver to
counterparties. Incidental revenues from the sale of by-products
such as silver are classified within cost of sales.
At December 31, 2004, we had fixed-price gold sales contracts
with various counterparties for a total of 13.5 million ounces of
future gold production and floating-price forward gold sales
contracts for 0.5 million ounces. In 2004, we allocated 6.5 million
ounces of fixed-price gold sales contracts specifically to
Pascua-Lama. The allocation of these contracts will help reduce gold
price risk at Pascua-Lama and will help secure financing for its
construction. In addition to the gold sales contracts allocated to
Pascua-Lama, we have 7.0 million ounces of corporate gold sales
contracts that we intend to settle through delivery of future gold
production from our operating mines and development projects,
excluding Pascua-Lama. The terms of the contracts are governed by
master trading agreements (MTAs) that we have in place with the
counterparties to the contracts. The contracts have final delivery
dates primarily over the next 10 years, but we have the right to
settle these contracts at any time over this period. Contract prices
are established at inception through to an interim date.
If we do not deliver at this interim date, a new interim date is
set. The price for the new interim date is determined in accordance
with the MTAs which have contractually agreed price adjustment
mechanisms based on the market gold price. The MTAs have both fixed
and floating price mechanisms. The fixed-price mechanism represents
the market price at the start date (or previous interim date) of the
contract plus a premium based on the difference between the forward
price of gold and the current market price. If at an interim date we
opt for a floating price, the floating price represents the spot
market price at the time of delivery of gold plus or minus the
difference between the previously fixed price and the market gold
price at that interim date. The final realized selling price under a
contract primarily depends upon the timing of the actual future
delivery date, the market price of gold at the start of the contract
and the actual amount of the premium of the forward price of gold
over the spot price of gold for the periods that fixed selling prices
are set. The mark-to-market on the fixed-price gold sales contracts
(at December 31, 2004) was negative $966 million for the Pascua-Lama
gold sales contracts at negative $949 million for the Corporate gold
sales contracts.
The difference between the forward price of gold and the current
market price, referred to as contango, can be expressed as a
percentage that is closely correlated to the difference between US
dollar interest rates and gold lease rates. Historically short-term
gold lease rates have been lower than longer-term rates. We use gold
lease rate swaps to achieve a more economically optimal term
structure for gold lease rates implicit in contango. Under the swaps
we receive a fixed gold lease rate, and pay a floating gold lease
rate, on a notional 2.1 million ounces of gold spread from 2005 to
2013. The swaps are associated with forward gold sales contracts
with expected delivery dates beyond 2006. Lease rate swaps are
classified as non-hedge derivatives (note 16C).
Floating spot price sales contracts were previously fixed-price
forward sales contracts for which, in accordance with the terms of
our MTAs, we have elected to receive floating spot gold and silver
prices, adjusted by the difference between the spot price and the
contract price at the time of such election. Floating prices were
elected for these contracts so that we could economically regain spot
gold price leverage under the terms of delivery into these contracts.
Furthermore, floating price mechanisms were elected for these
contracts at a time when the then current market price was higher
than the fixed price in the contract. The mark-to-market on these
contracts (at December 31, 2004) was negative $25 million, which
equates to an average reduction to the future spot sales price of
approximately $52 per ounce, when we deliver gold at spot prices
against these contracts.
At December 31, 2004, one counterparty made up 11% of the ounces
committed under gold bullion sales contracts.
Concentrate sales
Our Eskay Creek and Bulyanhulu mines produce gold in concentrate
form. Our Veladero and Pascua-Lama mines will also produce gold in
concentrate form. Under the terms of our concentrate sales contracts
with independent smelting companies, gold sales prices are set on a
specified future date after shipment based on market prices. We
record revenues under these contracts at the time of shipment, which
is when title passes to the smelting companies, using forward market
gold prices on the expected date that final sales prices will be set.
Variations between the price recorded at the shipment date and the
actual final price set under the smelting contracts are caused by
changes in market gold prices, and result in an embedded derivative
in the accounts receivable. The embedded derivative is recorded at
fair value each period until final settlement occurs, with changes in
fair value classified as a component of revenue.
Impact of derivative embedded in concentrate sales receivables
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Gains included in revenue $ - $ - $ 1
5. COST OF SALES
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Cost of goods sold (1),(3) $ 1,136 $ 1,110 $ 1,133
By-product revenues(2) (146) (114) (119)
Royalty expense 53 50 37
Mining taxes 12 15 5
Other expenses at producing mines(4) 16 11 14
---------------------------------------------------------------------
$ 1,071 $ 1,072 $ 1,070
---------------------------------------------------------------------
(1) The presentation of cost of goods sold includes accretion expense
at producing mines of $11 million (2003 - $10 million; 2002 -
$nil). The cost of inventory sold in the period reflects the
components described in note 11, except that for presentation
purposes the component of inventory cost relating to amortization
of property, plant and equipment is classified in the income
statement under "amortization". Some companies present this
amount under "cost of sales". The amount presented in
amortization rather than cost of sales is $425 million in 2004;
$497 million in 2003 and $493 million in 2002.
(2) We use silver sales contracts to sell a portion of silver
produced as a by-product. Silver sales contracts have similar
delivery terms and pricing mechanisms as gold sales contracts.
At December 31, 2004, we had fixed-price commitments to deliver
12.4 million ounces of silver at an average price of $5.50 per
ounce and floating spot price sales contracts for 12 million
ounces over periods primarily of up to 10 years.
(3) Cost of goods sold includes environmental remediation costs of
$34 million in 2002.
(4) Includes the reversal of $15 million of accrued costs on
resolution of the Peruvian tax assessment (see note 7).
Royalties
Certain of our properties are subject to royalty arrangements
based on mineral production at the properties. The most significant
royalties are at the Goldstrike and Bulyanhulu mines and the
Pascua-Lama and Veladero projects. The primary type of royalty is a
net smelter return (NSR) royalty. Under this type of royalty we pay
the holder an amount calculated as the royalty percentage multiplied
by the value of gold production at market gold prices less
third-party smelting, refining and transportation costs. Most
Goldstrike production is subject to an NSR or net profits interest
(NPI) royalty. The highest Goldstrike royalties are a 5% NSR and a
6% NPI royalty. Bulyanhulu is subject to an NSR-type royalty of 3%.
Pascua-Lama gold production from the areas located in Chile is
subject to a gross proceeds sliding scale royalty, ranging from 1.5%
to 10%, and a 2% NSR on copper production. For areas located in
Argentina, Pascua-Lama is subject to a 3% NSR on extraction of all
gold, silver and other ores. Production at Veladero is subject to a
3.75% NSR on extraction of all gold, silver and other ores.
Royalty expense is recorded at the time of sale of gold
production, measured using the applicable royalty percentage for NSR
royalties or estimates of NPI amounts.
6. OTHER (INCOME) EXPENSE
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Non-hedge derivative (gains) losses
(note 16C) $ (5) $ (71) $ 6
Gains realized on sale of assets (34) (34) (4)
Environmental remediation costs(2) 43 55 -
Impairment of long-lived assets
Eskay Creek 58 - -
Peruvian exploration properties 67 - -
Other 14 5 11
Impairment charges on investments
(note 10) 5 11 -
World Gold Council fees 9 10 12
Litigation costs - 16 -
Currency translation (gains) losses 1 (2) (1)
Pension expense (note 22B) - 4 2
Other items(1) - 2 (10)
---------------------------------------------------------------------
$ 158 $ (4) $ 16
---------------------------------------------------------------------
(1) Includes the reversal of $6 million of accrued costs on
resolution of the Peruvian tax assessment (see note 7) and $4
million in severance costs related to the sale of the Holt
McDermott mine.
(2) Includes costs at development projects and closed mines.
Gains realized on sale of assets
In 2004 we sold various assets, including the Holt-McDermott mine
in Canada and certain land positions around our inactive mine sites
in the United States. These land positions were fully amortized in
prior years and therefore any proceeds generate gains on sale, before
selling costs and taxes.
Environmental remediation costs at closed mines
During the production phases of a mine, we incur and expense the
cost of various activities connected with environmental aspects of
normal operations, including compliance with and monitoring of
environmental regulations; disposal of hazardous waste produced from
normal operations; and operation of equipment designed to reduce or
eliminate environmental effects. In limited circumstances, costs to
acquire and install plant and equipment are capitalized during the
production phase of a mine if the costs are expected to mitigate risk
or prevent future environmental contamination from normal operations.
When a contingent loss arises from the improper use of an asset,
a loss accrual is recorded if the loss is probable and reasonably
estimable. Amounts recorded are measured on an undiscounted basis,
and adjusted as further information develops or if circumstances
change. Recoveries of environmental remediation costs from other
parties are recorded as assets when receipt is deemed probable.
Impairment of long-lived assets
Eskay Creek
The asset group that comprises the Eskay Creek mine was tested
for impairment effective December 31, 2004. The principal factors
that caused us to test this asset group for impairment included:
downward revisions to proven and probable reserves; the impact of the
continued strengthening of the C$ against the US$ and upward
revisions to expected asset retirement costs in the fourth quarter of
2004. An impairment charge of $58 million was recorded, which
represents the amount by which the carrying amount of the asset group
exceeds its estimated fair value. Fair value was estimated using the
method described in note 12C.
Peruvian exploration properties
At the end of 2004, upon completion of the exploration program
for the year, we assessed the results and updated our future plans
for various exploration properties in Peru that were originally
acquired through the Arequipa acquisition in 1996. We concluded that
the results and future potential did not merit any further investment
for these properties. The assets were tested for impairment, and an
impairment charge of $67 million was recorded that reflects the
amounts by which their carrying amounts exceed their estimated fair
values. The fair value of this group of assets was judged to be
minimal due to the unfavorable results of exploration work in the
properties.
Litigation costs
In November 2003, we paid Inmet C$111 million (US $86 million),
in full settlement of the Inmet litigation. The settlement resulted
in an expense of US$14 million in fourth quarter 2003, combined with
post-judgment interest of $2 million in the first nine months of 2003.
7. INCOME TAX (RECOVERY) EXPENSE
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Current
Canada $ 19 $ 40 $ 44
International 24 14 15
---------------------------------------------------------------------
$ 43 $ 54 $ 59
---------------------------------------------------------------------
Deferred
Canada $ (26) $ (32) $ (45)
International 7 45 (8)
---------------------------------------------------------------------
$ (19) $ 13 $ (53)
---------------------------------------------------------------------
Income tax expense before
elements below(1) $ 24 $ 67 $ 6
Release of beginning of year
valuation allowances (5) (62) -
Outcome of tax uncertainties (141) - (22)
Change in tax status in Australia (81) - -
---------------------------------------------------------------------
Total (recovery) expense $ (203) $ 5 $ (16)
---------------------------------------------------------------------
(1) All amounts are deferred tax items except for a $21 million
portion of the $141 million recovery on resolution of the
Peruvian tax assessment in 2004, which is a current tax item.
Outcome of tax uncertainties
Peruvian tax assessment
On September 30, 2004, the Tax Court of Peru issued a decision in
our favor in the matter of our appeal of a 2002 income tax assessment
of $32 million, excluding interest and penalties. The Peruvian tax
agency, SUNAT, had until mid-January 2005 to appeal the decision.
The 2002 income tax assessment related to a tax audit of our
Pierina Mine for the 1999 and 2000 fiscal years. The assessment
mainly related to the validity of a revaluation of the Pierina mining
concession, which affects its tax basis. Under the valuation proposed
by SUNAT, the tax basis of the Pierina mining concession would have
changed from what we previously assumed with a resulting increase in
current and deferred income taxes. The full life of mine effect on
our current and deferred income tax liabilities, totaling $141
million, was recorded at December 31, 2002, as were other related
costs of about $21 million for periods through 2003.
In January 2005, we received confirmation in writing that there
would be no appeal of the September 30, 2004 Tax Court of Peru
decision. The confirmation concluded the administrative and judicial
appeals process with resolution in Barrick's favor. As a result, we
recorded a $141 million reduction in current and deferred income tax
liabilities and a $21 million reduction in other accrued costs in
2004; $15 million of which is classified in "other expenses at
producing mines" within cost of sales and $6 million of which is
classified in other (income) expense.
Other uncertainties
In 2002, we recorded a credit of $22 million reflecting the net
impact of tax planning completed in the period and the outcome of
certain tax uncertainties.
Changes in tax status in Australia
A new tax law has been enacted in Australia that allows wholly
owned groups of companies resident in Australia to elect to be
treated as a single entity and to file consolidated tax returns.
This new regime is elective and the election is irrevocable. Under
certain circumstances, the rules governing the election allow for a
choice to reset the tax cost basis of certain assets within a
consolidated group. This election will be effective for us for the
2004 fiscal year. This election results in an estimated upward
revaluation of the tax basis of our assets in Australia, by $110
million, with a corresponding $33 million adjustment to deferred
taxes.
In 2004, we filed an election to use US dollars as the functional
currency for Australian tax calculations and tax returns, whereas
previously Australian dollars were used. Prior to this election, the
favorable impact of changes in the tax basis of non-monetary assets
caused by changes in the US$:A$ exchange rate were not recorded, as
their realization was not certain. The election in 2004 created
certainty about the realization of these favorable tax temporary
differences and resulted in our recognition of these as deferred tax
assets amounting to $48 million. The impact of the change in tax
status was to increase the amount of deductible temporary differences
relating to non-monetary assets by $48 million.
Release of beginning of year valuation allowances
In 2004, we released valuation allowances totaling $5 million in
Australia following the consolidated tax return election described
above. In 2003, we released valuation allowances totaling $62
million, which mainly included: $21 million in North America
following a corporate reorganization of certain subsidiaries that
enabled us to utilize certain previously unrecognized tax assets; $16
million in Australia realized in 2003 due to an increase in taxable
income from higher gold prices; and $15 million in Argentina after
the approval to begin construction of our new Veladero mine and
classification of mineralization as a proven and probable reserve.
---------------------------------------------------------------------
Reconciliation to Canadian federal rate
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
At 38% statutory federal rate $ 17 $ 84 $ 67
Increase (decrease) due to:
Allowances and special tax
deductions(1) (34) (17) (12)
Impact of foreign tax rates(2) (5) (42) (67)
Expenses not tax-deductible 10 11 9
Release of beginning of year
valuation allowances (5) (62) -
Recognition of deferred tax assets(3) (81) - -
Valuation allowances set up against
current year tax losses 29 23 3
Outcome of tax uncertainties (141) - (22)
Withholding taxes on intercompany
interest 1 1 11
Mining taxes 5 8 3
Other items 1 (1) (8)
---------------------------------------------------------------------
Income tax expense (recovery) $ (203) $ 5 $ (16)
---------------------------------------------------------------------
(1) We are able to claim certain allowances and tax deductions unique
to extractive industries that result in a lower effective tax
rate.
(2) We operate in multiple foreign tax jurisdictions that have
different tax rates than the Canadian federal rate.
(3) In 2004, we recognized a $81 million deferred tax asset in
Australia due to a change in tax status.
Income tax returns
Our income tax returns for the major jurisdictions where we
operate have been fully examined through the following years: Canada
- 2000, United States - 2001, and Peru - 2000.
American Jobs Creation Act of 2004
The American Jobs Creation Act of 2004 ("the Act") was signed
into law on October 22, 2004. The Act creates an elective incentive
for U.S. multinationals to repatriate accumulated earnings from
controlled foreign corporations. The repatriation incentive is only
available for 2004 or 2005. We are currently evaluating the
application of the repatriation incentive; however, we cannot
complete our analysis until additional legislation and/or IRS
guidance is provided to clarify key elements of the legislation.
