TORONTO, Apr 28, 2005 (BUSINESS WIRE) -- Barrick Gold Corporation
(NYSE:ABX)(TSX:ABX)(LSE:BGD)(SWX:ABX)(BOURSE:ABX)
FIRST QUARTER REPORT 2005 - APRIL 28, 2005
Based on US GAAP and expressed in US dollars
Highlights
- First quarter 2005 net income was $51 million, or $0.10 per
share, and cash flow from operations was $122 million, or $0.23 per
share, compared to net income of $26 million, or $0.05 per share, and
cash flow from operations of $126 million, or $0.24 per share, in the
prior-year period.
- First quarter production was 1.1 million ounces of gold at a
total cash cost of $248(1) per ounce. The Company remains on track
with its previous guidance to produce between 5.4 - 5.5 million
ounces of gold for the year at an average total cash cost of
$220-$230 per ounce. As previously announced, the first half of 2005
is expected to have lower production and higher cash costs, with the
second half improving as Lagunas Norte and Veladero come on stream.
- Progress at Lagunas Norte is ahead of schedule and on budget,
with production now expected to commence in mid-June. The Tulawaka
mine achieved start-up during the quarter on time and did not have a
single lost-time accident during construction. Significant progress
continues to be made on the remaining development projects. Veladero
is on schedule to commence production in the fourth quarter of this
year and Cowal expects to pour its first gold in the first quarter of
2006. The Company continues to target approval of the environmental
impact assessments for Pascua-Lama by year-end 2005.
- Barrick and Falconbridge announced earlier this month that they
have entered into a 50/50 joint-venture agreement regarding the
Kabanga nickel deposit and related concessions in Tanzania, with
Falconbridge as the operator of the joint venture.
- In April 2005, the Company's wholly-owned subsidiary, Minera
Barrick Misquichilca S.A., successfully completed the issuance of $50
million in debt securities in the Peruvian capital markets. The net
proceeds from this offering will be used to partially fund the
construction of Lagunas Norte.
Barrick Gold Corporation today reported earnings of $51 million
($0.10 per share) and operating cash flow of $122 million ($0.23 per
share) for first quarter 2005 compared to earnings of $26 million
($0.05 per share) and operating cash flow of $126 million ($0.24 per
share) in the year-earlier period.
In first quarter 2005, earnings were favorably impacted by a
$46-per-ounce higher realized gold price, and lower interest and
amortization expense compared to the prior-year period, offset by
lower gold sales volumes due to the lower production levels and
higher total cash costs.
The Company's first quarter earnings also included $10 million in
after-tax asset/investment sales gains, a $3-million after-tax
non-hedge derivative gain, offset partially by a $3-million after-tax
foreign currency translation loss. Earnings in the prior-year quarter
included a $10-million after-tax non-hedge derivative loss, offset
partially by $2 million in after-tax asset/investment sales gains and
a $2-million after-tax foreign currency translation gain.
PRODUCTION AND COSTS
In first quarter 2005, Barrick produced 1.1 million ounces of
gold at total cash costs of $248 per ounce, compared to 1.3 million
ounces at total cash costs of $199 per ounce for the prior-year
quarter. As previously announced, the first half of 2005 is expected
to have lower production and higher cash costs, with the second half
improving as Lagunas Norte and Veladero come on stream. The Company
is on track with its previous guidance to produce 5.4 - 5.5 million
ounces of gold for the year at an average total cash cost of $220 -
$230 per ounce.
The North American region saw a decline in production over the
fourth quarter 2004 at higher total cash costs due to expected lower
grades mined at the Goldstrike open pit, and lower-than-expected
grades mined at Eskay Creek. The region is expected to slightly
exceed its production guidance for full year 2005.
The South American region had a solid production quarter, with
first quarter production at Pierina higher than the fourth quarter
2004 and at lower total cash costs. The region is expected to meet
its guidance for full year 2005.
The Australian/African region's production in the first quarter
was higher than the fourth quarter 2004 and at higher total cash
costs. Production for the full year, however, is now expected to be
marginally lower than previously expected, at slightly higher total
cash costs, primarily due to changes in forecasts at Bulyanhulu and
Plutonic. At Bulyanhulu, production and total cash cost guidance was
revised to reflect ongoing dilution and lower grades, and lower
projected throughput resulting from ongoing power supply
interruptions and a mechanical failure in the hoist gearbox. At
Plutonic, production and cash cost guidance was revised to reflect
lower underground grades and the discontinuation of open-pit mining
at the end of the second quarter 2005 as a result of contractor price
increases given the tight Australian labor market.
DEVELOPMENT PROJECTS UPDATE
Significant progress was made on all of Barrick's development
projects during the quarter.
"2005 represents a landmark year in the history of Barrick with
the expected start-up of three new mines," said Greg Wilkins,
President and Chief Executive Officer. "During the quarter, Tulawaka,
the first of Barrick's new generation of mines entered production,
and Lagunas Norte is now expected to commence gold production ahead
of schedule."
At the Lagunas Norte project in the Alto Chicama district in
Peru, progress is ahead of schedule and on budget, with production
now expected to commence in mid-June. The project is about 95%
complete, and commissioning of equipment and facilities commenced in
early April concurrent with construction activities. About 93% of the
project's required manpower is in place, with hiring expected to be
concluded by the end of April 2005.
At Veladero in the Frontera district in Argentina, progress
continues with overall mine development over 80% complete. Stacking
of ore on the valley-fill leach facility has commenced. The project
facilities' commissioning program began in March.
The Company's Cowal project in Australia is progressing well.
Engineering is 75% complete, mine development earthworks are well
advanced, and prestrip activities commenced in April 2005. Production
is expected to commence in the first quarter 2006.
At Barrick's Pascua-Lama project that straddles the Chilean and
Argentine border, approvals for the environmental impact assessments
are targeted by the end of 2005. Work continues on community and
government relations, permitting, protocol implementation and tax
stability.
At the East Archimedes project located at the Ruby Hill mine site
in Nevada, steady progress continues. Permitting approvals are
expected by the end of the year. The first gold pour is targeted for
mid-2007.
In Nevada, the power plant foundation work is progressing well
and building erection commenced during the quarter. The plant is
expected to commence operation in fourth quarter 2005.
EXPLORATION UPDATE
During the quarter, Barrick had drill programs underway on 14
properties(2). Early stage exploration was carried out in all regions
during the quarter, and is helping to identify areas for follow up
and drilling later in the year.
In the Frontera district in South America, exploration drilling
near the Veladero project began late in first quarter 2005, with
encouraging results back from the first hole drilled in the first
target. Drilling in the vicinity of Veladero will continue until the
onset of winter in June, with the program resuming in September.
Additional fieldwork, including mapping, sampling, trenching, is
ongoing to follow up targets defined by the regional compilation. The
work has identified high sulphidation-type systems at targets both
north and south of Pascua-Lama/Veladero. Regional work is also
underway along the rest of the belt to focus follow up in the third
quarter.
"The initial positive results confirm my belief in the potential
to add significant resources in the Frontera district," said Alex
Davidson, Executive Vice President, Exploration and Corporate
Development. "The targets look great, and are close to Veladero."
In North America, drill programs commenced at Goldstrike in
Nevada, with the objective of adding reserves and resources. The
Betze-Post exploration drift is 75% complete and a drill program at
North Post will commence in the second quarter. Other drill programs
in Nevada are planned or underway at Deep East Archimedes, REN and
Storm.
In the Alto Chicama district in northern Peru, work continues and
targets are being delineated at four areas for follow up this year.
In southern Peru, a drill program commenced at the Cuello Cuello
target at the end of the quarter and results are being evaluated.
In the Australia/Africa region, a 50,000-metre drill program
commenced in early January at Buzwagi in Tanzania to test for
mineralization beyond the currently defined resource. Initial results
are positive, confirming the potential for the project, and
engineering studies are ongoing. Drill programs are also underway on
two properties in the Lake Victoria district in Tanzania. At Kabanga
in Tanzania, a drill program began in January, including in-fill
drilling at Kabanga North and Main.
Barrick is building a new generation of mines around the globe
and has the lowest total cash costs among the major gold producers.
Its vision is to be the world's best gold company by finding,
developing and producing quality reserves in a profitable and
socially responsible manner. Barrick's shares are traded on the
Toronto, New York, London and Swiss stock exchanges and the Paris
Bourse.
(1) For an explanation of non-GAAP performance measures refer to
pages 18-21 of the Management's Discussion and Analysis found in the
First Quarter Report 2005.
(2) Barrick's exploration programs are designed and conducted
under the supervision of Alexander J. Davidson, P. Geo., Executive
Vice President, Exploration and Corporate Development of Barrick. For
information on the geology, exploration activities generally, and
drilling and analysis procedures on Barrick's material properties,
see Barrick's most recent Annual Information Form / Form 40-F on file
with Canadian provincial securities regulatory authorities and the US
Securities and Exchange Commission.
Key Statistics
(in United States dollars) Three months ended March 31
----------------------------
(Unaudited) 2005 2004
---------------------------------------------------------------------
Operating Results
Gold production (thousands of ounces) 1,135 1,278
Gold sold (thousands of ounces) 1,129 1,247
Per ounce data
Average spot gold price $ 427 $ 408
Average realized gold price 428 382
Cash operating costs(3) 234 187
Total cash costs(1)(3) 248 199
Amortization(3) 78 91
Total production costs(3) 326 290
---------------------------------------------------------------------
Financial Results (millions)
Gold sales $ 484 $ 477
Net income 51 26
Operating cash flow 122 126
Per share data (dollars)
Net income (basic and diluted) 0.10 0.05
Operating cash flow 0.23 0.24
Common shares outstanding (as at
March 31) (millions)(2) 534 532
---------------------------------------------------------------------
As at As at
March 31, Dec. 31,
--------------------------
2005 2004
---------------------------------------------------------------------
Financial Position (millions)
Cash and equivalents $ 1,330 $ 1,398
Non-cash working capital 161 141
Long-term debt 1,698 1,655
Shareholders' equity 3,633 3,563
---------------------------------------------------------------------
(1) Comprises cash operating costs, royalties and production taxes.
(2) Includes shares issuable upon exchange of BGI (Barrick Gold Inc.)
exchangeable shares.
(3) For an explanation of our use of non-GAAP performance measures
refer to pages 18 to 21 of Management's Discussion and Analysis.
Production and Cost Summary
Total
Production Cash Costs
-----------------------------------
(attributable ounces) (US$/oz)(1)
For the three months ended March 31 2005 2004 2005 2004
(Unaudited)
---------------------------------------------------------------------
North America
Open Pit 286,738 317,527 $ 276 $ 267
Underground 145,364 154,047 287 253
---------------------------------------------------------------------
Goldstrike Property Total 432,102 471,574 279 262
Eskay Creek 54,805 65,673 59 (19)
Round Mountain (50%) 93,898 93,496 223 207
Hemlo (50%) 62,355 61,142 260 227
Holt-McDermott(2) - 18,809 - 238
Marigold (33%) 14,109 8,602 226 248
---------------------------------------------------------------------
657,269 719,296 251 223
---------------------------------------------------------------------
South America
Pierina 145,983 231,898 134 82
---------------------------------------------------------------------
Australia/Africa
Plutonic 70,418 82,848 287 194
Darlot 27,420 34,250 249 208
Lawlers 31,233 26,618 287 236
Kalgoorlie (50%) 124,523 102,212 247 223
---------------------------------------------------------------------
253,594 245,928 263 213
Bulyanhulu 73,374 81,018 356 276
Tulawaka (70%) 4,554 - - -
---------------------------------------------------------------------
331,522 326,946 288 226
---------------------------------------------------------------------
Total 1,134,774 1,278,140 $ 248 $ 199
---------------------------------------------------------------------
Total Production Costs (US$/oz)(1)
----------------------------------
For the three months ended March 31
(Unaudited) 2005 2004
---------------------------------------------------------------------
Direct mining costs at market
foreign exchange rates $ 282 $ 238
Gains realized on currency hedge
contracts (22) (24)
By-product credits (26) (27)
---------------------------------------------------------------------
Cash operating costs 234 187
Royalties 11 9
Production taxes 3 3
---------------------------------------------------------------------
Total cash costs 248 199
Amortization 78 91
---------------------------------------------------------------------
Total production costs $ 326 $ 290
---------------------------------------------------------------------
(1) For an explanation of our use of non-GAAP performance measures
refer to pages 18 to 21 of Management's Discussion and Analysis.
(2) Holt-McDermott ceased production in fourth quarter 2004.
MANAGEMENT'S DISCUSSION AND ANALYSIS ("MD&A")
This portion of the Quarterly Report provides management's
discussion and analysis of the financial condition and results of
operations to enable a reader to assess material changes in financial
condition and results of operations as at and for the three-month
period ended March 31, 2005, in comparison to the corresponding
prior-year period. This MD&A has been prepared as of April 21, 2005.
This MD&A is intended to supplement and complement the unaudited
interim consolidated financial statements and notes thereto, prepared
in accordance with US generally accepted accounting principles ("US
GAAP"), for the three-month period ended March 31, 2005
(collectively, the "Financial Statements"), which are included in
this Quarterly Report on pages 22 to 34. You are encouraged to review
the Financial Statements in conjunction with your review of this
MD&A. This MD&A should be read in conjunction with both the annual
audited consolidated financial statements for the three years ended
December 31, 2004, the related annual MD&A included in the 2004
Annual Report, and the most recent Form 40-F/Annual Information Form
on file with the US Securities and Exchange Commission and Canadian
provincial securities regulatory authorities. Certain notes to the
Financial Statements are specifically referred to in this MD&A and
such notes are incorporated by reference herein. All dollar amounts
in this MD&A are in millions of US dollars, unless otherwise
specified.
For the purposes of preparing this MD&A, we consider the
materiality of information. Information is considered material if:
(i) such information results in, or would reasonably be expected to
result in, a significant change in the market price or value of
Barrick Gold Corporation's shares; or (ii) there is a substantial
likelihood that a reasonable investor would consider it important in
making an investment decision, or if it would significantly alter the
total mix of information available to investors. Materiality is
evaluated by reference to all relevant circumstances, including
potential market sensitivity.
CONTENTS
Executive Summary 6
Key Economic Trends 6
Results 7
Overview of First Quarter 2005 versus First Quarter 2004 7
Consolidated Gold Production and Sales 8
Results of Operating Segments 8
Other Costs and Expenses 13
Cash Flow 14
Balance Sheet 15
Quarterly Information 15
Off-Balance Sheet Arrangements 16
Critical Accounting Policies and Estimates 17
Non-GAAP Performance Measures 18
EXECUTIVE SUMMARY
In first quarter 2005 we produced 1.1 million ounces of gold at a
total cash cost of $248 per ounce. Our producing mines remain on
track to meet our production and total cash costs guidance for 2005
of between 5.4-5.5 million ounces at an average total cash cost of
$220-$230 per ounce. We had earnings of $51 million ($0.10 per share)
and generated operating cash flow of $122 million ($0.23 per share).
We made steady progress on the development of our new generation
of mines that are driving a targeted production profile of 6.8 - 7.0
million ounces by 2007. The Tulawaka mine in Tanzania achieved
start-up during first quarter as expected and two additional mines,
Lagunas Norte in Peru and Veladero in Argentina, are targeted to
enter production in 2005. At Lagunas Norte, progress is ahead of
schedule and on budget, with production now expected to commence in
mid-June 2005. At Veladero, progress continues with overall mine
development over 80% complete and production on track to commence in
the fourth quarter of 2005. These first three new mines are expected
to contribute to increased production and decreased total cash costs
per ounce beginning in the second half of 2005. At our fourth new
mine, Cowal in Australia, steady progress is being made with
engineering over 75% complete and production is expected to commence
in the first quarter 2006. We continued work on advancing our two
other projects in development, Pascua-Lama in Chile/Argentina and
East Archimedes in Nevada. We continue to target approval of the
Pascua-Lama environmental impact assessments by year-end 2005. We
also entered into a joint venture agreement with Falconbridge Limited
with respect to the Kabanga nickel deposit and related concessions in
Tanzania.