8. EARNINGS PER SHARE
---------------------------------------------------------------------
For the years ended Dec.31
($ millions, except shares in
millions and per share amounts
in dollars) 2004 2003 2002
---------------------------------------------------------------------
Income available to common stockholders
Basic $ 248 $ 200 $ 193
Effect of dilutive stock options - - -
---------------------------------------------------------------------
Diluted $ 248 $ 200 $ 193
---------------------------------------------------------------------
Weighted average shares outstanding
Basic 533 539 541
Effect of dilutive stock options 1 - -
---------------------------------------------------------------------
Diluted 534 539 541
---------------------------------------------------------------------
Earnings per share
Basic $ 0.47 $ 0.37 $ 0.36
Diluted $ 0.46 $ 0.37 $ 0.36
---------------------------------------------------------------------
9. SUPPLEMENTAL CASH FLOW INFORMATION
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Income statement items:
Currency translation losses $ 1 $ 5 $ -
(Gains) losses on investments (note 10) (1) 7 3
Accounting changes (note 2B) - 17 -
Accretion expense (note 17A) 18 17 -
Non-hedge derivative (gains) losses
(note 16C) (5) (71) 6
Inmet litigation - 16 -
Current income tax expense (note 7) 22 54 59
Impairment charges on long-lived
assets (note 6) 139 5 11
Revisions to expected cost of AROs
at closed mines (note 17A) 22 10 -
Amortization of debt issue costs 3 1 1
Losses on write-down of inventory
to market value (note 11) 9 3 6
Changes in:
Accounts receivable (2) 3 (12)
Inventories (51) (1) 26
Accounts payable 4 4 (25)
Capitalized mining costs 9 37 29
Other assets and liabilities (25) 6 (12)
Cash payments:
Merger and related costs - - (50)
Asset retirement obligations (33) (40) (70)
Current income taxes (45) (111) (52)
Other items - 4 35
---------------------------------------------------------------------
Other net operating activities $ 65 $ (34) $ (45)
---------------------------------------------------------------------
Interest paid, net of amounts
capitalized $ 19 $ 44 $ 57
---------------------------------------------------------------------
10. INVESTMENTS
Available-for-sale securities
---------------------------------------------------------------------
At Dec.31 2004 2003
---------------------------------------------------------------------
Fair Gains Fair Gains
value in OCI value in OCI
---------------------------------------------------------------------
Benefit plans:(1)
Fixed-income securities $ 11 $ - $ 6 $ -
Equity securities 19 10 26 8
Strategic investments:
Equity securities(2) 104 - 98 30
---------------------------------------------------------------------
Total $ 134 $ 10 $ 130 $ 38
---------------------------------------------------------------------
(1) Under various benefit plans for certain former Homestake
executives, a portfolio of marketable fixed-income and equity
securities are held in a rabbi trust that is used to fund
obligations under the plans.
(2) Other investments mainly include an investment in Highland Gold
with a fair value of $75 million at December 31, 2004.
Available-for-sale securities are recorded at fair value with
unrealized gains and losses recorded in OCI. Realized gains and
losses are recorded in earnings when investments mature or on sale,
calculated using the average cost of securities sold. We recognize
in earnings any unrealized declines in fair value judged to be other
than temporary (2004 - $5 million; 2003 - $11 million; 2002 - $nil).
Total proceeds from the sale of investments were $9 million in 2004
(2003 - $8 million; 2002 - $3 million).
Gains (losses) on investments recorded in earnings
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Realized on sale
Gains $ 6 $ 5 $ -
Losses - (1) (3)
Impairment charges (5) (11) -
---------------------------------------------------------------------
$ 1 $ (7) $ (3)
---------------------------------------------------------------------
Investment in Highland Gold Mining PLC ("Highland")
In 2004, we acquired a further 9.3 million common shares of
Highland for $40 million in cash. Combined with the purchase of 11.1
million common shares for $46 million in October 2003, we held a 14%
interest in Highland common shares at December 31, 2004.
We have also formed a strategic partnership with Highland under
which:
- We have the right to participate on an exclusive basis for up
to 50% on any acquisition made by Highland in Russia; and a similar
right extends to Highland for any acquisition made by us in certain
regions in Russia, excluding Irkutsk.
- We have a right of first refusal with respect to third-party
investment in Highland's Mayskoye property in the Chutotka region,
Russia, and plan to pursue discussions with Highland on establishing
a joint venture at Mayskoye.
Investment in Celtic Resources Holdings PLC ("Celtic")
On December 2, 2004, Barrick and Celtic entered into a
subscription agreement under which we agreed to subscribe for
3,688,191 units of Celtic for $7.562 per unit. Each unit consists of
one ordinary share of Celtic and one-half of one share purchase
warrant. Each whole warrant entitles us to acquire one ordinary
share of Celtic for $7.562, expiring on December 31, 2005. In the
event that Celtic does not acquire 100% of the license to the
Nezhdaninskoye deposit before June 1, 2005, the number of warrants
will automatically increase by 50%. Completion of the subscription
occurred on January 5, 2005 upon which we held a 9% interest in
Celtic's outstanding ordinary shares.
In connection with the completion of the subscription, Barrick
and Celtic entered into the following agreements:
- We have the pre-emptive right to subscribe for up to $75
million of Celtic shares at $7.562 per share.
- Nezhdaninskoye Right of First Refusal. Celtic has granted us
the right of first refusal on any proposed sale of its direct or
indirect interest in Nezhdaninskoye.
- Nezhdaninskoye Purchase Option. Celtic has granted us the
right to indirectly purchase 51% of its interest in Nezhdaninskoye
for $195 million, exercisable for a period of six months starting if
and when Celtic indirectly acquires 100% of Nezhdaninskoye.
- Kazakhstan Participation. Celtic has granted to us the right
to acquire 50% of any interest in any mineral property in Kazakhstan
that Celtic acquires. We have 12 months to elect to participate in
any such acquisitions by Celtic. To participate, we must pay Celtic
50% of the cost to Celtic of its interest in the mineral property.
11. ACCOUNTS RECEIVABLE, INVENTORIES AND OTHER CURRENT ASSETS
---------------------------------------------------------------------
At Dec.31 2004 2003
---------------------------------------------------------------------
Accounts receivable
Amounts due from concentrate sales $ 29 $ 26
Other 29 30
---------------------------------------------------------------------
$ 58 $ 56
---------------------------------------------------------------------
Inventories
Gold in process and ore in stockpiles $ 198 $ 163
Mine operating supplies 82 58
---------------------------------------------------------------------
280 221
Non-current ore in stockpiles(1) (65) (57)
---------------------------------------------------------------------
$ 215 $ 164
---------------------------------------------------------------------
Other current assets
Derivative assets (note 16C) $ 165 $ 154
Taxes recoverable 104 9
Prepaid expenses 17 15
---------------------------------------------------------------------
$ 286 $ 178
---------------------------------------------------------------------
(1) Ore that we do not expect to process in the next 12 months is
classified in other assets (note 14).
Inventories
Material extracted from our mines is classified as either ore or
waste. Ore represents material that can be mined, processed into a
saleable form and sold at a profit. Ore, which represents material
included in proven and probable reserves, is recorded as an asset
that is classified within inventory at the point it is extracted from
the mine. Ore is accumulated in stockpiles that are subsequently
processed into gold in a saleable form under a mine plan that takes
into consideration optimal scheduling of production of our reserves,
present plant capacity, and the market price of gold.
We record gold in process and ore in stockpiles at cost, less
provisions required to reduce inventory to market value. Costs
capitalized to inventory include direct and indirect materials and
consumables; direct labor; repairs and maintenance; utilities;
amortization of property, plant and equipment; amortization of
capitalized mining costs; and local mine administrative expenses.
Costs are removed from inventory and recorded in cost of sales based
on the average cost per ounce of gold in inventory. Average cost is
calculated based on the cost of inventory at the beginning of a
period, plus the cost of inventory produced in a period.
---------------------------------------------------------------------
Significant ore in stockpiles
---------------------------------------------------------------------
At Dec.31 2004 2003
---------------------------------------------------------------------
Goldstrike
Ore that requires roasting $ 23 $ 22
Ore that requires autoclaving 17 19
Kalgoorlie 46 32
---------------------------------------------------------------------
At Goldstrike, we expect to fully process the autoclave stockpile
by 2009 and the roaster stockpile by 2016. At Kalgoorlie, we expect
to process the stockpile by 2017.
Mine operating supplies are recorded at purchase cost, less
provisions to reduce slow-moving and obsolete supplies to market
value.
Cost of sales includes losses recorded to reduce inventory cost
to market value as follows: 2004 - $9 million; 2003 - $3 million;
2002 - $6 million.
12. PROPERTY, PLANT AND EQUIPMENT
---------------------------------------------------------------------
At Dec.31 2004 2003
---------------------------------------------------------------------
Acquired mineral properties and
capitalized mine development costs $ 4,489 $ 4,242
Buildings, plant and equipment 3,289 2,831
---------------------------------------------------------------------
7,778 7,073
Accumulated amortization (4,387) (3,945)
---------------------------------------------------------------------
$ 3,391 $ 3,128
---------------------------------------------------------------------
A Acquired mineral properties and capitalized mine development
costs
Exploration and development stage properties
We capitalize the cost of acquisition of land and mineral rights.
The cost is allocated between proven and probable reserves and
mineralization not considered proven and probable reserves at the
date of acquisition, based on relative fair values. If we later
establish that some mineralization meets the definition of proven and
probable gold reserves, we classify a portion of the capitalized
acquisition cost as relating to reserves.
After acquisition, various factors can affect the recoverability
of the capitalized cost of land and mineral rights, particularly the
results of exploration drilling. The length of time between the
acquisition of land and mineral rights and when we undertake
exploration work varies based on the prioritization of our
exploration projects and the size of our exploration budget. If we
conclude that the carrying amount of land and mineral rights is
impaired, we reduce this carrying amount to estimated fair value
through an impairment charge.
We capitalize costs incurred at development projects that meet
the definition of an asset after mineralization is classified as
proven and probable gold reserves (as defined by United States
reporting standards). Before classifying mineralization as proven
and probable gold reserves, costs incurred at development projects
are considered exploration costs, and are expensed as incurred.
Effective May 1, 2004, we determined that mineralization at Lagunas
Norte met the definition of proven and probable reserves for United
States reporting purposes. Following this determination, we began
capitalizing costs that meet the definition of an asset at Lagunas
Norte prospectively for future periods. The cost of start-up
activities at new mines such as recruiting and training is expensed
as incurred.
At December 31, 2004 the following assets were in an exploration,
development or construction stage and amortization of the capitalized
costs had not yet begun.
---------------------------------------------------------------------
Carrying amount at Targeted timing of
Dec.31, 2004 production start-up
---------------------------------------------------------------------
Development stage projects
Veladero $ 362 2005
Lagunas Norte 196 2005
Tulawaka 70 2005
Cowal 128 2006
Pascua-Lama 230 2009
Buzwagi 102 -
Nevada Power Plant 18 2005
---------------------------------------------------------------------
Total $ 1,106
---------------------------------------------------------------------
Interest cost is considered an element of the historical cost of
an asset when a period of time is necessary to prepare it for its
intended use. We capitalize interest costs to assets under
development or construction while activities are in progress. We
stop capitalizing interest costs when construction of an asset is
substantially complete and it is ready for its intended use. We
measure the amount capitalized based on cumulative capitalized costs,
exclusive of the impact, if any, of impairment charges on the
carrying amount of an asset.
Producing mines
We start amortizing capitalized mineral property acquisition and
mine development costs when production begins. Amortization is
capitalized as a component of the cost of inventory. Amortization is
calculated using the "units-of-production" method, where the
numerator is the number of ounces produced and the denominator is the
estimated recoverable ounces of gold contained in proven and probable
reserves.
During production at underground mines, we incur development
costs to build new shafts, drifts and ramps that will enable us to
physically access ore underground. The time over which we will
continue to incur these costs depends on the mine life, and in some
cases could be up to 25 years. These underground development costs
are capitalized as incurred. In years prior to 2003 we amortized the
aggregate total of historically capitalized costs, and estimated
costs that will be incurred to enable access to the ore body over the
remaining mine life, using the units-of-production method. In 2003,
we changed the method of amortizing these costs to better attribute
these costs to ounces of gold produced, as well as to remove the
uncertainty inherent in using estimates of future underground
development costs in the measurement of amortization.
Under our revised method of measuring amortization for
underground development costs, the cost incurred to access specific
ore blocks or areas of the mine, which only provides an economic
benefit over the period of mining that ore block or area, is
attributed to earnings using the units-of-production method where the
denominator is estimated recoverable ounces of gold contained in
proven and probable reserves within that ore block or area. If
capitalized costs provide an economic benefit over the entire mine
life, the costs are attributed to earnings using the
units-of-production method, where the denominator is the estimated
recoverable ounces of gold contained in total accessible proven and
probable reserves.
B Buildings, plant and equipment
We record buildings, plant and equipment at cost. We capitalize
costs that extend the productive capacity or useful economic life of
an asset. Repairs and maintenance expenditures are expensed as
incurred. We amortize the cost less estimated residual value, using
the straight-line method over the estimated useful economic life of
the asset. The longest estimated useful economic life for buildings
and equipment at ore processing facilities is 25 years and for mining
equipment is 15 years.
C Impairment evaluations - operating mines and development
projects
We review and test the carrying amounts of assets when events or
changes in circumstances suggest that the carrying amount may not be
recoverable. We group assets at the lowest level for which
identifiable cash flows are largely independent of the cash flows of
other assets and liabilities. For operating mines and development
projects, all assets are included in one group. If there are
indications that an impairment may have occurred, we prepare
estimates of expected future cash flows for each group of assets.
Expected future cash flows are based on a probability-weighted
approach applied to potential outcomes.
Estimates of expected future cash flow reflect:
- Estimated sales proceeds from the production and sale of
recoverable ounces of gold contained in proven and probable reserves;
- Expected future commodity prices and currency exchange rates
(considering historical and current prices, price trends and related
factors). In impairment assessments conducted in 2004 we used an
expected future market gold price of $400 per ounce, and an expected
future market A$:US$ exchange rate of $0.70 and C$:US$ exchange rate
of $0.82;
- Expected future operating costs and capital expenditures to
produce proven and probable gold reserves based on mine plans that
assume current plant capacity, but exclude the impact of inflation;
- Expected cash flows associated with value beyond proven and
probable reserves, which includes the expected cash outflows required
to develop and extract the value beyond proven and probable reserves;
and
- Environmental remediation costs excluded from the measurement
of asset retirement obligations.
We record a reduction of a group of assets to fair value as a
charge to earnings if expected future cash flows are less than the
carrying amount. We estimate fair value by discounting the expected
future cash flows using a discount factor that reflects the risk-free
rate of interest for a term consistent with the period of expected
cash flows.
D Capital commitments
At December 31, 2004, we had capital commitments of $322 million
for 2005/2006 in connection with construction at our development
projects and of a power plant in Nevada for the Goldstrike mine.
13. CAPITALIZED MINING COSTS
We capitalize and amortize certain costs relating to the removal
of waste rock at open-pit mines, commonly referred to as "stripping
costs". We include in inventory, amortization of amounts capitalized
based on a "stripping ratio" using the units-of-production method.
This accounting method results in the smoothing of these costs
over the life of a mine. Instead of capitalizing and amortizing
these costs, some mining companies capitalize them to inventory as
incurred, which may result in the reporting of greater volatility in
period-to-period results. If we followed a policy of capitalizing
these costs to inventory as incurred, rather than using our present
policy, our reported cost of sales would have been $9 million lower
in 2004 (2003 - $37 million lower, 2002 - $29 million lower).
Stripping ratios(1)
---------------------------------------------------------------------
For the years ended Mine life
Dec.31 (years)(2) 2004 2003 2002
---------------------------------------------------------------------
Goldstrike Open Pit 14 109:1 112:1 112:1
Pierina 4 60:1 48:1 48:1
---------------------------------------------------------------------
(1) The stripping ratio is calculated as the ratio of total tons (ore
and waste) of material to be moved compared to total recoverable
proven and probable gold reserves.
(2) Costs capitalized will be fully amortized by the end of the mine
lives. The carrying amount of capitalized mining costs is
grouped with property, plant and equipment for impairment
evaluation purposes.
14. OTHER ASSETS
---------------------------------------------------------------------
At Dec.31 2004 2003
---------------------------------------------------------------------
Derivative assets (note 16C) $ 257 $ 256
Ore in stockpiles (note 11) 65 57
Taxes recoverable 50 52
Deferred income tax assets (note 18) 97 59
Debt issue costs 38 11
Deferred stock-based compensation (note 21B) 5 6
Other 54 56
---------------------------------------------------------------------
$ 566 $ 497
---------------------------------------------------------------------
Debt issue costs
Additions to debt issue costs in 2004 principally relate to new
debt financings put in place during the year. Amortization of debt
issue costs is calculated on a straight-line basis or using the
interest method over the term of each debt obligation, and classified
as a component of interest cost.
15. OTHER CURRENT LIABILITIES
---------------------------------------------------------------------
At Dec.31 2004 2003
---------------------------------------------------------------------
Asset retirement obligations (note 17A) $ 33 $ 36
Current part of long-term debt (note 16B) 31 41
Derivative liabilities (note 16C) 11 3
Post-retirement benefits (note 22) 2 5
Deferred revenue 5 17
Other 1 17
---------------------------------------------------------------------
$ 83 $ 119
---------------------------------------------------------------------
16. FINANCIAL INSTRUMENTS
Financial instruments include cash; evidence of ownership in an
entity; or a contract that imposes an obligation on one party and
conveys a right to a second entity to deliver/receive cash or another
financial instrument. Information on certain types of financial
instruments is included in these financial statements as follows:
accounts receivable - note 11; investments - note 10; restricted
stock units - note 21.
A Cash and equivalents
Cash and equivalents include cash, term deposits and treasury
bills with original maturities of less than 90 days.
B Long-term debt
---------------------------------------------------------------------
At Dec.31
---------------------------------------------------------------------
2004 2003
---------------------------------------------------------------------
7 1/2% debentures(2) $ 495 $ 501
5 4/5% notes(3) 397 -
4 7/8% notes(4) 348 -
Veladero financing(5) 198 -
Bulyanhulu financing(6) 150 174
Variable-rate bonds(7) 63 80
Capital leases 5 5
Construction debt under build to suit lease(8) 30 -
Other interest - -
---------------------------------------------------------------------
1,686 760
Less: current part / interest capitalized (31) (41)
---------------------------------------------------------------------
$ 1,655 $ 719
---------------------------------------------------------------------
---------------------------------------------------------------------
For the years ended Dec.31
---------------------------------------------------------------------
2004 2003 2002
---------------------------------------------------------------------
Interest Effective Interest Effective Interest Effective
cost rate(1) cost rate(1) cost rate(1)
---------------------------------------------------------------------
7 1/2%
debentures(2) $ 31 6.1% $ 31 6.1% $ 38 5.7%
5 4/5% notes(3) 3 6.0% - - - -
4 7/8% notes(4) 2 5.0% - - - -
Veladero
financing(5) 4 7.5% - - - -
Bulyanhulu
financing(6) 14 8.0% 15 7.7% 15 7.2%
Variable-rate
bonds(7) 1 1.2% 1 1.1% 1 1.4%
Capital leases - 7.8% - 8.2% 1 7.9%
Construction debt
under build to
suit lease(8) - - - - - -
Other interest 5 - 2 - 4 -
---------------------------------------------------------------------
60 6.1% 49 6.3% 59 6.8%
Less: current
part/interest
capitalized (41) (5) (2)
---------------------------------------------------------------------
$ 19 $ 44 $ 57
---------------------------------------------------------------------
(1) The effective rate includes the stated interest rate under the
debt agreement, amortization of debt issue costs, and the impact
of interest rate contracts designated in a hedging relationship
with long-term debt.
(2) On April 22, 1997, we issued $500 million of debentures that
mature on May 1, 2007.
(3) On November 12, 2004, we issued $400 million of debentures that
mature on November 15, 2034. The debentures were issued at a $3
million discount.
(4) On November 12, 2004, we issued $350 million of debentures that
mature on November 15, 2014. The debentures were issued at a $2
million discount.
(5) One of our wholly owned subsidiaries, Minera Argentina Gold S.A.
in Argentina has a variable-rate limited recourse amortizing loan
facility for $250 million. At December 31, 2004, a total of $198
million had been drawn down under this facility. We have
guaranteed the loan until completion occurs, after which it will
become non-recourse. The loan is insured for political risks by
branches of the Canadian and German governments.
(6) One of our wholly owned subsidiaries, Kahama Mining Corporation
Ltd. in Tanzania, has a variable-rate non-recourse amortizing
loan for $150 million. The loan is insured for political risks
equally by branches of the Canadian government and the World
Bank.
(7) Certain of our wholly owned subsidiaries have issued
variable-rate, tax-exempt bonds of $25 million (due 2029) and $38
million (due 2032) for a total of $63 million.
(8) One of our wholly owned subsidiaries, Minera Barrick
Misquichilca, has entered into a $56 million build to suit lease
facility to finance the construction of the leach pad and process
facilities at the Lagunas Norte project. The five year lease
term begins on October 1, 2005. Amounts reimbursed for
construction costs at December 31, 2004 have been presented as
"construction debt" until the lease term begins. Obligations
under the lease will be repayable in 20 equal quarterly
installments over the term of the lease.
(9) We also have a credit and guarantee agreement with a group of
banks (the "Lenders"), which requires the Lenders to make
available to us a credit facility of up to $1 billion or the
equivalent amount in Canadian currency. The credit facility,
which is unsecured, matures in April 2008 and has an interest
rate of LIBOR plus 0.27% to 0.35% when used, and an annual
fee of 0.08%. We have not drawn any amounts under the credit
facility.
Scheduled debt repayments(1)
---------------------------------------------------------------------
2009 and
2005 2006 2007 2008 thereafter
---------------------------------------------------------------------
7 1/2% debentures $ - $ - $ 500 $ - $ -
5 4/5% notes - - - - 400
4 7/8% notes - - - - 350
Veladero financing - 24 46 38 90
Bulyanhulu financing 31 34 34 34 17
Variable-rate bonds - - - - 63
---------------------------------------------------------------------
$ 31 $ 58 $ 580 $ 72 $ 920
---------------------------------------------------------------------
(1) Excludes capital leases and build to suit lease facility.
Minimum payments under capital leases(1)
---------------------------------------------------------------------
Years ending Dec.31
---------------------------------------------------------------------
2005 $ 12
2006 15
2007 12
2008 11
2009 11
---------------------------------------------------------------------
Capital lease obligations $ 61
---------------------------------------------------------------------
(1) Includes the $56 million build to suit lease facility.
C Use of derivative instruments ("derivatives") in risk management
In the normal course of business, our assets, liabilities and
forecasted transactions are impacted by various market risks
including:
---------------------------------------------------------------------
Item Impacted by
---------------------------------------------------------------------
- Cost of sales
---------------------------------------------------------------------
- Consumption of oil and - Prices of oil and propane
propane
---------------------------------------------------------------------
- Local currency denominated - Currency exchange rates -
expenditures US dollar versus A$ and C$
---------------------------------------------------------------------
- Administration costs in local - Currency exchange rates -
currencies US dollar versus A$ and C$
---------------------------------------------------------------------
- Capital expenditures in local - Currency exchange rates - US
currencies dollar versus A$, C$ and EURO
---------------------------------------------------------------------
- Interest earned on cash - US dollar interest rates
---------------------------------------------------------------------
- Interest payments on - US dollar interest rates
variable-rate debt
---------------------------------------------------------------------
- Fair value of fixed-rate debt - US dollar interest rates
---------------------------------------------------------------------
Under our risk management policy we seek to mitigate the impact
of these market risks to control costs and enable us to plan our
business with greater certainty. The timeframe and manner in which
we manage these risks varies for each item based upon our assessment
of the risk and available alternatives for mitigating risk. For
these particular risks, we believe that derivatives are an effective
means of managing risk.
The primary objective of the hedging elements of our derivative
positions is that changes in the values of hedged items are offset by
changes in the values of derivatives. Most of the derivatives we use
meet the FAS 133 hedge effectiveness criteria and are designated in a
hedge accounting relationship. Some of the derivative positions are
effective in achieving our risk management objectives but they do not
meet the strict FAS 133 hedge effectiveness criteria, and they are
classified as "non-hedge derivatives".
Our use of derivatives is based on established practices and
parameters, which are subject to the oversight of the Finance
Committee of the Board of Directors. A Compliance Function
independent of the Corporate Treasury Group monitors derivative
transactions and has responsibility for recording and accounting for
derivatives.
Accounting policy for derivatives
We record derivatives on the balance sheet at fair value except
for gold and silver sales contracts, which are excluded from the
scope of FAS 133, because the obligations will be met by physical
delivery of our gold and silver production and they meet the other
requirements set out in paragraph 10(b) of FAS 133. In addition, our
past sales practices, productive capacity and delivery intentions are
consistent with the definition of a normal sales contract.
Accordingly, we have elected to designate our gold and silver sales
contracts as "normal sales contracts" with the result that the
principles of FAS 133 are not applied to them. Instead we apply
revenue recognition accounting principles as described in note 4.
On the date we enter into a derivative that is accounted for
under FAS 133, we designate it as either a hedging instrument or a
non-hedge derivative. A hedging instrument is designated in either:
- a fair value hedge relationship with a recognized asset or
liability; or
- a cash flow hedge relationship with either a forecasted
transaction or the variable future cash flows arising from a
recognized asset or liability.
At the inception of a hedge, we formally document all
relationships between hedging instruments and hedged items, including
the related risk-management strategy. This documentation includes
linking all hedging instruments to either specific assets and
liabilities, specific forecasted transactions or variable future cash
flows. It also includes the method of assessing retrospective and
prospective hedge effectiveness. In cases where we use regression
analysis to assess prospective effectiveness, we consider regression
outputs for the coefficient of determination (R-squared), the slope
coefficient and the t-statistic to assess whether a hedge is expected
to be highly effective. Each period, using a dollar offset approach,
we retrospectively assess whether hedging instruments have been
highly effective in offsetting changes in the fair value of hedged
items and we measure the amount of any hedge ineffectiveness. We
also assess each period whether hedging instruments are expected to
be highly effective in the future. If a hedging instrument is not
expected to be highly effective, we stop hedge accounting
prospectively. In this case accumulated gains or losses remain in
other comprehensive income ("OCI") until the hedged item affects
earnings. We also stop hedge accounting prospectively if:
- a derivative is settled;
- it is no longer highly probable that a forecasted transaction
will occur; or
- we de-designate a hedging relationship.
If we conclude that it is probable that a forecasted transaction
will not occur in the originally specified time frame, or within a
further two-month period, gains and losses accumulated in OCI are
immediately transferred to earnings. In all situations when hedge
accounting stops, a derivative is classified as a non-hedge
derivative prospectively. Cash flows from derivative transactions
are included under operating activities, except for derivatives
designated as a cash flow hedge of forecasted capital expenditures,
which are included under investing activities.
Changes in the fair value of derivatives each period are recorded
as follows:
- Fair value hedges: recorded in earnings as well as changes in
fair value of the hedged item.
- Cash flow hedges: recorded in OCI until earnings are affected
by the hedged item, except for any hedge ineffectiveness which is
recorded in earnings immediately.
- Non-hedge derivatives: recorded in earnings.
Summary of derivatives at Dec.31, 2004(1)
---------------------------------------------------------------------
Notional Amount by Term to Maturity
---------------------------------------------------------------------
Within 2 to 5 Over 5
1 year years years Total
---------------------------------------------------------------------
US dollar Interest rate contracts
Receive-fixed swaps (millions) $ 75 $ 725 $ - $ 800
Pay-fixed swaps (millions) - 150 125 275
---------------------------------------------------------------------
Net notional position $ 75 $ 575 $ (125) $ 525
---------------------------------------------------------------------
Currency contracts
C$:US$ contracts (C$ millions) C$ 350 C$ 600 C$ - C$ 950
A$:US$ contracts (A$ millions) A$ 844 A$ 1,291 A$ - A$ 2,135
EUR:US$ contracts (EUR millions) EUR 26 EUR - EUR - EUR 26
---------------------------------------------------------------------
Commodity contracts
Fuel (WTI) (thousands of barrels) 738 1,618 - 2,356
Propane contracts
(millions of gallons) 11 18 - 29
---------------------------------------------------------------------
---------------------------------------------------------------------
Fair
Accounting Classification by value
Notional Amount (millions)
---------------------------------------------------------------------
Cash flow Fair value
hedge hedge Non-Hedge
---------------------------------------------------------------------
US dollar Interest
rate contracts
Receive-fixed swaps
(millions) $ 300 $ 500 $ - $ (5)
Pay-fixed swaps
(millions) 150 - 125 (24)
---------------------------------------------------------------------
Net notional position $ 150 $ 500 $ (125) $ (29)
---------------------------------------------------------------------
Currency contracts
C$:US$ contracts
(C$ millions) C$ 935 C$ - C$ 15 $ 99
A$:US$ contracts
(A$ millions) A$ 2,125 A$ - A$ 10 $ 198
EUR:US$ contracts
(EUR millions) EUR 26 EUR - EUR - EUR 1
---------------------------------------------------------------------
Commodity contracts
Fuel (WTI)
(thousands of barrels) 1,946 - 410 $ 7
Propane contracts
(millions of gallons) 29 - - $ (3)
---------------------------------------------------------------------
(1) Excludes normal sales contracts
US dollar interest rate contracts
Cash flow hedges - cash balances
Receive-fixed swaps have been designated against the first $300
million of our cash balances as a hedge of the variability of
forecasted interest receipts on the balances caused by changes in
Libor.
Prior to December 2004, prospective and retrospective hedge
effectiveness was assessed using the hypothetical derivative method
under FAS 133. The prospective test involves comparing the effect of
a theoretical shift in the forward interest rate curve on the fair
value of both the actual and hypothetical derivative. The
retrospective test involves comparing the effect of actual changes in
interest rates in each period on the fair value of both the actual
and hypothetical derivative using a dollar offset approach. In
December 2004, we de-designated these swaps and immediately
re-designated them in a new hedging relationship in order to adopt a
new method of assessing prospective and retrospective effectiveness.
At the time of the redesignation these swaps had a fair value near
zero. From December 2004 onwards, under the new method, prospective
and retrospective hedge effectiveness is assessed using the change in
variable cash flows method. This involves a comparison of the
floating-rate leg of the swap to the variable-rate cash flows from
interest receipts on cash.
Each period the effective portion of changes in the fair value of
the swaps, which relates to future interest receipts, is recorded in
OCI. Also, as interest is received and recorded in earnings, an
amount equal to the difference between the fixed-rate interest earned
on the swaps and the variable-rate interest earned on cash is
recorded in earnings as a component of interest income.
Cash flow hedges - Bulyanhulu financing
Pay-fixed swaps totaling $150 million have been designated
against the Bulyanhulu financing, as a hedge of the variability in
forecasted interest payments caused by changes in Libor. We have
concluded that the hedges are 100% effective under FAS 133, because
the conditions of FAS 133 for the assumption of no hedge
ineffectiveness have been met. Changes in fair value of the swaps,
which relate to future interest payments, are recorded in OCI. Also,
as interest payments on the financing are recorded in earnings, an
amount equal to the difference between the fixed-rate interest paid
on the swap and the variable-rate interest paid on the financing is
recorded in earnings as a component of interest costs.
Fair value hedges
Receive-fixed swaps totaling $500 million have been designated
against the 7 1/2% debentures as a hedge of the variability in the
fair value of the debentures caused by changes in Libor. We have
concluded that the hedges are 100% effective under FAS 133, because
the critical terms (including: notional amount, maturity date,
interest payment and underlying interest rate - i.e. Libor) of the
swaps and the debentures are the same. Changes in fair value of the
swaps, together with an equal corresponding change in fair value of
the debentures, caused by changes in Libor, are recorded in earnings
each period. Also, as interest payments on the debentures are
recorded in earnings, an amount equal to the difference between the
fixed-rate interest received under the swap less the variable-rate
interest paid under the swap is recorded in earnings as a component
of interest costs.
Non-hedge contracts
We use gold lease rate swaps as described in note 4. The
valuation of gold lease rate swaps is impacted by market US dollar
interest rates. Our non-hedge pay-fixed swap position mitigates the
impact of changes in US dollar interest rates on the valuation of
gold lease rate swaps.