We continued to put in place financing for the construction costs
of our development projects. In April 2005, our wholly-owned
subsidiary, Minera Barrick Misquichilca S.A., successfully completed
the issuance of $50 million of debt securities in the Peruvian
capital markets. The net proceeds from this financing will be used to
partially fund the construction of the Lagunas Norte project in Peru.
KEY ECONOMIC TRENDS
The MD&A included in our 2004 Annual Report contained a
discussion of the key economic trends that affect our business and
how they impact our financial statements. In this interim MD&A, we
have included an update to reflect any significant changes in those
trends since the preparation of the 2004 Annual MD&A.
Gold Prices
The gold price was fairly volatile during first quarter 2005,
ranging from $412 to $445 per ounce with an average market gold price
of $427 per ounce. Gold prices continue to have a strong negative
correlation with the US dollar. We sold all of our production at
market gold prices, resulting in an average realized selling price of
$428 per ounce. We view the outlook for market gold prices to be
positive.
Silver Prices
Market silver prices have generally increased since the end of
2004, with an average market price of $6.98 per ounce during first
quarter 2005. Higher silver prices help to reduce total cash costs
per ounce of gold as silver sales are recorded as a by-product credit.
Currency Exchange Rates
At March 31, 2005, through our currency hedge position we have
protected local currency-based expenditures for approximately the
next three years at average exchange rates that are more favorable
than current market rates in early 2005. The average rates for
currency contracts designated against operating costs over the next
three years are $0.65 for Australian dollar contracts and $0.72 for
Canadian dollar contracts. Further details of our currency hedge
position are included in note 14 to the Financial Statements.
Energy Prices
Diesel Fuel
Fuel prices rose from $43 per barrel at the end of 2004 to $55
per barrel at March 31, 2005. Subsequent to the end of first quarter
2005, the price has declined slightly. To help control costs, we have
a fuel hedge position totaling 2.2 million barrels, for a portion of
our estimated future diesel fuel consumption over the next three
years, with an average cap price of $39 per barrel and participation
to an average floor price of $29 per barrel on almost half of the
position.
Electricity
Electricity prices have risen during 2004 and continue to rise in
2005 as a result of diesel fuel price increases and natural gas
demand, as well as excess demand for electricity. To partially
mitigate rising electricity costs, we are building a 115-megawatt
natural gas-fired power plant that will supply our Goldstrike mine.
Other Inflationary Cost Pressures
The mining industry has been experiencing significant
inflationary cost pressures. Steel prices and oil-related consumables
have risen significantly over the past few quarters and continue to
rise mainly impacting mine construction costs. We are focusing on
supply chain management and continuous improvement initiatives to
mitigate the impact of higher steel prices. Labor costs in Australia
have been rising when compared to first quarter 2004, as a result of
a supply shortage of skilled labor, which has been impacting
production costs at our Australian mines.
US dollar interest rates
Stronger economic indicators in the first quarter have resulted
in higher rates at quarter end when compared to 2004 year-end. In
periods of higher interest rates, we earn higher interest income on
cash balances and expect higher forward selling prices under our gold
sales contracts. Most of our long-term debt has fixed interest rates
and therefore interest expense is not materially affected by rising
interest rates.
RESULTS
Selected Quarterly Information
---------------------------------------------------------------------
For the three month period ended March 31
($ millions, except per share and per ounce data
in dollars)
2005 2004
---------------------------------------------------------------------
Gold production ('000s oz) 1,135 1,278
---------------------------------------------------------------------
Gold sales
'000s oz 1,129 1,247
$ millions $ 484 $ 477
---------------------------------------------------------------------
Market gold price(1) 427 408
---------------------------------------------------------------------
Realized gold price(1) 428 382
---------------------------------------------------------------------
Total cash costs (1,2) 248 199
---------------------------------------------------------------------
Amortization(1,2) 78 91
---------------------------------------------------------------------
Net income 51 26
---------------------------------------------------------------------
Net income per share - basic and diluted 0.10 0.05
---------------------------------------------------------------------
Cash inflow (outflow)
Operating activities 122 126
---------------------------------------------------------------------
Capital expenditures (242) (129)
---------------------------------------------------------------------
Financing activities $ 76 $ (82)
---------------------------------------------------------------------
(1) Per ounce weighted average.
(2) For an explanation of the use of non-GAAP performance measures,
refer to pages 18 to 21 of Management's Discussion and Analysis.
OVERVIEW OF FIRST QUARTER 2005 VERSUS FIRST QUARTER 2004
Earnings
Earnings in first quarter 2005 were $25 million higher than first
quarter 2004 as higher realized gold prices ($52 million pre-tax),
lower amortization rates ($15 million pre-tax) and a lower effective
income tax rate ($8 million) more than offset lower production
volumes ($11 million pre-tax) and higher total cash costs per ounce
($55 million pre-tax).
Earnings in first quarter 2005 also benefited from $8 million
lower pre-tax interest expense, a $6 million pre-tax non-hedge
derivative gain, and pre-tax gains on sale of investments totaling $9
million, partly offset by pre-tax currency translation losses of $4
million. Interest expense decreased by $8 million because all
interest incurred in first quarter 2005 was capitalized to
development projects. Following a change in trustee for a deferred
compensation plan, held via a rabbi trust, various investments were
sold resulting in realized gains of $9 million.
Special Items - Effect on earnings increase (decrease)
---------------------------------------------------------------------
For the three month period ended March 31
($ millions) 2005 2004
Pre- Post- Pre- Post-
Tax Tax Tax Tax
---------------------------------------------------------------------
Non-hedge derivative gains (losses) $ 6 $ 3 $ (15) $ (10)
---------------------------------------------------------------------
Gains on investment sales 9 9 2 1
---------------------------------------------------------------------
Gains on asset sales 1 1 2 1
---------------------------------------------------------------------
Foreign currency translation gains
(losses) (4) (3) 2 2
---------------------------------------------------------------------
Total $ 12 $ 10 $ (9) $ (6)
---------------------------------------------------------------------
Cash Flow
Our cash position as at December 31, 2004 decreased by $68
million to $1,330 million as at March 31, 2005. Operating cash flow
decreased by $4 million in first quarter 2005, when compared to first
quarter 2004, mainly due to lower gold sales volumes and increases in
working capital at our development projects. In first quarter 2005,
higher realized gold prices were offset by the impact of higher total
cash costs per ounce. Capital expenditures increased, when compared
to first quarter 2004, by $113 million to $242 million for first
quarter 2005 mainly due to the levels of construction activity at our
development projects. We received $49 million on the drawdown of cash
from existing financing facilities used to fund construction at our
development projects and $28 million of proceeds on shares issued on
exercise of stock options.
CONSOLIDATED GOLD PRODUCTION AND SALES
As expected, production in first quarter 2005 was 11% lower than
in first quarter 2004 primarily as a result of lower throughput and
mining lower-grade ore at Goldstrike open pit and Pierina, partly
offset by higher production at Kalgoorlie. Ounces sold decreased by
9% compared to first quarter 2004, consistent with the lower
production levels.
Consolidated total cash costs per ounce
---------------------------------------------------------------------
For the three month period ended March 31 (in dollars per ounce)
2005 2004
---------------------------------------------------------------------
Cost of goods sold(1) $ 282 $ 238
---------------------------------------------------------------------
Currency hedge gains (22) (24)
---------------------------------------------------------------------
By-product credits (26) (27)
---------------------------------------------------------------------
Cash operating costs 234 187
---------------------------------------------------------------------
Royalties/mining taxes 14 12
---------------------------------------------------------------------
Total cash costs(2) $ 248 $ 199
---------------------------------------------------------------------
(1) At market currency exchange rates.
(2) For an explanation of the use of non-GAAP performance measures,
refer to pages 18 to 21 of Management's Discussion and Analysis.
As expected, total cash costs per ounce in first quarter 2005
were higher than in first quarter 2004, primarily because of the
lower production, together with the effect of changes in average
currency hedge rates on total cash costs per ounce at our Australian
mines. In the second half of 2005, production is expected to increase
and total cash costs per ounce is expected to decrease, as Lagunas
Norte and Veladero begin production.
Although variations may occur at individual mines, we expect
consolidated production and total cash costs per ounce to meet our
full-year 2005 guidance range, which was disclosed in the most recent
40-F/Annual Information Form. In particular, we have revised the
full-year guidance for the Australia/Africa region to reflect lower
than expected production and slightly higher total cash costs per
ounce at Plutonic and Bulyanhulu.
We realized an average selling price of $428 per ounce for our
gold production in first quarter 2005, 12% higher than the $382 per
ounce realized in first quarter 2004, when average market gold prices
were lower. In first quarter 2005, we sold all of our production into
the spot market at market prices, whereas in first quarter 2004, we
sold 0.8 million ounces under forward gold sales contracts at lower
prices than spot and 0.4 million ounces into the spot market. We may
opportunistically deliver some of our production into gold sales
contracts in the remainder of 2005, consistent with our goal of
reducing our contract position over time. The price realized for gold
sales in 2005 will depend upon spot market conditions and the selling
prices of any gold sales contracts into which we voluntarily deliver,
which could be below prevailing spot market prices.
RESULTS OF OPERATING SEGMENTS
In our Financial Statements, we present a measure of historical
segment income that reflects gold sales at average consolidated
realized gold prices, less segment operating costs and amortization
of segment property, plant and equipment. Our segments mainly include
producing mines and development projects. We monitor segment
operating costs using "total cash costs per ounce(1)" statistics that
represent segment operating costs divided by ounces of gold sold in
each period. The discussion of results for producing mines focuses on
this statistic in explaining changes in segment operating costs.
(1) For an explanation of the use of non-GAAP performance
measures, refer to pages 18 to 21 of the MD&A.
NORTH AMERICA
In first quarter 2005, the region produced 9% less gold compared
with first quarter 2004 mainly because of lower throughput and the
mining of lower-grade ore, as expected, at the Goldstrike open pit
and the mining of lower-than-expected grades at Eskay Creek. Compared
to first quarter 2004, total cash costs per ounce were 13% higher,
mainly as a result of the processing of lower-grade ore, lower
throughput levels and lower volumes of silver produced as a
by-product. The region is expected to slightly exceed production
guidance and be within the range of total cash costs per ounce
guidance for the full year.
Goldstrike, United States
Segment income increased by $14 million in first quarter 2005
from first quarter 2004 levels, mainly due to higher realized gold
prices and 5% higher gold sales volumes, partly offset by 6% higher
total cash costs per ounce and 9% higher amortization expense.
Total cash costs per ounce were 3% higher than in first quarter
2004 as a result of 13% lower throughput levels due to harder ore
encountered in first quarter 2005.
At the underground mine, total cash costs per ounce were 13%
higher and production was 6% lower than first quarter 2004, mainly
due to lower ore throughput in first quarter 2005. Higher volumes of
ore were mined in first quarter 2004 from the Rodeo underground area
than in first quarter 2005. Higher maintenance and freight costs, as
well as higher backfill tons, resulting in increased usage of cement
and other consumables, contributed to the higher total cash costs per
ounce in first quarter 2005.
Amortization expense at Goldstrike increased by $3 million in
first quarter 2005 mainly due to the effect of the 5% increase in
ounces sold compared to first quarter 2004.
The construction of a 115-megawatt natural gas-fired power plant
in Nevada to supply our Goldstrike mine is on schedule, with the
plant expected to commence operations in fourth quarter 2005. Project
highlights include:
- Construction costs of $9 million were incurred in first quarter
2005.
- Delivery of the first engines is expected in early third
quarter 2005.
- Overall engineering is substantially complete.
- Site preparation work was completed in January 2005 and
foundation concrete work is 76% complete.
- Construction of buildings started in March 2005 and is on
schedule.
- Mechanical and electrical contracts were awarded in March 2005
and related work mobilization will start in April 2005.
Eskay Creek, Canada
Segment income for Eskay Creek in first quarter 2005 was in line
with first quarter 2004 as 18% lower gold sales volumes and 20% lower
by-product credits were offset by higher realized gold prices and $6
million lower amortization expense.
Compared to first quarter 2004, production decreased by 17%
because of an 8% decline in ore grade, 5% decline in tons processed
and 2% decline in gold recovery rates. Also, total cash costs per
ounce were $59 per ounce compared to a $10 recovery per ounce in
first quarter 2004, as a result of a 20% decrease in by-product
credits due to lower silver content in ore processed in first quarter
2005. The decrease in by-product credits was partly offset by lower
smelter costs.
Eskay Creek's full-year guidance for production and total cash
costs per ounce has been revised to reflect a continuation of mining
lower-than-expected ore grades into second quarter 2005. We now
expect to produce between 170,000 to 180,000 ounces in 2005 at an
average total cash cost of $130-$140 per ounce.
Amortization expense decreased by $6 million in first quarter
2005 compared to first quarter 2004 mainly due to the impact of the
impairment charge recorded in fourth quarter 2004 and lower gold
sales volumes.
Round Mountain (50% owned), United States
Segment income increased by $5 million in first quarter 2005,
mainly due to higher realized gold prices and a $1 million decrease
in amortization expense, partly offset by 8% higher total cash costs
per ounce. Revenues increased by 21% mainly due to higher realized
gold prices and an 8% increase in ounces sold.
Production and total cash costs per ounce were in line with first
quarter 2004 as gold ore grades improved by 19% offsetting 5% lower
throughput levels.
Amortization expense decreased by $1 million mainly because of
lower amortization rates due to the effect of reserve increases at
the end of 2004.
East Archimedes, United States
In 2004 we made a decision to proceed with the East Archimedes
project at the Ruby Hill mine site in Nevada. The project remains on
schedule with production expected to commence by mid-2007. Project
highlights include:
- Construction costs of $1 million were incurred in first quarter
2005.
- Permitting approvals are expected by the end of 2005.
- The mine fleet was ordered and delivery is expected in the
third quarter 2005.
SOUTH AMERICA
In first quarter 2005, all production was from the Pierina mine.
Lagunas Norte and Veladero are expected to begin significantly
contributing to the South America region's results in the second half
of 2005. The region is expected to achieve its production and total
cash costs per ounce guidance for the full year.
Pierina, Peru
Segment income decreased by $8 million in first quarter 2005
mainly due to 43% lower gold sales volumes with the expected decrease
in production levels in 2005, partly offset by $22 million lower
amortization expense.
Compared to first quarter 2004, production was 37% lower and
total cash costs per ounce were 63% higher, due to the expected
mining of lower-grade ore. Higher maintenance and fuel costs in first
quarter 2005 also contributed to the higher total cash costs per
ounce.
Amortization expense decreased by $22 million, mainly due to the
43% lower gold sales volumes, combined with lower amortization rates
due to the effect of reserve increases at the end of 2004.
Lagunas Norte, Peru
The project is ahead of schedule with its first gold pour now
expected in mid-June 2005. In first quarter 2005,
development/construction costs were capitalized, whereas in first
quarter 2004, the segment loss of $6 million represents expensed mine
development costs. Development costs were expensed prior to when the
project achieved the criteria to classify mineralization as a reserve
for US reporting purposes. Project highlights include:
- Construction of the overall project is about 95% complete, with
about 4,000 workers on-site.
- Construction costs of $53 million were incurred in first
quarter 2005.
- About 80% of required personnel were in place at quarter end,
with hiring expected to be completed by the end of April 2005.
- Commissioning of equipment and facilities started in early
April 2005.
- Structural steel work is 90% complete with all other contracts
on target for scheduled completion.
- The construction of a permanent camp was completed.
Veladero, Argentina
In first quarter 2005, overall mine development continued to
progress and the project is on schedule to commence production in
fourth quarter 2005. Project highlights include:
- Construction costs of $69 million were incurred in first
quarter 2005 and construction at the project is about 80% complete.
- Placement of the valley-fill heap leach secondary liner was
complete and the primary liner is 75% complete.
- Stacking of ore at the valley-fill heap leach facility
commenced in first quarter 2005.
- Steel erection at the secondary crusher is substantially
complete.
- Mainframe steel erection at the truck wash and concrete work
for the external pits has been completed.
- Process plant steel erection is about 85% complete.
- Installation of a power line from the plant to the crusher
areas is 75% complete. Pole and tower erection continues while
foundation work is complete.
- The primary crusher retainer wall is 95% complete.
- The rate of pre-stripping activities continues to improve with
a focus on increasing equipment availability.
- Drilling around the mine site began in late 2004 and we have
had positive drill results at Guanaco Zonzo target, located within 5
kilometers of Veladero.
Pascua-Lama, Chile/Argentina
In 2004, we made a decision to proceed with the development of
the Pascua-Lama project in Chile/Argentina, contingent upon obtaining
the necessary permits, approvals and fiscal regimes. We continue to
target approval of the environmental impact assessments for the
Pascua-Lama project by the end of 2005. We expect a three-year
construction phase to begin once the required permitting is completed
and other fiscal and taxation matters have been finalized, with
production targeted to commence in 2009.
In first quarter 2005, the segment loss of $1 million represents
non-capitalizable project expenditures. We also capitalized costs of
$19 million in first quarter 2005, including development costs and
capitalized interest.
AUSTRALIA/AFRICA
In first quarter 2005, gold production was 1% higher than in
first quarter 2004, mainly due to a 22% increase in production at
Kalgoorlie and the production start-up at Tulawaka, partly offset by
a 15% decrease in production at Plutonic and a 9% decrease at
Bulyanhulu. Total cash costs per ounce were 27% higher than in first
quarter 2004 mainly because of processing lower-grade ore at Plutonic
and 10% lower throughput at Bulyanhulu, combined with the effect of a
14% increase in average Australian dollar currency hedge rates. The
average rates of currency hedge contracts vary each year and
quarter-to-quarter, which impacts reported total cash costs per
ounce. The average exchange rate of hedge contracts in first quarter
2005 was $0.64 compared to $0.56 in first quarter 2004, which caused
total cash costs per ounce for the region to increase by 14%.
Full-year 2005 production and total cash costs per ounce guidance
for the region has been revised due to lower than expected production
at Plutonic and Bulyanhulu. We now expect to produce between
1,345,000 to 1,375,000 ounces in 2005 at an average total cash cost
of about $265-$280 per ounce.
Kalgoorlie (50% owned), Australia
Segment income increased by $2 million in first quarter 2005,
mainly due to the effect of higher realized gold prices, partly
offset by 11% higher total cash costs per ounce. Revenues were 9%
higher in first quarter 2005 mainly due to the higher realized gold
prices.
Gold production was 22% higher than in first quarter 2004 due to
the combined effect of 14% higher ore tons processed, 5% higher ore
grades and 1% higher gold recovery rates. Total cash costs per ounce
were 11% higher than in first quarter 2004 primarily due to higher
fuel prices and higher average exchange rates of currency hedge
contracts.
Amortization expense was in line with first quarter 2004.
Plutonic, Australia
Segment income decreased by $8 million in first quarter 2005
mainly due to 25% lower gold sales volumes, combined with 48% higher
total cash costs per ounce, partly offset by higher realized gold
prices. Revenues decreased by 17% in first quarter 2005 as lower gold
sales volumes were partly offset by higher realized gold prices.
Compared with first quarter 2004, gold production was 15% lower,
mainly due to an 8% decrease in tons of ore processed and a 7%
decrease in ore grades from the underground Timor area. In first
quarter 2004, ore tons processed were higher because a secondary mill
was operating, but this mill ceased operating in mid 2004. Total cash
costs per ounce were 48% higher than in first quarter 2004, mainly
due to the combined effect of lower gold production levels, higher
fuel and maintenance costs and higher average exchange rates of
currency hedge contracts.
Amortization decreased by $1 million mainly due to the lower gold
sales volumes.
Plutonic's full-year 2005 guidance has been revised to reflect
lower-than-expected production and higher-than-expected total cash
costs per ounce due to lower underground grades, the discontinuation
of open-pit mining and higher labor costs due to increased
competition for skilled labor in Australia. A decision was made to
discontinue open-pit mining at the end of second quarter 2005 due to
contractor price increases caused by the tight labor market in
Australia, resulting in a 40,000 ounce reduction in full-year
guidance. We now expect to produce between 280,000 to 285,000 ounces
in 2005 at an average total cash cost of $250-$260 per ounce.
Bulyanhulu, Tanzania
Segment loss was $4 million higher in first quarter 2005 mainly
due to 29% higher total cash costs per ounce and a $3 million
increase in amortization expense, partly offset by 15% higher gold
sales volumes and higher realized gold prices. Revenues were 32%
higher in first quarter 2005 reflecting the higher gold sales volumes
and higher realized gold prices.
Compared with first quarter 2004, gold production was 9% lower,
mainly due to a 10% decrease in the tons of ore processed. Total cash
costs per ounce were 29% higher than in first quarter 2004, mainly
due to the lower production levels, as well as higher contractor
costs and freight charges.
Amortization increased by $3 million due to the higher gold sales
volumes.
Bulyanhulu's full-year 2005 guidance has been revised to reflect
lower-than-expected production and higher-than-expected total cash
costs per ounce due to lower throughput in 2005 as a result of lower
equipment availability, mining schedule changes, ongoing power supply
interruptions and a mechanical failure in the hoist gearbox in April
2005. We now expect to produce between 320,000 to 325,000 ounces in
2005 at an average total cash cost of $330-$340 per ounce.
Tulawaka (70% owned), Tanzania
Tulawaka started production in mid-March 2005. Although 5,000
ounces were produced in the quarter, none of the ounces were sold.
Continuous operation of the process plant commenced in early
March 2005, while construction and commissioning were being
completed. By the end of first quarter 2005, all construction was
complete and all contractors demobilized including the EPCM
contractor. All performance tests for the process plant were complete
and signed off by quarter end. During the test phase, the plant
performance was in excess of design but was treating soft ore.
Cowal, Australia
The project remains on schedule for production to commence in
first quarter 2006. In first quarter 2005, the segment loss of $1
million represents non-capitalizable project expenditures. Project
highlights include:
- Capital expenditures incurred were $44 million.
- Engineering is 75% complete.
- Detailed excavation for the primary crusher pit was completed.
- Mine development earthworks is well underway with the
commencement of the key trench for the south tailings storage
facility.
- With the installation of pit dewatering pumps, pumping of pit
water to the northern tailings cell started in March 2005.
- Pre-strip activity commenced in early second quarter 2005.
Kabanga (50% owned), Tanzania
In April 2005, we entered into a joint-venture agreement with
Falconbridge Limited ("Falconbridge") with respect to the Kabanga
nickel deposit and related concessions in Tanzania. Falconbridge has
acquired a 50% indirect interest in respect of the Kabanga project
for $15 million and a funding commitment. Falconbridge will be the
operator of the joint venture. The Kabanga project has a current
estimated inferred resource of 26.4 million tonnes grading 2.6%
nickel(1).
Over the next several years, Falconbridge will fund and conduct a
further $50-million work plan that will include additional
exploration and infill drilling, and technical work to update the
resource model for Kabanga and bring the project towards feasibility.
It will establish a dedicated team in Tanzania to coordinate and
advance the work plan. Upon conclusion of the work plan, Falconbridge
will fund the next $95 million of any project development
expenditures to advance the Kabanga project. Thereafter, Falconbridge
and Barrick will share equally in joint-venture revenues and
expenditures.
(1) Resource calculations were prepared by employees of Barrick
under the supervision of Alexander J. Davidson, P. Geo., Executive
Vice President, Exploration and Corporate Development of Barrick.
Buzwagi, Tanzania
Buzwagi is a late-stage exploration project located about 80
kilometers south of the Bulyanhulu mine in the Lake Victoria district
in Tanzania. A 50,000-metre drill program commenced in early January
to test for mineralization beyond the currently defined resource.
Initial results are positive and confirm the potential for the
project. Engineering studies are also ongoing.
OTHER COSTS AND EXPENSES
Exploration, Development and Business Development Expense
---------------------------------------------------------------------
For the three month period ended March 31
($ millions) 2005 2004 Comments
---------------------------------------------------------------------
Exploration
---------------------------------------------------------------------
North America $ 7 $ 6
---------------------------------------------------------------------
Australia/Africa 12 8 Higher expenditures at
Buzwagi project in
first quarter 2005.
---------------------------------------------------------------------
South America 5 4
---------------------------------------------------------------------
Russia/Central Asia 1 1
---------------------------------------------------------------------
Other countries 1 -
---------------------------------------------------------------------
26 19
---------------------------------------------------------------------
Mine development Development costs are
expensed until
mineralization is
classified as proven
and probable reserves
for US reporting
purposes.
---------------------------------------------------------------------
Veladero 1 -
---------------------------------------------------------------------
Lagunas Norte - 6 We expensed development
costs until May 1,
2004, which is the
date when the project
achieved the criteria
to classify
mineralization as a
reserve for US
reporting purposes.
---------------------------------------------------------------------
1 6
---------------------------------------------------------------------
Non-capitalizable
project expenditures
---------------------------------------------------------------------
Cowal 1 -
---------------------------------------------------------------------
Pascua-Lama 1 -
---------------------------------------------------------------------
2 -
---------------------------------------------------------------------
---------------------------------------------------------------------
Business
development/other 2 4
---------------------------------------------------------------------
$ 31 $ 29
---------------------------------------------------------------------
Amortization, Administration and Interest Expense
---------------------------------------------------------------------
For the three month period ended March 31
($ millions, except per ounce data and percentages)
2005 2004 % Change Comments
---------------------------------------------------------------------
Amortization
---------------------------------------------------------------------
Absolute amount $ 93 $ 120 (23%) Decrease mainly due to
9% lower sales volumes
and 14% lower
amortization per
ounce.
---------------------------------------------------------------------
Per ounce
(dollars)(1) 78 91 (14%) Decrease following
reserve increases at
some mines at the end
of 2004, and the
impact of the Eskay
Creek impairment
charge recorded in
fourth quarter 2004.
---------------------------------------------------------------------
Administration 17 16 6% Higher regulatory
compliance costs in
2005. Expense guidance
of $90 million for
full-year 2005 has
been reduced to $75
million following the
deferral of the
implementation of the
new Share-Based
Payments (Stock
Options) standard that
will require all stock
options to be
expensed.
---------------------------------------------------------------------
Interest costs
---------------------------------------------------------------------
Incurred 28 12 133% Increase due to impact
of $750 million
debentures issued in
fourth quarter 2004
and drawdown of $222
million on the $250
million Veladero
financing.
---------------------------------------------------------------------
Capitalized 28 4 600% Higher amounts
capitalized to Lagunas
Norte, Veladero and
Cowal development
projects as
capitalized
construction costs
were about $600
million higher in
first quarter 2005.
Capitalization at
Pascua-Lama began on
July 1, 2004.
---------------------------------------------------------------------
Expensed - 8 N/A
---------------------------------------------------------------------
(1) For an explanation of the use of non-GAAP performance measures,
refer to pages 18 to 21 of Management's Discussion and Analysis.
Other (Income) Expense
---------------------------------------------------------------------
For the three month period ended March 31
($ millions) 2005 2004 Comments
---------------------------------------------------------------------
Non-hedge derivative
(gains)/losses $ (6) $ 15 Gains in first quarter
2005 mainly relate to
non-hedge fuel
contracts. Losses in
first quarter 2004
mainly relate to non-
hedge silver
contracts.
---------------------------------------------------------------------
Gains on asset/
investment sales (10) (4) Gains recorded in
first quarter 2005
mainly relate to the
sale of investments,
held in a rabbi trust
for a deferred
compensation plan,
as a result of a
change of the plan
trustee.
---------------------------------------------------------------------
Environmental
remediation costs 5 8
---------------------------------------------------------------------
Currency translation
(gains)/losses 4 (2)
---------------------------------------------------------------------
Other items 2 (1)
---------------------------------------------------------------------
$ (5) $ 16
---------------------------------------------------------------------
Income Taxes
Income tax expense of $14 million in first quarter 2005 was in
line with first quarter 2004. Our underlying expected effective tax
rate for 2005 is 22%, which is lower than the effective tax rate of
28% used in first quarter 2004. The decrease is primarily due to a
change in the geographic mix of gold production in 2005, and
therefore the mix of taxable income in different tax jurisdictions.
The expected rate for 2005 is based on a market gold price assumption
of $425 per ounce. If actual average market gold prices vary from
this assumption, our actual effective tax rate will also vary. The
expected underlying tax rate excludes the effect of gains and losses
on non-hedge derivatives; the effect of delivering into forward gold
sales contracts at prices below prevailing market prices; and any
release of deferred tax valuation allowances.
Please note: There is a graph relating to Cash Flow available on
CCNMatthews' website at the following link:
http://www2.ccnmatthews.com/database/fax/2000/ABX20428.jpg
Operating Activities
Operating cash flow decreased from first quarter 2004 by $4
million to $122 million in first quarter 2005. The key factors that
contributed to the year over year decrease are summarized in the
table below.
Key factors affecting operating cash flow
---------------------------------------------------------------------
For the three month Impact
period ended March 31 on
($ millions, except comparative
per ounce data) operating
cash
2005 2004 flow Comments
---------------------------------------------------------------------
Gold sales volumes
('000s oz) 1,129 1,247 $ (21)
---------------------------------------------------------------------
Realized gold
prices ($/oz) $ 428 $ 382 52
---------------------------------------------------------------------
Total cash costs
($/oz)(1) 248 199 (55)
---------------------------------------------------------------------
Sub-total (24) Refer to pages 8 and
12 for explanations of
changes in gold
production and sales.
---------------------------------------------------------------------
Other inflows
(outflows)
---------------------------------------------------------------------
Income tax payments (12) (29) 17 Refunds related to
prior periods received
in first quarter 2005
and lower required
income tax payments.
---------------------------------------------------------------------
Increase in
inventories (20) (5) (15) Increases in inventory
primarily reflect
supplies required to
support construction
at development
projects.
---------------------------------------------------------------------
Increase in taxes
recoverable (17) (6) (11) Tax recoverable
increased in first
quarter 2005 for goods
and services tax on
supplies and materials
used in construction
at development
projects. Amounts are
expected to be
recovered after
production begins. A
$33 million recovery
of a portion of taxes
recoverable at March
31, 2005 is expected
in second quarter
2005.
---------------------------------------------------------------------
Other non-cash
working capital 29 3 26 Timing of supplier
payments.
---------------------------------------------------------------------
Interest expense - 8 8 Increase in amounts
capitalized to
development projects
in first quarter
2005.
---------------------------------------------------------------------
Effect of other factors (5)
---------------------------------------------------------------------
Total $ (4)
---------------------------------------------------------------------
(1) Total cash costs per ounce is a non-GAAP performance measure. For
more information, see pages 18 to 21.
Investing Activities
---------------------------------------------------------------------
For the three month period ended March 31
($ millions) 2005 2004 $ Change Comments
---------------------------------------------------------------------
Growth capital
Expenditures(1)
---------------------------------------------------------------------
Veladero $ 69 $ 64 $ 5 Construction activity
started in first
quarter 2004 with
similar expenditure
levels in first
quarter 2005.
---------------------------------------------------------------------
Lagunas Norte 53 6 47 Construction activity
started in second
quarter 2004.
---------------------------------------------------------------------
Cowal 44 20 24 Construction activity
started in second
quarter 2004.
Principal expenditure
in first quarter 2004
was a $15 million
payment under a
property acquisition
agreement.
---------------------------------------------------------------------
Tulawaka 5 3 2 Construction activity
started in first
quarter 2004.