Currency contracts
Cash flow hedges
Currency contracts totaling C$935 million, A$2,125 million and
EURO 26 million have been designated against forecasted local
currency denominated expenditures as a hedge of the variability of
the US dollar amount of those expenditures caused by changes in
currency exchange rates. Hedged items are identified as the first
stated quantity of dollars of forecasted expenditures in a future
month. For a C$730 million and A$1,671 million portion of the
contracts, we have concluded that the hedges are 100% effective under
FAS 133 because the critical terms (including: notional amount and
maturity date) of the hedged items and currency contracts are the
same. For EUR 26 million, and the remaining C$205 million and A$454
million portions, prospective and retrospective hedge effectiveness
is assessed using the hypothetical derivative method under FAS 133.
The prospective test involves comparing the effect of a theoretical
shift in forward exchange rates on the fair value of both the actual
and hypothetical derivative. The retrospective test involves
comparing the effect of historic changes in exchange rates each
period on the fair value of both the actual and hypothetical
derivative using a dollar offset approach. The effective portion of
changes in fair value of the currency contracts is recorded in OCI
until the forecasted expenditure impacts earnings. For expenditures
capitalized to the cost of inventory, this is upon sale of inventory,
and for capital expenditures, this is when amortization of the
capital assets is recorded in earnings.
If it is probable that a hedged item will no longer occur, the
accumulated gains or losses in OCI for the associated currency
contract are reclassified to earnings immediately. The
identification of which currency contracts are associated with these
hedged items uses a last-in, first-out ("LIFO") approach, based on
the order in which currency contracts were originally designated in a
hedging relationship.
Commodity contracts
Cash flow hedges
Commodity contracts totaling 1,946 thousand barrels of diesel
fuel and 29 million gallons of propane have been designated against
forecasted purchases of the commodities for expected consumption at
our mining operations. The contracts act as a hedge of the impact of
variability in market prices on the cost of future commodity
purchases. Hedged items are identified as the first stated quantity
in millions of barrels/gallons of forecasted purchases in a future
month. Prospective and retrospective hedge effectiveness is assessed
using the hypothetical derivative method under FAS 133. The
prospective test is based on regression analysis of the
month-on-month change in fair value of both the actual derivative and
a hypothetical derivative caused by actual historic changes in
commodity prices over the last three years. The retrospective test
involves comparing the effect of historic changes in commodity prices
each period on the fair value of both the actual and hypothetical
derivative using a dollar offset approach. The effective portion of
changes in fair value of the commodity contracts is recorded in OCI
until the forecasted transaction impacts earnings. The cost of
commodity consumption is capitalized to the cost of inventory, and
therefore this is upon the sale of inventory.
If it is probable that a hedged item will no longer occur, the
accumulated gains or losses in OCI for the associated commodity
contract are reclassified to earnings immediately. The
identification of which commodity contracts are associated with these
hedged items uses a LIFO approach, based on the order in which
commodity contracts were originally designated in a hedging
relationship.
Non-hedge contracts
Non-hedge fuel contracts are used to mitigate the risk of oil
price changes on consumption at the Pierina, Eskay Creek and Lagunas
Norte mines. On completion of regression analysis, we concluded that
the contracts do not meet the "highly effective" criterion in FAS 133
due to currency and basis differences between contract prices and the
prices charged to the mines by oil suppliers. Despite not qualifying
as an accounting hedge, the contracts protect the Company to a
significant extent from the effects of oil price changes.
Derivative assets and liabilities
---------------------------------------------------------------------
2004 2003
---------------------------------------------------------------------
At Jan.1 $ 337 $ 29
Derivatives settled (120) (91)
Change in fair value of:
Non-hedge derivatives 3 52
Cash flow hedges
Effective portion 147 348
Ineffective portion - 1
Fair value hedges (8) (2)
---------------------------------------------------------------------
At Dec.31 $ 359(1) $ 337(1)
---------------------------------------------------------------------
Classification:
Other current assets $ 165 $ 154
Other assets 257 256
Other current liabilities (11) (3)
Other long-term obligations (52) (70)
---------------------------------------------------------------------
$ 359 $ 337
---------------------------------------------------------------------
(1) Derivative assets and liabilities are presented net and related
amounts due to/from counterparties if the conditions of FIN No.
39, Offsetting of Amounts Related to Certain Contracts, are met.
Amounts receivable from counterparties netted against derivative
liabilities totaled $16 million at December 31, 2004.
Non-hedge derivative gains (losses)(1)
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Non-hedge derivatives
Commodity contracts $ (9) $ 3 $ (2)
Currency contracts (4) 17 8
Interest rate contracts 16 32 (12)
---------------------------------------------------------------------
3 52 (6)
Hedge ineffectiveness
Ongoing hedge inefficiency - 1 -
Due to changes in timing of
hedged items 2 18 -
---------------------------------------------------------------------
$ 5 $ 71 $ (6)
---------------------------------------------------------------------
(1) Non-hedge derivative gains (losses) are classified as a component
of other (income) expense.
Cash Flow Hedge Gains (Losses) in OCI
---------------------------------------------------------------------
Commodity price hedges
---------------------------------------------------------------------
Gold/Silver Fuel
---------------------------------------------------------------------
At Dec.31, 2001 $ 25 $ -
Effective portion of change in
fair value of hedging instruments (4) -
Transfers to earnings:
On recording hedged items in earnings (12) -
---------------------------------------------------------------------
At Dec.31, 2002 9 -
Effective portion of change in fair
value of hedging instruments 4 (1)
Transfers to earnings:
On recording hedged items in earnings (13) -
Hedge ineffectiveness due to changes in
timing of hedged items - -
---------------------------------------------------------------------
At Dec.31, 2003 - (1)
Effective portion of change in fair value of
hedging instruments - 7
Transfers to earnings:
On recording hedged items in earnings - (4)
Hedge ineffectiveness due to changes in
timing of hedged items - -
---------------------------------------------------------------------
At Dec.31, 2004 $ - $ 2
---------------------------------------------------------------------
Gold Cost of
Hedge gains/losses classified within Sales sales
---------------------------------------------------------------------
Portion of hedge gain (loss) expected to
affect 2005 earnings(2) $ - $ 3
---------------------------------------------------------------------
Currency hedges
---------------------------------------------------------------------
Operating Administration Capital
costs costs expenditures
---------------------------------------------------------------------
At Dec.31, 2001 $ - $ - $ -
Effective portion of change
in fair value of
hedging instruments 33 - -
Transfers to earnings:
On recording hedged items
in earnings (7) - -
---------------------------------------------------------------------
At Dec.31, 2002 26 - -
Effective portion of change in
fair value of
hedging instruments 251 32 54
Transfers to earnings:
On recording hedged items in
earnings (58) (7) -
Hedge ineffectiveness due to
changes in timing of
hedged items - - (18)(1)
---------------------------------------------------------------------
At Dec.31, 2003 219 25 36
Effective portion of change
in fair value of hedging
instruments 117 19 19
Transfers to earnings:
On recording hedged items
in earnings (96) (11) (5)
Hedge ineffectiveness due to
changes in timing of
hedged items - - (2)(1)
---------------------------------------------------------------------
At Dec.31, 2004 $ 240 $ 33 $ 48
---------------------------------------------------------------------
Hedge gains/losses Cost of
classified within sales Administration Amortization
---------------------------------------------------------------------
Portion of hedge gain (loss)
expected to affect 2005
earnings(2) $ 110 $ 18 $ 2
---------------------------------------------------------------------
---------------------------------------------------------------------
Interest rate hedges
---------------------------------------------------------------------
Cash Long-term
balances debt Total
---------------------------------------------------------------------
At Dec.31, 2001 $ - $ - $ 25
Effective portion of change in
fair value of hedging instruments 37 (17) 49
Transfers to earnings:
On recording hedged items in earnings (11) 5 (25)
---------------------------------------------------------------------
At Dec.31, 2002 26 (12) 49
Effective portion of change in fair
value of hedging instruments 9 (1) 348
Transfers to earnings:
On recording hedged items in earnings (18) 5 (91)
Hedge ineffectiveness due to changes in
timing of hedged items - - (18)
---------------------------------------------------------------------
At Dec.31, 2003 17 (8) 288
Effective portion of change in fair
value of hedging instruments 5 (20) 147
Transfers to earnings:
On recording hedged items in earnings (19) 3 (132)
Hedge ineffectiveness due to changes in
timing of hedged items - - (2)
---------------------------------------------------------------------
At Dec.31, 2004 $ 3 $ (25) $ 301(2)
---------------------------------------------------------------------
Interest Interest
Hedge gains/losses classified within income cost
---------------------------------------------------------------------
Portion of hedge gain (loss) expected
to affect 2005 earnings(2) $ 7 $ (4) $ 136
---------------------------------------------------------------------
(1) On determining that certain forecasted capital expenditures were
no longer likely to occur within two months of the originally
specified time frame.
(2) Based on the fair value of hedge contracts at December 31, 2004.
D Fair Value of Financial Instruments
Fair value is the value at which a financial instrument could be
closed out or sold in a transaction with a willing and knowledgeable
counterparty over a period of time consistent with our risk
management or investment strategy. Fair value is based on quoted
market prices, where available. If market quotes are not available,
fair value is based on internally developed models that use
market-based or independent information as inputs. These models
could produce a fair value that may not be reflective of future fair
value.
Fair value information
---------------------------------------------------------------------
At Dec.31 2004 2003
---------------------------------------------------------------------
Carrying Estimated Carrying Estimated
amount fair value amount fair value
---------------------------------------------------------------------
Financial assets
Cash and equivalents(1) $ 1,398 $ 1,398 $ 970 $ 970
Accounts receivable(1) 58 58 56 56
Investments(2) 134 134 130 130
Derivative assets(3) 422 422 410 410
---------------------------------------------------------------------
$ 2,012 $ 2,012 $ 1,566 $ 1,566
---------------------------------------------------------------------
Financial liabilities
Accounts payable(1) $ 335 $ 335 $ 245 $ 245
Long-term debt(4) 1,686 1,731 760 841
Derivative liabilities(3) 63 63 73 73
Restricted stock units(5) 6 6 10 10
---------------------------------------------------------------------
$ 2,090 $ 2,135 $ 1,088 $ 1,169
---------------------------------------------------------------------
(1) Recorded at cost. Fair value approximates the carrying amounts
due to the short-term nature and generally negligible credit
losses.
(2) Recorded at fair value. Quoted market prices, when available, are
used to determine fair value. If quoted market prices are not
available, then fair values are estimated by using quoted prices
of instruments with similar characteristics or discounted cash
flows.
(3) Recorded at fair value using liquid market pricing based on
exchange traded prices, broker-dealer quotations or related input
factors which assume all counterparties have the same credit
rating.
(4) Long-term debt is generally recorded at cost except for
obligations that are designated in a fair value hedge
relationship, which are recorded at fair value in periods where a
hedge relationship exists. The fair value of long-term debt is
based on current market interest rates, adjusted for our credit
quality.
(5) Recorded at fair value based on the period end market stock
price.
E Credit risk
Credit risk is the risk that a third party might fail to fulfill
its performance obligations under the terms of a financial
instrument. For cash and equivalents and accounts receivable, credit
risk represents the carrying amount on the balance sheet.
For derivatives, when the fair value is positive, this creates
credit risk. When the fair value of a derivative is negative, we
assume no credit risk. In cases where we have a legally enforceable
master netting agreement with a counterparty, credit risk exposure
represents the net amount of the positive and negative fair values
for similar types of derivatives. For a net negative amount, we
regard credit risk as being zero. A net positive amount for a
counterparty is a reasonable measure of credit risk when there is a
legally enforceable master netting agreement. We mitigate credit
risk by:
- entering into derivatives with high credit-quality
counterparties;
- limiting the amount of exposure to each counterparty; and
- monitoring the financial condition of counterparties.
Credit quality of financial assets
---------------------------------------------------------------------
At Dec.31, 2004 S&P Credit rating
---------------------------------------------------------------------
AA- or A- or
higher higher B to BBB Total
---------------------------------------------------------------------
Cash and equivalents $ 744 $ 654 $ - $ 1,398
Derivatives(1) 303 71 - 374
Accounts receivable - - 58 58
---------------------------------------------------------------------
$ 1,047 $ 725 $ 58 $ 1,830
---------------------------------------------------------------------
Number of counterparties(2) 14 5 -
---------------------------------------------------------------------
Largest counterparty (%) 31.5 35.1 -
---------------------------------------------------------------------
Concentrations of credit risk
---------------------------------------------------------------------
United Other
At Dec.31, 2004 States Canada International Total
---------------------------------------------------------------------
Cash and equivalents $ 1,172 $ 69 $ 157 $ 1,398
Derivatives(1) 145 193 36 374
Accounts receivable 7 22 29 58
---------------------------------------------------------------------
$ 1,324 $ 284 $ 222 $ 1,830
---------------------------------------------------------------------
(1) The amounts presented reflect the net credit exposure after
considering the effect of master netting agreements.
(2) For cash and equivalents and derivatives combined.
F Risks relating to the use of derivatives
By using derivatives, in addition to credit risk, we are affected
by market risk and market liquidity risk. Market risk is the risk
that the fair value of a derivative might be adversely affected by a
change in commodity prices, interest rates, gold lease rates, or
currency exchange rates, and that this in turn affects our financial
condition. We manage market risk by establishing and monitoring
parameters that limit the types and degree of market risk that may be
undertaken. We mitigate this risk by establishing trading agreements
with counterparties under which we are not required to post any
collateral or make any margin calls on our derivatives. Our
counterparties cannot require settlement solely because of an adverse
change in the fair value of a derivative.
Market liquidity risk is the risk that a derivative cannot be
eliminated quickly, by either liquidating it or by establishing an
offsetting position. Under the terms of our trading agreements,
counterparties cannot require us to immediately settle outstanding
derivatives, except upon the occurrence of customary events of
default such as covenant breaches, including financial covenants,
insolvency or bankruptcy. We generally mitigate market liquidity
risk by spreading out the maturity of our derivatives over time.
17. OTHER LONG-TERM OBLIGATIONS
---------------------------------------------------------------------
At Dec.31 2004 2003
---------------------------------------------------------------------
Asset retirement obligations $ 334 $ 282
Pension benefits (note 22) 49 48
Post-retirement benefits (note 22) 26 26
Derivative liabilities (note 16C) 52 70
Restricted stock units (note 21B) 6 10
Other 32 28
---------------------------------------------------------------------
$ 499 $ 464
---------------------------------------------------------------------
A Asset retirement obligations (AROs)
---------------------------------------------------------------------
2004 2003
---------------------------------------------------------------------
At Jan.1 $ 318 $ 334
AROs incurred in the period 14 -
Impact of revisions to expected cash flows
Adjustments to carrying amount of assets 32 -
Charged to earnings 22 10
Settlements
Cash payments (33) (40)
Settlement gains (4) (3)
Accretion 18 17
---------------------------------------------------------------------
At Dec.31 367 318
Current part (33) (36)
---------------------------------------------------------------------
$ 334 $ 282
---------------------------------------------------------------------
In 2003 we adopted FAS 143 and changed our accounting policy for
reclamation and closure costs. Previously we accrued estimated
reclamation and closure costs over the life of our mines using the
units-of-production method based on the estimated recoverable ounces
of gold in proven and probable reserves.
AROs arise from the acquisition, development, construction and
normal operation of mining property, plant and equipment, due to
government controls and regulations that protect the environment on
the closure and reclamation of mining properties. Under FAS 143 we
record the fair value of an ARO when it is incurred. At operating
mines the effect is recorded as an adjustment to the corresponding
asset carrying amount. At closed mines, the adjustment is charged
directly to earnings. The fair value of AROs are measured by
discounting the expected cash flows using a discount factor that
reflects the risk-free rate of interest. We prepare estimates of
timing and amount of expected cash flows when an ARO is incurred,
which are updated to reflect changes in facts and circumstances, or
if we are required to submit updated mine closure plans to regulatory
authorities. The principal factors that can cause expected cash
flows to change are: the construction of new processing facilities;
changes in the quantities of material in reserves and a corresponding
change in the life of mine plan; changing ore characteristics can
impact required environmental protection measures and related costs;
changes in water quality that impact the extent of water treatment
required; and changes in laws and regulations governing the
protection of the environment. In general, as the end of the mine
life becomes nearer, the reliability of expected cash flows
increases. AROs are adjusted to reflect the passage of time
(accretion) calculated by applying the discount factor implicit in
the initial fair value measurement to the beginning of period
carrying amount of the AROs. Accretion is recorded in earnings as an
operating expense. Upon settlement of an ARO we record a gain or
loss if the actual cost differs from the carrying amount of the ARO.