Production started in
March 2005.
---------------------------------------------------------------------
Pascua-Lama 19 4 15 Similar development
expenditures in first
quarter 2005.
Capitalization of
interest in first
quarter 2005.
---------------------------------------------------------------------
Nevada Power Plant 9 - 9 Construction activity
started in fourth
quarter 2004.
---------------------------------------------------------------------
East Archimedes 1 - 1 Construction activity
started in first
quarter 2005.
---------------------------------------------------------------------
Sub-total 200 97 103
---------------------------------------------------------------------
Sustaining capital
expenditures
---------------------------------------------------------------------
North America 15 14 1
---------------------------------------------------------------------
Australia/Africa 23 15 8 Higher expenditures on
Underground
development and mining
equipment at
Bulyanhulu in first
quarter 2005.
---------------------------------------------------------------------
South America 3 2 1
---------------------------------------------------------------------
Other 1 1 -
---------------------------------------------------------------------
Sub-total 42 32 10
---------------------------------------------------------------------
Total $ 242 $ 129 $ 113
---------------------------------------------------------------------
(1) Includes construction costs and capitalized interest.
Financing Activities
The most significant financing cash flows in first quarter 2005
were $49 million of drawdowns under the lease facility for Lagunas
Norte and the Veladero project financing, and $28 million received on
the exercise of employee stock options. We also made scheduled
payments under long-term debt obligations totaling $1 million in
first quarter 2005.
BALANCE SHEET
SHAREHOLDERS' EQUITY
Outstanding Share Data
As at April 14, 2005, 534 million of our common shares, one
special voting share and 1.4 million Exchangeable Shares not owned by
Barrick (exchangeable into 0.7 million of our common shares) were
issued and outstanding. As at April 14, 2005, options to purchase 23
million common shares were outstanding under our option plans, as
well as options to purchase one million common shares under certain
option plans inherited by us in connection with prior acquisitions.
Comprehensive Income
Comprehensive income consists of net income or loss, together
with certain other economic gains and losses that collectively are
described as "other comprehensive income", and excluded from the
income statement.
In first quarter 2005, the other comprehensive loss of $9 million
mainly included gain reclassification adjustments totaling $40
million for gains of $9 million on the sale of investments and gains
of $31 million on hedge contracts designated for 2005 that were
transferred to earnings in first quarter 2005; partly offset by gains
of $21 million on hedge contracts designated for future periods
caused primarily by changes in currency exchange rates, interest
rates and fuel prices.
QUARTERLY INFORMATION ($ millions, except where indicated)
---------------------------------------------------------------------
2005 2004 2003
---------------------------------------------------------------------
Q1 Q4 Q3 Q2 Q1 Q4 Q3 Q2
---------------------------------------------------------------------
Gold sales $ 484 $ 501 $ 500 $ 454 $ 477 $ 536 $ 549 $ 491
Net income 51 156 32 34 26 77 35 59
Net income per share
- basic (dollars) 0.10 0.30 0.06 0.06 0.05 0.14 0.07 0.11
---------------------------------------------------------------------
Our financial results for the last eight quarters reflect the
following general trends: rising spot gold prices with a
corresponding rise in prices realized from gold sales; and declining
gold production, sales volumes, and rising total cash costs per ounce
as a number of our mines process lower-grade ore and are subject to
rising input costs due to inflationary pressures. The trend of lower
production and higher total cash costs per ounce is expected to
reverse in the second half of 2005 as our lower cost Lagunas Norte
and Veladero mines begin production. Net income in each quarter also
reflects the timing of various special items. The items affecting
first quarter 2005 and first quarter 2004 are presented in a table on
page 8.
OFF-BALANCE SHEET ARRANGEMENTS
The MD&A included in our 2004 Annual Report contained a detailed
discussion of off-balance sheet arrangements. In this interim MD&A,
we have included a brief discussion and an update to reflect any
significant changes in off-balance sheet arrangements.
Gold and Silver Sales Contracts
We have historically used gold and silver sales contracts as a
means of selling a portion of our gold and silver production. The
contracting parties are bullion banks whose business includes
entering into contracts to purchase gold or silver from mining
companies. All our gold and silver sales contracts (including
Corporate Gold Sales Contracts, Pascua-Lama Gold Sales Contracts and
Floating Spot-Price Gold Sales Contracts) retain all the benefits of
our Master Trading Agreements ("MTAs") and are not subject to
margining, downgrade or unilateral and discretionary "right to break"
provisions. Furthermore, as part of our MTAs, Pascua-Lama Gold Sales
Contracts are not subject to any provisions regarding any final
go-ahead decisions with Pascua-Lama construction, or any possible
delay or change in the Pascua-Lama project. Barrick guarantees the
performance of all its gold and silver sales contracts.
Corporate Gold Sales and Floating Spot-Price Gold Sales Contracts
We had fixed-price Corporate Gold Sales Contracts, which at March
31, 2005 totaled 6.8 million ounces. This represents approximately
one year of expected future gold production and approximately 10% of
our proven and probable reserves, excluding Pascua-Lama. We reduced
our fixed-price Corporate Gold Sales contracts by 0.2 million ounces
in first quarter 2005 by converting 0.2 million ounces of fixed-price
contracts to floating spot-price contracts.
At March 31, 2005, we had floating spot-price gold sales
contracts under which we are committed to deliver 0.7 million ounces
of gold over the next ten years at spot prices, less an average
fixed-price adjustment of $72 per ounce.
Key Aspects of Corporate Gold Sales Contracts
(at March 31, 2005)
---------------------------------------------------------------------
Current termination date of contracts. 2014 in most cases.
---------------------------------------------------------------------
Average estimated realizable price in 2014. $433/oz.(1)
---------------------------------------------------------------------
Mark-to-market value at March 31, 2005.
Corporate Gold Sales Contracts $(876) million.(2)
Floating Spot-Price Gold Sales Contracts. $(48) million.(2)
---------------------------------------------------------------------
(1) Approximate estimated value based on current market US dollar
interest rates and an average lease rate assumption of 1%.
Accelerating gold deliveries would likely lead to reduced
contango that would otherwise have built up over time. Barrick
may choose to settle any gold sales contract in advance of this
termination date at any time, at its discretion. Historically,
delivery has occurred in advance of the contractual termination
date.
(2) At a spot gold price of $427 per ounce, and market interest
rates.
We have an obligation to deliver gold by the termination date,
currently 2014 in most cases. However, because we typically fix the
price of gold under our gold sales contracts to a date that is
earlier than the termination date of the contract (referred to as the
"interim price-setting date"), the actual realized price on the
contract termination date depends upon the actual gold market forward
premium ("contango") between the interim price-setting date and the
termination date. The price in the table above is not necessarily
representative of the prices that may be realized each quarter for
actual deliveries into gold sales contracts, in particular if we
choose to settle any gold sales contract in advance of the
termination date, which we have the right to do at our discretion.
Pascua-Lama Gold Sales Contracts
In anticipation of building Pascua-Lama and in support of any
related financing, we have 6.5 million ounces of existing fixed-price
gold sales contracts specifically allocated to Pascua-Lama (the
"Pascua-Lama Gold Sales Contracts"). The allocation of these
contracts will help reduce gold price risk at Pascua-Lama and is
expected to help secure the financing for its construction. We expect
the allocation of these contracts to eliminate any requirement by
lenders to add any incremental gold sales contracts in the future to
support the financing of Pascua-Lama.
Key Aspects of Pascua-Lama Gold Sales Contracts
(at March 31, 2005)
---------------------------------------------------------------------
Expected delivery dates.(1) 2009-2017, the term of
the expected financing.
---------------------------------------------------------------------
Future estimated average realizable price. $375/oz.(2)
---------------------------------------------------------------------
Mark-to-market value at March 31, 2005. $(931) million.(3)
---------------------------------------------------------------------
(1) The contract termination dates are 2014-2017 in most cases, but
we expect to deliver Pascua-Lama production against these
contracts starting in 2009.
(2) Upon delivery of production from 2009-2017, the term of expected
financing. Approximate estimated value based on current market
contango.
(3) At a spot gold price of $427 per ounce and market interest rates.
These contracts represent just over 35% of the 17.6 million
ounces of gold reserves at Pascua-Lama, and do not impact any of the
643 million ounces of silver contained in gold reserves.
Fair Value of Derivative Positions
---------------------------------------------------------------------
At Mar.31, At Dec.31,
Unrealized Gain/(Loss) 2005 2004
---------------------------------------------------------------------
Corporate Gold Sales Contracts(1) $ (924) $ (975)
---------------------------------------------------------------------
Pascua-Lama Gold Sales Contracts (931) (966)
---------------------------------------------------------------------
Silver Sales Contracts(1) (33) (26)
---------------------------------------------------------------------
Foreign currency contracts 260 298
---------------------------------------------------------------------
Interest and lease rate contracts 37 45
---------------------------------------------------------------------
Fuel contracts 36 4
---------------------------------------------------------------------
$ (1,555) $ (1,620)
---------------------------------------------------------------------
(1) Includes floating spot-price contracts.
Contractual Obligations and Commitments
Purchase obligations for capital expenditures include only those
items where binding commitments have been entered into. They do not
include the full amount of future capital expenditures required to
complete construction of the Company's development projects, because
commitments have yet to be made for a portion of these estimated
future capital costs. Significant changes to the December 31, 2004
contractual obligations and commitments include an additional $150
million of capital commitments mainly at the development projects and
an additional $120 million of purchase obligations for supplies and
consumables and power contracts that the Company expects to incur
mainly in 2005 and 2006.
In first quarter 2005, we have drawn an additional $49 million of
long-term debt on our Veladero project financing facilities and lease
facility for Lagunas Norte that will result in additional repayments
of about $8-10 million each year for 2006 to 2009 and the remainder
will be repaid in 2010 and thereafter.
Capital expenditures not yet committed
We expect to incur about $2.3 billion in capital to complete the
development of our present projects over the next five years
(Veladero, Lagunas Norte, Cowal, Pascua-Lama and East Archimedes) and
the Nevada Power Plant. A total of about $0.3 billion of these
amounts had been committed at the end of first quarter 2005, with the
remainder not yet committed.
CRITICAL ACCOUNTING POLICIES AND ESTIMATES
Management has discussed the development and selection of our
critical accounting estimates with the Audit Committee of the Board
of Directors, and the Audit Committee has reviewed the disclosure
relating to such estimates in conjunction with its review of this
MD&A. The accounting policies and methods we utilize determine how we
report our financial condition and results of operations, and they
may require management to make estimates or rely on assumptions about
matters that are inherently uncertain.
In this MD&A, we have not repeated information provided in our
2004 annual MD&A. We have provided an update for any changes or
expected changes in accounting policies and critical accounting
estimates that were not included in our 2004 annual MD&A.
Accounting Policy Changes
There were no changes in accounting policies in the first quarter
of 2005 that significantly impacted our Financial Statements.
EITF Issue No. 04-6, Accounting for Stripping Costs Incurred
during Production in the Mining Industry ("EITF 04-6")
In March 2005, the FASB approved EITF 04-6. On adoption of EITF
04-6, we will be required to change our accounting policy for
stripping costs. Historically, stripping costs have been capitalized
on the balance sheet under Capitalized Mining Costs and attributed to
earnings using a stripping ratio that results in a smoothing of these
costs over the life of the mine. Under EITF 04-6, stripping costs
incurred in the production phase will be capitalized as a component
of inventory cost each period. This new method of accounting under
EITF 04-6 will likely lead to greater period-to-period volatility in
production costs. The mines most significantly affected will be
Goldstrike open pit, Pierina and Kalgoorlie, as well as our Veladero
and Lagunas Norte development projects after they begin production in
2005. Adoption of EITF 04-6 is required by first quarter 2006, but
earlier adoption is permitted. On adoption, the Company may choose to
record a cumulative effect adjustment in earnings of the period of
adoption, or alternatively retroactively restate all prior periods
for the effect of the change. We are presently evaluating the impact
of EITF 04-6, and we may early adopt EITF 04-6 during 2005.
FAS 123R, Accounting for Stock-Based Compensation ("FAS 123R")
In April 2005, the SEC announced the deferral of the effective
date of FAS 123R. FAS 123R will now be effective by the first quarter
of fiscal 2006 for Barrick. We expect to complete preparations for
the adoption of FAS 123R in 2005, ready for adoption in first quarter
2006. Consequently, we have revised our guidance for administration
expense in 2005 down from $90 million to $75 million.
Critical Accounting Estimates
Certain accounting estimates have been identified as being
"critical" to the presentation of our financial condition and results
of operations because they require management to make particularly
subjective and/or complex judgments about matters that are inherently
uncertain; and there is a reasonable likelihood that materially
different amounts could be reported under different conditions or
using different assumptions and estimates. Critical accounting
estimates include:
- Reserve estimates used to measure amortization of property,
plant and equipment;
- Stripping ratios used to measure amortization of capitalized
mining costs;
- Impairment assessments of long-lived assets;
- The fair value of asset retirement obligations; and
- The measurement of deferred income tax assets and liabilities
and assessments of the amounts of valuation allowances recorded.
Reserve Estimates Used to Measure Amortization of Property, Plant
and Equipment
We record amortization expense based on the estimated useful
economic lives of long-lived assets. Changes in reserves, effective
December 31, 2004, caused amortization during first quarter 2005 to
decrease by $3 million for the mines listed below, which had reserve
estimate changes (other than production) greater than 10%.
Impact of Historic Changes in Reserve Estimates on Amortization
---------------------------------------------------------------------
For the three
($ millions, except As at December month period ended
reserves in 31, 2004 March 31, 2005
millions of Reserves increase Amortization increase
contained oz) (decrease)(1) (decrease)
---------------------------------------------------------------------
Goldstrike
---------------------------------------------------------------------
Underground 0.1 $ -
---------------------------------------------------------------------
Open pit 1.8 (2)
---------------------------------------------------------------------
Plutonic 0.2 -
---------------------------------------------------------------------
Eskay Creek (0.1) 1
---------------------------------------------------------------------
Kalgoorlie (0.2) -
---------------------------------------------------------------------
Pierina 0.3 (2)
---------------------------------------------------------------------
(1) Each year we update our reserve estimates as at the end of the
year as part of our normal business cycle. Reserve changes, shown
in millions of contained ounces, affect amortization expense on
a prospective basis.
Stripping Ratios Used to Measure Amortization of Capitalized
Mining Costs
Effective January 1, 2005, we increased the stripping ratios for
Goldstrike - Open Pit and Pierina to reflect updated reserves at the
end of 2004. The amounts presented represent the estimated impact on
quarterly amortization caused by these changes, based on production
levels and sales volumes in the first quarter.
Impact of Historic Changes in Stripping Ratios
---------------------------------------------------------------------
Amortization
increase
Stripping Ratio used in (decrease)(1)
($ millions, except ratios) 2005 2004 2005
---------------------------------------------------------------------
Goldstrike open pit 127:1 109:1 $ (3)
---------------------------------------------------------------------
Pierina 86:1 60:1 $ 1
---------------------------------------------------------------------
(1) Impact of the year on year change in the stripping ratio used to
amortize capitalized mining costs. Amortization of capitalized
mining costs is recorded as a component of the cost of inventory,
and consequently impacts cost of sales in the income statement.
Impairment Assessments of Investments
Each reporting period we review all investments whose fair value
at the end of the period is below cost to determine whether an
other-than-temporary impairment has occurred. We consider both
positive and negative evidence in order to reach a conclusion on
whether any impairment is other-than-temporary, and if necessary,
record any losses that are other-than-temporary in earnings within
other (income)/expense. Changes in the values of investments are
caused by market factors beyond our control and could be significant.
Consequently, the amount of any impairment charge recorded could
materially impact earnings in a particular reporting period. In first
quarter 2005, we reviewed two investments for impairment purposes and
concluded that the impairment in value was not other-than-temporary,
as disclosed in note 11 to the interim financial statements. If a
further or prolonged deterioration in value of these investments
occurs, we may reach a different conclusion that could lead to the
recognition of an impairment charge in earnings of a future period.
NON-GAAP PERFORMANCE MEASURES
---------------------------------------------------------------------
FOR THE THREE MONTH PERIOD ENDED MARCH 31
($ MILLIONS, EXCEPT PER OUNCE INFORMATION) 2005 2004
---------------------------------------------------------------------
Total cash costs - per US GAAP(1) $ 283 $ 250
---------------------------------------------------------------------
Accretion expense and reclamation costs at
the operating mines (3) (2)
---------------------------------------------------------------------
Total cash costs - per Gold Institute
Production Cost Standard $ 280 $ 248
---------------------------------------------------------------------
Ounces sold (thousands) 1,129 1,247
---------------------------------------------------------------------
Total cash costs per ounce - per US GAAP
(dollars)(2) $ 251 $ 200
---------------------------------------------------------------------
Total cash costs per ounce - per Gold
Institute Production Cost Standard
(dollars)(2) $ 248 $ 199
---------------------------------------------------------------------
(1) Equal to cost of sales and other operating expenses less
accretion expense and reclamation costs at non-operating mines.
(2) Per ounce weighted average.
We have included total cash costs per ounce data because these
statistics are a key performance measure that management uses to
monitor performance. We use these statistics to assess how well our
producing mines are performing compared to plan and also to assess
the overall effectiveness and efficiency of our mining operations. We
believe that the inclusion of these statistics in MD&A helps an
investor to assess performance "through the eyes of management". We
understand that certain investors also use these statistics to assess
our performance. The inclusion of total cash costs per ounce
statistics enables investors to better understand year-on-year
changes in production costs, which in turn affect profitability and
the ability to generate operating cash flow for use in investing and
other activities. We report total cash costs per ounce data
calculated in accordance with The Gold Institute Production Cost
Standard (the "Standard"). Adoption of the Standard is voluntary, but
we understand that most senior gold producers follow the Standard
when reporting cash cost per ounce data. The data does not have a
meaning prescribed by US GAAP and therefore amounts presented may not
be comparable to data presented by gold producers who do not follow
the Standard. Total cash costs per ounce are derived from amounts
included in the Statements of Income and mine site operating costs
such as mining, processing, administration, royalties and production
taxes, but exclude amortization, reclamation costs, financing costs,
and capital, development and exploration costs. A US GAAP measure of
costs per ounce has also been presented as required by securities
regulations that govern non-GAAP performance measures. Commentary
within this Management's Discussion and Analysis is focused on the
"total cash costs" measure as defined by the Standard.
The data is intended to provide additional information and should
not be considered in isolation or as a substitute for measures of
performance prepared in accordance with GAAP. The measures are not
necessarily indicative of operating profit or cash flow from
operations as determined under GAAP. As can be seen from the tables
on pages 20 to 21 reconciling the GAAP and non-GAAP measures, the
GAAP and non-GAAP measures are not significantly different.
Reconciliation of Total Cash Costs Per Ounce to Financial Statements
---------------------------------------------------------------------
Goldstrike - Goldstrike - Eskay Round
Open Pit Underground Creek(2) Mountain
---------------------------------------------------------------------
For the three
month period
ended March 31 2005 2004 2005 2004 2005 2004 2005 2004
---------------------------------------------------------------------
Total cash
production
costs -
per US
GAAP(1) $ 84.2 $ 77.1 $ 41.4 $ 35.7 $ 3.4 $(1.1) $ 21.1 $ 18.2
Accretion
expense and
reclamation
costs at
operating
mines (0.6) (0.6) (0.1) (0.1) (0.2) (0.1) (0.4) (0.4)
---------------------------------------------------------------------
Total cash
production
costs per
Gold Institute
Production
Cost
Standard $ 83.6 $ 76.5 $ 41.3 $ 35.6 $ 3.2 $(1.2) $ 20.7 $ 17.8
---------------------------------------------------------------------
Ounces sold
(thousands) 304 287 144 141 54 66 93 86
Total cash
costs per
ounce sold
per US GAAP
(dollars)(3) $ 278 $ 269 $ 287 $ 254 $ 62 $ (18) $ 228 $ 212
---------------------------------------------------------------------
Total cash
costs per
ounce sold -
per Gold
Institute
Production
Cost Standard
(dollars)(4) $ 276 $ 267 $ 287 $ 253 $ 59 $ (19) $ 223 $ 207
---------------------------------------------------------------------
---------------------------------------------------------------------
Holt- Marigold
Hemlo McDermott Total North America
---------------------------------------------------------------------
For the three
month period
ended March 31 2005 2004 2005 2004 2005 2004 2005 2004
---------------------------------------------------------------------
Total cash
production
costs - per
US GAAP(1) $ 17.2 $ 14.2 $ - $ 5.2 $ 3.2 $ 2.1 $ 170.5 $151.4
Accretion
expense and
reclamation
costs at
operating
mines - - - - - - (1.3) (1.2)
---------------------------------------------------------------------
Total cash
production
costs per
Gold Institute
Production
Cost
Standard $ 17.2 $ 14.2 $ - $ 5.2 $ 3.2 $ 2.1 $169.2 $150.2
---------------------------------------------------------------------
Ounces sold
(thousands) 66 62 - 22 14 8 675 672
Total cash
costs per
ounce sold
per US GAAP
(dollars)(3) $ 260 $ 227 $ - $ 238 $ 226 $ 248 $ 253 $ 225
---------------------------------------------------------------------
Total cash
costs per
ounce sold -
per Gold
Institute
Production
Cost Standard
(dollars)(4) $ 260 $ 227 $ - $ 238 $ 226 $ 248 $ 251 $ 223
---------------------------------------------------------------------
---------------------------------------------------------------------
Total South
Pierina America Plutonic Darlot
---------------------------------------------------------------------
For the three
month period
ended March 31 2005 2004 2005 2004 2005 2004 2005 2004
---------------------------------------------------------------------
Total cash
production
costs - per
US GAAP(1) $ 18.6 $ 19.4 $ 18.6 $ 19.4 $ 19.4 $17.3 $ 6.4 $ 7.7
Accretion
expense and
reclamation
costs at
operating
mines (1.3) (0.8) (1.3) (0.8) - - - -
---------------------------------------------------------------------
Total cash
production
costs per
Gold Institute
Production
Cost
Standard $ 17.3 $18.6 $ 17.3 $ 18.6 $ 19.4 $17.3 $ 6.4 $ 7.7
---------------------------------------------------------------------
Ounces sold
(thousands) 129 227 129 227 67 89 26 37
Total cash
costs per
ounce sold
per US GAAP
(dollars)(3) $ 144 $ 86 $ 144 $ 86 $ 287 $ 194 $ 249 $ 208
---------------------------------------------------------------------
Total cash
costs per
ounce sold -
per Gold
Institute
Production
Cost Standard
(dollars)(4) $ 134 $ 82 $ 134 $ 82 $ 287 $ 194 $ 249 $ 208
---------------------------------------------------------------------
(1) Represents cost of sales and other operating costs (excluding
amortization and accretion expense and reclamation costs for
non-operating mines).
(2) Eskay Creek's total cash costs in three month period ended March
31, 2005 are impacted by higher silver prices which the Company
treats as a by-product. Total cash costs on a co-product basis
for the three month period ended March 31 are: 2005 - gold
$234 per ounce, silver $3.80 per ounce (2004 - gold $186 per
ounce, silver $3.49 per ounce).
(3) Represents total cash production costs per US GAAP divided by
ounces sold.
(4) Represents total cash production costs per Gold Institute
Production Cost Standard divided by ounces sold.
---------------------------------------------------------------------
Total Australia
Lawlers Kalgoorlie Bulyanhulu /Africa
---------------------------------------------------------------------
For the three
month period
ended March 31 2005 2004 2005 2004 2005 2004 2005 2004
---------------------------------------------------------------------
Total cash
production
costs - per
US GAAP(1) $ 8.9 $ 7.1 $ 28.6 $ 26.3 $ 30.6 $20.7 $ 93.9 $ 79.1
Accretion
expense and
reclamation
costs at
operating
mines (0.1) - (0.2) (0.2) (0.1) (0.1) (0.4) (0.3)
---------------------------------------------------------------------
Total cash
production
costs per
Gold Institute
Production
Cost
Standard $ 8.8 $ 7.1 $28.4 $ 26.1 $30.5 $ 20.6 $ 93.5 $ 78.8
---------------------------------------------------------------------
Ounces sold
(thousands) 31 30 115 117 86 75 325 348
Total cash costs
per ounce sold
per US GAAP
(dollars)(2) $ 289 $ 236 $ 248 $ 225 $ 357 $ 277 $ 289 $ 227
---------------------------------------------------------------------
Total cash costs
per ounce sold
- per Gold
Institute
Production
Cost Standard
(dollars)(3) $ 287 $ 236 $ 247 $ 223 $ 356 $ 276 $ 288 $ 226
---------------------------------------------------------------------
(1) Represents cost of sales and other operating costs (excluding
amortization and accretion expense and reclamation costs for
non-operating mines).
(2) Represents total cash production costs per US GAAP divided by
ounces sold.
(3) Represents total cash production costs per Gold Institute
Production Cost Standard divided by ounces sold.
Reconciliation of Amortization Costs per Ounce to Financial
Statements
---------------------------------------------------------------------
For the three month period ended March 31 2005 2004
---------------------------------------------------------------------
Amortization expense per consolidated
financial statements $ 93 $ 120
Amortization expense recorded on property,
plant and equipment not at operating mine sites (4) (6)
---------------------------------------------------------------------
Amortization expense for per ounce calculation $ 89 $ 114
---------------------------------------------------------------------
Ounces sold (thousands) 1,129 1,247
---------------------------------------------------------------------
Amortization per ounce (dollars) $ 78 $ 91
---------------------------------------------------------------------
Consolidated Statements of Income
Barrick Gold Corporation
(in millions of United States Three months ended
dollars, except per share data) (Unaudited) March 31,
--------------------
2005 2004
--------------------
Gold sales (notes 3 and 4) $ 484 $ 477
---------------------------------------------------------------------
Costs and expenses
Cost of sales (1) (note 5) 291 254
Amortization (note 3) 93 120
Administration 17 16
Exploration, development and business development 31 29
Other (income) expense (note 6) (5) 16
---------------------------------------------------------------------
57 42
---------------------------------------------------------------------
Interest income 8 6
Interest expense (note 14) - (8)
---------------------------------------------------------------------
Income before income taxes and other items 65 40
Income tax expense (note 7) 14 14
---------------------------------------------------------------------
Net income for the period $ 51 $ 26
---------------------------------------------------------------------
Earnings per share data (note 8):
Net income
Basic and diluted $ 0.10 $ 0.05
---------------------------------------------------------------------
(1) Exclusive of amortization (note 5).
The accompanying notes are an integral part of these unaudited
interim consolidated financial statements.
Consolidated Statements of Cash Flows
Barrick Gold Corporation
(in millions of United States Three months ended
dollars) (Unaudited) March 31,
--------------------
2005 2004
---------------------------------------------------------------------
OPERATING ACTIVITIES
Net income for the period $ 51 $ 26
Amortization 93 120
Deferred income taxes (note 7) 3 (4)
Gains on sale of assets (note 6) (1) (2)
Gains on sale of investments (note 6) (9) (2)
Other items (note 9) (15) (12)
---------------------------------------------------------------------
Net cash provided by operating activities 122 126
---------------------------------------------------------------------
INVESTING ACTIVITIES
Property, plant and equipment
Capital expenditures (note 3) (242) (129)
Sales proceeds 5 2
Investments
Purchases (note 11) (28) (41)
Sales proceeds - 4
---------------------------------------------------------------------
Net cash used in investing activities (265) (164)
---------------------------------------------------------------------
FINANCING ACTIVITIES
Capital stock
Proceeds on exercise of stock options 28 13
Repurchased for cash - (95)
Long-term debt
Proceeds (note 14a) 49 -
Repayments (1) -
---------------------------------------------------------------------
Net cash provided by (used in)
financing activities 76 (82)
---------------------------------------------------------------------
Effect of exchange rate changes on cash
and equivalents (1) -
Net decrease in cash and equivalents (67) (120)
Cash and equivalents at beginning of period 1,398 970
---------------------------------------------------------------------
Cash and equivalents at end of period $ 1,330 $ 850
---------------------------------------------------------------------
The accompanying notes are an integral part of these unaudited
interim consolidated financial statements.
Consolidated Balance Sheets
Barrick Gold Corporation
(in millions of United States dollars)
(Unaudited) At Mar.31 At Dec. 31
------------------------
2005 2004
---------------------------------------------------------------------
ASSETS
Current assets
Cash and equivalents $ 1,330 $ 1,398
Accounts receivable 52 58
Inventories (note 10) 235 215
Other current assets 329 286
---------------------------------------------------------------------
1,946 1,957
Investments (note 11) 141 134
Property, plant and equipment (note 12) 3,551 3,391
Capitalized mining costs (note 13) 222 226
Other assets 591 566
---------------------------------------------------------------------
Total assets $ 6,451 $ 6,274
---------------------------------------------------------------------
LIABILITIES AND SHAREHOLDERS' EQUITY
Current liabilities
Accounts payable $ 365 $ 335
Other current liabilities 90 83
---------------------------------------------------------------------
455 418
Long-term debt (note 14) 1,698 1,655
Other long-term obligations 528 499
Deferred income tax liabilities 137 139
---------------------------------------------------------------------
Total liabilities 2,818 2,711
---------------------------------------------------------------------
Shareholders' equity
Capital stock (note 15) 4,157 4,129
Deficit (573) (624)
Accumulated other comprehensive income (note 17) 49 58
---------------------------------------------------------------------
Total shareholders' equity 3,633 3,563
---------------------------------------------------------------------
Contingencies and commitments (note 18)
---------------------------------------------------------------------
Total liabilities and shareholders' equity $ 6,451 $ 6,274
---------------------------------------------------------------------
The accompanying notes are an integral part of these unaudited
interim consolidated financial statements.
Consolidated Statements of Shareholders' Equity
Barrick Gold Corporation
(in millions of United States dollars) -------------------------
(Unaudited) 2005 2004
---------------------------------------------------------------------
Common shares (number in millions)
At January 1 534 535
Issued on exercise of stock options - 1
Repurchased (note 15a) - (4)
---------------------------------------------------------------------
At March 31 534 532
---------------------------------------------------------------------
Common shares (dollar in millions)
At January 1 $ 4,129 $ 4,115
Issued on exercise of stock options 28 13
Repurchased (note 15a) - (35)
---------------------------------------------------------------------
At March 31 $ 4,157 $ 4,093
---------------------------------------------------------------------
Deficit
At January 1 $ (624) $ (694)
Net income 51 26
Adjustment on repurchase of
common shares (note 15a) - (60)
---------------------------------------------------------------------
At March 31 $ (573) $ (728)
---------------------------------------------------------------------
Accumulated other comprehensive income
(note 17) $ 49 $ 72
---------------------------------------------------------------------
Total shareholders' equity at March 31 $ 3,633 $ 3,437
---------------------------------------------------------------------
Consolidated Statements of Comprehensive Income
Three months ended
Barrick Gold Corporation March 31,
(in millions of United States dollars) ---------------------
(Unaudited) 2005 2004
---------------------------------------------------------------------
Net income $ 51 $ 26
Other comprehensive loss, net of tax (note 17) (9) (1)
---------------------------------------------------------------------
Comprehensive income $ 42 $ 25
---------------------------------------------------------------------
The accompanying notes are an integral part of these unaudited
interim consolidated financial statements.
NOTES TO UNAUDITED INTERIM CONSOLIDATED FINANCIAL STATEMENTS
Tabular dollar amounts in millions of United States dollars,
unless otherwise shown. References to C$, A$ and EUR are to Canadian
dollars, Australian dollars and Euros, respectively.