Settlement gains are classified in other (income) expense. Other
environmental remediation costs that are not AROs as defined by FAS
143 are expensed as incurred (see note 6).
The major parts of the carrying amount of AROs at the end of 2004
relate to: tailing and heap leach pad closure/ rehabilitation - $69
million; demolition of buildings/mine facilities - $29 million;
ongoing water treatment - $93 million; ongoing care and maintenance -
$89 million; and other activities - $87 million.
18. DEFERRED INCOME TAXES
Recognition and measurement
We record deferred income tax assets and liabilities where
temporary differences exist between the carrying amounts of assets
and liabilities in our balance sheet and their tax bases. The
measurement and recognition of deferred income tax assets and
liabilities takes into account: enacted rates that will apply when
temporary differences reverse; interpretations of relevant tax
legislation; tax planning strategies; estimates of the tax bases of
assets and liabilities; and the deductibility of expenditures for
income tax purposes. We recognize the effect of changes in our
assessment of these estimates and factors when they occur. Changes
in deferred income tax assets, liabilities and valuation allowances
are allocated between net income and other comprehensive income based
on the source of the change.
Deferred income taxes have not been provided on the undistributed
earnings of foreign subsidiaries, which are considered to be
reinvested indefinitely outside Canada. The determination of the
unrecorded deferred income tax liability is not considered
practicable.
Sources of deferred income tax assets and liabilities
---------------------------------------------------------------------
At Dec.31 2004 2003(1)
---------------------------------------------------------------------
Deferred tax assets
Tax loss carry forwards $ 295 $ 388
Capital tax loss carry forwards 48 52
Alternative minimum tax ("AMT")credits 121 120
Foreign tax credits 3 3
Asset retirement obligations 106 85
Property, plant and equipment 158 129
Post-retirement benefit obligations 18 21
Other 9 40
---------------------------------------------------------------------
Gross deferred tax assets 758 838
Valuation allowances (578) (554)
---------------------------------------------------------------------
Net deferred tax assets 180 284
Deferred tax liabilities
Property, plant and equipment (127) (443)
Derivatives (95) (99)
---------------------------------------------------------------------
$ (42) $ (258)
---------------------------------------------------------------------
Classification:
Non-current assets (note 14) $ 97 $ 59
Non-current liabilities (139) (317)
---------------------------------------------------------------------
$ (42) $ (258)
---------------------------------------------------------------------
(1) 2003 deferred tax asset balances for property, plant and
equipment and other have been restated with a corresponding
restatement of valuation allowances.
Expiry dates of tax losses and AMT credits
---------------------------------------------------------------------
No
expiry
'05 '06 '07 '08 '09+ date Total
---------------------------------------------------------------------
Tax losses(1)
Chile $ - $ - $ - $ - $ - $ 670 $ 670
Tanzania - - - - - 152 152
U.S. - - - - 224 - 224
Other 28 23 6 14 109 24 204
---------------------------------------------------------------------
$ 28 $ 23 $ 6 $ 14 $333 $ 846 $1,250
---------------------------------------------------------------------
AMT credits(2) - - - - - $ 121 $ 121
---------------------------------------------------------------------
(1) Represents the gross amount of tax loss carry forwards translated
at closing exchange rates at December 31, 2004.
(2) Represents the amounts deductible against future taxes payable in
years when taxes payable exceeds "minimum tax" as defined by
United States tax legislation.
Valuation allowances
We consider the need to record a valuation allowance against
deferred tax assets on a country-by-country basis, taking into
account the effects of local tax law. A valuation allowance is not
recorded when we conclude that sufficient positive evidence exists to
demonstrate that it is more likely than not that a deferred tax asset
will be realized. The main factors considered are:
- historic and expected future levels of future taxable income;
- opportunities to implement tax plans that affect whether tax
assets can be realized; and
- the nature, amount and expected timing of reversal of taxable
temporary differences.
Levels of future taxable income are mainly affected by: market
gold and silver prices; forecasted future costs and expenses to
produce gold reserves; quantities of proven and probable gold
reserves; market interest rates and foreign currency exchange rates.
If these factors or other circumstances change, we record an
adjustment to the valuation allowances to reflect our latest
assessment of the amount of deferred tax assets that will more likely
than not be realized.
A valuation allowance of $34 million has been set up against
certain deferred tax assets in Argentina. Historically, we have had
no income generating operations in Argentina, but following the
production start-up at Veladero in 2005, various factors will affect
future levels of taxable income in Argentina, including the volume of
gold produced and sold, gold selling prices and costs incurred to
produce gold. It is reasonably possible that an adjustment will be
made to this valuation allowance in the near term. A valuation
allowance of $189 million has been set up against certain deferred
tax assets in the United States. A majority of this valuation
allowance relates to AMT credits which have an unlimited carry
forward period. Increasing levels of future taxable income due to
gold selling prices and other factors and circumstances may result in
an adjustment to this valuation allowance.
Source of changes in deferred tax balances
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Temporary differences
Property, plant and equipment $ (86) $ 26 $ (30)
Asset retirement obligations (21) (2) 4
Tax loss carry forwards 93 (10) (22)
Derivatives (4) 82 13
Other (5) 4 (5)
---------------------------------------------------------------------
$ (23) $ 100 $ (40)
Adjustment to deferred tax balances
due to change in tax status(1) (81) - -
Release of beginning of year
valuation allowances (5) (62) -
Outcome of tax uncertainties (120) - (22)
---------------------------------------------------------------------
$ (229) $ 38 $ (62)
---------------------------------------------------------------------
Intraperiod allocation to:
Income before income taxes $ (225) $ (49) $ (75)
Cumulative accounting changes - 5 -
OCI (4) 82 17
Balance sheet reclassifications 13 23 (17)
---------------------------------------------------------------------
$ (216) $ 61 $ (75)
---------------------------------------------------------------------
(1) Relates to change in tax status in Australia (note 7).
19. CAPITAL STOCK
A Common shares
Our authorized capital stock includes an unlimited number of
common shares (issued 533,575,185 shares); 9,764,929 First preferred
shares, Series A (issued nil); 9,047,619 Series B (issued nil); 1
Series C special voting share (issued 1); and 14,726,854 Second
preferred shares Series A (issued nil).
During 2004, we repurchased 4.47 million common shares (2003:
8.75 million) for $95 million (2003: $154 million), at an average
cost of $21.20 per share (2003: $17.56). This resulted in a
reduction of common share capital by $35 million (2003: $67 million)
and a $60 million charge (being the difference between the repurchase
cost and the average historic book value of shares repurchased) to
retained earnings (2003: $87 million).
In 2004, we declared and paid dividends in US dollars totaling
$0.22 per share (2003 - $0.22 per share, 2002 - $0.22 per share).
B Exchangeable Shares
In connection with a 1998 acquisition, Barrick Gold Inc. ("BGI"),
issued 11.1 million BGI exchangeable shares, which are each
exchangeable for 0.53 of a Barrick common share at any time at the
option of the holder, and have essentially the same voting, dividend
(payable in Canadian dollars), and other rights as 0.53 of a Barrick
common share. BGI is a subsidiary that holds our interest in the
Hemlo and Eskay Creek Mines.
At December 31, 2004, 1.4 million (2003 - 1.5 million) BGI
exchangeable shares were outstanding, which are equivalent to 0.7
million Barrick common shares (2003 - 0.8 million common shares).
The equivalent common share amounts are reflected in the number of
common shares outstanding.
At any time on or after December 31, 2008, or when fewer than 1.4
million BGI exchangeable shares are outstanding, we have the right to
require the exchange of each outstanding BGI exchangeable share for
0.53 of a Barrick common share. While there are exchangeable shares
outstanding, we are required to present summary consolidated
financial information relating to BGI.
Summarized financial information for BGI
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Total revenues and other income $ 216 $ 226 $ 203
Less: costs and expenses 287 238 191
---------------------------------------------------------------------
Income (loss) before taxes $ (71) $ (12) $ 12
---------------------------------------------------------------------
Net loss $ (41) $ (31) $ (1)
---------------------------------------------------------------------
---------------------------------------------------------------------
At Dec.31 2004 2003
---------------------------------------------------------------------
Assets
Current assets $ 67 $ 81
Non-current assets 119 236
---------------------------------------------------------------------
$ 186 $ 317
---------------------------------------------------------------------
Liabilities and shareholders' equity
Other current liabilities 24 20
Intercompany notes payable 395 545
Other long-term liabilities 36 9
Deferred income taxes 20 67
Shareholders' equity (289) (324)
---------------------------------------------------------------------
$ 186 $ 317
---------------------------------------------------------------------
20. OTHER COMPREHENSIVE INCOME (LOSS) ("OCI")
---------------------------------------------------------------------
2004 2003 2002
---------------------------------------------------------------------
Accumulated OCI at Jan.1
Cash flow hedge gains, net of tax
of $99, $17, nil $ 189 $ 32 $ 25
Investments, net of tax of $nil, $nil,
$nil 38 (6) (4)
Currency translation adjustments,
net of tax of $nil, $nil, $nil (147) (144) (123)
Additional pension liability, net
of tax of $nil, $nil, $nil (7) (7) (5)
---------------------------------------------------------------------
$ 73 $ (125) $ (107)
---------------------------------------------------------------------
OCI for the year:
Changes in fair value of cash flow hedges 147 348 49
Changes in fair value of investments (27) 37 (5)
Currency translation adjustments 1 (3) (21)
Adjustments to pension liability (5) - (2)
Less: reclassification adjustments for
gains/losses recorded in earnings
Transfers of cash flow hedge gains to
earnings:
On recording hedged items in earnings (132) (91) (25)
Hedge ineffectiveness due to changes
in timing of hedged items (2) (18) -
Investments:
(Gains) losses realized on sale (6) (4) 3
Other than temporary impairment charges 5 11 -
---------------------------------------------------------------------
OCI, before tax (19) 280 (1)
Income tax expense related to OCI 4 (82) (17)
---------------------------------------------------------------------
Other comprehensive income (loss),
net of tax $ (15) $ 198 $ (18)
---------------------------------------------------------------------
Accumulated OCI at Dec.31
Cash flow hedge gains, net of tax
of $95, $99, $17 206 189 32
Investments, net of tax of $nil,
$nil, $nil 10 38 (6)
Currency translation adjustments,
net of tax of $nil, $nil, $nil (146) (147) (144)
Additional pension liability, net of
tax of $nil, $nil, $nil (12) (7) (7)
---------------------------------------------------------------------
$ 58 $ 73 $(125)
---------------------------------------------------------------------
21. STOCK-BASED COMPENSATION
A Stock options
Employee stock option activity (number of shares in millions)(2)
---------------------------------------------------------------------
2004 2003 2002
---------------------------------------------------------------------
Average Average Average
Shares price Shares price Shares price
---------------------------------------------------------------------
C$ options
At Jan.1 22 19 19
Granted 1 $ 28 5 $ 29 6 $ 25
Exercised(1) (2) $ 25 (1) $ 24 (4) $ 25
Cancelled/expired (2) $ 28 (1) $ 28 (2) $ 34
---------------------------------------------------------------------
At Dec.31 19 22 19
---------------------------------------------------------------------
US$ options
At Jan.1 2 3 6
Granted 5 $ 24 - - - -
Exercised(1) (1) $ 15 (1) $ 13 (2) $ 12
Cancelled/expired - - - - (1) $ 25
---------------------------------------------------------------------
At Dec.31 6 2 3
---------------------------------------------------------------------
(1) The exercise price of the options is the closing share price on
the day before the grant date. They vest evenly over four years,
beginning in the year after granting, and are exercisable over
7-10 years. At December 31, 2004, 13 million (2003 - 1 million,
2002 - 5 million) common shares, in addition to those currently
outstanding, were available for granting options.
(2) We are also obliged to issue about 0.3 million common shares
(2003 - 0.5 million common shares) in connection with outstanding
stock options assumed as part of a business combination in 1999.
These options have an average exercise price of C$20 (2003 -
C$20) and an average remaining term of one year.
Stock options outstanding (number of shares in millions)
---------------------------------------------------------------------
Outstanding Exercisable
---------------------------------------------------------------------
Range of Average
exercise Average life Average
prices Shares price (years) Shares price
---------------------------------------------------------------------
C$ options
$ 22 - $ 31 17 $ 27 7 10 $ 26
$ 32 - $ 43 2 $ 39 2 2 $ 39
---------------------------------------------------------------------
19 6 12
---------------------------------------------------------------------
US$ options
$ 9 - $ 18 1 $ 12 5 - -
$ 22 - $ 37 5 $ 24 6 1 $ 30
---------------------------------------------------------------------
6 6 1
---------------------------------------------------------------------
We record compensation cost for stock options based on the excess
of the market price of the stock at the grant date of an award over
the exercise price. Historically, the exercise price for stock
options has equaled the market price of stock at the grant date,
resulting in no compensation cost.
Option information
---------------------------------------------------------------------
For the years ended Dec.31
(per share and option
amounts in dollars) 2004 2003 2002
---------------------------------------------------------------------
Fair value per option $ 6.87 $ 8.50 $ 6.40
Valuation assumptions:
Expected term (years) 5 6 6
Volatility 30% 40% 40%
Dividend yield 1.0% 1.0% 1.4%
Risk-free interest rate 3.8% 4.5% 5.0%
---------------------------------------------------------------------
Pro forma effects
Net income, as reported $ 248 $ 200 $ 193
Stock-option expense (29) (24) (21)
---------------------------------------------------------------------
Pro forma net income $ 219 $ 176 $ 172
---------------------------------------------------------------------
Net income per share:
As reported - Basic $ 0.47 $ 0.37 $ 0.36
As reported - Diluted $ 0.46 $ 0.37 $ 0.36
---------------------------------------------------------------------
Pro forma(1) $ 0.41 $ 0.33 $ 0.32
---------------------------------------------------------------------
(1) Basic and diluted.
B Restricted Stock Units (RSUs) and Deferred Share Units (DSUs)
Under our RSU Plan, selected employees are granted RSUs, where
each RSU has a value equal to one Barrick common share. RSUs vest
and will be settled on the third anniversary of the grant date.
Additional RSUs are credited to reflect dividends paid on Barrick
common shares. RSUs are recorded at fair value on the grant date,
with a corresponding amount recorded as deferred compensation that is
amortized on a straight-line basis over the vesting period. Changes
in the fair value of the RSUs are recorded, with a corresponding
adjustment to deferred compensation. Compensation expense for 2004
was $4 million (2003 - $4 million). At December 31, 2004, the
weighted average remaining contractual life of RSUs was 2.0 years.
Under our DSU plan, Directors receive 50% of their basic annual
retainer in the form of DSUs, with the option to elect to receive
100% of such retainer in DSUs. Each DSU has the same value as one
Barrick common share. DSUs must be retained until the Director
leaves the Board, at which time the cash value of the DSUs will be
paid out. Additional DSUs are credited to reflect dividends paid on
Barrick common shares. DSUs are recorded at fair value on the grant
date and are adjusted for changes in fair value. Director's fee
expense for DSUs for 2004 was $0.6 million (2003: $0.2 million).
DSU and RSU activity
---------------------------------------------------------------------
DSUs Fair value RSUs Fair value
(in per unit (in per unit
thousands) (in dollars) thousands) (in dollars)
---------------------------------------------------------------------
At Dec.31, 2001 - $ - 515 $ 16
Canceled - (30) 20
Dividends - - 4 17
---------------------------------------------------------------------
At Dec.31, 2002 - $ - 489 $ 15
Canceled - - (171) 17
Granted 8 21 130 22
Dividends - - 4 20
---------------------------------------------------------------------
At Dec.31, 2003 8 $ 23 452 $ 23
Canceled - - (58) 23
Settled - - (293) 25
Granted 23 22 131 24
Dividends - 3 20
---------------------------------------------------------------------
At Dec.31, 2004 31 $ 24 235 $ 24
---------------------------------------------------------------------
22. POST-RETIREMENT BENEFITS
A Defined contribution pension plans
Certain employees take part in defined contribution employee
benefit plans. We also have a retirement plan for certain officers
of the Company, under which we contribute 15% of the officer's annual
salary and bonus. Our share of contributions to these plans, which
is expensed in the year it is earned by the employee, was $19 million
in 2004, $16 million in 2003 and $13 million in 2002.
B Defined benefit pension plans
We have one qualified defined benefit pension plan that covers
certain of our United States employees and provides benefits based on
employees' years of service. Our policy is to fund the amounts
necessary on an actuarial basis to provide enough assets to meet the
benefits payable to plan members under the Employee Retirement Income
Security Act of 1974. Independent trustees administer assets of the
plans, which are invested mainly in fixed-income and equity
securities. On December 31, 2004, the qualified defined benefit plan
was amended to freeze benefit accruals for all employees, resulting
in a curtailment gain of $2 million.
As well as the qualified plan, we have nonqualified defined
benefit pension plans covering certain employees and former directors
of the Company. An irrevocable trust ("rabbi trust") was set up to
fund these plans. The fair value of assets held in this trust was
$31 million in 2004 (2003 - $32 million), and is recorded in our
consolidated balance sheet under Investments.
Actuarial gains and losses arise when the actual return on plan
assets differs from the expected return on plan assets for a period,
or when the expected and actuarial accrued benefit obligations differ
at the end of the year. We amortize actuarial gains and losses over
the average remaining life expectancy of plan participants, in excess
of a 10% corridor.
Pension expense
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Return on plan assets $ (11) $ (11) $ (17)
Service cost - - 3
Interest cost 12 14 16
Actuarial gains (losses) 1 - (1)
Gain (loss) on curtailment/settlement (2) 1 1
---------------------------------------------------------------------
$ - $ 4 $ 2
---------------------------------------------------------------------
C Pension plan information
Fair value of plan assets
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003
---------------------------------------------------------------------
Balance at Jan.1 $ 166 $ 170
Actual return on plan assets 14 19
Company contributions 6 8
Benefits paid (16) (31)
---------------------------------------------------------------------
Balance at Dec.31 $ 170 $ 166
---------------------------------------------------------------------
---------------------------------------------------------------------
At Dec.31 2004 2003
---------------------------------------------------------------------
Target Actual Actual Actual
---------------------------------------------------------------------
Composition of plan assets:
Equity securities 50% 46% $ 78 $ 66
Debt securities 50% 54% 92 100
---------------------------------------------------------------------
100% 100% $ 170 $ 166
---------------------------------------------------------------------
Projected benefit obligation (PBO)
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003
---------------------------------------------------------------------
Balance at Jan.1 $ 221 $ 227
Interest cost 12 14
Actuarial losses 3 11
Benefits paid (16) (31)
Curtailments/settlements (2) -
---------------------------------------------------------------------
Balance at Dec.31 $ 218 $ 221
---------------------------------------------------------------------
Funded status(1) $ (48) $ (55)
Unrecognized actuarial losses 11 11
---------------------------------------------------------------------
Net benefit liability recorded $ (37) $ (44)
---------------------------------------------------------------------
ABO(2),(3) $ 217 $ 217
---------------------------------------------------------------------
(1) Represents the fair value of plan assets less projected benefit
obligations. Plan assets exclude investments held in a rabbi
trust that are recorded separately on our balance sheet under
Investments (fair value $31 million at December 31, 2004). In
the year ending December 31, 2005, we do not expect to make any
further contributions.
(2) For 2004 we used a measurement date of December 31, 2004 to
calculate accumulated benefit obligations.
(3) Represents the ABO for all plans. The ABO for plans where the
PBO exceeds the fair value of plan assets was $49 million
(2003: $217 million).
Investment strategy
We employ a total return investment approach, whereby a mix of
equities and fixed-income investments is used to maximize the
long-term return of plan assets. Risk is diversified through a blend
of equity and fixed-income investments, and also across geography and
market capitalization in US large cap stocks, US small cap stocks,
and international securities. Investment risk is measured and
monitored on an ongoing basis through annual liability measurements,
periodic asset/liability studies, and quarterly investment portfolio
reviews.
Rate of return on plan assets
In estimating the long-term rate of return for plan assets,
historical markets are studied and long-term historical returns on
equities and fixed-income investments reflect the widely accepted
capital market principle that assets with higher volatility generate
a greater return over the long run. Current market factors such as
inflation and interest rates are evaluated before long-term capital
market assumptions are finalized.
Expected future benefit payments
---------------------------------------------------------------------
For the years ending Dec.31
---------------------------------------------------------------------
2005 $ 16
2006 15
2007 16
2008 16
2009 16
2010 - 2014 $ 89
---------------------------------------------------------------------
Total recorded benefit liability
---------------------------------------------------------------------
At Dec.31 2004 2003
---------------------------------------------------------------------
Current $ - $ 3
Non-current 37 41
---------------------------------------------------------------------
Benefit plan liability $ 37 $ 44
Additional minimum liability (note 20) 12 7
---------------------------------------------------------------------
$ 49 $ 51
---------------------------------------------------------------------
D Actuarial assumptions
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Discount rate(1)
Benefit obligation 5.50% 6.25% 6.50%
Pension cost 6.25% 6.50% 6.75%
Return on plan assets(1) 7.00% 7.00% 8.50%
Wage increases 5.00% 5.00% 5.00%
---------------------------------------------------------------------
(1) Effect of a one-percent change: Discount rate: $22 million change
in ABO and change in pension cost; Return on plan assets:
$2 million change in pension cost.
E Other post-retirement benefits
We provide post-retirement medical, dental, and life insurance
benefits to certain employees. We use the corridor approach in the
accounting for post-retirement benefits. Actuarial gains and losses
resulting from variances between actual results and economic
estimates or actuarial assumptions are deferred and amortized over
the average remaining life expectancy of participants when the net
gains or losses exceed 10% of the accumulated post-retirement benefit
obligation. In 2004, we recorded a benefit expense of $2 million
(2003 - $nil, 2002 - $nil).
Other post-retirement benefits expense
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Interest cost $ 2 $ 1 $ 2
Prior service cost - - (1)
Curtailments/settlements - (1) (1)
---------------------------------------------------------------------
$ 2 $ - $ -
---------------------------------------------------------------------
Fair value of plan assets
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003
---------------------------------------------------------------------
Balance at Jan. 1 $ - $ -
Contributions 2 2
Benefits paid (2) (2)
---------------------------------------------------------------------
Balance at Dec. 31 $ - $ -
---------------------------------------------------------------------
Accumulated post-retirement benefit obligation
(APBO)
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003
---------------------------------------------------------------------
Balance at Jan. 1 $ 24 $ 28
Interest cost 2 1
Actuarial losses 5 (3)
Benefits paid (2) (2)
---------------------------------------------------------------------
Balance at Dec. 31 $ 29 $ 24
---------------------------------------------------------------------
Funded status (29) (24)
Unrecognized actuarial losses 1 (4)
---------------------------------------------------------------------
Net benefit liability recorded $ (28) $ (28)
---------------------------------------------------------------------
We have assumed a health care cost trend of 10% in 2004,
decreasing ratability to 5% in 2009 and thereafter. The assumed
health care cost trend had a minimal effect on the amounts reported.
A one percentage point change in the assumed health care cost trend
rate at December 31, 2004 would have increased the post-retirement
obligation by $3 million or decreased the post-retirement benefit
obligation by $2 million and would have had no significant effect on
the benefit expense for 2004.
Expected future benefit payments
---------------------------------------------------------------------
For the years ending Dec.31
---------------------------------------------------------------------
2005 $ 2
2006 2
2007 2
2008 2
2009 2
2010 - 2014 $ 9
---------------------------------------------------------------------
23. CONTINGENCIES, LITIGATION AND CLAIMS
Certain conditions may exist as of the date the financial
statements are issued, which may result in a loss to the Company but
which will only be resolved when one or more future events occur or
fail to occur. In assessing loss contingencies related to legal
proceedings that are pending against us or unasserted claims that may
result in such proceedings, the Company and its legal counsel
evaluate the perceived merits of any legal proceedings or unasserted
claims as well as the perceived merits of the amount of relief sought
or expected to be sought.
If the assessment of a contingency suggests that a loss is
probable, and the amount can be reliably estimated, then a loss is
recorded. When a contingent loss is not probable but is reasonably
possible, or is probable but the amount of loss cannot be reliably
estimated, then details of the contingent loss are disclosed. Loss
contingencies considered remote are generally not disclosed unless
they involve guarantees, in which case we disclose the nature of the
guarantee. Legal fees incurred in connection with pending legal
proceedings are expensed as incurred.
Bre-X Minerals
In 1998, we were added as a defendant in a class action lawsuit
initiated against Bre-X Minerals Ltd., and certain others in the
United States District Court for the Eastern District of Texas,
Texarkana Division. The class action alleges, among other things,
that statements made by us in connection with our efforts to secure
the right to develop and operate the Busang gold deposit in East
Kalimantan, Indonesia were materially false and misleading and
omitted to state material facts relating to the preliminary due
diligence investigation undertaken by us in late 1996.
On March 31, 2003, the Court denied all of the Plaintiffs'
motions to certify the case as a class action. The Plaintiffs have
not filed an interlocutory appeal of the Court's decision denying
class certification to the Fifth Circuit Court of Appeals. On June
2, 2003, the Plaintiffs' submitted a proposed Trial and Case
Management Plan, suggesting that the Plan would cure the defects in
the Plaintiffs' motions to certify the class. The Court has taken no
action with respect to the proposed Trial and Case Management Plan.
The Plaintiffs' case against the Defendants may now proceed in due
course, but not on behalf of a class of Plaintiffs but only with
respect to the specific claims of the Plaintiffs named in the
lawsuit. Having failed to certify the case as a class action, we
believe that the likelihood of any of the named Defendants succeeding
against Barrick with respect to their claims for securities fraud is
remote. The amount of potential loss, if any, which we may incur
arising out of the Plaintiffs' claims is not determinable.
Blanchard complaint
On January 7, 2003, we were served with a Complaint for
Injunctive Relief by Blanchard and Company, Inc. ("Blanchard"), and
Herbert Davies ("Davies"). The complaint, which is pending in the
U.S. District Court for the Eastern District of Louisiana, also names
J.P. Morgan Chase & Company ("J.P. Morgan") as a defendant, along
with an unspecified number of additional defendants to be named
later. The complaint, which has been amended several times, alleges
that we and bullion banks with whom we entered into spot deferred
gold sales contracts have manipulated the price of gold, in violation
of U.S. anti-trust laws and the Louisiana Unfair Trade Practices and
Consumer Protection Law. Blanchard and Davies both allege that they
have been injured as a seller of gold due to reduced interest in gold
as an investment. The complaint seeks damages and an injunction
terminating certain of our trading agreements with J.P. Morgan and
other bullion banks. In September 2003 the Court issued an Order
granting in part and denying in part Barrick's motions to dismiss
this action. Discovery has commenced in the case and a trial date
has been tentatively set for July 2005. We intend to defend the
action vigorously.
McKenzie complaint
On September 21, 2004, a putative class action complaint was
filed in the U.S. District Court for the Eastern District of
Louisiana against Barrick and J.P. Morgan. The plaintiffs, Dr. Gregg
McKenzie and others are alleged purchasers of gold and gold
derivatives. The complaint alleges violations of the U.S. anti-trust
laws and also of the Commodity Exchange Act, based upon the same
conduct as alleged in the Blanchard complaint. The complaint seeks
damages and an injunction terminating certain of our trading
agreements with J.P. Morgan. On December 17, 2004, a second and
substantially identical complaint was filed in the same court against
the same defendants. Barrick has not yet been served with this
second complaint. Barrick intends to defend both actions vigorously.
Wagner complaint
On June 12, 2003, a complaint was filed against Barrick and
several of its current or former officers in the U.S. District Court
for the Southern District of New York. The complaint is on behalf of
Barrick shareholders who purchased Barrick shares between February
14, 2002 and September 26, 2002. It alleges that Barrick and the
individual defendants violated US securities laws by making false and
misleading statements concerning Barrick's projected operating
results and earnings in 2002. The complaint seeks an unspecified
amount of damages. Other parties on behalf of the same proposed
class of Barrick shareholders filed several other complaints, making
the same basic allegations against the same defendants. In September
2003, the cases were consolidated into a single action in the
Southern District of New York. The plaintiffs filed a Consolidated
and/or Amended Complaint on November 5, 2003. On January 14, 2004
Barrick filed a motion to dismiss the complaint. On September 29,
2004, the Court issued an order granting in part and denying in part
Barrick's motion to dismiss the action. The Court granted the
plaintiffs leave to file a Second Amended Complaint, which was filed
on October 20, 2004. The plaintiffs filed a Third Amended Complaint
on January 6, 2005. We intend to defend the action vigorously.
Wilcox complaint
On September 8, 2004, two of our U.S. subsidiaries, Homestake
Mining Company of California ("Homestake California") and Homestake
Mining Company ("Homestake") were served with a First Amended
Complaint by persons alleging to be current or former residents of a
rural area near the former Grants Uranium Mill. The Complaint, which
was filed in the U.S. District Court for the District of New Mexico,
identifies 26 plaintiffs. Homestake and Homestake California, along
with an unspecified number of unidentified defendants, are named as
defendants. The plaintiffs allege that they have suffered a variety
of physical, emotional and financial injuries as a result of exposure
to radioactive and other hazardous substances. The Complaint seeks
an unspecified amount of damages. A motion to dismiss the claim was
filed with the Court, but the Court has not yet ruled on the motion.
We intend to defend the action vigorously.
24. JOINT VENTURES
Our major interests in joint ventures are a 50% interest in the
Kalgoorlie Mine in Australia; a 50% interest in the Round Mountain
Mine in the United States; and a 50% interest in the Hemlo Mine in
Canada.
SUMMARY FINANCIAL INFORMATION (100%)
Income statement and cash flow information
---------------------------------------------------------------------
For the years ended Dec.31 2004 2003 2002
---------------------------------------------------------------------
Revenues $ 889 $ 775 $ 650
Costs and expenses 663 638 582
---------------------------------------------------------------------
Net income $ 226 $ 137 $ 68
---------------------------------------------------------------------
Operating activities(1) $ 291 $ 127 $ 175
Investing activities(1) $ (46) $ (60) $ (54)
Financing activities(1) $ - $ - $ -
---------------------------------------------------------------------
(1) Net cash inflow (outflow).