1. NATURE OF OPERATIONS
Barrick Gold Corporation ("Barrick" or the "Company") engages in
the production and sale of gold from underground and open-pit mines,
including related activities such as exploration and mine
development. Our operations are mainly located in North America,
South America, Australia and Africa.
2. SIGNIFICANT ACCOUNTING POLICIES
A Basis of preparation
The United States dollar is the principal currency of our
operations. We prepare our primary consolidated financial statements
in United States dollars and under United States generally accepted
accounting principles ("US GAAP"). The accompanying unaudited interim
consolidated financial statements have been prepared in accordance
with US GAAP for the preparation of interim financial information.
Accordingly, they do not include all of the information and
disclosures required by US GAAP for annual consolidated financial
statements. The accounting policies used in the preparation of the
accompanying unaudited interim consolidated financial statements are
the same as those described in our audited consolidated financial
statements and the notes thereto for the three years ended December
31, 2004.
In the opinion of management, all adjustments considered
necessary for the fair presentation of results for the periods
presented have been reflected in these financial statements. These
unaudited interim consolidated financial statements should be read in
conjunction with the audited annual consolidated financial statements
and the notes thereto for the three years ended December 31, 2004.
The preparation of these financial statements requires us to make
estimates and assumptions. The most significant estimates and
assumptions are: quantities of proven and probable gold reserves;
expected value of mineral resources not considered proven and
probable reserves; expected future costs and expenses to produce
proven and probable reserves; expected future commodity prices and
foreign currency exchange rates; and expected costs to meet asset
retirement obligations. Decisions and assessments affected by our
critical estimates and assumptions include:
- decisions as to whether mine development costs should be
capitalized or expensed;
- assessments of whether groups of long-lived assets are impaired
and the fair value of those groups of assets that are the basis for
measuring impairment charges;
- assessments of our ability to realize the benefits of deferred
income tax assets;
- the useful lives of long-lived assets and the measurement of
amortization recorded in earnings;
- the fair value of asset retirement obligations; and
- assessments of whether investments are impaired.
We regularly review these estimates and assumptions that affect
our financial statements; however, actual outcomes could differ from
estimates and assumptions.
B Accounting developments
EITF Issue No. 04-6, Accounting for Stripping Costs Incurred
during Production in the Mining Industry (EITF 04-6)
In March 2005, the FASB approved EITF 04-6. On adoption of EITF
04-6, we will be required to change our accounting policy for
stripping costs. Historically, stripping costs have been capitalized
on the balance sheet under Capitalized Mining Costs and attributed to
the cost of inventory using a stripping ratio that results in the
smoothing of these costs over the life of a mine. Under EITF 04-6,
actual stripping costs incurred each period during the production
phase will be capitalized as a component of inventory cost for the
period. This new method of accounting under EITF 04-6 will likely
lead to greater period-to-period volatility in inventory costs and
therefore cost of sales. The mines most significantly affected will
be Goldstrike Open Pit, Pierina and Kalgoorlie, as well as our
Veladero and Lagunas Norte development projects after they begin
production in the second half of 2005. Adoption of EITF 04-6 is
required by first quarter 2006, but earlier adoption is permitted. On
adoption, a Company may choose to record a cumulative effect
adjustment in earnings of the period of adoption, or alternatively
retroactively restate all prior periods for the effect of the change.
We are presently evaluating the impact of EITF 04-6, and we may early
adopt EITF 04-6 during 2005.
FAS 123R, Accounting for Stock-Based Compensation (FAS 123R)
In December 2004, the FASB issued FAS 123R. FAS 123R is
applicable to transactions in which an entity exchanges its equity
instruments for goods and services. It focuses primarily on
transactions in which an entity obtains employee services in
share-based payment transactions. FAS 123R requires that the fair
value of such equity instruments is recorded as an expense as
services are performed. Prior to FAS 123R, only certain pro forma
disclosures of accounting for these transactions at fair value were
required. FAS 123R will be effective for our first quarter 2006
financial statements, and permits varying transition methods
including: retroactive adjustment of prior periods as far back as
1995 to give effect to the fair value based method of accounting for
awards granted in those prior periods; or prospective application
beginning in 2006. We are presently evaluating the effect of the
varying methods of adopting FAS 123R. We expect to adopt FAS 123R
using the prospective method effective January 1, 2006. Under this
transition method we will begin recording stock option expense
prospectively, starting in first quarter 2006.
FIN 47, Accounting for Conditional Asset Retirement Obligations
(FIN 47)
FIN 47 was issued in March 2005 and relates to the accounting for
a legal obligation to perform an asset retirement activity, when the
timing or method of settlement are conditional on a future event,
which may not be within the control of the entity. FIN 47 requires
recognition of a liability for the fair value of a conditional asset
retirement obligation if the fair value can be reasonably estimated.
FIN 47 is effective no later than the end of fiscal years ending
after December 31, 2005. We are presently evaluating the impact of
FIN 47.
C Changes in estimates
Gold Mineral Reserves
Effective December 31, 2004, we updated our estimates of proven
and probable gold mineral reserves. Following the update of these
estimates, we prospectively revised calculations of amortization of
property, plant and equipment. The effect of the change in reserve
estimates on amortization of property, plant and equipment for the
three months ended March 31, 2005 was a decrease in this expense by
approximately $3 million for mines with a greater than 10% change
(other than ounces produced) in the reserve estimates. We also
revised the estimated stripping ratios used in the calculation of
amortization of capitalized mining costs, with an increase in the
stripping ratios at Goldstrike Open Pit and at Pierina. The effect of
the change in these stripping ratios is described in note 13.
3. SEGMENT INFORMATION
Income statement information
---------------------------------------------------------------------
Segment Segment
operating income
Gold sales costs (loss)
---------------------------------------------------------------------
For the three months
ended March 31 2005 2004 2005 2004 2005 2004
---------------------------------------------------------------------
Goldstrike $ 193 $ 163 $ 125 $ 112 $ 30 $ 16
Round Mountain 40 33 21 18 15 10
Eskay Creek 23 25 3 (1) 14 14
Hemlo 28 24 17 14 7 8
Other producing mines 6 12 3 7 2 1
---------------------------------------------------------------------
North America 290 257 169 150 68 49
---------------------------------------------------------------------
Kalgoorlie 49 45 28 26 16 14
Plutonic 29 35 20 17 7 15
Bulyanhulu 37 28 31 21 (5) (1)
Other producing mines 24 25 15 15 6 7
Cowal - - 1 - (1) -
---------------------------------------------------------------------
Australia/Africa 139 133 95 79 23 35
---------------------------------------------------------------------
Pierina 55 87 17 19 23 31
Lagunas Norte - - - 6 - (6)
Veladero - - 1 - (1) -
Pascua-Lama - - 1 - (1) -
---------------------------------------------------------------------
South America 55 87 19 25 21 25
---------------------------------------------------------------------
Exploration group - - 26 19 (26) (19)
---------------------------------------------------------------------
Segment total $ 484 $ 477 $ 309 $ 273 $ 86 $ 90
---------------------------------------------------------------------
Reconciliation of segment income
---------------------------------------------------------------------
For the three months ended March 31 2005 2004
---------------------------------------------------------------------
Segment income $ 86 $ 90
Accretion expense at producing mines (3) (2)
Other expenses (8) (4)
Amortization of corporate assets (4) (6)
Business development costs (2) (4)
Administration (17) (16)
Interest income 8 6
Interest expense - (8)
Other income (expense) 5 (16)
---------------------------------------------------------------------
Income before income taxes and other items $ 65 $ 40
---------------------------------------------------------------------
Asset information
---------------------------------------------------------------------
Segment capital
Amortization expenditures
---------------------------------------------------------------------
For the three months ended March 31 2005 2004 2005 2004
---------------------------------------------------------------------
Goldstrike $ 38 $ 35 $ 20 $ 9
Round Mountain 4 5 - -
Eskay Creek 6 12 1 1
Hemlo 4 2 2 1
Other operating segments 1 4 2 3
---------------------------------------------------------------------
North America 53 58 25 14
---------------------------------------------------------------------
Plutonic 2 3 3 2
Kalgoorlie 5 5 2 2
Cowal - - 44 20
Bulyanhulu 11 8 14 8
Tulawaka - - 5 3
Other operating segments 3 3 4 3
---------------------------------------------------------------------
Australia/Africa 21 19 72 38
---------------------------------------------------------------------
Pierina 15 37 3 2
Veladero - - 69 64
Pascua-Lama - - 19 4
Lagunas Norte - - 53 6
---------------------------------------------------------------------
South America 15 37 144 76
---------------------------------------------------------------------
Segment total 89 114 241 128
Other items not allocated to segments 4 6 1 1
---------------------------------------------------------------------
Enterprise total $ 93 $ 120 $ 242 $ 129
---------------------------------------------------------------------
4. REVENUE AND GOLD SALES CONTRACTS
---------------------------------------------------------------------
For the three months ended March 31 2005 2004
---------------------------------------------------------------------
Gold bullion sales
Spot market sales $ 452 $ 189
Gold sales contracts - 260
---------------------------------------------------------------------
452 449
Concentrate sales 32 28
---------------------------------------------------------------------
$ 484 $ 477
---------------------------------------------------------------------
At March 31, 2005, we had fixed-price gold sales contracts with
various counterparties for a total of 13.3 million ounces of future
gold production and floating-price forward gold sales contracts for
0.7 million ounces. In 2004, we allocated 6.5 million ounces of
fixed-price gold sales contracts specifically to Pascua-Lama. The
allocation of these contracts will help reduce gold price risk at
Pascua-Lama and is expected to help secure financing for its
construction. In addition to the gold sales contracts allocated to
Pascua-Lama, we had 6.8 million ounces of corporate gold sales
contracts that we intend to settle through delivery of future gold
production from our operating mines and development projects,
excluding Pascua-Lama. The mark-to-market on the fixed-price gold
sales contracts (at March 31, 2005) was negative $931 million for the
Pascua-Lama Gold Sales Contracts and negative $924 million for the
Corporate Gold Sales Contracts.
Floating spot price sales contracts were previously fixed-price
forward sales contracts for which, in accordance with the terms of
our master trading agreements, we have elected to receive floating
spot gold and silver prices, adjusted by the difference between the
spot price and the contract price at the time of such election.
Floating prices were elected for these contracts so that we could
economically regain spot gold price leverage under the terms of
delivery into these contracts. Furthermore, floating price mechanisms
were elected for these contracts at a time when the then current
market price was higher than the fixed price in the contract. The
mark-to-market on these contracts (at March 31, 2005) was negative
$48 million, which equates to an average reduction to the future spot
sales price of approximately $72 per ounce, when we deliver gold at
spot prices against these contracts.
5. COST OF SALES
---------------------------------------------------------------------
For the three months ended March 31 2005 2004
---------------------------------------------------------------------
Cost of goods sold(1) $ 296 $ 268
By -product revenues(2) (29) (34)
Royalty expense 13 12
Mining taxes 3 4
Other expenses 8 4
---------------------------------------------------------------------
$ 291 $ 254
---------------------------------------------------------------------
(1) Cost of goods sold includes accretion expense at producing mines
of $3 million (2004 - $2 million). The cost of inventory sold in
the period reflects all components capitalized to inventory,
except that, for presentation purposes, the component of
inventory cost relating to amortization of property, plant and
equipment is classified in the income statement under
"amortization". Some companies present this amount under "cost of
sales". The amount presented in amortization rather than cost of
sales was $89 million in the three months ended March 31, 2005
(2004 - $114 million).
(2) We use silver sales contracts to sell a portion of silver
produced as a by-product. Silver sales contracts have similar
delivery terms and pricing mechanisms as gold sales contracts.
At March 31, 2005, we had fixed-price commitments to deliver 12.1
million ounces of silver at an average price of $5.61 per ounce,
and floating spot price sales contracts for 12 million ounces,
over periods primarily of up to 10 years.
6. OTHER (INCOME) EXPENSE
---------------------------------------------------------------------
For the three months ended March 31 2005 2004
---------------------------------------------------------------------
Non-hedge derivative (gains) losses (note 14b) $ (6) $ 15
Gains on sale of assets (1) (2)
Environmental remediation costs(1) 5 8
Gains on sale of investments (9) (2)
World Gold Council fees 2 2
Currency translation (gains) losses 4 (2)
Pension expense 1 1
Other items (1) (4)
---------------------------------------------------------------------
$ (5) $ 16
---------------------------------------------------------------------
(1) Includes costs at development projects and closed mines.
Pension expense
---------------------------------------------------------------------
For the three months ended March 31 2005 2004
---------------------------------------------------------------------
Expected return on plan assets $ (3) $ (3)
Interest cost on benefit obligation 3 4
Actuarial losses 1 -
---------------------------------------------------------------------
$ 1 $ 1
---------------------------------------------------------------------
7. INCOME TAX EXPENSE
---------------------------------------------------------------------
For the three months ended March 31 2005 2004
---------------------------------------------------------------------
Current $ 11 $ 18
Deferred 3 (4)
---------------------------------------------------------------------
$ 14 $ 14
---------------------------------------------------------------------
Actual effective income tax rate 22% 35%
---------------------------------------------------------------------
The primary reasons why our actual effective income tax rate differs
from the 38% Canadian statutory rate are due to certain allowances
and special deductions unique to extractive industries, and also
because we operate in multiple tax jurisdictions that have different
tax rates than the Canadian federal rate.
8. EARNINGS PER SHARE
---------------------------------------------------------------------
For the three months ended March 31
($ millions, except shares in millions and
per share amounts in dollars) 2005 2004
---------------------------------------------------------------------
Income available to common stockholders
Basic $ 51 $ 26
Effect of dilutive stock options - -
---------------------------------------------------------------------
Diluted $ 51 $ 26
---------------------------------------------------------------------
Weighted average shares outstanding
Basic 534 535
Effect of dilutive stock options 2 2
---------------------------------------------------------------------
Diluted 536 537
---------------------------------------------------------------------
Earnings per share
Basic and diluted $ 0.10 $ 0.05
---------------------------------------------------------------------
9. SUPPLEMENTAL CASH FLOW INFORMATION
---------------------------------------------------------------------
For the three months ended March 31 2005 2004
---------------------------------------------------------------------
Income statement items:
Currency translation (gains) losses $ 3 $ (2)
Accretion expense 5 4
Non-hedge derivative (gains) losses (6) 15
Current income tax expense 11 18
Changes in:
Accounts receivable 6 (3)
Inventories (20) (5)
Accounts payable 21 -
Capitalized mining costs 4 1
Taxes recoverable (17) (6)
Other assets and liabilities (2) 5
Cash payments:
Asset retirement obligations (8) (10)
Current income taxes (12) (29)
---------------------------------------------------------------------
Other net operating activities $ (15) $ (12)
---------------------------------------------------------------------
10. INVENTORIES
---------------------------------------------------------------------
At Mar.31, At Dec.31,
2005 2004
---------------------------------------------------------------------
Inventories
Gold in process and ore in stockpiles $ 206 $ 198
Mine operating supplies 95 82
---------------------------------------------------------------------
301 280
Non-current ore in stockpiles(1) (66) (65)
---------------------------------------------------------------------
$ 235 $ 215
---------------------------------------------------------------------
(1) Ore that we do not expect to process in the next 12 months is
classified in other assets.
11. INVESTMENTS
Available-for-sale securities
---------------------------------------------------------------------
At Mar.31, 2005 At Dec.31, 2004
---------------------------------------------------------------------
Gains Gains
Fair (Losses) Fair (Losses)
value in OCI value in OCI
---------------------------------------------------------------------
Securities in an unrealized
gain position
Benefit plans:(1)
Fixed-income securities $ - $ - $ 11 $ -
Equity securities - - 19 10
Strategic investments:
Equity securities(2) 51 17 24 13
---------------------------------------------------------------------
$ 51 $ 17 $ 54 $ 23
---------------------------------------------------------------------
Securities in an unrealized
loss position(3)
Strategic investments:
Equity securities(2) $ 90 $ (9) $ 80 $ (13)
---------------------------------------------------------------------
$ 141 $ 8 $ 134 $ 10
---------------------------------------------------------------------
(1) Under various benefit plans for certain former Homestake
executives, a portfolio of marketable fixed-income and equity
securities are held in a rabbi trust that is used to fund
obligations under the plans. As at March 31, 2005, the portfolio
consisted entirely of cash that is restricted as to its use,
which was classified within "other current assets."
(2) Mainly includes an investment in Celtic Resources (fair value of
$29 million at March 31, 2005).
(3) All securities have been in a continuous unrealized loss position
for less than twelve months.
Strategic equity investments in an unrealized loss position
mainly include an investment in Highland Gold with a fair value of
$79 million at March 31, 2005, and an unrealized loss of $7 million
at that date. All of the companies in this group operate in the gold
mining industry, and their market share prices are significantly
impacted by the price of gold. The investments were last in an
unrealized gain position in early March 2005, but, following a
decline in market prices, two investments were in an unrealized loss
position at March 31, 2005. In evaluating whether this impairment was
"other than temporary" we took into consideration the relatively
recent decline in value; our positive outlook for the price of gold;
the prospective nature of mineral properties held by these companies;
and also the relative amount of the unrealized loss at March 31, 2005
compared to the fair value of the investments. We concluded that the
impairments were not "other than temporary", and no impairment
charges were recorded at March 31, 2005.
Investment in Celtic Resources Holdings PLC ("Celtic")
On January 5, 2005 we completed a subscription for 3,688,191
units of Celtic for $7.562 per unit for a total cost of $28 million.
Each unit consists of one ordinary share of Celtic and one-half of
one share purchase warrant. On completion, we held a 9% direct
interest in Celtic's outstanding common shares. Each whole warrant
entitles us to acquire one ordinary share of Celtic for $7.562,
expiring on December 31, 2007. We determined that the share purchase
warrants are derivative instruments as defined by FAS 133. The
warrants are classified as non-hedge derivatives with changes in fair
value subsequent to acquisition recorded in earnings. In the event
that Celtic does not acquire 100% of the license to the
Nezhdaninskoye deposit before June 1, 2005, the number of warrants
will automatically increase by 50%. We also entered into the
following agreements:
- We have a pre-emptive right to subscribe for up to $75 million
of Celtic shares at $7.562 per share.
- Celtic has granted us a right of first refusal on any proposed
sale of its direct or indirect interest in Nezhdaninskoye, as well as
the right to indirectly purchase 51% of its interest in
Nezhdaninskoye for $195 million, exercisable for a period of six
months starting if and when Celtic acquires 100% of Nezhdaninskoye.
- Celtic has granted us the right to acquire 50% of any interest
in any mineral property in Kazakhstan that Celtic acquires for a
period of 12 months after any such acquisition for an amount equal to
50% of the cost to Celtic of its interest in the mineral property.
12. PROPERTY, PLANT AND EQUIPMENT
The following assets are not being amortized.
---------------------------------------------------------------------
Carrying Carrying Targeted
amount at amount at timing of
March 31, December 31, production
2005 2004 start-up
---------------------------------------------------------------------
Development projects
Veladero $ 419 $ 349 2005
Lagunas Norte 252 196 2005
Cowal 176 128 2006
Pascua-Lama 261 243 2009
Buzwagi exploration project 102 102 -
Nevada Power Plant 27 18 2005
---------------------------------------------------------------------
Total $ 1,237 $ 1,036
---------------------------------------------------------------------
Capital commitments
In addition to entering into various operational commitments in
the normal course of business, we have new commitments of
approximately $150 million to be paid during 2005 for construction
activities at our development projects and for a power plant in
Nevada for the Goldstrike mine.
13. CAPITALIZED MINING COSTS
We capitalize and amortize certain costs relating to the removal
of waste rock at open-pit mines, commonly referred to as "stripping
costs". We include in inventory, amortization of amounts capitalized
based on a "stripping ratio" using the units-of-production method.
This accounting method results in the smoothing of these costs over
the life of a mine. Instead of capitalizing and amortizing these
costs, some mining companies capitalize them to inventory as
incurred, which may result in the reporting of greater volatility in
period-to-period results. If we followed a policy of capitalizing
these costs to inventory as incurred, rather than using our present
policy, our reported cost of sales would have been $4 million lower
for the three months ended March 31, 2005 (2004 - $1 million lower).
Stripping ratios(1)
---------------------------------------------------------------------
For the three months ended March 31 2005 2004
---------------------------------------------------------------------
Goldstrike Open Pit 127:1 109:1
Pierina 86:1 60:1
---------------------------------------------------------------------
(1) Effective January 1, 2005, we revised the estimated stripping
ratios on update of our gold mineral reserves. The effect of this
change on amortization of capitalized mining costs for the three
months ended March 31, 2005 was an increase at Goldstrike Open
Pit of $3 million, and increase at Pierina of $1 million.
14. FINANCIAL INSTRUMENTS
A Long-term debt
Interest expense
---------------------------------------------------------------------
For the three months ended March 31 2005 2004
---------------------------------------------------------------------
Interest incurred $ 28 $ 12
Less: capitalized 28 4
---------------------------------------------------------------------
Interest expense $ - $ 8
---------------------------------------------------------------------
In first quarter 2005, we drew down $24 million under the $250
million Veladero financing facility, resulting in a total amount of
$222 million outstanding under the facility at March 31, 2005. Also
in first quarter 2005, we drew down $25 million under a $56 million
build to suit lease facility held by one of our wholly owned
subsidiaries, Minera Barrick Misquichilca (MBM), as well as securing
an expansion of the original facility to a total facility of $80
million. At March 31, 2005, a total of $55 million had been drawn
down under this facility, which is being used to finance the
construction of the leach pad and process facilities at the Lagunas
Norte project. MBM is also finalizing a second build to suit lease
facility for $20 million, which will also be used to finance the
construction of the leach pad and process facilities at the Lagunas
Norte project.
On April 15, 2005, MBM issued $50 million of debt securities in
the Peruvian capital markets. The net proceeds will be used to
partially fund the construction of the Lagunas Norte project. The
debt securities bear interest at Libor plus 1.72%, and mature in 2013.
B Derivative instruments ("derivatives")
Summary of derivatives at March 31, 2005(1)
---------------------------------------------------------------------
Accounting
Notional Amount by Classification Fair
Term to Maturity by Notional Amount value
---------------------------------------------------------------------
Cash Fair
Within 2 to 5 Over 5 flow value Non-
1 year years years Total hedge hedge Hedge
---------------------------------------------------------------------
US dollar
Interest rate
contracts
Receive-fixed
swaps
(millions) $ 75 $ 925 $ - $1,000 $ 425 $ 500 $ 75 $(16)
Pay-fixed
swaps
(millions) - 175 100 275 150 - 125 (18)
---------------------------------------------------------------------
Net notional
position $ 75 $ 750 $ (100) $ 725 $ 275 $ 500 $(50) $(34)
---------------------------------------------------------------------
Currency
contracts
C$:US$
contracts
(C$
millions) C$ 316 C$ 534 C$ - C$ 850 C$788 C$ - C$ 62 $ 88
A$:US$
contracts
(A$
millions) A$ 747 A$1,335 A$ - A$2,082 A$2,072 A$ - A$ 10 $ 172
EUR :US$
contracts
(EUR
millions) EUR 32 EUR - EUR - EUR 32 EUR 32 EUR - EUR - EUR -
---------------------------------------------------------------------
Commodity
contracts
Fuel (WTI)
(thousands
of barrels) 809 1,389 - 2,198 1,549 - 649 $ 33
Propane
contracts
(millions
of gallons) 15 14 - 29 29 - - $ 3
---------------------------------------------------------------------
(1) Excludes normal sales contracts, gold lease rate swaps and share
purchase warrants.
US dollar interest rate contracts
Cash flow hedges - cash balances
Receive-fixed swaps have been designated against the first $425
million of our cash balances as a hedge of the variability of
forecasted interest receipts on the balances caused by changes in
Libor.
Cash flow hedges - Bulyanhulu financing
Pay-fixed swaps totaling $150 million have been designated
against the Bulyanhulu financing as a hedge of the variability in
forecasted interest payments caused by changes in Libor.
Fair value hedges
Receive-fixed swaps totaling $500 million have been designated
against the 7 1/2% debentures as a hedge of the variability in the
fair value of the debentures caused by changes in Libor.
Non-hedge contracts
On completion of a prospective effectiveness test using the
variable cash flows method, we concluded that receive-fixed swaps
with a total notional amount of $75 million do not meet the "highly
effective" criteria under FAS 133. Consequently, the swaps were
classified as non-hedge derivatives. Despite not qualifying as an
accounting hedge, the swaps protect the Company to a significant
extent from the impact of changes in Libor on interest receipts on
cash balances.
We use gold lease rate swaps to achieve a more economically
optimal term structure for gold lease rates implicit in fixed-price
gold sales contracts. The valuation of gold lease rate swaps is
impacted by market US dollar interest rates. Our non-hedge pay-fixed
swap position mitigates the impact of changes in US dollar interest
rates on the valuation of gold lease rate swaps.
Currency contracts
Cash flow hedges
Currency contracts totaling C$788 million, A$2,072 million and
EUR 32 million have been designated against forecasted local currency
denominated expenditures as a hedge of the variability of the US
dollar amount of those expenditures caused by changes in currency
exchange rates.
Commodity contracts
Cash flow hedges
Commodity contracts totaling 1,549 thousand barrels of diesel
fuel and 29 million gallons of propane have been designated against
forecasted purchases of the commodities for expected consumption at
our mining operations.
Non-hedge contracts
Non-hedge fuel contracts are used to mitigate the risk of oil
price changes on consumption at the Pierina, Eskay Creek and Lagunas
Norte mines. On completion of regression analysis, we concluded that
the contracts do not meet the "highly effective" criterion in FAS 133
due to currency and basis differences between contract prices and the
prices charged to the mines by oil suppliers. Despite not qualifying
as an accounting hedge, the contracts protect the Company to a
significant extent from the effects of oil price changes.
Non-hedge derivative gains (losses)(1)
---------------------------------------------------------------------
For the three months ended March 31 2005 2004
---------------------------------------------------------------------
Non-hedge derivatives
Commodity contracts $ 4 $ (12)
Currency contracts 2 -
Interest rate contracts 1 (4)
Share purchase warrants 1 -
---------------------------------------------------------------------
8 (16)
Hedge ineffectiveness
Ongoing hedge inefficiency (3) -
Due to changes in timing of hedged items 1 1
---------------------------------------------------------------------
$ 6 $ (15)
---------------------------------------------------------------------
(1) Non-hedge derivative gains (losses) are classified as a component
of other (income) expense.
Cash Flow Hedge Gains (Losses) in OCI
Commodity
price Interest rate
hedges Currency hedges hedges
---------------------------------------------------------------------
Opera- Adminis- Capital Long-
ting tration expend- Cash term
Fuel costs costs itures balances debt Total
---------------------------------------------------------------------
At Dec.31,
2004 $ 2 $ 240 $ 33 $ 48 $ 3 $ (25) $ 301
Effective
portion of
change in
fair value
of hedging
instruments 25 (10) 2 1 (1) 4 21
Transfers to
earnings:
On recording
hedged items
in earnings (2) (25) (3) (1) (1) 1 (31)
Hedge
ineffectiveness
due to changes
in timing of
hedged items - - - (1) - - (1)
---------------------------------------------------------------------
At Mar.31,
2005 $ 25 $ 205 $ 32 $ 47 $ 1 $ (20) $ 290
---------------------------------------------------------------------
Hedge gains/
losses Cost of Cost of Adminis- Amorti- Inte- Inte-
classified sales sales tration zation rest rest
within income cost
---------------------------------------------------------------------
Portion of
hedge gain
(loss)
expected to
affect earnings
in the next
twelve months(1) $ 9 $ 100 $ 15 $ 2 $ 7 $ (4) $ 129
---------------------------------------------------------------------
(1) Based on the fair value of hedge contracts at March 31, 2005.
15. CAPITAL STOCK
A Common Shares
During the three month period ended March 31, 2004, we
repurchased 4.47 million common shares for $95 million, at an average
cost of $21.20 per share. This resulted in a reduction of common
share capital by $35 million and a $60 million charge (being the
difference between the repurchase cost and the average historic book
value of shares repurchased) to retained earnings.
B Exchangeable Shares
In connection with a 1998 acquisition, Barrick Gold Inc. ("BGI"),
issued 11.1 million BGI exchangeable shares, which are each
exchangeable for 0.53 of a Barrick common share at any time at the
option of the holder, and have essentially the same voting, dividend
(payable in Canadian dollars), and other rights as 0.53 of a Barrick
common share. BGI is a subsidiary that holds our interest in the
Hemlo and Eskay Creek Mines.
At March 31, 2005, 1.4 million BGI exchangeable shares were
outstanding, which are equivalent to 0.7 million Barrick common
shares (2004 - 0.8 million common shares). While there are
exchangeable shares outstanding, we are required to present summary
consolidated financial information relating to BGI.
Summarized financial information for BGI
---------------------------------------------------------------------
For the three months ended March 31 2005 2004
---------------------------------------------------------------------
Total revenues and other income $ 52 $ 52
Less: costs and expenses (57) (53)
---------------------------------------------------------------------
Loss before taxes $ (5) $ (1)
---------------------------------------------------------------------
Net loss $ (5) $ (3)
---------------------------------------------------------------------
---------------------------------------------------------------------
At Mar.31, At Dec.31,
2005 2004
---------------------------------------------------------------------
Assets
Current assets $ 107 $ 67
Non-current assets 116 119
---------------------------------------------------------------------
$ 223 $ 186
---------------------------------------------------------------------
Liabilities and shareholders' equity
Other current liabilities 27 24
Intercompany notes payable 393 395
Other long-term liabilities 35 36
Deferred income taxes 16 20
Shareholders' equity (248) (289)
---------------------------------------------------------------------
$ 223 $ 186
---------------------------------------------------------------------
16. STOCK-BASED COMPENSATION
We record compensation cost for stock options based on the excess
of the market price of the stock at the grant date of an award over
the exercise price. Historically, the exercise price for stock
options has equaled the market price of stock at the grant date,
resulting in no compensation cost. We provide information in the
following table to illustrate the pro forma effect of following an
accounting policy of expensing the fair value of stock options.
Stock option expense (per share amounts in dollars)
---------------------------------------------------------------------
For the three months ended March 31 2005 2004
---------------------------------------------------------------------
Pro forma effects
Net income, as reported $ 51 $ 26
Stock-option expense (7) (7)
---------------------------------------------------------------------
Pro forma net income $ 44 $ 19
---------------------------------------------------------------------
Net income per share:
As reported(1) $ 0.10 $ 0.05
Pro forma(1) $ 0.09 $ 0.04
---------------------------------------------------------------------
(1) Basic and diluted.