Balance sheet information
---------------------------------------------------------------------
At December 31 2004 2003
---------------------------------------------------------------------
Assets
Inventories $ 102 $ 99
Property, plant and equipment 506 543
Other assets 93 64
---------------------------------------------------------------------
$ 701 $ 706
---------------------------------------------------------------------
Liabilities
Current liabilities $ 87 $ 77
Long-term obligations 110 104
---------------------------------------------------------------------
$ 197 $ 181
---------------------------------------------------------------------
Mine Statistics
UNITED STATES
---------------------------------
Open Pit Underground
Three months ended December 31, 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 29,946 33,149 373 420
Tons processed (thousands) 2,670 2,445 345 423
Average grade (ounces per ton) 0.161 0.161 0.427 0.390
Recovery rate (percent) 86.6% 80.8% 90.8% 89.3%
---------------------------------------------------------------------
Production (thousands of ounces) 373 325 134 147
Production costs per ounce
Cash operating costs $ 214 $ 235 $ 212 $ 240
Royalties and production taxes 14 15 21 21
---------------------------------------------------------------------
Total cash costs 228 250 233 261
Amortization 62 57 97 118
---------------------------------------------------------------------
Total production costs $ 290 $ 307 $ 330 $ 379
---------------------------------------------------------------------
Capital expenditures
(US$ millions) $ 23 $ 3 $ 10 $ 8
---------------------------------------------------------------------
Year ended December 31, 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 134,212 141,693 1,573 1,631
Tons processed (thousands) 10,779 10,041 1,566 1,622
Average grade (ounces per ton) 0.151 0.189 0.400 0.385
Recovery rate (percent) 85.1% 82.0% 89.7% 88.3%
---------------------------------------------------------------------
Production (thousands of ounces) 1,381 1,559 561 552
Production costs per ounce
Cash operating costs $ 231 $ 215 $ 234 $ 234
Royalties and production taxes 16 18 21 19
---------------------------------------------------------------------
Total cash costs 247 233 255 253
Amortization 61 53 120 122
---------------------------------------------------------------------
Total production costs $ 308 $ 286 $ 375 $ 375
---------------------------------------------------------------------
Capital expenditures
(US$ millions) $ 42 $ 23 $ 30 $ 28
---------------------------------------------------------------------
UNITED STATES
-----------------------------------
Goldstrike Total Round Mountain
Three months ended December 31, 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 30,319 33,569 4,736 4,735
Tons processed (thousands) 3,015 2,868 8,905 8,832
Average grade (ounces per ton) 0.192 0.195 0.015 0.012
Recovery rate (percent) 87.7% 83.3% n/a n/a
---------------------------------------------------------------------
Production (thousands of ounces) 507 472 84 91
Production costs per ounce
Cash operating costs $ 213 $ 236 $ 211 $ 159
Royalties and production taxes 17 17 52 31
---------------------------------------------------------------------
Total cash costs 230 253 263 190
Amortization 72 76 18 59
---------------------------------------------------------------------
Total production costs $ 302 $ 329 $ 281 $ 249
---------------------------------------------------------------------
Capital expenditures
(US$ millions) $ 33 $ 11 $ 1 $ 1
Year ended December 31, 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 135,785 143,324 19,743 24,563
Tons processed (thousands) 12,345 11,663 36,963 31,470
Average grade (ounces per ton) 0.183 0.216 0.015 0.016
Recovery rate (percent) 86.2% 83.6% n/a n/a
---------------------------------------------------------------------
Production (thousands of ounces) 1,942 2,111 381 393
Production costs per ounce
Cash operating costs $ 231 $ 220 $ 187 $ 150
Royalties and production taxes 18 18 34 23
---------------------------------------------------------------------
Total cash costs 249 238 221 173
Amortization 79 72 46 54
---------------------------------------------------------------------
Total production costs $ 328 $ 310 $ 267 $ 227
---------------------------------------------------------------------
Capital expenditures
(US$ millions) $ 72 $ 51 $ 5 $ 6
---------------------------------------------------------------------
AUSTRALIA
------------------------------------
Plutonic Darlot
Three months ended December 31, 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 3,567 2,699 217 211
Tons processed (thousands) 644 732 215 224
Average grade (ounces per ton) 0.127 0.132 0.137 0.172
Recovery rate (percent) 90.4% 91.0% 95.0% 96.8%
---------------------------------------------------------------------
Production (thousands of ounces) 74 88 28 37
Production costs per ounce
Cash operating costs $ 243 $ 187 $ 247 $ 172
Royalties and production taxes 8 9 8 10
---------------------------------------------------------------------
Total cash costs 251 196 255 182
Amortization 42 49 63 59
---------------------------------------------------------------------
Total production costs $ 293 $ 245 $ 318 $ 241
---------------------------------------------------------------------
Capital expenditures
(US$ millions) $ 4 $ 4 $ 1 $ 2
---------------------------------------------------------------------
Year ended December 31, 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 13,722 14,180 896 876
Tons processed (thousands) 2,662 3,010 861 879
Average grade (ounces per ton) 0.127 0.123 0.170 0.182
Recovery rate (percent) 90.0% 89.9% 95.8% 96.9%
---------------------------------------------------------------------
Production (thousands of ounces) 304 334 140 155
Production costs per ounce
Cash operating costs $ 214 $ 185 $ 203 $ 156
Royalties and production taxes 9 8 7 8
---------------------------------------------------------------------
Total cash costs 223 193 210 164
Amortization 34 31 53 52
---------------------------------------------------------------------
Total production costs $ 257 $ 224 $ 263 $ 216
---------------------------------------------------------------------
Capital expenditures
(US$ millions) $ 15 $ 44 $ 7 $ 7
---------------------------------------------------------------------
AUSTRALIA
------------------------------------
Lawlers Kalgoorlie
Three months ended December 31, 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 250 200 11,431 13,062
Tons processed (thousands) 217 210 1,870 1,844
Average grade (ounces per ton) 0.138 0.135 0.069 0.071
Recovery rate (percent) 95.8% 96.9% 85.5% 87.8%
---------------------------------------------------------------------
Production (thousands of ounces) 29 27 110 115
Production costs per ounce
Cash operating costs $ 240 $ 259 $ 232 $ 205
Royalties and production taxes 9 9 9 10
---------------------------------------------------------------------
Total cash costs 249 268 241 215
Amortization 68 58 40 53
---------------------------------------------------------------------
Total production costs $ 317 $ 326 $ 281 $ 268
---------------------------------------------------------------------
Capital expenditures
(US$ millions) $ 3 $ 1 $ 3 $ 2
---------------------------------------------------------------------
Year ended December 31, 2004 2003 2004 2003
---------------------------------------------------------------------
Tons mined (thousands) 3,365 1,152 45,459 48,677
Tons processed (thousands) 866 806 7,142 7,171
Average grade (ounces per ton) 0.133 0.128 0.072 0.071
Recovery rate (percent) 96.1% 95.8% 86.6% 85.8%
---------------------------------------------------------------------
Production (thousands of ounces) 110 99 444 436
Production costs per ounce
Cash operating costs $ 238 $ 241 $ 223 $ 201
Royalties and production taxes 8 8 8 8
---------------------------------------------------------------------
Total cash costs 246 249 231 209
Amortization 53 42 44 48
---------------------------------------------------------------------
Total production costs $ 299 $ 291 $ 275 $ 257
---------------------------------------------------------------------
Capital expenditures
(US$ millions) $ 5 $ 14 $ 10 $ 14
---------------------------------------------------------------------
CANADA
-----------------------------------
Holt-
Hemlo Eskay Creek McDermott
Three months ended December 31, 2004 2003 2004 2003 2004 2003
--------------------------------------------- ----------- ----------
Tons mined (thousands) 1,182 1,039 68 63 - 142
Tons processed (thousands) 507 514 70 65 - 150
Average grade (ounces per ton) 0.140 0.133 1.138 1.481 - 0.166
Recovery rate (percent) 93.5% 95.1% 93.3% 94.1% - 93.5%
--------------------------------------------- ----------- ----------
Production (thousands of
ounces) 66 65 73 83 - 23
Production costs per ounce
Cash operating costs $222 $219 $1 $15 $- $210
Royalties and production taxes 9 8 6 5 - -
--------------------------------------------- ----------- ----------
Total cash costs 231 227 7 20 - 210
Amortization 56 37 190 132 - 144
--------------------------------------------- ----------- ----------
Total production costs $287 $264 $197 $152 $- $354
--------------------------------------------- ----------- ----------
Capital expenditures (US$
millions) $3 $3 $2 $1 $- $-
--------------------------------------------- ----------- ----------
Year ended December 31, 2004 2003 2004 2003 2004 2003
--------------------------------------------- ----------- ----------
Tons mined (thousands) 4,715 4,178 269 272 380 557
Tons processed (thousands) 2,019 1,971 263 275 394 559
Average grade (ounces per ton) 0.130 0.143 1.178 1.432 0.149 0.170
Recovery rate (percent) 94.0% 95.0% 93.1% 93.7% 93.1% 94.3%
--------------------------------------------- ----------- ----------
Production (thousands of
ounces) 247 268 290 352 55 90
Production costs per ounce
Cash operating costs $231 $218 $26 $48 $197 $239
Royalties and production taxes 9 8 5 4 - -
--------------------------------------------- ----------- ----------
Total cash costs 240 226 31 52 197 239
Amortization 50 40 176 132 114 131
--------------------------------------------- ----------- ----------
Total production costs $290 $266 $207 $184 $311 $370
--------------------------------------------- ----------- ----------
Capital expenditures (US$
millions) $8 $10 $7 $5 $- $-
--------------------------------------------- ----------- ----------
PERU TANZANIA
----------- ------------
Pierina Bulyanhulu
Three months ended December 31, 2004 2003 2004 2003
------------------------------------------------------ ------------
Tons mined (thousands) 9,657 10,106 258 257
Tons processed (thousands) 4,248 - 274 261
Average grade (ounces per ton) 0.025 0.071 0.366 0.341
Recovery rate (percent) - - 88.3% 88.5%
------------------------------------------------------ ------------
Production (thousands of ounces) 94 206 89 79
Production costs per ounce
Cash operating costs $146 $89 $307 $301
Royalties and production taxes - - 15 15
------------------------------------------------------ ------------
Total cash costs 146 89 322 316
Amortization 165 181 70 125
------------------------------------------------------ ------------
Total production costs $311 $270 $392 $441
------------------------------------------------------ ------------
Capital expenditures (US$ millions) $6 $8 $20 $9
------------------------------------------------------ ------------
Year ended December 31, 2004 2003 2004 2003
------------------------------------------------------ ------------
Tons mined (thousands) 40,225 39,501 1,118 945
Tons processed (thousands) 16,746 15,839 1,123 980
Average grade (ounces per ton) 0.034 0.074 0.352 0.363
Recovery rate (percent) - - 88.4% 88.1%
------------------------------------------------------ ------------
Production (thousands of ounces) 646 912 350 314
Production costs per ounce
Cash operating costs $106 $83 $270 $235
Royalties and production taxes - - 13 11
------------------------------------------------------ ------------
Total cash costs 106 83 283 246
Amortization 165 182 99 123
------------------------------------------------------ ------------
Total production costs $271 $265 $382 $369
------------------------------------------------------ ------------
Capital expenditures (US$ millions) $8 $17 $46 $36
------------------------------------------------------ ------------
SUMMARY GOLD MINERAL RESERVES AND MINERAL RESOURCES
For the year ended December 31, 2004
---------------------------------------------------------------------
Tons Grade Ounces
Based on attributable ounces (000's) (oz/ton) (000's)
---------------------------------------------------------------------
NORTH AMERICA
Goldstrike Open Pit (proven and
probable) 123,334 0.131 16,188
(mineral resource) 22,318 0.050 1,107
---------------------------------------------------------------------
Goldstrike
Underground (proven and
probable) 7,575 0.392 2,970
(mineral resource) 6,268 0.379 2,373
---------------------------------------------------------------------
Goldstrike Property
Total (proven and
probable) 130,909 0.146 19,158
(mineral resource) 28,586 0.122 3,480
---------------------------------------------------------------------
Round Mountain (50%)
(proven and
probable) 86,983 0.018 1,538
(mineral resource) 45,364 0.015 666
---------------------------------------------------------------------
East Archimedes (proven and
probable) 17,093 0.059 1,011
(mineral resource) 3,049 0.061 187
---------------------------------------------------------------------
Hemlo (50%) (proven and
probable) 13,946 0.090 1,260
(mineral resource) 5,251 0.113 594
---------------------------------------------------------------------
Eskay Creek (proven and
probable) 485 1.058 513
(mineral resource) 476 0.538 256
---------------------------------------------------------------------
Marigold (33%) (proven and
probable) 32,244 0.023 744
(mineral resource) 17,768 0.022 387
---------------------------------------------------------------------
Holt-McDermott (proven and
probable) - - -
(mineral resource) - - -
---------------------------------------------------------------------
SOUTH AMERICA
Pascua-Lama (proven and
probable) 360,759 0.049 17,615
(mineral resource) 43,468 0.064 2,797
---------------------------------------------------------------------
Veladero (proven and
probable) 396,517 0.032 12,849
(mineral resource) 21,804 0.021 449
---------------------------------------------------------------------
Lagunas Norte (proven and
probable) 229,449 0.040 9,123
(mineral resource) 16,153 0.024 395
---------------------------------------------------------------------
Pierina (proven and
probable) 65,026 0.039 2,508
(mineral resource) 15,363 0.022 341
---------------------------------------------------------------------
AUSTRALIA/AFRICA
Kalgoorlie (50%) (proven and
probable) 87,894 0.059 5,181
(mineral resource) 12,798 0.068 866
---------------------------------------------------------------------
Plutonic (proven and
probable) 18,291 0.137 2,512
(mineral resource) 13,203 0.158 2,085
---------------------------------------------------------------------
Cowal (proven and
probable) 63,600 0.039 2,495
(mineral resource) 47,534 0.034 1,596
---------------------------------------------------------------------
Lawlers (proven and
probable) 3,222 0.126 405
(mineral resource) 4,824 0.159 765
---------------------------------------------------------------------
Darlot (proven and
probable) 7,142 0.147 1,048
(mineral resource) 3,984 0.119 473
---------------------------------------------------------------------
Bulyanhulu (proven and
probable) 23,913 0.443 10,596
(mineral resource) 4,253 0.546 2,321
---------------------------------------------------------------------
Tulawaka (70%) (proven and
probable) 1,077 0.355 382
(mineral resource) 584 0.068 40
---------------------------------------------------------------------
Buzwagi (proven and
probable) - - -
(mineral resource) 27,127 0.074 2,016
---------------------------------------------------------------------
OTHER (proven and
probable) 287 0.411 118
(mineral resource) 4,702 0.158 744
---------------------------------------------------------------------
TOTAL (proven and
probable) 1,538,837 0.058 89,056
(mineral resource) 316,291 0.065 20,458
---------------------------------------------------------------------
For the year ended December 31, 2003
---------------------------------------------------------------------
Tons Grade Ounces
Based on attributable ounces (000's) (oz/ton) (000's)
---------------------------------------------------------------------
NORTH AMERICA
Goldstrike Open Pit (proven and
probable) 109,742 0.143 15,685
(mineral resource) 37,403 0.061 2,264
---------------------------------------------------------------------
Goldstrike
Underground (proven and
probable) 9,177 0.377 3,460
(mineral resource) 5,841 0.426 2,489
---------------------------------------------------------------------
Goldstrike Property
Total (proven and
probable) 118,919 0.161 19,145
(mineral resource) 43,244 0.110 4,753
---------------------------------------------------------------------
Round Mountain (50%)
(proven and
probable) 89,852 0.018 1,583
(mineral resource) 37,770 0.017 645
---------------------------------------------------------------------
East Archimedes (proven and
probable) - - -
(mineral resource) 15,632 0.050 786
---------------------------------------------------------------------
Hemlo (50%) (proven and