17. OTHER COMPREHENSIVE INCOME (LOSS) ("OCI")
---------------------------------------------------------------------
2005 2004
---------------------------------------------------------------------
Accumulated OCI at Jan.1
Cash flow hedge gains, net of tax of $95, $99 $ 206 $ 189
Investments, net of tax of $nil, $nil 10 38
Currency translation adjustments, net of tax of
$nil, $nil (146) (147)
Additional pension liability, net of tax of
$nil, $nil (12) (7)
---------------------------------------------------------------------
$ 58 $ 73
---------------------------------------------------------------------
Other comprehensive income (loss) for the period:
Changes in fair value of cash flow hedges 21 18
Changes in fair value of investments 7 7
Less: reclassification adjustments for gains/losses
recorded in earnings:
Transfers of cash flow hedge gains to earnings:
On recording hedged items in earnings (31) (33)
Hedge ineffectiveness due to changes in timing
of hedged items (1) (1)
Investments:
Gains realized on sale (9) -
---------------------------------------------------------------------
Other comprehensive loss, before tax (13) (9)
Income tax recovery related to OCI 4 8
---------------------------------------------------------------------
Other comprehensive loss, net of tax $ (9) $ (1)
---------------------------------------------------------------------
Accumulated OCI at March 31
Cash flow hedge gains, net of tax of $91, $91 199 181
Investments, net of tax of $nil, $nil 8 45
Currency translation adjustments, net of tax of
$nil, $nil (146) (147)
Additional pension liability, net of tax of
$nil, $nil (12) (7)
---------------------------------------------------------------------
$ 49 $ 72
---------------------------------------------------------------------
18 CONTINGENCIES
Bre-X Minerals
In 1998, we were added as a defendant in a class action lawsuit
initiated against Bre-X Minerals Ltd., and certain others in the
United States District Court for the Eastern District of Texas,
Texarkana Division. The class action alleges, among other things,
that statements made by us in connection with our efforts to secure
the right to develop and operate the Busang gold deposit in East
Kalimantan, Indonesia were materially false and misleading and
omitted to state material facts relating to the preliminary due
diligence investigation undertaken by us in late 1996.
On March 31, 2003, the Court denied all of the Plaintiffs'
motions to certify the case as a class action. Following the March
31, 2003 denial of the Plaintiffs' motions, the Court received a
proposed Trial Plan along with full briefings from the parties with
respect to the Plan. On March 31, 2005, the Court treated Plaintiffs'
submission as a motion to vacate or change its class certification
order of March 31, 2003. The Court denied Plaintiffs' motion because
the Plaintiffs did not identify any new legal authority or changed
circumstance that justified modification of the prior order. In the
absence of an appeal, we believe this ruling should, in substance,
end the case. On April 14, 2005, Plaintiffs filed a petition with the
Fifth Circuit Court of Appeals requesting permission to file an
appeal of the Court order. Defendants will oppose the petition on the
grounds that it is untimely and procedurally improper. The amount of
potential loss, if any, which we may incur arising out of the
Plaintiffs' claims is not determinable.
Blanchard complaint
On January 7, 2003, we were served with a Complaint for
Injunctive Relief by Blanchard and Company, Inc. ("Blanchard"), and
Herbert Davies ("Davies"). The complaint, which is pending in the
U.S. District Court for the Eastern District of Louisiana, also names
J.P. Morgan Chase & Company ("J.P. Morgan") as a defendant, along
with an unspecified number of additional defendants to be named
later. The complaint, which has been amended several times, alleges
that we and bullion banks with whom we entered into spot deferred
gold sales contracts have manipulated the price of gold, in violation
of U.S. anti-trust laws and the Louisiana Unfair Trade Practices and
Consumer Protection Law. Blanchard and Davies both allege that they
have been injured as a seller of gold due to reduced interest in gold
as an investment. The complaint seeks damages and an injunction
terminating certain of our trading agreements with J.P. Morgan and
other bullion banks. In September 2003, the Court issued an Order
granting in part and denying in part Barrick's motions to dismiss
this action. In February 2005, the Court granted Blanchard's motion
to amend their complaint to add an allegation of a violation of the
Commodity Exchange Act and amend its allegation of Barrick's
violation of anti-trust laws. Discovery has commenced in the case and
a trial date has been tentatively set for July 2005. We have and will
continue to vigorously defend the action.
McKenzie complaint
On September 21, 2004, a putative class action complaint was
filed in the U.S. District Court for the Eastern District of
Louisiana against Barrick and J.P. Morgan. The plaintiffs, Dr. Gregg
McKenzie and others are alleged purchasers of gold and gold
derivatives. The complaint alleges violations of the U.S. anti-trust
laws and also of the Commodity Exchange Act, based upon the same
conduct as alleged in the Blanchard complaint. The complaint seeks
damages and an injunction terminating certain of our trading
agreements with J.P. Morgan. On December 17, 2004, a second and
substantially identical complaint was filed in the same court against
the same defendants. Barrick has not yet been served with this second
complaint. We have and will continue to vigorously defend both
actions.
Wagner complaint
On June 12, 2003, a complaint was filed against Barrick and
several of its current or former officers in the U.S. District Court
for the Southern District of New York. The complaint is on behalf of
Barrick shareholders who purchased Barrick shares between February
14, 2002 and September 26, 2002. It alleges that Barrick and the
individual defendants violated U.S. securities laws by making false
and misleading statements concerning Barrick's projected operating
results and earnings in 2002. The complaint seeks an unspecified
amount of damages. Other parties on behalf of the same proposed class
of Barrick shareholders filed several other complaints, making the
same basic allegations against the same defendants. In September
2003, the cases were consolidated into a single action in the
Southern District of New York. The plaintiffs filed a Consolidated
and/or Amended Complaint on November 5, 2003. On January 14, 2004,
Barrick filed a motion to dismiss the complaint. On September 29,
2004, the Court issued an order granting in part and denying in part
Barrick's motion to dismiss the action. The plaintiffs filed a Second
Amended Complaint on October 20, 2004. The Court granted the
plaintiffs leave to file a Third Amended Complaint, which was filed
on January 6, 2005. We have and will continue to vigorously defend
the action.
Wilcox complaint
On September 8, 2004, two of our U.S. subsidiaries, Homestake
Mining Company of California ("Homestake California") and Homestake
Mining Company ("Homestake") were served with a First Amended
Complaint by persons alleging to be current or former residents of a
rural area near the former Grants Uranium Mill. The Complaint, which
was filed in the U.S. District Court for the District of New Mexico,
identifies 26 plaintiffs. Homestake and Homestake California, along
with an unspecified number of unidentified defendants, are named as
defendants. The plaintiffs allege that they have suffered a variety
of physical, emotional and financial injuries as a result of exposure
to radioactive and other hazardous substances. The Complaint seeks an
unspecified amount of damages. A motion to dismiss the claim was
filed with the Court, but the Court has not yet ruled on the motion.
We have and will continue to vigorously defend the action.
Mine Statistics
UNITED STATES
---------------------------------------------------
Goldstrike Round
(Unaudited) Open Pit Underground Total Mountain
Three months
ended March 31 2005 2004 2005 2004 2005 2004 2005 2004
---------------------------------------------------------------------
Tons mined
(thousands) 32,412 34,086 382 438 32,794 34,524 4,497 4,786
Tons processed
(thousands) 2,329 2,661 389 452 2,718 3,113 9,096 9,609
Average grade
(ounces per
ton) 0.148 0.144 0.411 0.383 0.186 0.179 0.019 0.016
Recovery rate
(percent) 83.1% 82.8% 91.0% 89.0% 84.2% 83.7% n/a n/a
---------------------------------------------------------------------
Production
(thousands of
ounces) 287 318 145 154 432 472 94 93
Production costs
per ounce
Cash operating
costs $ 262 $ 250 $ 264 $ 230 $ 263 $ 243 $ 188 $ 174
Royalties and
production
taxes 14 17 23 23 16 19 35 33
---------------------------------------------------------------------
Total cash
costs 276 267 287 253 279 262 223 207
Amortization 67 63 119 120 84 82 46 60
---------------------------------------------------------------------
Total production
costs $ 343 $ 330 $ 406 $ 373 $ 363 $ 344 $ 269 $ 267
---------------------------------------------------------------------
Capital
expenditures
(US$ millions) $ 11 $ 3 $ 9 $ 6 $ 20 $ 9 $ - $ -
---------------------------------------------------------------------
AUSTRALIA
---------------------------------------------------
Plutonic Darlot Lawlers Kalgoorlie
Three months
ended March 31 2005 2004 2005 2004 2005 2004 2005 2004
---------------------------------------------------------------------
Tons mined
(thousands) 2,200 2,613 184 212 177 401 10,397 11,680
Tons processed
(thousands) 641 694 173 218 212 208 1,831 1,600
Average grade
(ounces per ton) 0.123 0.132 0.165 0.162 0.153 0.131 0.077 0.073
Recovery rate
(percent) 89.2% 90.5% 95.6% 97.2% 96.0% 97.0% 88.5% 87.4%
---------------------------------------------------------------------
Production
(thousands
of ounces) 70 83 27 34 31 27 125 102
Production costs
per ounce
Cash operating
costs $ 277 $ 186 $ 240 $ 201 $ 279 $ 229 $ 237 $ 217
Royalties and
production taxes 10 8 9 7 8 7 10 6
---------------------------------------------------------------------
Total cash
costs 287 194 249 208 287 236 247 223
Amortization 31 31 67 48 51 45 40 39
---------------------------------------------------------------------
Total production
costs $ 318 $ 225 $ 316 $ 256 $ 338 $ 281 $ 287 $ 262
---------------------------------------------------------------------
Capital
expenditures
(US$ millions) $ 3 $ 2 $ 2 $ 2 $ 2 $ 1 $ 2 $ 2
---------------------------------------------------------------------
Mine Statistics
CANADA
---------------------------------------------------
(Unaudited) Hemlo Eskay Creek Holt-McDermott
Three months
ended March 31 2005 2004 2005 2004 2005 2004
---------------------------------------------------------------------
Tons mined
(thousands) 1,132 890 56 65 - 139
Tons processed
(thousands) 492 477 57 60 - 135
Average grade
(ounces per ton) 0.136 0.137 1.058 1.145 - 0.150
Recovery rate
(percent) 93.7% 94.1% 91.3% 93.2% - 92.6%
---------------------------------------------------------------------
Production
(thousands of
ounces) 62 61 55 66 - 19
Production costs
per ounce
Cash operating
costs $ 249 $ 217 $ 53 $ (25) $ - $ 238
Royalties and
production taxes 11 10 6 6 - -
---------------------------------------------------------------------
Total cash costs 260 227 59 (19) - 238
Amortization 54 40 115 179 - 145
---------------------------------------------------------------------
Total production
costs $ 314 $ 267 $ 174 $ 160 $ - $ 383
---------------------------------------------------------------------
Capital
expenditures
(US$ millions) $ 2 $ 1 $ 1 $ 1 $ - $ -
---------------------------------------------------------------------
PERU TANZANIA
---------------------------------------------------
Pierina Bulyanhulu Tulawaka
Three months
ended March 31 2005 2004 2005 2004 2005 2004
---------------------------------------------------------------------
Tons mined
(thousands) 11,374 10,323 228 284 916 -
Tons processed
(thousands) 4,017 4,038 244 272 24 -
Average grade
(ounces per ton) 0.026 0.049 0.341 0.337 0.192 -
Recovery rate
(percent) - - 88.4% 88.4% 97.2% -
---------------------------------------------------------------------
Production
(thousands of
ounces) 146 232 73 81 5 -
Production costs
per ounce
Cash operating
costs $ 134 $ 82 $ 345 $ 263 $ - $ -
Royalties and
production taxes - - 11 13 - -
---------------------------------------------------------------------
Total cash costs 134 82 356 276 - -
Amortization 115 165 123 107 - -
---------------------------------------------------------------------
Total production
costs $ 249 $ 247 $ 479 $ 383 $ - $ -
---------------------------------------------------------------------
Capital
expenditures
(US$ millions) $ 3 $ 2 $ 14 $ 8 $ 5 $ 3
---------------------------------------------------------------------
CORPORATE OFFICE TRANSFER AGENTS AND REGISTRARS
Barrick Gold Corporation CIBC Mellon Trust Company
BCE Place, Canada Trust Tower, P.O. Box 7010,
Suite 3700 Adelaide Street Postal Station
161 Bay Street, P.O. Box 212 Toronto, Ontario M5C 2W9
Toronto, Canada M5J 2S1 Tel: (416) 643-5500
Tel: (416) 861-9911 Toll-free throughout
Fax: (416) 861-0727 North America: 1-800-387-0825
Toll-free within Canada and Fax: (416) 643-5501
United States: 1-800-720-7415 Email: inquiries@cibcmellon.ca
Email: investor@barrick.com Website: www.cibcmellon.com
Website: www.barrick.com
SHARES LISTED Mellon Investor Services L.L.C.
ABX-The Toronto Stock Exchange 85 Challenger Road,
The New York Stock Exchange Overpeck Center
The Swiss Stock Exchange Ridgefield Park, New Jersey
La Bourse de Paris 07660
BGD-The London Stock Exchange Tel: (201) 329-8660
Toll-free within the
United States:
1-800-589-9836
Website: www.mellon-investor.com
INVESTOR CONTACT:
Darren Blasutti
Vice President,
Investor Relations
Tel: (416) 307-7341
Email: dblasutti@barrick.com
MEDIA CONTACT:
Vincent Borg
Vice President,
Corporate Communications
Tel: (416) 307-7477
Email: vborg@barrick.com
FORWARD-LOOKING INFORMATION
Certain information contained or incorporated by reference in
this First Quarter Report 2005, including any information as to our
future financial or operating performance, constitutes
"forward-looking statements". All statements, other than statements
of historical fact, are forward-looking statements. The words
"believe", "expect", "anticipate", "contemplate", "target", "plan",
"intends", "continue", "budget", "estimate", "may", "will",
"schedule" and similar expressions identify forward-looking
statements. Forward-looking statements are necessarily based upon a
number of estimates and assumptions that, while considered reasonable
by us, are inherently subject to significant business, economic and
competitive uncertainties and contingencies. Known and unknown
factors could cause actual results to differ materially from those
projected in the forward-looking statements. Such factors include,
but are not limited to: fluctuations in the currency markets (such
as the Canadian and Australian dollars versus the U.S. dollar);
fluctuations in the spot and forward price of gold or certain other
commodities (such as silver, copper, diesel fuel and electricity);
changes in U.S. dollar interest rates or gold lease rates that could
impact the mark to market value of outstanding derivative instruments
and ongoing payments/receipts under interest rate swaps and variable
rate debt obligations; risks arising from holding derivative
instruments (such as credit risk, market liquidity risk and mark to
market risk); changes in national and local government legislation,
taxation, controls, regulations and political or economic
developments in Canada, the United States, Australia, Chile, Peru,
Argentina, Tanzania, Russia or Barbados or other countries in which
we do or may carry on business in the future; business opportunities
that may be presented to, or pursued by, us; our ability to
successfully integrate acquisitions; operating or technical
difficulties in
connection with mining or development activities; the speculative
nature of gold exploration and development, including the risks of
obtaining necessary licenses and permits; diminishing quantities or
grades of reserves; adverse changes in our credit rating; and
contests over title to properties, particularly title to undeveloped
properties. In addition, there are risks and hazards associated with
the business of gold exploration, development and mining, including
environmental hazards, industrial accidents, unusual or unexpected
formations, pressures, cave-ins, flooding and gold bullion losses
(and the risk of inadequate insurance, or inability to obtain
insurance, to cover these risks). Many of these uncertainties and
contingencies can affect our actual results and could cause actual
results to differ materially from those expressed or implied in any
forward-looking statements made by, or on behalf of, us. Readers are
cautioned that forward-looking statements are not guarantees of
future performance. All of the forward-looking statements made in
this First Quarter Report 2005 are qualified by these cautionary
statements. Specific reference is made to Barrick's most recent Form
40-F/Annual Information Form on file with the US Securities and
Exchange Commission and Canadian provincial securities regulatory
authorities for a discussion of some of the factors underlying
forward-looking statements.
We disclaim any intention or obligation to update or revise any
forward-looking statements whether as a result of new information,
future events or otherwise.
Barrick Gold Corporation (PARIS:ABX) (NYSE:ABX) (TSX:ABX)
(Swiss:ABX) (LSE:BGD)
SOURCE: Barrick Gold Corporation
Barrick Gold Corporation
Vincent Borg
Vice President, Corporate Communications
(416) 307-7477
Fax: (416) 861-1509
media@barrick.com