probable) 17,557 0.099 1,744
(mineral resource) 3,017 0.090 271
---------------------------------------------------------------------
Eskay Creek (proven and probable) 927 1.015 941
(mineral resource) 422 0.287 121
---------------------------------------------------------------------
Marigold (33%) (proven and
probable) 31,089 0.024 737
(mineral resource) 13,334 0.020 268
---------------------------------------------------------------------
Holt-McDermott (proven and probable) 340 0.162 55
(mineral resource) 452 0.195 88
---------------------------------------------------------------------
SOUTH AMERICA
Pascua-Lama (proven and
probable) 296,411 0.057 16,862
(mineral resource) 115,845 0.030 3,487
---------------------------------------------------------------------
Veladero (proven and
probable) 317,187 0.035 11,115
(mineral resource) 67,715 0.023 1,540
---------------------------------------------------------------------
Lagunas Norte (proven and
probable) 159,250 0.045 7,155
(mineral resource) 25,751 0.067 1,735
---------------------------------------------------------------------
Pierina (proven and
probable) 61,393 0.045 2,768
(mineral resource) 25,421 0.016 419
---------------------------------------------------------------------
AUSTRALIA/AFRICA
Kalgoorlie (50%) (proven and
probable) 97,047 0.061 5,894
(mineral resource) 44,584 0.058 2,580
---------------------------------------------------------------------
Plutonic (proven and
probable) 20,635 0.128 2,646
(mineral resource) 13,395 0.147 1,967
---------------------------------------------------------------------
Cowal (proven and
probable) 63,600 0.039 2,495
(mineral resource) 47,534 0.034 1,596
---------------------------------------------------------------------
Lawlers (proven and
probable) 3,234 0.124 402
(mineral resource) 8,777 0.129 1,136
---------------------------------------------------------------------
Darlot (proven and
probable) 7,627 0.149 1,135
(mineral resource) 4,194 0.130 546
---------------------------------------------------------------------
Bulyanhulu (proven and
probable) 27,882 0.391 10,907
(mineral resource) 4,300 0.440 1,894
---------------------------------------------------------------------
Tulawaka (70%) (proven and probable) 1,093 0.337 368
(mineral resource) 680 0.066 45
---------------------------------------------------------------------
Buzwagi (proven and probable) - - -
(mineral resource) - - -
---------------------------------------------------------------------
OTHER (proven and probable) - - -
(mineral resource) 4,772 0.170 812
---------------------------------------------------------------------
TOTAL (proven and
probable) 1,314,043 0.065 85,952
(mineral resource) 476,839 0.052 24,689
---------------------------------------------------------------------
GOLD MINERAL RESERVES(1)
As at December 31, 2004 PROVEN
---------------------------------------------------------------------
Tons Grade Ounces
Based on attributable ounces (000's) (oz/ton) (000's)
---------------------------------------------------------------------
NORTH AMERICA
Goldstrike Open Pit 66,943 0.121 8,077
Goldstrike Underground 2,871 0.494 1,419
Goldstrike Property Total 69,814 0.136 9,496
Round Mountain (50%) 50,123 0.017 831
East Archimedes 7,363 0.061 446
Hemlo (50%) 8,611 0.103 885
Eskay Creek 233 1.124 262
Marigold (33%) 17,777 0.024 421
---------------------------------------------------------------------
SOUTH AMERICA
Pascua-Lama 35,124 0.058 2,035
Veladero 21,306 0.038 799
Alto Chicama 4,644 0.044 206
Pierina 26,234 0.055 1,446
---------------------------------------------------------------------
AUSTRALIA/AFRICA
Kalgoorlie (50%) 48,079 0.055 2,621
Plutonic 358 0.025 9
Cowal 5,191 0.046 238
Lawlers 1,082 0.124 134
Darlot 2,798 0.120 337
Bulyanhulu 1,915 0.401 767
Tulawaka (70%) 22 0.273 6
---------------------------------------------------------------------
OTHER - - -
---------------------------------------------------------------------
TOTAL 300,674 0.070 20,939
---------------------------------------------------------------------
As at December 31, 2004 PROBABLE
Tons Grade Ounces
Based on attributable ounces (000's) (oz/ton) (000's)
---------------------------------------------------------------------
NORTH AMERICA
Goldstrike Open Pit 56,391 0.144 8,111
Goldstrike Underground 4,704 0.330 1,551
Goldstrike Property Total 61,095 0.158 9,662
Round Mountain (50%) 36,860 0.019 707
East Archimedes 9,730 0.058 565
Hemlo (50%) 5,335 0.070 375
Eskay Creek 252 0.996 251
Marigold (33%) 14,467 0.022 323
---------------------------------------------------------------------
SOUTH AMERICA
Pascua-Lama 325,635 0.048 15,580
Veladero 375,211 0.032 12,050
Lagunas Norte 224,805 0.040 8,917
Pierina 38,792 0.027 1,062
---------------------------------------------------------------------
AUSTRALIA/AFRICA
Kalgoorlie (50%) 39,815 0.064 2,560
Plutonic 17,933 0.140 2,503
Cowal 58,409 0.039 2,257
Lawlers 2,140 0.127 271
Darlot 4,344 0.164 711
Bulyanhulu 21,998 0.447 9,829
Tulawaka (70%) 1,055 0.356 376
---------------------------------------------------------------------
OTHER 287 0.411 118
---------------------------------------------------------------------
TOTAL 1,238,163 0.055 68,117
---------------------------------------------------------------------
As at December 31, 2004 TOTAL
---------------------------------------------------------------------
Tons Grade Ounces
Based on attributable ounces (000's) (oz/ton) (000's)
---------------------------------------------------------------------
NORTH AMERICA
Goldstrike Open Pit 123,334 0.131 16,188
Goldstrike Underground 7,575 0.392 2,970
Goldstrike Property Total 130,909 0.146 19,158
Round Mountain (50%) 86,983 0.018 1,538
East Archimedes 17,093 0.059 1,011
Hemlo (50%) 13,946 0.090 1,260
Eskay Creek 485 1.058 513
Marigold (33%) 32,244 0.023 744
---------------------------------------------------------------------
SOUTH AMERICA
Pascua-Lama 360,759 0.049 17,615
Veladero 396,517 0.032 12,849
Lagunas Norte 229,449 0.040 9,123
Pierina 65,026 0.039 2,508
---------------------------------------------------------------------
AUSTRALIA/AFRICA
Kalgoorlie (50%) 87,894 0.059 5,181
Plutonic 18,291 0.137 2,512
Cowal 63,600 0.039 2,495
Lawlers 3,222 0.126 405
Darlot 7,142 0.147 1,048
Bulyanhulu 23,913 0.443 10,596
Tulawaka (70%) 1,077 0.355 382
---------------------------------------------------------------------
OTHER 287 0.411 118
---------------------------------------------------------------------
TOTAL 1,538,837 0.058 89,056
---------------------------------------------------------------------
(1) Mineral reserves ("reserves") have been calculated as at December
31, 2004 in accordance with National Instrument 43-101, as
required by Canadian securities regulatory authorities and, for
the United States, in accordance with Industry Guide 7 (under the
Securities Exchange Act of 1934) as interpreted by the Staff
of the U.S. Securities and Exchange Commission. Calculations
have been prepared by employees of Barrick under the
supervision of Rene L. Marion, P.Eng., Vice-President,
Technical Services of Barrick. Except as noted below, reserves
have been calculated using an assumed gold price of US$375 per
ounce, a silver price of US$5.50 per ounce and an exchange rate
of $1.45 Can$/US$. Reserves at the Australian properties assumed
a gold price of Aus$560 per ounce. Reserves at the Hemlo property
assumed a gold price of US$350 per ounce and an exchange rate
of $1.35 Can$/US$. Reserves at Round Mountain are based on pit
designs consistent with a gold price of US$375 per ounce.
Reserves at the Marigold property assumed a gold price of US$350
per ounce. Reserve calculations incorporate current and/or
expected mine plans and cost levels at each property. Cost
estimates at each Australian property assumed an exchange rate of
$0.70 US$/Aus$. Varying cut-off grades have been used depending
on the mine and type of ore contained in the reserves. Barrick's
normal data verification procedures have been employed in
connection with the calculations. For a more detailed description
of the methods used in calculating Barrick's reserves and
resources, see Barrick's most recent Annual Information Form/Form
40-F on file with Canadian provincial securities regulatory
authorities and the U.S. Securities and Exchange Commission.
GOLD MINERAL RESOURCES(1)
As at
December 31, 2003 MEASURED (M) INDICATED (I) (M)+(I)
---------------------------------------------------------------------
Based on
attributable Tons Grade Ounces Tons Grade Ounces Ounces
ounces (000's)(oz/ton) (000's) (000's) (oz/ton) (000's) (000's)
---------------------------------------------------------------------
NORTH AMERICA
Goldstrike
Open Pit 12,119 0.054 651 10,199 0.045 456 1,107
Goldstrike
Underground 2,114 0.361 764 4,154 0.387 1,609 2,373
Goldstrike
Property
Total 14,233 0.099 1,415 14,353 0.144 2,065 3,480
Round
Mountain
(50%) 21,734 0.013 272 23,630 0.017 394 666
East
Archimedes 979 0.063 62 2,070 0.060 125 187
Hemlo (50%) 1,800 0.091 163 3,451 0.125 431 594
Eskay Creek 156 0.558 87 320 0.528 169 256
Marigold
(33%) 7,500 0.021 154 10,268 0.023 233 387
---------------------------------------------------------------------
SOUTH AMERICA
Pascua-Lama 5,724 0.058 333 37,744 0.065 2,464 2,797
Veladero 1,092 0.020 22 20,712 0.021 427 449
Lagunas Norte 277 0.025 7 15,876 0.024 388 395
Pierina 4,305 0.030 128 11,058 0.019 213 341
---------------------------------------------------------------------
AUSTRALIA/AFRICA
Kalgoorlie
(50%) 3,907 0.066 258 8,891 0.068 608 866
Plutonic 349 0.221 77 12,854 0.156 2,008 2,085
Cowal 2,594 0.038 98 44,940 0.033 1,498 1,596
Lawlers 244 0.098 24 4,580 0.162 741 765
Darlot 1,089 0.148 161 2,895 0.108 312 473
Bulyanhulu - - - 4,253 0.546 2,321 2,321
Tulawaka (70%) - - - 584 0.068 40 40
Buzwagi 69 0.072 5 27,058 0.074 2,011 2,016
---------------------------------------------------------------------
OTHER 4,702 0.158 744 744
---------------------------------------------------------------------
TOTAL 66,052 0.049 3,266 250,239 0.069 17,192 20,458
---------------------------------------------------------------------
As at December 31, 2003 INFERRED
---------------------------------------------------------------------
Tons Grade Ounces
Based on attributable ounces (000's) (oz/ton) (000's)
---------------------------------------------------------------------
NORTH AMERICA
Goldstrike Open Pit 722 0.073 53
Goldstrike Underground 6,899 0.346 2,388
Goldstrike Property Total 7,621 0.320 2,441
Round Mountain (50%) 43,171 0.013 562
East Archimedes - - -
Hemlo (50%) 4,233 0.144 608
Eskay Creek 280 0.496 139
Marigold (33%) 61,477 0.014 859
---------------------------------------------------------------------
SOUTH AMERICA
Pascua-Lama 36,728 0.044 1,613
Veladero 63,110 0.017 1,045
Lagunas Norte 9,718 0.022 215
Pierina 101 0.010 1
---------------------------------------------------------------------
AUSTRALIA/AFRICA
Kalgoorlie (50%) 588 0.056 33
Plutonic 10,349 0.192 1,988
Cowal 31,053 0.033 1,011
Lawlers 1,114 0.139 155
Darlot 127 0.213 27
Bulyanhulu 4,303 0.587 2,526
Tulawaka (70%) 161 0.075 12
Buzwagi 804 0.056 45
---------------------------------------------------------------------
OTHER 4,802 0.139 669
---------------------------------------------------------------------
TOTAL 279,740 0.050 13,949
---------------------------------------------------------------------
(1) Resources which are not reserves have demonstrated economic
viability.
CONTAINED SILVER WITHIN REPORTED GOLD RESERVES(1)
Assumed metal prices; Gold: US$375/oz Silver:US$5.50/oz
Copper: US$0.90/lb
---------------------------------------------------------------------
For the year ended Dec. 31, 2004 PROVEN
---------------------------------------------------------------------
Tons Grade Ounces
(000s) (oz/ton) (000s)
---------------------------------------------------------------------
AFRICA
Bulyanhulu 1,915 0.30 566
---------------------------------------------------------------------
NORTH AMERICA
Eskay Creek 189 67.93 12,838
---------------------------------------------------------------------
SOUTH AMERICA
Lagunas Norte 4,644 0.11 514
Pascua-Lama 35,124 1.93 67,693
Pierina 26,234 0.24 6,223
Veladero 21,306 0.54 11,538
---------------------------------------------------------------------
TOTAL 89,412 1.11 99,372
---------------------------------------------------------------------
For the year ended Dec. 31, 2004 PROBABLE
---------------------------------------------------------------------
Tons Grade Ounces
(000s) (oz/ton) (000s)
---------------------------------------------------------------------
AFRICA
Bulyanhulu 21,998 0.35 7,668
---------------------------------------------------------------------
NORTH AMERICA
Eskay Creek 295 34.72 10,241
---------------------------------------------------------------------
SOUTH AMERICA
Lagunas Norte 224,805 0.10 22,704
Pascua-Lama 325,635 1.77 575,492
Pierina 38,792 0.16 6,335
Veladero 375,211 0.50 188,785
---------------------------------------------------------------------
TOTAL 986,736 0.82 811,225
---------------------------------------------------------------------
For the year ended Dec. 31, 2004 TOTAL
---------------------------------------------------------------------
Process
Tons Grade Ounces reco-
(000s) (oz/ton) (000s) very %
---------------------------------------------------------------------
AFRICA
Bulyanhulu 23,913 0.34 8,234 65.0%
---------------------------------------------------------------------
NORTH AMERICA
Eskay Creek 484 47.68 23,079 91.4%
---------------------------------------------------------------------
SOUTH AMERICA
Lagunas Norte 229,449 0.10 23,218 22.3%
Pascua-Lama 360,759 1.78 643,185 77.8%
Pierina 65,026 0.19 12,558 32.7%
Veladero 396,517 0.51 200,323 6.8%
---------------------------------------------------------------------
TOTAL 1,076,148 0.85 910,597 60.4%
---------------------------------------------------------------------
(1) Silver is accounted for as a by-product credit against reported
or projected gold production costs.
CONTAINED SILVER WITHIN REPORTED GOLD RESOURCES
For the year ended Dec. 31, 2003 MEASURED (M)
---------------------------------------------------------------------
Tons Grade Ounces
(000s) (oz/ton) (000s)
---------------------------------------------------------------------
AFRICA
Bulyanhulu - - -
---------------------------------------------------------------------
NORTH AMERICA
Eskay Creek 156 22.346 3,486
---------------------------------------------------------------------
SOUTH AMERICA
Lagunas Norte 277 0.155 43
Pascua-Lama 5,724 1.548 8,862
Pierina 4,305 0.206 886
Veladero 1,092 0.392 428
---------------------------------------------------------------------
TOTAL 11,554 1.186 13,705
---------------------------------------------------------------------
For the year ended Dec. 31, 2003 INDICATED (I)
---------------------------------------------------------------------
Tons Grade Ounces
(000s) (oz/ton) (000s)
---------------------------------------------------------------------
AFRICA
Bulyanhulu 4,253 0.342 1,454
---------------------------------------------------------------------
NORTH AMERICA
Eskay Creek 320 17.641 5,645
---------------------------------------------------------------------
SOUTH AMERICA
Lagunas Norte 15,876 0.124 1,971
Pascua-Lama 37,744 1.498 56,543
Pierina 11,058 0.019 213
Veladero 20,712 0.364 7,531
---------------------------------------------------------------------
TOTAL 89,963 0.815 73,357
---------------------------------------------------------------------
For the year ended Dec. 31, 2003 TOTAL (M) + (I)
---------------------------------------------------------------------
Tons Grade Ounces
(000s) (oz/ton) (000s)
---------------------------------------------------------------------
AFRICA
Bulyanhulu 4,253 0.342 1,454
---------------------------------------------------------------------
NORTH AMERICA
Eskay Creek 476 19.183 9,131
---------------------------------------------------------------------
SOUTH AMERICA
Lagunas Norte 16,153 0.125 2,014
Pascua-Lama 43,468 1.505 65,405
Pierina 15,363 0.072 1,099
Veladero 21,804 0.365 7,959
---------------------------------------------------------------------
TOTAL 101,517 0.858 87,062
---------------------------------------------------------------------
CORPORATE OFFICE TRANSFER AGENTS AND REGISTRARS
Barrick Gold Corporation CIBC Mellon Trust Company
BCE Place, Canada Trust Tower, P.O. Box 7010, Adelaide Street
Suite 3700 Postal Station
161 Bay Street, P.O. Box 212 Toronto, Ontario M5C 2W9
Toronto, Canada M5J 2S1 Tel: (416) 643-5500
Tel: (416) 861-9911 Toll-free throughout
Fax: (416) 861-0727 North America: 1-800-387-0825
Toll-free within Canada Fax: (416) 643-5501
and United States: 1-800-720-7415 Email: inquiries@cibcmellon.ca
Email: investor@barrick.com Web site: www.cibcmellon.com
Web site: www.barrick.com
SHARES LISTED Mellon Investor Services L.L.C.
ABX - The Toronto Stock Exchange 85 Challenger Road,
The New York Stock Exchange Overpeck Center
The Swiss Stock Exchange Ridgefield Park,
La Bourse de Paris New Jersey 07660
BGD - The London Stock Exchange Tel: (201) 329-8660
Toll-free within
the United States:
1-800-589-9836
Web site:
www.mellon-investor.com
INVESTOR CONTACT
Darren Blasutti
Vice President,
Investor Relations
Tel: (416) 307-7341
Email: dblasutti@barrick.com
Barrick Gold Corporation (NYSE:ABX) (TSX:ABX) (Swiss:ABX)
(PARIS:ABX) (LSE:BGD)
SOURCE: Barrick Gold Corporation
Barrick Gold Corporation
Vincent Borg
Vice President, Corporate Communications
(416) 307-7477
Fax: (416) 861-1509
media@barrick.com